Hi,
We are using Product Cost Collector (Product cost by period) to capture the cost.
I have the following queries.
We are using standard REM profile, Target cost,
1. If I calculate WIP at the month end in a scenario where no GR has been made (No final good produced) will system calculate the WIP based on  consumption (material and activities)  for that month.
In this scenario month end settlement should post the WIP values also.
2. Will system calculate the Target cost for the PCC if no GR is made for that month?
3. If settlement is made will there be an entry posted for the materials and activities consumed?
4. How SAP determines WIP in a repetitive scenario, in the following cases.
    Scenario 1 - Month  end confirmtaion with GR (Goods delievered)
    Scenario 2 - Month end calculation with GR , only GI has happened and no final product has been delivered, and my Cost captured thru GR wil be equivalent to the WIP.
Please help me to understand the process.

http://help.sap.com/saphelp_470/helpdata/en/90/ba6671446711d189420000e829fbbd/content.htm

Similar Messages

  • Incorporating Quality check in Repetitive scenario

    Hi PP Experts,
    I have a requirement which is as follows for Repetitive scenario
    I need to do Quality check (for total carbonate (TC) value -- say will be in decimal)on one of the semifinished material and based on that result the operator controls the input temperature to the machine (say for example if total TC is 10 then the temp is say 110 deg). The requirement is that the TC for the semifinished material shud be captured and that information will be used by the operator in the control room.
    Im trying to do this throug inspection character in the rate routing.
    My Queries are
    1. Do i woork with inspection lot?
    2. How do I work with inspection characters?
    Any suggestion as to how it shud be done wud be rewarded.
    Thanks in advance
    Vinod

    Vinod,
    You need to assign the insp characterisc TC in the routing operation.
    Enter the control key as PP04 for the operation in routing CA22.
    Select the operation and go to Insp charac. Enter the MIC in this.
    When you create Insp lot through MSPR the insp lot will have this charc.
    Hope now it is clear. Reward points and clos this thread.
    rgds
    ram

  • Quality check in Repetitive Scenario

    Hi Experts,
    I have a requirement which is as follows for Repetitive scenario
    I need to do Quality check (for total carbonate (TC) value -- say will be in decimal)on one of the semifinished material and based on that result the operator controls the input temperature to the machine (say for example if total TC is 10 then the temp is say 110 deg). The requirement is that the TC for the semifinished material shud be captured and that information will be used by the operator in the control room.
    Im trying to do this throug inspection character in the rate routing.
    My Queries are
    1. Do i woork with inspection lot?
    2. How do I work with inspection characters?
    Any suggestion as to how it shud be done wud be rewarded.
    Thanks in advance
    Vinod

    Vinod,
    You need to assign the insp characterisc TC in the routing operation.
    Enter the control key as PP04 for the operation in routing CA22.
    Select the operation and go to Insp charac. Enter the MIC in this.
    When you create Insp lot through MSPR the insp lot will have this charc.
    Hope now it is clear. Reward points and clos this thread.
    rgds
    ram

  • WIP on Repetitive Manufacturing

    Hi,
    I’ like to have your help for the following situation:
    I have the material VIDRO001 on plant IC created to be used in Repetitive Manufacturing. It has assigned a REM profile and a production version.
    For it, I created the material cost estimate. The cost was saved, marked and released. Now, the material has the planned and standard cost for the current period.
    The material has a product cost collect (order type RM01) with:
    . Costing variant for planned costs – PREM
    . Costing variant for actual costs – PPP2
    . Result analysis key – 000003
    For the product cost collector it was created a material cost estimate with costing status KA (costed without errors).
    The valuation variant assigned for WIP is defined with priority 1 on “Plan Costs/Preliminary Cost Estimate”.
    For the product cost collector, I have done the following process:
    . Goods issue – 15.45 Eur
    . Production activities (operation 10) – 15.84 Eur
    . Overheads (by overhead costs processing) – 1.27 Eur
    So, in this scenario, I have as Work in Process 32.56 Eur.
    However, when I execute the Work in Process Processing, the WIP value calculated is 0.
    This processing is done with transaction KKAS with the following data:
    . Material – VIDRO001
    . Plant – IC
    . WIP to Period – 11
    . Fiscal Year – 2006
    . RA Version – 0
    . Test Run active
    . Log Information Message – active
    Thanks and best regards,
    António Oliveira

