CK24 error for raw material

Dear All,
We have executed CK11N of current period for single Raw Material ( w/o quantity struc. Selected in material master) and saved it, but when try to mark & release the material for the current period, the system  displays a message as u201COf 0 materials, 0 cost estimates were updated successfullyu201D. Its newly procured raw material.
When we check in KEKO, KEPH & CKIS table the entry exists, but we are not able to execute the standard price for this raw material. In the start of this period we have executed CK40 for all the material (including raw materials) has been updated with standard price.
We have deleted the costing run couple of times and recreated the cost estimation,but of no use.
We have activated Material Ledger and this raw material has price control u2018Su2019 with price determination u20183u2019. We are in ecc 6.03
Do suggest.

Hi ,
We are facing this problem for all type of material. Once we save cost estimation in CK11N  and when we try execute once again CK11n for the same material system is calculating Cost estimation again without error message and we are not able to Mark & Release the Cost estimation.
Normally the system will not allow to calculate the cost estimation,if the cost estimation has been already calculated.
We have currently changed price control S from V for all type of material to maintain Standard cost from Actual cost.
Do suggest,if we have left out any config settings.
We are facing this issue in production client.
Do revert.
Regards,

Similar Messages

  • Cost object for raw material consumption posting

    the raw material cosumption posting is done in the background when the goods issue is done. so where do we assign cost object for the primary cost element of raw material consumption account. since we create primary cost element for raw material consumption account, it will expect us to give cost object, so where we assign cost object for the raw material consumption cost element

    hi
    since the raw material cost is relevent for cost accounting u need to maintain primary cost elment accounts.When ever u confirm goods, the rm issue will take place automatically and will be debited to either product cost collector or production order. so u need not to assign any cost object for these consumption accounts why bcoz issues will take palce aganist a production order or product cost collector which is a cost object .
    regards
    siva

  • What are the possible cost objects for raw material consumption postings

    what are the possible cost objects for raw material consumption postings. i want to know whether it can be work order(maintenance order).

    For example, you are confirming a process order and issuing raw materials to the process order, the system in the background creates the consumption posting and will by default use the process order as a cost object.
    Similarly, when you are issuing materials to a work order, you will use MB1A and with movement type 261 and the system prompts you to enter the order number.  If you are using movement type 201, then the system prompts you to enter the cost center and so on.
    Thanks,
    Madhav Nanduri

  • Diff stock GL account for raw material

    Hi,
    We have raw material under 2 different location, one is under raw material warehouse, another one is under staging area which belongs to production. From time to time, we will issue stock from RM warehouse to staging area.
    The stock GL account (either debit or credit) for the raw material is RM Stock (140001) when we do any movement.
    But we do not want like this. We want that when there is any movement from raw material warehouse location, it will charge to GL account 140001 (RM Stock). And when the movement is from starging area location, it will charge to another GL account (140002 - production stock).
    We want to seperate out the GL account for the raw material if they are under different storage location.
    Can this be done?
    Kindly please advise. Thank you.

    Hi Sim
    Valuation of Stock is done at Plant level and not Storage Location Level. Within a Plant, you can differentiate the G/L accounts based on the Valuation Class assigned in the Accounting view in Material Master.
    The above settings enable automatic account determination at the time of GR. If you want different G/L accounts for different areas, there are 2 options:
    1. Configure and Activate Split Valuation. This will enable you to give different Valuation Classes for different Storage Locations in Matl Master.
    2. The better option is to make the 2 locations as 2 different plants and extend the materials to both these plants.
    However, pls mention your purpose of differentiating the G/L accounts. If it is only to view the stocks in the 2 areas, there are many reports like MB52, etc.
    Hope this clarifies.
    Thanks

  • Report for raw material usage

    Hi All,
    i need to take the report for the raw material that used in the finished product.
    in the finished products, how much the raw materials are used .

