Changing from Standard cost to FIFO

Hi Experts,
One of my client want to change from standard cost to FIFO.
Can you please specify what precautions should I take before proceeding this change ?(system wise/accounting )
(I am aware of back up procedures,please donot specify that procedures)
What are the things I should be aware of ?(system wise )
Thank you
bishal

Hi,
Issue all the stock. After that you can change the valuation method.
This is a good time to see if everything is alright with the system.
When all the stock has been issued the following should be true:
- Inventory Audit Report for all items and all warehouses should be 0 (zero)
- The balance of all the stock accounts should at this time be 0 (zero)
If this is not the case. Contact support.
I take it for granted that you will do this in a testenvironment before doing it on the productive database.
Hope it helps.
Jesper

Similar Messages

  • What is the impact if we switch from standard costing to actual costing?

    Hi all,
    what is the impact if we switch from standard costing to actual costing?
    what are the changes is needed in costing?
    thanks.

    Hello,
    Its an nice idea to switch from standard to actual costing. It would be advisable to make this switch over happen in a new period praferably with a new year. You would need to carry out the settings for material ledger / actual costing and for the accounting settings you may refer to sap note 908737.
    Not much costing changes would be necessary to the existing configuration but you would need to activate material ledger and allign your Inventory accordingly. The settings for ML would be relatively simple but the main problem would be handling the inventory that you already have in stock. You would also need to have a proper closing procedure followed by next month's planning approach which would actualise the inventory at the end of the month and decide the methodology for next month's plan valuation. It  should be kept in mind for configuring ML.
    The closing sequence would be as under:
    1. Complete all Cost Center and production order postings.
    2. Complete all Cost center Assessment / Distribution
    3. Calculate Actual rate
    4. Revaluate production orders
    5. Calculate WIP
    6. Settle Production Order
    7. Run Costing Run (CKMLCP)
    Material ledger is capable of actualising activity costs and WIP as well and you should configure it according to your need.
    You can follow the standard SAP documentations for configurations + Note 908737 for configuring ML.
    Kind Regards // Shaubhik

  • Names in Members field under the UNIX Attributes Tab have changed from standard format (i.e. John Doe) to the actual account name (jdoe)

    Hello,
    Names in Members field under the UNIX Attributes Tab have changed from standard format (i.e. John Doe) to the actual account name (jdoe). The only time this happens is if a domain account is deleted and the remnant of the account remains and has to be removed
    manually. However all of the accounts, with the exception of any new ones recently added, now show the account name only. Any ideas on what caused this and how to fix it?
    Thanks :)

    Hi,
    I have not heard from you for some days, currently I am providing the related article for you. Hope this will help you on this matter.
    The UNIX Attributes tab does not appear in the Active Directory Users and Computers MMC snap-in when Server for NIS is installed in the domain
    http://support.microsoft.com/kb/921913/en-us
    Thank you.
    Best regards,
    Steven Song
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread.

  • User Exist for Material master data changes like standard cost, master pric

    Hello,
    Could anyone please provide the user exit name for the following requirement. 
    The trigger to transfer data from SAP to Unix directory should be whenever one of the SAP field values change (standard cost, master price, Type Of Sales) or whenever a new item is added to SAP.  The data will be interfaced out of SAP NIGHTLY using the certain data format.
    thanks
    kumar

    Hi Lakshminarayanan
      thanks for your information.
    i have tested by changing the Type of Sales in material master(MM02) but the FM - EXIT_SAPLMGMU_001(MGA00001) did NOT get trigger. i did not write any code in side the INCLUDE program.i just tried wether the User Exit is getting trigger or not while changing the material master.
    Please advise me how to test it.
    Thanks
    Kumar

  • Routing different from Standard Cost: Scrap Variance Calculation

    Hi,
    We have issue with Scrap Variance Calculation/WIP calculation when the Routing in the production order is different from the routing in th standard cost. When we run varaince calculation we are getting an error message saying that variance can be calculated as quantity structre of the production order is different from quantity structure of the standard cost. I understand that this is standard SAP. But routing changes seems to be pretty common acorss the Industries espcially when the demand is high and the manufacturing happens in different machines.Do any of  you had similar issues and can you share how this can be resolved.
    Thanks,Sasi

    Hi Sasi
    Go to OPR4_KKS AND OPR4_KKS1 and see... I think you can convert this msg into warning message..
    Regards
    Ajay M

  • To zoom into labour hours from standard cost estimate

    Hi,
    Is there a way to zoom into the labour hours used for a standard cost estimate?

