CK11n Calculation

Hi,
  Kindly tell me how 'Total Value' is calculated by 'Fixed value' with 'Quantity' in Tcode CK11n ? Because Material cost is calulated by 'Material price' and 'Bom Qty'. If I put value in Routing(CA01) for machine and setup time and machine hr. rate in KP26 how it is calulcated in Total Value by all these items. Please explain me clearly.
With Regards,
  Samrat

Hi.
I am explaining where I am getting still trouble in proper product cost calculation. Here we are using Multilevel BOM. In CK11n screen - Material overview, I am getting detail list of Material's BOM costing price which is not correct value. Material 1000018             123.71    final finished material
             1000018-750      123.71
             1000018-710      123.53
             1000018-050      123.53
             1000018-030      123.53
             1000018-010      123.53
              2292                  41.63 
Here 2292 is the Raw material and its price is Rs. 41.63. If we want to calculate its Forge(Plant) cost will be in level 1000018-010 - 41.632.675(BOM Qty)= Rs.111.36(Material Cost). Here Foriging price is Rs,10/Kg aginst cost centre which is assigned in KP26. So Forge cost is - 102.675 = Rs 26.75
Total Forge cost will be = 111.36+26.75= Rs. 138.11 which is not coming. Only Material's cost price Rs 111.36 is coming. Forging cost and Total Forging cost is not coming. In Routing value is maintained against activity type "Machine". Still it is not properly reflecting its actual cost price.
   Kindly give me urgent solution.
With Regards,
Samrat

Similar Messages

  • Recording actual times vs std times

    Hi,
         If std times are recorded in a production order confirmation, then wouldnt the variance on the order be zero assuming all the components are yield was as planned. Why then do clients request to record std times during order confirmations? I think it is a very bad practice. If we need to reconcile the actuals then what is the process? I found this document http://scn.sap.com/docs/DOC-53036 but dont know if its the solution which can be recommended. Any thoughts ?
    Thanks

    Dear GS
    usually when there is a production flow implemented actual cost and effetctive cost are same compared in order to figure out if the Controlling activity (CK11N calculation cost ) are near to real production.Without actual cost a lot of controlling functions will get without meaning  because the result will be always perfect.
    I advise you according to own scenary to implement this flow PP-CO if you thing could be relevant for your business, otherwise if the really differences are little important you can continue to manage it to standard value.
    Let me know if i have been useful for you.
    Daniele

  • Overheads not calculated in CK11N cost estimation

    Hi all,
    I have two issues
    1. When i am executing CK11N,i am not able to get the overhead calculation in itemization,but its showing some ridiculess firgure in cost component structure.I am using dependency D020.
    2 . when i am using  dependency D050 the system not calculating overheads.
    We have single plant with two process Repetative and Process order.I want to calculate the overhead on the Order type basis but the system is not calculating the overhead.
    So i changed the dependency to D050,now its showing the overhead figure in cost component structure but whic is not matching with the overhead rate i have given..
    as my go live is 20 of this month .....its bit emergency
    Revert
    Regards
    Pran

    Hi all,
    Thnx for your reply.
    But i have maintained all the entries in the respective  area,even though  i am geeting the issue.
    It was working fine for my previous repetative manufacturing ...i am using the single cost sheet for both  repetative and process order.
    And one more thing is that i have a Semi finished goods which is the output of REIM  order and is included in process order of the finished good.
    The system is calculating the overheads for the semi finished good too once again.
    Eg,
    Raw Material A and B produces Semi finish material C overheads and the utilities are calculated correctly in Repetative manufacturing.
    The semi finished material C is used in producing the finished material D ....in which the system is not caculating the utilities.The big problem is that the figure(value) of  itemzation and the Cost component structure is showing two different values.
    I am not sure and able to know how and why the system calculates and from where it gets these values  ......  totally  confussed and under pressure (may not be able to to explain properly).
    Revert
    Pran

  • Planned overhead is calculating wrongly in CK11N run, it is just more than double

