Dear Gurus,
        I have 2 questions about ECN , pls. help .
1> If we made a wrong ECN in BOM with change number, pls. advise how to cancel this ECN in BOM.I tried to delete the change record in CC02 but it's not allowed since BOM has been changed already.If I made a new change in BOM with new change number, in BOM it will show a new change number, but I don't want to show these change numbers because it should be no changes happen, pls. advise how to recall the change and remove the change number in BOM .
2> We use change number when we change routing ( CA02) in the past, now due to some internal issue, we want to remove all change numbers in routing, I can't find any option in CC02 or CA02, pls. advise is it possible to remove existing change number?
Thanks & best regards,
Tina

Dear Tina,
In my understanding you may not be able to delete the change number assignment made in BOM or routing.
But you can define an alternative date for the made changes and set the valid from date as say 31.12.5555.
Check and revert.
Regards
Mangalraj.S

Similar Messages

  • Error while changing BOM with change number

    Hi ALL, Please help me with followed error message, I am using ECM. I created ECR and converted to ECO and then released.
    Object management record cannot be generated
    Message no. 29046
    Diagnosis
    You want to change the BOM with the entered change number.
    One of the following situations triggered this error message:
    1. The indicator that allows automatic generation is not set for object type BOM in the change master.
    2. The indicator generation only on initial creation is set for object type BOM
    3. You are processing a change request.
    System response
    The system checks whether the indicator object management record will be generated is set in the change master.
    If the indicator generation only on initial creation is set, the system checks whether the BOM exists in the system.
    Procedure
    If you are authorized to change the change master, execute the following steps:
    For 1.)
    Set this indicator for object type BOM or create the control record in the change master.
    For 2.)
    If the BOM already exists in the system and the generation only on initial creation indicator is set, the system can no longer generate the control record automatically.
    In this case you have to add the object control record to the change master first, then you can change the BOM in relation to the change number.
    For 3.)
    You cannot generate any object control records for a change request.

    Hi
    With your question regarding changing BOM with change number  it looks lke there may be problem in defining the Object types,objects.Moreover whenever converted to ECO you need to enter into cs02 tcode for changing the bom with relevant change number and valid from date.
    Hope this gives you a clear idea.let me know if you need anyfurther inputs.
    Regards
    Praveen

  • Change number mandatory Routing for a particular Plant

    Dear All,
    i have requirement to make change no field mandatory for only one plant. this field should not be mandatory for other plant. I tried with OP5A tcode, using plant as influencing field, change no as modified field and content as plant no. so its working but,
    it doesnt work for the 1st time execution. from 2nd time only its working. like this user will be able to make the changes without change number in every login 1st time.
    So i set the plant as user parameter in user profile and made it working. but its not full proof soluton. can any one suggest some solution??
    please suggest.
    Thanks & Regards
    Vinay
    Edited by: vinay  upadhyay on Sep 7, 2009 9:46 AM

    Hello Santosh
    The change number requirements on CS02 is controlled by the authorization object C_STUE_ROH.
    Note 420878 provides more information about this scenario.
    Check the relevant information provided on the note below:
    Symptom
    In Customizing of the BOM, the history requirement is set or a BOM requires a history. Despite this, it is possible to process BOMS without engineering change management. The system only processes a warning message (29 045) which can be skipped.
    Additional key words
    CS02, change number, OS27, W045(29)
    Cause and prerequisites
    Authorization profile
    Solution
    Check the authorization profile of the respective user.
    Example:
             C_STUE_NOH <OBJ>
                &_SAP_ALL    <AUT>
                    NOHIS      <FLD>
    would have the authorization to process BOMs requiring history without a change number. In this case, if you change '*' to ' ' in NOHIS, you will no longer receive a warning, but rather an error message.
    BR
    Caetano

  • TS1702 I have followed all instructions through iTunes to cancel Jillian Michaels Slimdown app on iPhone4 and impossible.  Do I need to cancel my credit card or change number on credit card to avoid being charged weekly for this app?

    I have followed all instructions in iTunes to cancel Jillian Michaels Slimdown app on iPhone 4.  I downloaded the app via my iPhone 4.  Will I have to call and cancel credit card or change the number on my credit card to avoid being charged for this app weekly?  Can I just delete app and my credit card will not be charged?  Please help!

