Change PO transfer - status comes held

Hello Everyone,
We are using Extended Classic scenario. The buyer is trying to ORDER purchase order change so however we are getting a message to HOLD for changes.  When I CHECK the PO - no hard errors are returned - only warning messages.
Can you help me to find problem in PO?
Regards,
Khushbu.

Hi,
SAP Supplier Relationship Management->SRM Server->Cross-Application Basic Settings->Switch On Version Control for Purchasing Documents
Check if flag is checked for BUS2201.
Can you list the Warning messages you received here? Is anything peculiar in that?
regards,
MRao

Similar Messages

  • Is it possible to change the user status of a TECO Order

    Hello Folks
    Is it possible to changes the user status of a TECO Order?
    I have tried to change it using the FM 'STATUS_CHANGE_EXTERN'. Its working fine for NON TECO Orders but not for TECO Orders.
    On the other hand I was able to manually change the user status for a TECO Order in transaction IW32.
    I need to change the user status from NFBK to FBK.
    Please provide some inputs for the same.
    Thanks n Regards
    Ramesh

    The simple way is via the Internationalization settings via ARD or RDP or Screen Sharing, either via System Preferences or (if enabled) via the menu bar. If you're looking for a lower-level approach, there's not AFAIK a direct command for this. As for one possible approach, might [threadID=2106201|http://discussions.apple.com/thread.jspa?threadID=2106201] help?

  • Not change the scheduled status after new planning explosion

    Dear  Expert
    We do detail schedule once a month, but MRP heuristic run in every day. We need new explosion every date for new master data, but after new exlopsion the allocated order come back to status 'deallocated'. Then we can not distinguish which are the plan order already scheduled which are new.  Is that any way to keep the order in allocated after new explosion.
    Thanks
    Hailiang

    In MMBE te stock should be showing in restricted batch status.
    Use MSC2n to change the batch status to released.
    Modify the "next inspection date" to the current date.  Set the SLED to the next day.
    Check MMBE and the stock should now show in unrestricted stock.
    Run QA07 using the material as an input and you should get a new recurring inspection lot for the material.  Do not enter in any value for the "window" of expired material in the bottom half of the screen.
    You should get an 09 lot generated now.  (As long as 09 inspection type is active).
    Craig

  • SAP AFS - change in allocation status

    Gurus,
    Is there anyway that i can tell who changed the allocation status of an item from R (reserved) to F (fixed).
    Regards,
    ottley.

    Hi,
    Refer to the following link
    [Allocation status|http://help.sap.com/saphelp_afs60/helpdata/en/89/f7adeea99c11d4b38c005004394d11/content.htm]
    Regards,
    Amit

  • R12: Is there a Public API to change the LifeCycle Status / Item Status ?

    Hi,
    R12.1.3 Advance Product Catalog :
    Is there any Public API to change the LifeCycle Status / Item Status from one phase to
    next phase specific to Product Information Management ?
    Thanks,

    Hi;
    All APIs are listed in Oracle Integration Repository
    http://irep.oracle.com/index.html
    http://download.oracle.com/docs/cd/E12839_01/apirefs.1111/e10652/toc.htm
    API User Notes - HTML Format [ID 236937.1]
    R12.0.[3-4] : Oracle Install Base Api / Open Interface Setup Test [ID 427566.1]
    Oracle Trading Community Architecture API User Notes, June 2003 [ID 241320.1]
    Technical Uses of Customer Interface and TCA-API [ID 269121.1]
    Pelase also check below:
    Api's in EBS
    Re: Api's in EBS
    http://sairamgoudmalla.blogspot.com/2009/05/script-to-find-oracle-apis-for-any.html
    API
    Fixed Asset API
    List of API
    Re: List of APIs
    Oracle Common Application Components API Reference Guide
    download.oracle.com/docs/cd/B25284_01/current/acrobat/jta115api.pdf
    List of APIs and open interface R12
    Re: List of APIs and open interface R12
    Regard
    Helios

  • You cannot cancel a change request with status New.

    We're just starting to dive into SCSM. We created a test Change Request and now want to delete / cancel it. When we try, we get a message
    "You cannot cancel a change request with status New."
    Is there an easy way to remove this?
    Orange County District Attorney

    Hi, a Little late but..
    This is a problema from your 3 scsm services, maybe in your principal or secundary server.  You must to restart services in an special order and delete application cache.
    Please review
    http://www.systemcentercentral.com/scsm-2012-tip-all-workflows-stuck-in-new-status-and-never-completing-issue-and-workaround/
    it Works!
    If you have principal and secondary do it in both servers.
    I think this problem is for bad performance in databases and application, so review your hardware design, and logical, so review workflow performance too.
    For items when state new, you must change it to inprogress with smlets

  • Sales order as complete and change the delivery status.

