Standard Cost Validity Date

We are going to keep our existing standards for at least some portion of fiscal 2010. The product costs that are in SAP are due to expire on 12/31/2009. My question is that can I change the validity dates on the existing costs or do I have to redo standard costs for the new year.
Can you please help me on this?
Thanks
Kishore

Hi'
If you don't have any changes in standard cost estimate you have to rerun the standard cost for new period..
As per my knowledge we cannot extend the periods for existing standard cost estimates..
Regards
Srinu

Similar Messages

  • Change Cost center valid date

    Hi, Export,
         Can we change the cost center valid date from 2007.10.01 to 2007.08.01? If it can change, Pls tell me how to change it.Thanks.
    best regards
    Park Han

    Well, it's a little late to reply to the original question, but I found this thread while trying to figure out how to do the same thing myself and thought I would update it with the answer in case anyone else stumbles across this thread while searching as I did.
    You can actually make a change in the valid from date by using a KS01 Create Cost Center transaction and referencing the original cost center to create the additional period you want to add. 
    In this case in KS01 you would fill out the fields in this manner:
    Cost Center: Existing Cost Center to be changed, let's say 1000
    Valid From 2007.08.01
    Valid to: 2007.09.30
    Reference Cost Center: 1000
    Controlling Area: Whatever the controlling area is
    In effect, rather than changing the cost center, you are creating the extra time period from the new from date to the original from date and referencing it to the cost center.
    The end result for us was that KS03 shows the cost center with the new from date and the old to date, which was the change we wanted.
    Not quite as obvious as a change, but it worked for us.

  • Change of Cost center validation date

    Hi
    HCM consultant required cost centre validity date w.e.f 01.01.1970 because he told he is facing problem at the time of creation of Position and position assigned to personal number.
    My controlling area and version validity start from 1970 but I have created cost centres/profit centres w.e.f 01.1.2010 to 31.12.9999 in production server,  I can not delete profit centre, cost centres because transactional data is there.
    How I can change profit centre, cost centre validity date.
    regards
    imdad

    If you need to extend the CC master data use KSO1.
    Create Cost center with 01/01/1970 to 12/31/2009. Also extend the validity date of profit center assigned to cost center before extending cost center.
    Regards,
    Mohan

  • Updating Standard Cost for an Item in Item Master Data

    How do you change the Item Cost field under the Inventory Data tab in Item Master Data if Standard Cost is selected as Valuation Method.  This field is greyed out.

    Hi ,
    If you have an inventory in the warehouse , you cannot change the item price of the standard cost .
    So it is greyed out .Once you donot have inventory ,this field becomes active and you can enter the price .
    Second option is from Item Revaluation .
    Please test it in test environment
    Thank you
    Bishal

  • User Exist for Material master data changes like standard cost, master pric

    Hello,
    Could anyone please provide the user exit name for the following requirement. 
    The trigger to transfer data from SAP to Unix directory should be whenever one of the SAP field values change (standard cost, master price, Type Of Sales) or whenever a new item is added to SAP.  The data will be interfaced out of SAP NIGHTLY using the certain data format.
    thanks
    kumar

    Hi Lakshminarayanan
      thanks for your information.
    i have tested by changing the Type of Sales in material master(MM02) but the FM - EXIT_SAPLMGMU_001(MGA00001) did NOT get trigger. i did not write any code in side the INCLUDE program.i just tried wether the User Exit is getting trigger or not while changing the material master.
    Please advise me how to test it.
    Thanks
    Kumar

  • CO-PA Cost Component do not match with Standard Cost Component Values

    Dear Members,
    The CO-PA Cost Components (as mapped through KE4R), do not match with Standard Cost Component values for the Group Currency. In local currency the values match.
    System is correctly picking up VPRS value, both in local currency and Group Currency, which is equal to the total of Standard Cost Components however, it is the Value Fields linked to the Standard Cost Components in Group Currency that do not match.
    In KE40, the Indicator is 4:Released Standard Cost Estimate matching Goods issue Date.
    I have verified KEPH/CKMLPKEPH tables. The values are same as that of VPRS.
    Any help/clues?
    Regards
    Satya