    I'm not sure if this is what you mean, but you can see the quantity of each of the activity types in the itemization view of the cost estimate (CK13N or CK84_99).  If the quantity is not visible in your default display layout, you can added from the dropdown.
    thanks,

  • How to Change Costing Methods Average Costing to FIFO Costing

    hi folks,
    i had requirement i.e i want to change from average costing to fifo costing in my current company?
    how can we change this?
    any solutions will be appreciated
    regards,
    sri

    Look at the default categories form to find the category that is is assigned for inventory.
    Then go to the category set and see what the level of control is. If it is master see if you can change it to organization. (If items are assigned you may not be able to).
    I think then you can change the attribute controls.

  • Standard cost change

    Hi,
    During costing run, there is change in standard cost, system  update this cost, How it is updated.
    It is understand that the moving price is updated from GR/IR Clearance.
    focus on standard cost.
    Regards,
    Deven

    Hi Deven,
    I was also in the same confusion in last few month,
    See,
    There are two Price in SAP,
    1) Moving Average (MVP) , 2) Standard Price.
    SAP recommend (MVP) for Raw material and other Consumables and Standard Price for Semi Finished and Finished.
    Because finished Product with MVP has no control on your Price, it always Fluctuates.
    Also SAP Does not always recommend to use  MR21.
    To have control on our finished product companies fix STD Price.
    Say i make Refined oil at 50 rs per KG.
    I know Approximate quantity of  R/w and other consumable for Preparing 1 Kg oil
    Say my components are
    1) Crude oil 2 kg @ 10 rs kg =  20 rs MVP
    2) Hexane 3 KG
    3) Sulphuric acid, Bleching powder, degum powder 3 kg each.
    This is where my BOM is Defined.
    Now labour charge is 10 /hr , electricity 2000 kw, OVHD 2000 rs.
    This is where i prepare Routing, Now i club BOM and Routing to Production Version.
    My Plan  is fix, it my rarely change .
    Now when i run CK 11n System fetch data from Prd Version, Calculate STD price.
    If Suppose u say Crude oil heaxane rate per KG has changed, say Crude is nw 30 rs /kg. or my labour hr has increased,
    Since my FM is std , Now i dont want to change using MR21, so nw change BOM routing to Future plan and run CK11n mark and
    release for future price.
    Sorry for all if any error, if so correct me
    This may clear ur Doubt Deven.
    Regards,
    Pavanidlur
    As we Use Standard for  FM/SFM ,

  • Change price control indicator from standard price to moving avg price.

    Hi All,
    There is a material which has a negative stock for the previous period and the previous period is already closed.
    When i want to change the price control indicator from S to V for that material in the current period, it shows an error that "negative stock is there, unable to change price indicator".
    Kindly help me to solve this issue.
    Thanks,
    AK

    the price control indicator can be changed  from standard price to moving avg price at any time .......with some restrictions.
    And one of these restriction is the one you see.
    You must not have negative stock.
    Hence you have to make the negative stock zero
    Since your negative stock is in the previous period, you either have to allow posting into previous periods (trx MMRV , of course Finance has to allow this as well)  first. Then you can post e.g. a 202 movement with previous period date  which has a quantity that equals your negative quantity. then you change your price control, then you do a 201 movement (again with previous period date), finally you can restrict posting into previous periods again in MMRV.
    or you just wait a few days, then with the month end closure your curent period becomes previous period and hopefully you will not have negative stocks again. then you can change the price control without any problem (I usually take care that moving average and standard price are equal befor I change the price control)

  • Urgent Help in Standard Costing

    Dear sap friends
    Company want to use standard costing in sap, however they are changing their standard costs sometimes in the middle of the month and various times per month.  The discussion is around what the best practice should be and to understand why theya re changing these so frequently.  Accordingly we will need to find a soultion for them and/ or they need to be educated  and use standard costing as it should be.
    Kindly give me your advise about the standard price changing every time in the best practise. what i suppose to give them feed back and what is the best soultion i can provide the client.
    Regards,
    Henry
    Moderator: Please observe the [forum rules|/thread/931177 [original link is broken];. This is the second thread of yours we have to lock due to an inappropriate thread title - please DO NOT use the word "urgent" in the title.
    Edited by: Karl Helm  on Jul 11, 2008 9:58 AM