    Hello All,
    We  produces an order but then the customer calls and does not want the material so we in turn will scrap the material against the production order using transaction MB1A mvmt type 951 E. 
    Since the material were scrapped and no material were shipped against the sales order, the sales order u201Coverall statusu201D remains open and the delivery status is u201Cnot deliveredu201D.
    To close the order  we u201CRejected line itemu201D and moved on.
    I would like to know if there is another way we can set the sales order as complete and change the delivery status. 
    Regards
    Amit

    Hello,
    you can use the status profile for the same. but a better way would still be to use the rejection reasons . the rejectionr reasons are very well integrated with the document flow as well as transfer of requreiemnts to Production
    so a best practise would be to use rejection reason
    hope this helps
    Thanks
    akasha

  • Change Document for Status Management

    Hi,
      I have a process order in which I have deleted a material component. If you click on the material button, then select a material which has been deleted and press the magnifying glass it will take you the details. Then beside the status field there is a Information button. Press it and it will take you to the change status field. Choose one of the status and in the menu click on extras -> change documents -> for status. I need the table fields for the change status which contains the object key, etc. I chekced the report behind it and have tried to pick up the status with regards to the material component. It does not display the material component status but the process order status which have been changed. I need the details for the changed material document and not the process order. ( Tried Table Jest but with no luck ).
    regards
    Aveek

    It is strange that you don't find any information for Change Documents in CDHDR or CDPOS. All change documents are stored in these two tables.
    You might want to check this as well :
    http://www.members.tripod.com/abap4/SAP_Functions.html and search for Change Document in that page
    Regards,
    Subramanian V.

  • How to change designer workflow status manually?

    Hi All,
    I need to change designer workflow status manually. I tried to edit with datasheet view but couldn't. How to do this? thanks in advance!

    Hi Sam,
    According to your post, my understanding is that you wanted to change the workflow status manully in SharePoint Designer.
    There is no out of the box way to accomplish this with SharePoint, and we also can not achieve it with SharePoint Designer.
    We can use the Visual Studio to custom the status.
    In SharePoint object model the status of the workflow is modeled through the SPWorkflowStatus enumeration. Each status value is an integer that represents its place in a zero-based ordered list.
    The status values can be extended through the StatusColumn element in the ExtendedStatusColumnValues section of the Workflow.xml file.
    More information: http://blog.naikoo.com/?p=25
    http://sharepoint.ginni.me/2010/01/setting-workflow-status-to-custom.html
    I hope this helps.
    Thanks,
    Wendy
    Wendy Li
    TechNet Community Support

  • Guidelines on Change documents and Status Management

    Hi Friends,
        I am not sure whether this is the right question or not but I am in desprate need of it.
        The thing I find my self no where sometimes when I think of working on Chagne documents and Status management. I have been into WF for about 2 years. but never got a BEST chance to work on complicate workflows.
         <b>Can anyone give me some ways or links where I can find clear difference between change docs and status mngt and how to work on those ?</b>
        I did search in blogs but didnt find much. so posting a new thread. sorry for the inconvenience.
    Thanks
    Reddy

    Hi Reddy ,
    Go through these links.
    the Tcode for Change document is swec,
    http://help.sap.com/saphelp_47x200/helpdata/en/c5/e4aee2453d11d189430000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/8c/1923d1932b11d2a5ea0060087a79ea/frameset.htm
    http://help.sap.com/saphelp_erp2004/helpdata/en/db/7a2a40ce93185de10000000a1550b0/content.htm
    Thanks & Regards
    Hari Sankar M

  • How can I change my Developers status from Individual to Company?

    How can I change my Developers status from Individual to Company? Please

    https://developer.apple.com/support/ios/account-management.html

  • OIM 9.1 DB Recon Changes Locked Account status in OIM back to Provisioned

    Hi,
    I have a scheduled task that runs the OIM DBAccessReconTask but am seeing some unexpected behavior. Here are the steps to produce the error:
    1. Provision a DB account to a user in OIM (this creates an account in the target database and the account shows in the user's resource profile with a status of "Provisioned")
    2. Disable the DB account in OIM from the User's Resource profile screen (this successfully disables the account in the database and changes the account status to "Disabled")
    3. Run the DBAccessReconTask
    4. After the DBAccessRecon task completes the status of the DB account in the database is still disabled but in OIM on the user's resource profile screen it is marked as "Provisioned"
    I did not expect this to be changed to provisioned in OIM since it is disabled in the database. Has anyone seen similar issues when running the DBAccessReconTask or know a way to fix this?