    Hi Raj,
    Option 1. You can get the data from MARD, MAST & STPO tables.
    From MARD you can read the unrestricted stock i.e. LABST field.
    From MAST, read the finished product i.e. MATNR & WERKS (Material & PLant)
    From STPO read the component i.e. IDNRK & MENGE (Component & Qty).
    Option 2. You can get the data from MARD, AFKO, RESB tables.
    This would give you an exact consumption feedback.
    AFKO for production order details. (PLNBEZ for header material).
    RESB for components (qty consumed) for the order - Fields MATNR (Component), BDMNG (Req. qty), ENMNG (Withdrawn qty).
    You can now build the logic with the required multiplication i guess. If any further info is required, revert back.
    If helpful award points
    Regards,
    Vivek

  • QM for raw material 103 mv. type

    Hello QM Gurus,
    Please help me in following senario,
    When I am doing GR for the raw material, I am posting the stock to blocked stock through 103 mov. type.
    In system the inspection lot is being created but it is not in released status, although inspection plan is properly defined, hence I cannot do the result recording for the lot.
    If anybody can suggest where the problem is.
    Your king suggestion are expected.
    Regards,
    Amit Shirsath.

    I'm listing out some common mistakes because of which the Lot wont be in REL status.
    First in MM03 QM view -check for the inspection type(01) and 05 for other GR to be active.This should be fine in ur case since your are saying the lot is created.Make sure the check mark Automatic assignment to be checked ,Check characs and also Insp with task list.
    Second-Make sure the inspection Plan(QP01 display) was created with the same Key date as the Insepction lot or even earlier .The key date can be checked under qa03 to display Insp lot.
    Third-make sure the Usage is the same as in the Inspection lot.The usage is the one which links the Plan to the Lot .It should be 5 for GR from PO and 53 for other GR in the insp plan. You can check the Inscpetion lot usage by going to QA03.
    Check all these, ur problem should be solved.Please let me know if there is any furthur problem.And also reward if helpful and close the thread.
    regards,
    Naik

  • Cost Run for Raw Material taking Standard Price instead of Moving Price

    Hi all,
    We ran a material costimate with normal components FG>SFG>RM.  The RM price Control is set to
    V (Moving Average Price) and for SFG & FG it is S(Std. Price).  After we run CK11N, the price for
    RM in Material Master changes as per Moving Price.  We found that the RM Component is
    costed based on Standard Price and not on the previous cost run Moving Average Price.  After
    certain period, if we again do cost run, the sytem is again picking up the standard price for costing
    not the revised Moving Price.  We have checked the Valuation Variant in the Costing Variant, where the strategy given is 1. Moving Average Price 2. Standard Price.  We also tried to change the
    sequence as 1. Price as per Purchase Info Record 2. Moving Average Price and 3. Standard Price and
    also 1. Standard Price and 2. Moving Average Price.  Our requirement is when we run the cost estimate the raw material has to pick the price of previous moving price stored in the Material Master.  Kindly tell us where to set the indicator.
    Thanks,
    Sadashivan

    Hi Srikanth,
    Problem solved.  I checked the sequence in Valuation Variant and modified in Valuation Variant for Plant which I have not set previously and now the system is working correctly.
    Thanks,
    Sadashivan

  • GR based IV Indicator do not appear in PO for Raw material

    Dear All,
    I am creating a PO for material with cost center . Vendor is maintained with GR based IV and ERS Indicators.
    If a non valuated material (i.e. with quantity update and without value update)  is used in PO , I am able to  see  Tick for GR based IV indicator.
    But in the same PO when Raw material( quantity update & value update ) is used , Tick for GR based IV indicator disappears although it is there in Vendor Master.
    Please provide your valuable advice/solution.
    Thanking you in anticipation
    Regards,
    Vishwas

    Hello,
    Check GR based IV tick in Purchase inforecord for Pur. Org., material and vendor combination.
    Regards,
    Shailesh

  • Re: Quality Certificate requirement At MIGO for raw material

    Dear all,
    I have a requirement where I want the system ask for Quality certificate while doing the goods receipt. The system should not allow me to process the transaction-MIGO if certificate is not recieved.
    Please advice
    Regards,
    Vivek Sharma