    Hi,
    In case of billing documents the group valuation approach is managed in the data structures of the legal valuation in additional value fields. To control costs and revenues in the different views separately, you must create additional value fields and assign them to the data structures.
    The field contents must be filled via the CO-PA user exit, they cannot be entered by assigning conditions to value fields. The profit center valuation is updated in a separate ledger. No separate value fields are necessary.
    The exit to be used is function module 'EXIT_SAPLKEII_002' ( enhancement COPA0005 ). Within the exit you have the complete SD data avaialble in the tables 'T_ACCIT' and 'T_ACCCR'. The conditions can be found in T_ACCIT and the corresponding values ( linked via 'POSNR' ) in table T_ACCCR. The PA line item and the corresponding SD item in table ACCIT
    can be mapped via the line item field 'RPOSN' and the field 'POSNR_SD' in table ACCIT.
    regards
    Waman

  • Validity date in RFQ

    Hi all,
    Can anyone explain me what is the correct definition of the Validity start date and end date in the RFQ.
    The reason I am asking this question is , If you eneter the start date and end date in the RFQ and create the PO with reference to RFQ, these dates gets copied on to the PO. if the document type of PO is NB then these fields are not visible on PO screen bu in the background the table EKPO is updated with these two filed. And the if you try to eneter the SES after these dates sysetm is not allowing and giving the message as SES date is beyond the valididty date.
    Has any one come across any such issue. Can any one suggest any solution to this.

    Hi Don,
    RFQ means...requesting quotation from a vendor. Validity date start and validity end means the quotation should be send before the validity end date from the vendor. Before getting the quotation and before knowing the rate, how could you make purchase order to that vendor. Before you rise PO, you should maintain the quotation in ME47. As per standard SAP, you should rise po w.r.to quotation.
    Regards,
    Prasath

  • Costing validation at sales order.

    In case of MTS scenario,  if material is standard costing then system is to validate at delivery for further process i.e   system is to chk either costing is done or not?
    if not system is to stop further processesing

    In Make To Stock scenario, costing run will be made on a periodical basis and this differs from plant to plant.  Some plant runs on a monthly basis and some plants run once in two or three months and it is up to the discretion of the clients.
    You can generate invoice even if a material is not costed in MTS scenario and if you want to prevent this, you have to add this logic in your existing routine which you maintained in VTFL for the field "Data: VBRK/VBRP".
    thanks
    G. Lakshmipathi

  • Status of transfer (shipment costs header data)

    Kindly explain it to me in general language,
    Status of transfer (shipment costs header data)
    This status describes the stage of forwarding for a shipment cost document.
    Use
    The status is determined by the system and cannot be changed manually. To determine the status, the system cumulates the item statuses. The following rules apply:
    Item     | Status
      000001 | _ | A | B | C | B | C | C | C
      000002 | _ | _ | _ | _ | A | A | B | C
    Header   | _ | A | B | C | B | B | B | C
    You can select shipment costs that have reached a certain forwarding status.

    Dear Pradeep,
    the matrix describes how the header status gets calculated when the cost document has two items.
    The header status is a cumulation of the item status. This is valid for the calculation, accounting and
    transfer status!
    Example:
    If item 00001 has status 'C' and item 00002 'A', the header status will be 'B'.
    Item | Status
    000001 | _ | A | B | C | B | C | C | C
    000002 | _ | _ | _  | _ | A | A | B | C
    Header | _ | A | B | C | B | B | B | C
    Regards,
    Tom

  • No release of production order without standard cost estimate

    Hi All,
    I have an requirement, that is production order for a material should not be released or saved if standard cost estimate for that period is not released. Basically it should not allow to release or save the production for that material, is SCE is not run for that period. I tried various options, i also overheard its possible through user exit and many people have succeed in that.
    Has anybody overcome this problem, please do let me know. And which user exit??
    Thanks in advance
    With Best Regards
    GJ.