    Hi Gurus
    1) While running CK11N overhead cost is calculating wrongly on base (material price). In my case I have maintained 1% Overhead on raw material for Duty in cost sheet. In my case no routing, and my FG is getting produced by process order. My Raw material cost is showing Rs. 2,364.45 but my Duty is showing Rs. 48.73, When I run CK11N for Finished goods.
    When I Check the costing structure it is showing all the material for costing, if i drill down there it is calculating correctly for Raw materials. Say heavy furnace oil material cost is Rs. 36,140.16 /M.T and overhead is Rs. 361.40 and for all raw material it is calculating correct 1%. But for my finished goods it is just more than 2%.
    As per my understanding over head is calculating for RM once @ 1% and later material cost + overhead cost getting calculated by 1% again.
    Please see the attachment. I have furnished a statement for this also.
    2) Also Please tell me the T-Code for costing run as actual cost. and how can I show a comparison report on planned and actual report for a product costing.
    3) My scenario is this is a power generation Co. Not possible to maintain activity cost. What they want to do is. on the last day of a month they will take the trial balance for the plant/ business area and will set the percentage in cost sheet (Actual for current month / planned for next month) for admin, manpower and other costs based on raw material GL values.
    So I have created a cost sheet where I have maintained base and assigned those RM GL/ Cost elements and other costs I have maintained in cost sheet based on row No. 10 (base) and assigned secondary cost elements and percentages assigned as per overhead type and plant, in cost component structure I have maintained same cost elements as set earlier in cost sheet.
    Please find the file attached
    Please suggest me if I M wrong.
    Thanks & Regards
    Subrata

    Hi.
    In itemization of CK11N over head is showing correct. But the material cost for RM is already after charging overhead. I have checked the itemization of Process order there for the first material was Rs. 144.56, but in the itemization view of CK11N it is showing Rs.148.90/- That means exactly after adding 3% overhead which I maintained in cost sheet.
    Itemization of Ck11N
    Itemization of COR2
    Please Help
    Thanks & Regards
    Subrata

  • CK11N :: Activity Price calculations

    Hi Friends,
    During the costing run in CK11N transaction, we are facing a little bit issue with activity value calculation. System is providing accurate times as per routings and also displaying correct rate as mentioned in activity, but during calculation, it is making something else value.
    e.g. for an activity according to routing system is calculating 0.04 Mins, which is accurate, and displaying activity rates as 148.89 Inr/Hr. According to calculations, system should calculate as
    148.89 / 60 * 0.04 = 0.10, whereas system is generating the value of 0.15.
    Can you please suggest how system is calculating the values and are we doing some wrong calculation or we have to make some another way for calculating the activity values.
    Your kind response is appreciable.
    Rgds, Krishan Raheja.

    Activity Price is calculated on Interative basis. See whether you have run the Actual Activity price calculation through TC: KSII.
    Regards
    Kamlesh

  • Std Cost Calculation in Sales Order - EK02 and by T-Code CK11N

    Hi,
    I have repharsed my question and described it point wise as still i am unbale to solve. Please help.
    1. I have defined a new cost relevance indicator Y with 110%. the managements wants to see 10% extra cost in the sales order on some meterials of the BOM. This is working fine with the costing variant defined for sales order costing EK02.
    2. When i run cost by CK11n, it calculates cost based only on indicator X irrespective of what indicator has been defined in the BOM, which is also ok.
    3.Further, the costing variants defined iin steps 1 and 2 are different and both are maintained by different T.Codes, OKY9 & OKKN
    4. We need a new csoting variant for sales order costing that calculates cost same as CK11n, I ahve tried but it calculates cost based on the indicator defined in BOM
    5. I want to understand exactly where in the configuration of casting varaint (OKY9) or configuration of cost relevance indicator (OS21) what do i have to change to take the effect
    Appreciate your support
    SAPXPT

    Hi
       Use substitution method and values arrived  based on 10% of the sale order value and  Use CK74N Additive cost before you run costing run.
    Hope this might help!
    Regards

  • Calculation for subcontracting item of type N (non stock) as it for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • Cost center planning for overhead calculation

    Gurus,
    I have a doubt regarding the cost center planning for overhead calculation.
    My scenario is:
    There is a service cost center from which a certain percentage I want to allocate to the products as overhead. Now while doing so I have created a cost center and a cost element of type 43 (internal activity allocation). This cost element is the base for overhead calculation. Also I have created one cost element of type 41 (overhead rates). I have defined the credit (of cost sheet) with the cost element of type 41 and the cost center as mentioned.
       Now I am facing a problem while planning the cost center with cost element type 43 through KP06.The system is throwing the error message: 'Cost element xxxx can only be used for activity input'. My understanding is we must carry out the planning for the cost center to allocate a certain percentage to the product cost estimate. If I am not allowed to use the cost element of type 43 to plan, what should I use for the planning?
    Request your suggestion.
    Thanks in advance!
    Snigdho.