    Hi Vivek,
    You need to perform following settings.
    Configuration
    Follow the path
    Run trx QCC0->QM in Logistics->QM in Procurement-->Define Control Keys.
    Here create your own control key
    Where you can set the rest data as per your requirement but for to check the check box for "Cert Required" is must be activated to meet the requirement relevant to this thread.
    Save
    Say you have configured your Control Key ZZ01
    Now just below this one small configuration is mandatory is Run trx QCC0->QM in Logistics->QM in Procurement-->Define Keys for Certificate Processing
    Maintain Description
    Execute it and go to "Define Certificate Types"
    Here either for your relevant certification type or  for new type (if you wish to create new), maintain the data as below
    "Certificate Required for Each Purchase Order Item" ==== Active
    "Certif. per GR Item" ==== Active
    "Certif. check required" ==== Active
    "Control W/O Certif." Set any error message, I would suggest to select "Without lot error message, with lot error message"
    "Enhanced cert. processing" ==== Don't Activate
    "No certif. confirmation at GR" ==== Don't Activate
    The rest settings are not important to maintain so leave them blank.
    At Master Level
    In QM view of MM for the material maintain "QM Control Key" that just created "ZZ01"
    and the certificate type that is just created or amended. under the procurement data.
    Maintain Q-Info record for Material - Vendor - Plant combination (QI01)
    Now as per your requirement system will ask for the confirmation for certificate receipt as Yes/No. under the Purchase Order data in MIGO at item level data.
    If you select "NO" to it it will not allow to post the GR.
    I hope this is what you were looking for.
    Regards,
    Shyamal

  • How I fixed the "unsupported image format" error for RAW files

    After deleting the .plist file stopped working, I decided to go ahead & reinstall Aperture and...voila--problem fixed. RAW files are again displaying without any trouble (just like they used to!)
    G5 2.3DP   Mac OS X (10.4)  

    Just an update. Restarted computer and attempted rebuilds of iPhoto library a couple more times and finally files and photos mostly recovered, except for those I had tried to open. Aperture seems to have a problem, or a host of them, dealing with RAW files, and there is no update yet for the Sony RX1R for Aperture or iPhoto. Lightroom 5, on the other hand, seems to work great with these files directly, so that will be where all photos go for now. Will iPhoto and Aperture just become old archives? It is so infuriating that Apple does not allow for simple importing and exporting compatibility with such an excellent program as Lightroom 5 just to protect their somewhat poorly supported Aperture. I've been a staunch Apple supporter and user since the 80's, but having more doubts about the direction this company is taking.

  • Error for Refresh Materialized View

    Hi, All
    I get a error when I refresh the Materialized View, But I can't solve this error.
    ORA-12008: error in materialized view refresh path
    ORA-04045: errors during recompilation/revalidation of MV_NAME
    ORA-00600: internal error code, arguments: [qsmqSetupTableMetadata-2], [], [], [], [], [], [], []
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2255
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2461
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2430
    ORA-06512: at line 1
    Do you know how I can solve this problem?
    Please let me know that.
    JWS

    hi,
    can u give some info... like whether the MVs are and from where you are trying to refresh...... we also had similiar prob when we tried to refresh the MV in Schema A from Schema B
    rgds
    Mahesh

  • Materialldgr HardCurrency error for same material for the sameperiod

    Hi
    In Materilal ledger , if we check the valuation of the same material for the same period in USD (Hard Currency), there is not any receipt
    Problem description
    The valuation of the material XYZ123 in the MEC of May 2009 resulted in an increase from a cost of 28.21 MXN to a cost of 646.46 MXN
    The main reason for this increase was the reception from lower levels of a cost of 1,721,192.24 MXN
    Afterwards on June, we have a similar amount for 1,632,170.67 MXN
    But if we check the valuation of the same material for the same period in USD, there is not any receipt
    So there is not an increase in hard currency price.  Could you please explain to us where are these amounts coming from and why do they appear only in local currency and not in hard currency?
    What could be the reason in Material Ledger.
    Thanks & Regards
    Malakondareddy