    Hi...
    I have faced the same problem in my previous project. What i have instructed to my client is to take control of Master data and put the status as "03" Blocked for movement till the statndard cost is released for this material.
    You can relase the status to "E2" in Cross Plant Status Field in Costing one view once the cost estimate is released for the material.
    I hope this works for you.
    Please let me know if you require any fruther information.
    Thank you,
    Regards,
    Santosh
    Rewards points if helpful.

  • Mass extention of service entry sheet condition record validity date

    Hi all,
          I have immediate requirement. i need to extend the validity date for condition record related to the Service entry sheet. This has to done mass sheet changes.
         I am looking for Any bapi or Standard function module or any config changes.
    I am looking forward for your valuable inputs.
    Regards,
    Sreenivasa Sarma K

    Arun,
    This doesn't suprise me...
    I'm not sure if there is a standard solution, but you could do this via user-exit/BADI (see [here|http://www.sapfans.com/forums/viewtopic.php?p=648307] under maintenance plans )
    PeteA
    [www.pjas.com]

  • ALE BOM. Updates ALL! items with validity date & change no.

    Hi All,
    We are having problems where ALE-BOM sent with change in validity date (with change no) to a particular item. What happens is that ALE-BOM will instead update ALL! items with the same validity date and change number.
    Next,when we process ALE again for the same BOM with a different validity date(with change no), then only that
    particular item is updated with validity date and change no.
    Would anyone know what could be the problem that when changes are sent for the first time all items are updated?
    [Version: SAP 4.6C/ SAPKH46C48]
    Regards,
    Neeth

    Dear:
                   The error itself telling you the correction. You profit center which is assigned to your cost center has a validity date less than the one you are now assigning.You can check in KE52 against the profit center assigned to your cost center master data. However the best thing is to go to KS01 and create this cost center with desired validity date.
    This will resolve your issue.
    Regards

  • User lock / Validity date?

    Hello IDM Gurus,
    I needed your insight on an issue we're facing; Using standard tasks from the SAP provisioning framework, we have a task that locks a user in a connected SAP system; and we have another task that sets a person's validity date to today's date (basically invalidating their account by the following day); After locking a user using the task we then go ahead and set the same user's validity date as today's date; as a result of this, the administrator lock set previously ends up disappearing. I don't believe this is normal behavior; shouldn't a validity date and an admin lock exist independent of each other? Is this happening because of the way the SAP Provisioning framework sets a validity date?
    Would greatly appreciate any advice and insight on the issue!
    Thanks a lot in advance!
    Best regards,
    Sandeep

    closed.

  • Factory Calendar Validity Date Expires 2010

    Hi All,
    In all standard SAP systems Factory Calendars are delivered with a validity date until 2010 at first installation.
    This could lead to follow-up errors at the turn of the year.To overcome the issue we need to extend the validity date of Factory Calender across all SAP system.
    As per my understanding we can extend the validity of calender manually in OLTP system (i.e. ECC etc) but in BW system we mostly transfer these validity using the "Transfer global settings".
    Is there a way to maintain these validity directly in BW instead of importing it from ECC, and is this recommonded to do it directly in BW?
    If we do it directly in, BW will this impact sync between OLTP and BW system etc?
    Any expert advice is highly appreciated...
    Regards
    Dev

    Yes, the settings can be maintained in BW, in the same IMG position as ECC.
    If you have a single ECC system and BW system, I would always 'Transfer Global Settings' in a daily (or weekly - minimum) process chain to insure consistancy between the systems.
    If my BW consolidated multiple ECC systems, I would maintian the BW system manually
    John Hawk

  • How to changed the Cost Center Date

    Hi All,
    I have an issue. Cost center is created which have a valid date from 10.01.2009.
    Upon checking my set up in the SAP my default date format it is DD.MM.YYYY.
    It have mistakenly inputted a different date instead of October 1, 2009 it inputted January 10, 2009.
    To resolved: When i went to KS02. I could not edit the valid dates just the master information. And also in KS12.
    Is there a way i could change the valid dates of the cost center?

    Hi,
    But did you succeed to delete it via KS04 or not? If there are postings in this period, then obviously, it won't be possible to delete it and the validity period could not be shortened retroactively anymore.
    Regards,
    Eli
    P.S. OKEON won't help you...

Maybe you are looking for