    Hi Suraj,
    thanks for your response.
    In fact, we have more settings on IMG path you mentioned. On that settings we have:
    . Define Results Analysis Keys
    000003 - WIP Calculation at Target Costs
    . Define Results Analysis Versions
    CIFL – 0 – Planned/Real Version, with the following parameters active:
       Split Creation/Usage
       Generate Line Items
       Deletion Allowed
       Assignment/RA Key
       Update/RA Key
       Status Control – A
       Cutoff period for actual RA/WIP – 1,1998
       Actual RA
       Several cost elements defined
    . Define Valuation Method (Target Costs)
      CIFL  0  000003  REL   2  WIP Calculation on Basis of Target Costs
      CIFL  0  000003  DLV   3  Cancel Data of WIP Calculation and Results Ana
      CIFL  0  000003  PREL 1 WIP Calculation on Basis of Target Costs
      CIFL  0  000003 TECO  4 Cancel Data of WIP Calculation and Results Ana
    . Define Valuation Variant for WIP and Scrap (Target Costs)
       Valuation variant – D02
       Priority 1 – Plan Costs/Preliminary Cost Estimate
       Priority 2 – Current Std Cost Estimate
    . Assignment of Valuation Variant for WIP
      CIFL     0     000003     D02
    . Define Line Ids
       0001     COP     Primary costs
       0001     COS     Secondary costs
       0001     REV     Revenues
       0001     SET     Settled costs
    . Define Assignment
       Several entries for CIFL/0, depending on cost elements
    . Define Update
       Several entries for CIFL/0, depending on Line Id with the respective cost elements
    . Define Posting Rules for Settling Work in Process
    CIFL  IC  0  WIPR  0     8135200009  3520000000
    Sorry for the extensive explanation and thanks again for your attention.
    Best regards,
    António Oliveira

  • WIP FOR REPETITIVE MANUFACTURING WITH VALUATED SALES ORDER

    Dear All,
    We are in the process of implementing Repetitive manufacturing with valuated sales order(MTO). I want to clarify whether in this scenario WIP will be generated.
    Since, at the time of final backflushing, what ever GR done for finished goods, the GI for its components will be done automatically. The components will be issued based on the BOM. I think in this scenario WIP will not be there.
    Please tell me whether i am correct.
    regards
    ranga

    Thanks. I have another scenario. My client wants to transfer all cost of HR,Admin, finance etc and other indirect production cost center cost to production cost center. I mean they want to charge on the product. I have to production cost center. Client will give me the basis for allocating the cost. I have to do assessment and distribution for cost allocation
    But, I want to clarify how do i include the admin, hr or finance and indirect production cost center cost in cost component structure if i do the above process.
    How to do the cost splitting.
    regards
    ranga

  • Lookup issue for File to Idoc scenario-- Urgent Pls.

    Hi All,
    Iam doing File to IDoc scenario with one file --> any of 3 R/3 systems.
    Routing has to be done dynamically using a lookup file, based on the incoming GLN code and last character of the Order Reference number.
    The last character of the Order ref Num will have A,B or C.
    Where,  ' A'  for  R/3 152 Client
                 ' B' for  R/3 142 Client
                 'C'  for  R/3  132 Client.
    1. PlantGLN_Routing lookup file :
    DestinationSystem,   Plant GLNCode,       Partner Number,  
    A,                            5000243000473,         GDKDVRC152,     
    B,                            5000243000473,         GDKDVRC142,      
    C,                            5000243000473,         GDKDVRC132,      
    A                                 500034000487           GDKDVRC152,     
    B                                 500034000487           GDKDVRC142,     
    C                                 500034000487           GDKDVRC132,
    By Using DestinationSystem and Plant GLN Code as lookup key --> I need to get the value of partner system.
    2.  IdocCtrlLookup
    Purpose: To read the IdocCtrlLookup file to populate the Idoc control segment
    Now based on the partner system from previous table --> I need to get the details of Sender Port , Sender Partner Type , Sender Partner Function , Sender Partner Number , Rx Port , Rx Partner Type , Rx Partner Function , Rx Partner Number.
    Please help me how can acheive this scenario with the help of lookups.
    Its very urgent.
    Regards
    Krupakar.