    I have followed all instructions in iTunes to cancel Jillian Michaels Slimdown app on iPhone 4.  I downloaded the app via my iPhone 4.  Will I have to call and cancel credit card or change the number on my credit card to avoid being charged for this app weekly?  Can I just delete app and my credit card will not be charged?  Please help!

  • Enginering Change Number (ECN)&  alternative date

    Hi
    We have a scenario like this:
    We are having ECN effective in our system.
    Now we want to use the alternative date functionality for some objects.
    Ex:- we have a BOM with change number for which valid from date say" X".
    Already change is effective  from "X" date.
    If we  change valid from date of "X" to altrnate date say "Y"for this object, & if we  want to change this object with reference to this change number , the system is automatically changing the earlier changes also new valid from date "Y".
    I want to know is there any method to avoid this.
    Any suggestion advnce thnks.
    Regards
    Rao

    Hi Rao
      actually alternative date functionality is used like if you have BOM, task list created with reference to an ECn with a validity date and suppose you wish to activate the Bom to a different validity date with same ECN. then BOm will be active from the alternative date whereas the tasklist will be active from the validity data of the ECN.
    procedure
      in CC01 or CC02
      verify objects are assigned to the ECN ( BOM, TL etc) by selecting the object assginment button if not assigned then assign  the same.
      create the ECN with alternatedatekay and alternate dates by presssing the altrnate date button.
    after creating the altrnate dates
    from the same screen select the alternate date and then press the object assignement button
    Now select the appropriate object and then press assignobject. now press the details key you can see the alternate date assigned
    Just save it
    thats all everything is fine
    regards
    Sk
    Reward your points

  • BOM change number field is compulsory

    Hi Guys,
    I need to setup BOM (CS02) change number entry field is compulsory (using TCode CS02). How to setup config settings? pls advise
    Thanks,
    Sankaran

    Dear Muthusamy,
    Even if you have maintained settings in OS27,In T code CS02 ,the system allows
    you to change the BOM without a change number.
    The same question was posted by Mr.Anbalagan ,3 days before.
    <b>The follwing are the answers which I posted to him,check this under post thread name <b>ECR Number</b></b>
    <i>If you want to make Change number field as mandatory for CS02,u have to do it
    using the authorisation object.For certain users you can make this as an
    mandatory field ,just discuss with Basis & ABAP consultants,they can help out
    you in this regard.
    Though you might have done settings perfectly in OS27,OS54,but the system
    allows you to change a BOM without any change number.</i>
    <b>Answer2:</b>
    <i>
    Plz make this Authorization Object C_STUE_NOH as mandatory for T code CS02.
    I'm sure BASIS & ABAP consultant can help you in this regard.
    I have checked in my system for certain users,like without change number it doesnt allow to change BOM,
    So after giving SU53,I found the authorization obeject C_STUE_NOH was missing.
    So go ahead in using this object.</i>
    <b>answer3:</b>
    <i>You can make that field in CS02 as a mandatory for certain users,using a field
    exit.
    Field name AENNR -Change number can be made as mandatory .
    Plz explain the case to ABAP consultant.
    First in SE37 he will be checking whether this particular field AENNR has got a field exit.
    Later on he will be writing some codes to make this field as mandatory.
    This is what i wanted to convey to u.
    In my project ,for the core users the field has been made mandatory,so in CS02,he/she cant go inside without giving the change number.
    At that time when u give SU53,this authorisation object will be found not given.
    So just have a word with the ABAP consultant,he can help u.</i>
    <b>Reward points if useful.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • Change number in bom

    I want to make change number in CS02 and CS20 as mandatory. Pls suggest the procedure..

    1.Change number is used to create / change BOM with respect to a change number. The reason for using this field is, in many organizations, they use the concept of ECM, where-in each change needs to be monitored & logged. So a change number is first created in CC01 & then the same is assigned in cs01.
    2.This change number must be allowed to use for the business object BOM,which means whilke
    creating the change number you have to include the settings for usage in BOM.
    3.Using the change number we can trace the history of the BOM.
    4.History includes the created date,changes made,it might be an additon of componet or a change in
    the component details,a deletion of compoent.
    5.There are certain config settings to make this field as mandatory,otherwise the system will allow you
    to create or change a BOM without change number in CS01 or cs02...