    Hi Suren,
    Thanks for the reply. Originally I thought your solution would work but after analyzing it closer there is a more fundamental problem we are having with the DBReconTask. We only want the reconciliation to take place going from OIM to the database and not vice versa (i.e. changes to an account in OIM should be pushed to the database but not from the database to OIM). However, currently if a change is made in the database (a role is added, the profile is changed, etc...) and the DBReconTask is run then it will be updated in OIM. Do you know how this can be achieved? These are the properties we currently use when creating the task:
    Properties props = new Properties();
    props.put("Target System Login Recon - Resource Object name:", ro.getName());
    props.put("Target System User Recon - Resource Object name:", ro.getName());
    props.put("Trusted Source Recon - Resource Object name:", "Xellerate User");
    props.put("Server", itResource.getName());
    props.put("Record Size", "ALL");
    props.put("isTrusted", "NO");
    props.put("DBName", "nodata");
    props.put("ExcludeSystemUsers", "nodata");
    props.put("ReconcileLockedUser", "YES");
    props.put("Login Name", "nodata");

  • Change the transaction status when creating a follow up activity

    Hello All
    We need to change the activity status if a follow up document is created from. E.g. If an activity is created type 001  then a follow-up activity type 003 as a follow up document from 001 the system automatically changes the activity status from open to in process. I need detailed steps regarding how to reach this
    Regards
    Jacopo

    See if you can "exploit" CRM_COPY_BADI and function modules CRM_STATUS_CHANGE_EXTERN to change the User status or CRM_STATUS_CHANGE_INTERN for System status.

  • Exit or Badi for controlling the change of user status in notification

    Hi,
    I want to check the current user status of notification while saving the notificaton. If the current user status satisifies particular situation, then the notification should be save else not.
    Is there any user exit or Badi which can be used to control the change of user status in notification.
    Thanks
    SUMIT

    Hi Pushpa,
    Thanks for the reply.
    the problem over here is that the BADi IQS0_STATUS_MAINTAIN only allows to disable the user status.
    the other function module STATUS_READ only fetches the data from JEST.
    whereas my problem is that i want to check on the changed status on the screen(which is not saved also).
    Appreciate your reply on the same.
    Thanks
    SUMIT

  • Possible to Change the Order Status

    Hai
    When i am booking the sales order the status is showing the Booked is it possible to change the Booked status according to the customer requirement ....
    thanks in advance
    M.Meenashi Sundaram

    Hai its possible to change the order status from the
    setup>quick codes>order management>
    type --flow status
    we can able to change it
    thanks
    M.Meenashi Sundaram

Maybe you are looking for

  • Multiple Rows Update / Refresh Toplink Query when database trigger involved

    Hi everybody! I have two easy troubles for you; the platform is the same as the SRDemo Toplink version. 1.     Multiple Rows Update: I want to update with mergeEntity method, multiple rows for an isolated table; that method receives a parameter that

  • Has anyone had any success with an external antenna on a UMW190?

    Although I am getting good service from my UMW190 without an external antenna, I am in a low signal area and would like to have rock solid coverage. I have tried a 1900Mhz yagi, a blade antenna, an omni, and a grid antenna.  I am not seeing any diffe

  • Still not receiving iMessages on my Mac

    I am Still not receiving iMessages on my Mac, even after the Moutain Lion 10.8.2 update and iOS6 on my iPhone 4S.  Does anyone know how to solve this? I was under the impression that after the 10.8.2 update and iOS6 and having all of the correct pref

  • Problem Slideshow in fullscreen

    I think this problem is an hard problem however.... Note on my system: MacMini 1,25 GhZ with OSX 10.4.4, iPhoto 5.0.4 and the monitor is a TV LCD 32" 16:9 linked with DVI After upgrade to iPhoto 5.0.2 when launch slideshow in fullscreen my photos (in

  • Create object/structure like dynamic internal table

    Hi, We have created dynamic internal table with some fields. for the above how to create structure or internal table like dynamic internal table structure . Scenario: internal table itab1 ( with header line) have 5 fields. Based on some of the condit