    HI,
    Here you would have to use one mapping for dynamic routing , based on this create IM and use it in receiver determination.
    the another mapping is general to file to idoc.
    see the dynamic routing link here
    Dynamic Configuration of Some Communication Channel Parameters using Message Mapping -
    /people/william.li/blog/2006/04/18/dynamic-configuration-of-some-communication-channel-parameters-using-message-mapping
    Also if you know the field name the context object can be defined for partner no that can be used in receiver determination in condition. to particular partner no in receiver determination.
    Regards
    Chilla

  • JDBC-XI-IDoc scenario -- Urgent

    Hi All,
    I am doing a scenario JDBC-XI-IDoc.
    Now the Oracle table in the source system, has a control table as well.
    This control table has 2 fields MSGID and MSGTSTAMP. These 2 fields has to be updated for each record.
    Now please tell me, how this can be handled?
    The MSGID and MSGTSTAMP r created in XI, so we need to send it back to source system, but how?
    Its urgent, early reply will b appreciated.
    Thanks in advance.
    Neetesh

    Hi Neetesh,
    Yes , you can do it using BPM.
    <i>So, it should be something like- XI triggers IDoc to R/3 and almost at the same time, sends back the MSGID and MSGTSTAMP to JDBC.</i>
    >>> Then I think you can do without Synch communication.
    -Receive the Message in BPM(after mapping)
    -Fork step to send both messages at same time
    -Send to Idoc 
    -Send to JDBC
    But you need to have 2 receivers.
    1) BPM->Idoc
    2) BPM->JDBC
    It will do.
    SO u can do without Synch communication also.
    Pls acknowledge
    Regards,
    Moorthy

  • New sales doc. type scenario-Urgent

    Hi all,
    I have got a scenario:
    A customer complaint order type has to be made which will take the reference of a Billing doc. Now, based on that Customer complaint order type, Credti memo request and returns order going to be made.
    I have made a customer complaint order type Zcut and maintain Item category as Zcat.
    In vov8, i have maintained:
    created no. range for the doc. type
    Check reference mandatory field with "M"
    Billing Block field with "06" sign & approval.
    In vov7, i have maintained:
    Billing relevance "F'
    Pricing "X"
    I have also maintained copycontrol measures between Biiling doc. and sales doc. with VTAF and between Sales doc. & Sales doc. with VTAA.
    Now, when iam creating this doc. type with reference to the Billing doc. , it is not doing following things:
    1.no customer name, quantity, amount is getting copied
    2. required del. Date is coming as mandatory
    can anyone give solution for it. it is urgent
    Thanx in advance,
    Sourav

    Pls check..for VTAF
    =>Header level--between ur billing type which i assume is F2 and complaint SO e.g. ZCUT
    three routine
    DataT 052 Billing doc.header----use for data transfer from VBAK
    DataT 103 Bus Data Hdr Billing---use for copying business data
    DataT 003 Bill.header partner-----use for copying business partners
    => At item level u wll see TAN which i assume ur using while issue goods..duoble click on TAN...in new screen
    ur "ItemCat Proposa" at target sales doc type ZCUT should have ZCAT ie ur return item category
    also check following routine
    DataT 153 Item from BillingDoc-----use for VBAP data transfer
    DataT 104 Bus Data Item Billng-- --use for business data transfer at item level
    DataT 004 Bill.item partner-----use for business partners transfer at item level
    Copying requirements    303 "Always an item"
    Pos./neg. quantity         Blank   
    Pricing type                  D
    Regards
    Jagdish