    Hi Satesh,
    As per your email we can change the standard price only period end. if customer wants to change middle of month or weekly what i suppose to be do.. what advice i can give to the client.  also can you explain to me about standard price, and document price. i got a note standard price and document price difference will go to variance. please explain standard price and documnet price. When they are calcuallating vairance.
    Regards
    Paul

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • Standard Cost Validity Date

    We are going to keep our existing standards for at least some portion of fiscal 2010. The product costs that are in SAP are due to expire on 12/31/2009. My question is that can I change the validity dates on the existing costs or do I have to redo standard costs for the new year.
    Can you please help me on this?
    Thanks
    Kishore

    Hi'
    If you don't have any changes in standard cost estimate you have to rerun the standard cost for new period..
    As per my knowledge we cannot extend the periods for existing standard cost estimates..
    Regards
    Srinu

  • Standard Cost and 'What if' cost

    Hi
    Standard Cost and 'What if' cost
    Please explain what is the difference between Standard Cost and 'What if' cost estimate.
    Does anybody has the idea about 'What If' cost estimate.
    Raju

    Hi Venkat,
    First of all there is no concept called What if cost in SAP.
    I feel you might be talking about the simulation cost.
    Simulation cost is a cost estimate done based on certain different parameters which may be different from standard cost.
    For example, we may do simulation costing using Plan Version 11.  Normally we will be using Version 0 for standard cost.
    Please let me know are you talking about the simulation costing or Cost Object planning.
    Best Regards
    Surya

  • Change costing method from Moving Average to Standard costing

    Hi Expert
    I need to find out the prerequisites for changing the valuation method of an item from Moving average to Standard costing.
    (In the forums i found a note which discusses the change of costing method from FIFO to Moving average.)
    It would be greatly appreciated if i can get a reply ASAP
    Thank you
    Regards
    Apsara

    Hi Son
    Let me rephrase my previous question as i have asked it incorrectly.
    Step 1. Make all quantities of the stock zero and also close all Open PO, SO etc
    Step 2. change the inventory valuation method
    Step 3. Enter new stock prices for the standard cost through stock revaluation. My question is can this be (step 3) done through DTW
    Thank you
    Kind Regards
    Apsara

  • I have moved from the US to Norway, and want to change my apple ID to the Norwegian appstore. However, I am not allowed ot change from the US store before I use up my balance, which is 0.17 dollar. The problem is that nothing costs 0.17 dollar.Please help

    I have moved from the US to Norway, and want to change my apple ID to the Norwegian appstore. However, I am not allowed ot change from the US store before I use up my balance, which is 0.17 dollar. The problem is that nothing costs 0.17 dollar and I do no longer have an american visa card, only Norwegian. Is there any way I can erase the credit on my account so I can change the appstore country? Or osmething I can use this credit on? Thank you very much

    Try contacting the store support staff at: http://www.apple.com/emea/support/itunes/contact.html they are usually pretty good at sorting out these issues.

Maybe you are looking for

  • Mail Accounts Shortcut no longer working in Lion

    In Snow Leopard I heavily relied on some custom shortcuts for switching between my different email accounts when sending mail as outlined in this site: http://hints.macworld.com/article.php?story=20081120093222315 . Then I upgraded to Lion and much t

  • Problem after upgrade

    I upgraded Apex from 2.1 to 3.1, in Oracle XE 10g. The log generated by apexins.sql contains the following message, as expected by installation instructions: "Thank you for installing Oracle Application Express. Oracle Application Express is installe

  • Move line on graph with mouse

    I have what I believe to be a unique application where I need to draw a line on a graph which can be moved by simply clicking in predefined boxes attached to the line. Boxes above and below the line in the upper right and lower left will be used to r

  • Connecting remote station

    i am planning a network with headquarter and 2 branches all 3 sites connected to the internet, each site have the following headquarter: 3 real IP's (router, nw 6.5 Server, firewall) - ISP 1 all other workstations on the headquarter having a dynamic

  • Programmatically creating a page with portlets in it

    Hello! I need a little help figuring out how to programmatically create a page and add a couple portlets to it. I have figured out how to create the PageDefinition and that code works great. How can I add 2 portlets (the portlet definitions already e