  • BOM mapping with change number error during IDoc process

    Hi all,
    i am creating BOM using IDoc BOMMAT04.i have checked this IDoc will use FM IDOC_INPUT_BOMMAT inside.
    in this function module, it is using FM CSAP_MAT_BOM_CREATE and CSAP_MAT_BOM_MAINTAIN to create and change.
    currently, creation and deletion is success. but when change, if the change number passed as an input parameter, the IDoc process error saying that the BOM header not allowed to update for read-only field.
    if i not pass the change number, the change will be success, but no change number displayed in the item. that is not the user expected.
    and if i delete the bom with change number, create a new BOM for the same material is not aloowed, saying that BOM already existing.
    it seems that CSAP_MAT_BOM_CREATE and CSAP_MAT_BOM_MAINTAIN cannot support much. it is limited.
    can anyone have any good solutions? thanks!

    yeah, for the change, i have solved it.
    but currently, if i delete the existing BOM with a change number, the re-creation is not allowed by the IDoc saying that the BOM already existing.
    if i delete in CS02 without change number, it deleted from DB and can be re-create.
    but if delete in IDoc without change number, it failed saying that local BOM can not be deleted by ALE.
    do you have any solution? i want to implment in IDoc: delete existing BOM and create a new one for the same material with change number. (currently the standard IDoc FM not support BOM group)

  • Entering Change NUmber in CS02

    gRETINGS..
                     I want to chaneg  my BOM  with change number ..now system asking for entering change numeber ...
    - what number range i should use.?
    - where we define this numebr range (path)?
    - can system take internal number range ?
    - Wht else setting i have to do for change number record ???

    Dear SAP PP,
    You can create the number Ranges for the Change number using the T Code OS53--->under this click on change
    intervals--->Click on Insert Interval(Shift+F1),enter the from and To Number range and under this if you include the check box for
    external means external number definition is allowed.
    So say if you have defined a number range 1 to 50000,and during internal number range definition,while creating the change
    number in CC01,the system checks the last created number and it proposes the next running number automatically.Say if the last
    number was 25000,today if you create a change number using CC01,after saving the data the system says change number
    25001 has been created successfully.It does not mean the system creates a change automatically in the case of internal number
    range defined.
    In the case of external number definition,in the input screen of CC01 itself you can enter any number falling within this number
    range and then save the data.
    Always try to use internal number range.
    This change number will be used in the T Codes CS01/CS01 for creation or BOM modification.
    Check and revert back with your further queries.
    Regards
    Mangalraj.S

  • ECN field obliged when changing a BOM

    Hi all,
      I found after flaged the historical demand and ECM in OS27,it is still just a warning message that tells the user a ECN should be maintained when doing CS02,changing the message type and category is not available in the standard system.
    How many other ways that I can make the filed ECN is a must when changing the BOM,besides SHD0.
    Is there a standard and easy solution?
    Txk!

    Dear,
    For user you can do it through the Authorization object C_STUE_NOH
    Please refer this link for details,
    Re: Change number mandetory for CS20 -reg
    Regards,
    R.Brahmankar

  • PI 7.31 (single stack) posting RFC gives this error: RFC_ERROR_SYSTEM_FAILURE: Processing of change number CO-01234 cancelled (raised by system ECCHostXYZ)

    I'm trying to determine if I am dealing with an RFC connection issue or just an error resulting from the RFC itself.
    The error says "Processing of change number...cancelled (raised by...ECCHostXYZ)".
    I thought this was a problem with my RFC config because it is labeled as "RFC_ERROR_SYSTEM_FAILURE".
    However, when I google that specific message, it appears to be an error specific to change order creation.
    Here’s my google search: http://goo.gl/ZhKsm3
    Here is the error again:
    RFC_ERROR_SYSTEM_FAILURE: Processing of change number CO-01234 cancelled (raised by system ED1|ecc-host-xyz)
    When I check ST22, I see no RFC errors.

    Hi Jody,
    No st22 exception is needed to be throwed in order to raise a controlled exception in the RFC.
    You would need to check the RFC in the ECC system with the data that you are sending from PI, if the data is the same, you would need to check PI user RFC roles with the ECC roles user that you used to check the data integrity in the ECC test.
    To avoid this error you can do a Z RFC to wrap the standard RFC and to control the exceptions errors with a BAPIRET2 strucutre to return to PI.
    Hope this helps.
    Regards.