  • Subcontracting Scenario -urgent

    Hi all
    our clients requires different scenario how would we map these into the SAP
    1-We send the material to Sub contracting Vendor for Machining operation suppose 100 piece. but Vendor make the some pieces faulty (Rejection) like 10 piece.
    2- by default vendor send some pieces without doing any machining operation.like  5 piece out of 100
    3- Some times we issues material defect pieces  to subcontracting  vendor by default 
    4- Component we have already received but some of them are get reject on production line but component can be rectify and for rectification we send the component back to Vendor for precessing without paying anything to vendor for this rectification
    How would we map these four scenario in SAP
    These are the scenario  please gives your valuable suggestion to map into SAP
    Thanks
    Edited by: JAM SAP on Feb 10, 2008 4:23 PM

    Dear Jam as far as my knowledge is concerned you can refer the Subcontract Scenario mentioned below :
    1) 100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and in Quality 10 Pcs gets rejected 90 is accepted
    In this scenario -if you are having quality check then material will be in blocked stock in quality rejection,and the material can be sent to scrap(or Rejection) stores but if you dont have quality check in that case when GRN of subcontracting PO is done for that you can do 542 movement of the raw material on which processing is done ,transaction code is MB1B and you can select the scrap(or rejection) stores during that movement.
    2)100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and vendor sends 90 with processed and  10 pcs without processing
    In this scenario-you can simply do 542 movement of the raw material on which processing is done ,transaction code is MB1B and you can select the Rawmaterial (which was sent to vendor for processing) stores during that movement.
    3)100 Pcs sent for subcontracting ,out of which 10 pcs of RM which was sent for processing is defective GRN of Sucontracting PO takes Place and vendor sends 90 with processed and  10 pcs without processing which are defective from our side back.
    In this scenario-you can do 542 movement of the raw material-defective pcs which was sent to vendor ,transaction code is MB1B and you can select the scrap(or rejection) stores during that movement.
    4)100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and  100 pcs is accepted but during processing it is found that the component which is in WIP which was received from subcontractor 10 pcs are not machined properly so it has to be reworked and to be sent back to subcontracting vendor for
    reprocessing and this processing should be w/o charges.
    Well in this case the WIP component which is found that it is not m/ced properly can be taken back into stock with 502 movement -T code-MB1C or it material to material transfer can be done ...i.e from WIP stock i am doing RM stock with 309 movement ,T Code-MB1A so that my original RM can be in stock and i can send this RM or WIP item to the vendor for reworking.
    For this you will have to make a subcontracting PO of the 10 Pcs which has to be reworked with Free Item to be ticked in PO(Because you dont want the charge of processing to be given to vendor). You will be doing the 541 movement so that in system it will show that stocks are lying with vendor , Create Challan ,
    T Code -J1if01 and after processing vendor will send it back .so you will do GRN of this subcontract PO and now the same can be utilised for further production purpose.
    WELL DEAR FRIEND HERE IN ALL THE SCENARIO I HAVE NOT MENTIONED ABT SUBCONTACTING CHALLAN RECONCILATION (J1iFq),You will have to take care of that in each of these scenarion mentioned above.
    Hope this information will be of some use to you
    Regds
    Shailesh

  • Subcontracting Scenarios (Urgent)

    Hi
    I want to map following scenario in subcontracting (viz different from normal case) and need ur suggestions..Please reply on bold points...Matter urgent
    1) MRP will be run based on data from DM & S.O. MRP result will generate purchase req for raw materials..*I want to have an good overview over the demand so as to judge the exact purchasing quantities...How to do this?*
    2) Based on PO; GR will be done for the raw materials in storage locations. I want that raw materials which are for subcontractor should only go to subcontractor stock......(Currently we dont have QM view in MM)
    3) Quality control must be done for each goods recieved based on inspection sets
    4) Now when raw materials will be forwarded to subcontractor; +i need shipping documents (delivery note + customer invoice) and transport order which can be sent+
    5) Lastly when i recieve finished goods; they should undergo quality check like incoming materials
    Please give ur comments
    Rgds
    Edited by: Vicky Khabrani on Feb 7, 2008 1:45 PM