    Hi
    Since you mentioned catg 43 cost element, I thought you are using Activuty Type
    To apply overhead on the product during CK11N, you need not plan any value on the cost center... The values planned in the cost center can not be used as a BASE in your costing sheet....
    It goes like this
    1. Your cost estimate has BOM + Routing
    2. So, the cost elements that you would see during CK11N, can be broadly classified into 3 types
    a. Primary cost ele - Material Consumption accounts for BOM components
    b. Secondary cost ele (Catg 43) - If you use any actvity type in the routing
    c. Secondary cost ele (Catg 41) - These cost elements are parasites... They need some basis to calculate the overhead value... That basis can be either the (a) or (b) above.....
    I think, what you are planning to do is Plan Primary cost ele in a cost center and trying to use the same as the Basis.. That wont work!
    What you need to do is
    a. PLan the values in the cost center, say, 100,000 USD
    b. Absorb it on the basis of 2.a or 2.b
    If 2.b is not applicable in your case, since you are not using activity types, then 2.a is the Only option left for you
    Hope it is clear....
    Regards
    Ajay M

  • Freight Calculation in Standard cost Run

    Hi,
    The requirement is while doing the standard cost calculation through CK11N / CK40N system should show seperately how much is freight plan cost &; how much is duty plan cost.e.g.
    100 is material price as per condition PB00 Cost element 355100
    10 is freight cost (ZFR1 10%) Cost element 363170
    5 is duty cost (Zduty lets say 0.5%) Cost element 363171
    So taotal cost will be 115
    I wanted to get this in cost component wise. Client does not want manual intervention so do not want to go for additive cost method
    I had tried through Purchasing info record. I have maintained the valuation variant accordingly. Assigned correct sub strategy to it & also maintained delivery cost button in the same screen to assign conditions to origin group.
    Also I had maintained purchasing info record through me11 ; mainteined conditions there.
    These above mentioned cost elements are mapped in cost component  structure in T code OKTZ. Seperately for material ,freight &; duty
    Now when I make a PO, system is showing correct calculation as per the conditions.When I do the GR the Freight &; duty is getting posted &; these GLs are having above mentioned primary cost elements . .So the primary cost element is also getting posted correctly.
    Now the problem is
    While doing the cost run system shows me Seperate cost for material as 100 , seperate for freight 10 & seperate for duty 5, but to the same cost element i.e. 355100. So all the cost is shown as material cost ; nothing is displayed as freight or duty
    If I see the cost element report the corresponding value is flown to the corresponding cost element. But  it is not reflecting in proper cost component in cost run
    .Please guide me why this is happening. How can I resolve this
    Regards,
    Abhijit

    Hi Ajay,
    I was waiting for your reply.
    As mentioned by you, I have mapped my cost component structure like Raw material, Freigh, Duty & assigned the corresponding cost elements to it.. But still in itemisation view it shows three values
    consumption cost element 355100 - 100
    consumption cost element 355100 - 10  (which should go to freight component where I have assigned the Freight cost element)
    consumption cost element 355100  -5   (which should go to Duty component where I have assigned the Duty cost element)
    FI entries are getting posted correctly. Values are flown to coresponding cost elements.
    For the time being We will keep duty part side. We are discussing with client on this.
    But, what could be the reason of this problem. How I can achieve the below mentioned result.
    Cost component view
    Raw material -100
    Freight  - 10
    Duty - 5

  • Batch-input for exporting cost calculation to a local file (ecc 6.0)

    Hi,
    we had a batch-input to export some data in a local file (excel format) in SAP 4.5B.
    We recorded transaction CK11 for a material number, we got Itemization screen and then we recorded menu' option "List . Export . Local file / Spreadsheet). If the batch-input ran in foreground it would produce required outputs (some excel files).
    Now we are migrating from 4.5B version to Ecc6.0; we recorded same transaction (both ck11 and ck11n, to be more ), but at execution time the window for local file saving never is displayed and B.I. stops with error.
    One difference is that now data are collected into a container,  instead that in a write list ...

    Hi again,
    the data i look for is a result of calculation of different tables so for every single product, it is calculated. In standart CO reports, there is no such report that give me that detail.
    Finally i managed to call print OK code, but it was in the foreground processing mode, i cannot run it on backround processing..
    I know i misuse the LSMW, but i think LSMW may have such flexibility to use such reports, thanks to SAP.. it was an adhoc report i tried to combine, so writing a program may be much more time consuming.

  • Wrong Calculation of  Sales & Administration Cost and COGS

    Dear Sir,
    We have a scenario where we charge Over-Head on the Labour . Accordingly we have made necessary setting in the configuration .  But in the Cost Run , we find that  COGS  / Sales & Administration Cost  is getting calculated wrongly .
    To explain it further , say Material Cost is 100 and Labour Cost is 40 . Over-Head defined on Labour is say 50% .
    In the Ck11n , we are getting following values :
    COGM                                    --->   140
    Sales & Administration Cost    -
    >   60 
    COGS                                   -
    >   200
    So the mistake is , that in "Sales & Administration Cost "  it is clubbing both Labour and OH . So instead of 60 the value must have been 20 .
    Same is true for COGS , here instead of 200 , correct value must have been 160 .
    Kindly guide me , how to resolve this error .
    Regards
    Sonia