    Hello friend,
                      i feel that u want to send the material to the supplier of that equipment for sum work,
    then it would b better that u maintain the supplier model no. or manufacturing part no. which u can give in the detail.
    it would be better to give the manufacturer part no. The manufacturer can more easil track the part by giving the manufacturer part no, rather then giving your own SAP No.
    and regarding the SUB-Equipment and its part no. there is no standard functionality.
    Regards,
    yk
    Edited by: 1234_abcd on Apr 1, 2010 5:27 PM

  • Getting QM parameter values for Raw Material on the basis of goods receipt

    Hi All,
    I have requirement, while generating inspection lot these  tables MCXD&MCXA should update.
    when we need a QM parameter value for the month, It should be the average of all the inspection lot generated for the month.
    Thanks in advance
    Regards
    Hanamanta

    Ok.. I assume your talking about the actual test result value.  These do not roll up into the QM LIS structures used in transactions MCXA or MCXD.
    You might be able to create your own structures and have them updated but you would have develop that.
    You can create run charts for various MIC's and utilize the SPC functionality if you need monthly averages and trends.
    If your batch managed you can easily get reports of batch values via the CL30N transaction.  You'll want to make sure you have a characteristic for batch production or receipt date so you can sort and select by date.  These can then be loaded to Excel for summing and averaging.
    Craig

  • List of process order for particular raw material

    Dear PP Gurus,
    Suppose we have one raw material said - X and this is used to create finished product A, B, C an D.
    Now I would like to know, In particular period how many process order is created for raw material X?
    Ex. for one month only 2 process order usind raw material X are created. 1(finished product - A and 2 (finished product- B)
    I tried COOISPI but not getting success.
    Through MB51 I can get report of process order against which material is issued. (261 is done)
    But my basic req. is to know the process order created.
    I am from MM side so no much more idea in PP area.As working for SAP support we have to look little bit in PP ara.
    Thanks all
    Rajan

    Hi Rajan,
    You can use COOISPI and select Documented Goods Movement and give the Basic Start date range as you want and execute.
    You can use filters in Movement types and get your desired result. 261 is for Goods issue of the components and 101 is for Goods Receipt of the header material.
    Hope it clears your doubts.
    Regards
    Suri

  • Default Raw material valuation type consideration for st. cost esti. of FG

    Dear SAP gurus,
    For Raw materials we have split valuation (DOMESTIC, IMPORT).
    During standard cost estimate of finished product, system is considering always DOMESTIC valuation for raw material component. why system is behaving like this.
    But we need to consider the header price(Moving average header price updated in Material master). Where we can maintain the relevant configuration settings.
    Thanks and regards
    Venkat V

    Hi Venkat
    I have never seen this.. It always takes the header price from the costing view....
    Check in OMWC is you have specified DOMESTIC as the mandatory val type for external procurement
    Regards
    Ajay M

Maybe you are looking for

  • Issues with using leapord as a gateway.

    I performed a clean install of mac osx server 10.5.1 on our new xserve. I then used the gateway setup assistant to set the xserve up as a router. Ethernet 1 has a static IP which is connected to our dsl line. Ethernet 2 is connected to a switch with

  • Static methods in class accessed by jsp/servlet

    I wanted to conceptually know ... If I have a class specifically doing some quering to database and giving results to jsp and servlet ... does this make sense? Static methods are ok ? Is it secure enough if I have all connection classes local to a me

  • Adding a video clip

    I have a video and I want to add another video clip kind of in the background on top of the original video clip. How can I do that? Thanks!

  • Deleted messages keep returning

    I have configured both enterprise as well as internet mail (gmail). Since 2 weeks I have a problem when deleting mails from the internet mail: some deleted e-mails return as unread new messages. Who can help me?

  • Iphoto created slide would not work in FCE

    I created a slide using Iphoto and saved it as a quicktime movie. When I imported it to Final Cut Express, it can only play the backqround music after I rendered it but not the photos. I thought FCE can accept any quicktime files but why is this not