  • BOM Change Number

    How to make change no mandatory for BOM creation and change?
    The required config should not impact any other objects except BOM Creation & Change.

    Dear Venkat,
    In case of CS01/CS02 to make the change number as mandatory,follow this steps,
    1.In OS27 - Check box included for BOM validity maintained,EC Management active,History Requirement.
    2.In OS25 - BOM usage 1 & BOM status 1 - History Requirement check box is included.
    3.Authorization object C_STUE_NOH is with No.For this you should take the help from your BASIS
    consultant,while creating a new role in PFCG for this Authorization object C_STUE_NOH the value must
    be set as No.
    In most of the cases consultants peform the first 2 step alone,in that case only a warning message is displayed,only if step 3 is
    done ,an error message gets displayed and the user cannot enter or make any changes for the BOM without any change
    number.
    Regards
    Mangalraj.S

  • How to set change number is prerequisite when change BOM?

    Dear SAP Experts,
    I have actived EC management  in BOM control data in IMG. But when i changed
    BOM ( the code  CS02 )  with change number blank, system had not given an error message. SO,how to set change number is prerequisite when change BOMs?
    Thanks...
    Regards,
    Joey.

    Just a guess: Transaction os27 and change the number range to external.
    Matthias

  • Different Effective Date in One BOM with only ONE Change Number

    Hi gurus
    here is my complete question?
    Is it possible to realize this function that Different Effective Date in One BOM for different BOM items with only ONE Change Number?
    Thanks for your information/help in advance.

    Dear Zhao,
    Using One change number it's not possible to define a different valid from date for the BOM changes of a single material BOM.
    In case if the same change number is used for making different material's BOM component,then a different valid from date for
    each BOM can be defined,but at any given point not for each component/item level of the same BOM.
    Check and revert back.
    Regards
    Mangalraj.S

  • Error when I change the BOM without a change number

    Hi,
    I would like to receive an Error when I change the BOM without a change number.
    I define the modification parameter (EC management active and History reqmnt), I configure history reqmnt for BOM (I choice the status 1 and 3 for my BOM usage 5)
    In change the message type I don’t have the really message number in the liste.
    How can I create a new message (045) so that I get an error by changing the BOM without a change number.
    Thanks

    Dear Dede,
    check for the Authorization Object C_STUE_NOH for the
    particular User Id's for which you want to Create or Change a
    BOM without a Change number.
    So assign this Authorization Object under all user id's for which
    you want to have this control.
    Adding the mentioned Authorization Object in particular User
    Id's will resolve the problem.
    This can be done using PFCG T code by adding in particular
    Roles.
    Revert back incase of any clarifications.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Rescue and Recovery Won't Open on My R61i Laptop

    Computer: 2008 Lenovo R61i Laptop with Windows XP, SP 3, 2 GB RAM, Intel Duo Core processor, 34 GB free on the hard drive I had been wondering why my 160 GB hard drive was filling up even though I only have 10 GB of documents, photos, and videos save

  • Illustrator no longer loads

    I recently upgraded to OS 10.5 on Friday then 10.5.5 today and now Illustrator (V11) now won't load at all. (yea, I know I need to upgrade my Adobe)<br /><br />The error is The application "Illustrator" could not be opened because of a shared library

  • Map Viewer Errors Thrown

    This is a followup on the post "JAVA Error Messages Thrown When Deploying Map Viewer," from Jun 12, 2008 11:22 AM. (reprinted below) Basically there are a number of java errors thrown when attempting to install Mapviewer. Has anyone else come across

  • Datasource not created - 10.1.3 dev preview

    Hi, I have a database connection in my Connections panel which doesn't get deployed to the test environment when I run/debug my application. When i use the same setup under 10.1.2 I can expand the application server connection I created for the test

  • Can\t install Adobe Flash 10.2 - tell me to close M. Firefox. How?

    How do I close M. Firefox in order to install Adobe Flash 10.2? Thx, Isabel PS Explain with simple sentences. I am easily confused. For example, a box below says "Installed plug-ins". My answer is "What? Pardon me? ".