    Hi
    Please ceck your costing sheet.There should be two base one for Material and another for Labour.
    In the Overhead rate you have to mention the labour Row correctly.
    Also check the costing variant whether correct costing sheet has been assigned or not
    Thanks
    Ansuman

  • Re: create material cost estimate with ck11n without

    hi gurus,
    i need to do create material cost estimate with ck11n without cost result but before i need to check the BOM with material component 11111, and also instruct me how to correct maintain BOM list to get the standard cost
    if anybody do the same scenoria giveme your golden inputs
    thanks in advance,
    kumar.b

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman

  • CK11N- Material cost estimate with & without agreement

    Hi,
    I have one material say M1 which I procure from two vendors A1 & B1.
    I have maintained info record for A1 with Rs.150 & B1 with Rs 100.
    Also I have an agreement with vendor A1 with price Rs 150.
    Source list is maintained for these two vendors & I have maintained outline agreement no with vendor A1 & also made vendor A1 Fixed Vendor.
    Now I run T code CK11N, where system is picking price for M1 as 100.
    But when I remove agrrement no from source list for vendor A1, system picks Rs 150 in CK11N.
    What is the logic behind this? Note that in any case my vendor A1 is 'Fixed Vendor'.
    Kindly guide me on the same.
    Regards,
    Piyush

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman

  • Material Cost estimate error in CK11N

    Hallo friend,
      While I cost estimate in particular material through CK11N then this error occur as No price could be determined for material/batch 1002769-750/ plant XYZ. Even the material is maintained in BOM and Routing also.  What would be the procedure for costing calculation ?
    With Regards,
      Samrat
    Edited by: Samrat Roy on Feb 25, 2008 3:07 PM

    Hi,,
    kindly tell me urgent solution which is still pending.
      With Regards,
       Samrat

  • Material cost estimate with quantity structure (tcode: CK11N)

    Hey dear friends.
    I donu2019t know in which forum I should put my question above.
    In fact, Iu2019m new to SAP PM module.
    Iu2019m trying to create material cost estimate with quantity structure (tcode: CK11N) for a material u201CXu201D.
    This material is manufactured.
    While running the transaction CK11N, I got an error message.
    After analyzing this error message, Iu2019ve realised that somebody had assigned wrong activity types to cost centers which are linked to this material in tcode: CR03, tab: costing.
    So Iu2019ve changed and assigned the right activity types.
    Then, Iu2019ve tried to run the tcode CK11N again. But the system still brings the wrong activity types and seems to ignore the ones that Iu2019ve assignedu2026
    It seems like the old activity types still linked to the cost centers somewhere else than in tcode CR03u2026
    Any idea about what am I mising ?
    Thank's in advance.
    Bahia.

    Dear Bahia,
    If its rate routing means,i guess you must be working in REM scenario.
    So goto CA22,delete the existing operation and then assign the same work center in a new
    operation,check what activity types is it proposing in the rate routing,if its reflecting correctly means
    save the datas.
    Also goto KKF6N--->click the change mode icon and then calculator button to create a preliminary cost
    estimate and then save the datas.
    One of our forum friend has asked you to check the production order read PP master data once
    again,but understand there is no production order concept in REM scenario,only planned orders.
    Then come back with your queries.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Jun 17, 2009 12:05 PM

Maybe you are looking for

  • Photo orientation wrong when synched back to iPhone

    Hi, I take photos on my iPhone, then I put them into a folder and I keep that folder synched to the iPhone. That folder contains other photos from my Nikon cameras too. Mostly all the photos I take on the iPhone are in the portrait orientation (1200x

  • Why do 30fps videos import as 0fps

    I'm having trouble with some videos in iMovie'11... Most movies (in mp4 format) import perfectly, other mp4 videos import but then don't play - a "0" is displayed in the lower left corner of the thumbnail and says that the current clip frame rate (0f

  • RF Goods receipt,Confirm,Create & Pack HU

    Hi ABAP Guru,                      I am developing a module pool for RF devices in which i have designed 3 screens (e.g. 100,101,102) In SCREEN 100 i m giving PROCESS ORDER when ever im pressing NEXT button for that process order i will get material,

  • Search criteria in VA02/ VA03

    Hi Can i add any new fields in the search criteria in VA02/VA03 screen . Generally only the fields Purchase Order No, Sold-to party, Delivery,Billing Document, WBS Element . I want to add the reference field from the header accounting tab page . If s

  • I inserted a mini CD (3") and it will not eject, how can I get it out??

    I inserted a mini CD (3") and it will not eject, how can I get it out??  I tried a little shaking, and restarting and holding the mouse pad down.  I heard the spinning but still cannot eject or read the disc.