    Hi
    When creating the Material Master, add the QM view also. As told in the above views, create an Inspection Type 01, tick check box Active, tick the check box Post to Insp Stock, 100% inspection, and remove any other ticks in the check boxes.
    When doing GR, goods will be directly posted into the Quality stock. An Inspection Lot will be created. you have to give a UD for this Inspection Lot in t.code QA11. Take the Inspection Lot no. from the GR document. or in QE52, you will get the inspection lots displayed.
    Pick up the required one, give the UD as accepted or Rejected. If accepted, put this into the unrestricted usage in the next tab of the same UD t.code.
    I hope this information is clear
    Regards
    Chandra

  • How the Tax amount calculated in AR for this scenario (11i)

    Dear All,
    I have some doubts with the Tax amount in the AR Trx. Please look into below scenario.
    Step1: Create SO and AR Trx
    In OM side:
    1. I created a SO 001 and there is a item A only. The item's Unit Selling Price is *100$*, Quantity is *1*. Then the SO flown to AR.
    In AR side:
    1. AR Trx 001 is created for the SO and Tax rate is 17%. Hence the AR Trx Total Amount = Line Amount + Tax Amount = 100 + (100 0.17) = 117*.
    Step2: The item has been return from customer.
    In OM Side:
    2. I added the same item with the Unit Selling Price *200$* and Quantity -1. Then the new SO line flown to AR.
    In AR side:
    2. Credit Memo is create for the return line of SO.
    My doubt is:
    What's the tax amount for the Credit Memo? It is 200 * 0.17 or the original trx tax amount (100 * 0.17)?
    Thanks & Best Regards!
    Jerome

    Jerome,
    The tax calculated on the Credit memo is always based on the Credit memo amount. So it will be on $200.
    However there are few things you need to consider here. If you are creating a RMA in OM and if overapplication is not enabled for the AR Transaction type, the RMA will fail during Autoinvoice since you cannot credit more than the Invoice amount.
    One thing I am not sure though is whether you can actually create a RMA with a price different than that of the Original Order.
    Hope that helps.
    Thanks,
    Anil

  • Excise duty not getting captured for export scenario-Urgent

    Dear All,
    When I am creating the export sales scenario then excise component is showing in condition records, even while creating the excise invoice the excise component reflects in the invoice. But once the excise invoice is saved & i go to display of excise invoice then the excise components are coming as zero.
    During creation of excise invoice if i click on utilization button and come back on main screen without any changes, then also the excise component are getting nil.
    Can anybody please suggest the reason & solution for this.
    Thanks & Regards,
    Antima

    Dear Antima
    1)  Go to Logistics-General --> Tax on Goods Movements --> India --> Basic Settings --> Maintain Excise Registrations.  Here see for your Excise Registration, whether the box is selected for "AED" and "AT1".
    2)  Go to Logistics-General --> Tax on Goods Movements --> India --> Basic Settings --> Maintain Excise Groups.  Here see for your Excise Group, the box is ticked for "Automatic Posting".
    I think somewhere your settings in this area (Tax on Goods Movements) is missing and I cant figure out exactly.  Anyway please check the above two areas.
    thanks
    G. Lakshmipathi

  • Tax Calculation in PO Printing prrogram - medruck- URGENT

    My requirement is, In PO Printout I hv to print Tax amount  along with Item gross price ( Tax should display at item level)
    Now i found that , it is in TABLE KONP as condition type is created by functional consultant
    for particular one tax code i.e. V0 . There are 21 entries in same table, how my system came to know which condition type I hv to pick.
    While I hv some Filed which i get from table EKKO, EKPO and KONV, and all tax classification store in A003 table. But the condition types  stored  in KONV is not there in KONP.
    So any one help me it 's urgent.
    Point will revert for Answer .

    Hi,
    Thanks for the reply. Now I am getting issue in the Migo.
    a) Excise tab is activated in the header and line item.
    b) Automatic tax is not comming in the MIGO, which is maintained in the FV11 with Tax code V0, j1id settings also done.
    c) While giving the ED Amount Manually in the Line item excise tab, and saving the MIGO, the message comes Tax code V8 is not defined for Tax procedure TAXINN , Where as so far we have not created tax code V8, and it is not there in the drop down list in FTXP & in PO Invoice tab tax code.
    Message is coming with the dump and document is not saved.
    Awaiting reply , how to pick the Excise details in the MIGO and how can we avoide dump coming for tax code V8, which is not at all created in the system so far.
    manish Gupta

  • Problem with MTO scenario-urgent

    hi everyone,
    our client is using MTO process, where they will exchange halb materials for the fert level production order. i.e according to MTO sales order will trigger procurement seperately at all levels of bom( as sales order stock). what is happening at the client side is they are converting plnd orders to production orders generated in the stock requirement list for HALBS, as thier wish they want to use these randomly for fert production,
    costs differences are arising.....
    so kindly suggest a solution
    thanks
    madhu

    Hi Madhu,
    Your requirement is simple. If my understanding is right in your scenario you have a FERT (A) which is MTO and the assemblies/components (B) used for manufacturing it is a stock item or MTS.
    For component A you have to define in material master MRP view 3 with planning strategy - 20 and in MRP4 maintain "1" for Individual and Collective requirement indicator.
    For component B you have to define in material master MRP view 3 with a suitable planning strategy -(Not= 20) and in MRP4 maintain "2" for Individual and Collective requirement indicator.
    This would resolve the problem. Reward your points,
    thank you,
    Regards,
    Prasobh

  • Considering stocks of both plants in special procure. type scenario.-urgent

    Hi dudes,
    Our client is using special procurement type 80(prod.in alternative plant), he is getting planned order in delivering plant as requirement generated by planning plant. while running MRP in both plants, it would consider only the stock of planning plant but not the stock of delivering plant suppose stock is made in delivering plant individually(say manual orders). As the requirement generated by planning plant, the planned order will be generated in delivering plant irrespective of its individual stock.
    can we make the system to consider what ever the stock in delivering plant and create no planned order if stock is there.
    thanks in advance
    Robert

    Robert,
    If that was your requirement why not use Special Procurement key 70 (Withdraw from alternate plant). In this case system only creates reservation and Planning at Supplying plant will be based on the Net requirement calculation considering all recipets, Stock and Issues.
    Regards,
    Prasobh

Maybe you are looking for

  • New Custom Field in Delivery output Communication Structure

    Hello friends, I need your help to Solve my below problem We want the delivery output to be triggered based on the shipping point and storage location. Storage location is at item level and is not in LIKP and hence not in KOMKBV2 (Output Comm Structu

  • Email Alert for Purchase Order Release

    Hi, When a PO is subject to release I would like an external email to be sent to the relevant user as per assignments in config. I have used standard workflow for PO release and this is working with no problems, alerts successfully going to the workf

  • FM 8 Problem with diacritical marks in index

    I have text in Latvian using Times new Roman Baltic fonts with items marked for inclusion in the index. When an index is generated, the index automatically is generated using Times New Roman fonts and the diacritics are wrong. Changing the font to Ti

  • Where does PSE8 save the serial number?

    I have three iMacs at home, but I only use two of them since the first one is broken. I had PSE8 installed on the iMacs, and during the summer bought CS5. Since I didn't need to use PSE8 on this iMac, I deinstalled it by dragging it to the trash can.

  • Applet Not Running in IE. Need IE settings for running applet.

    Hi I am facing a problem with Applet while running in IE-6. The problem is very simple; Applet is not running in IE-6, not even a simple applet which displays just a Label. I am using Java Version 1.4 Settings for IE is as follows Java (Sun) CHECKED