CKCPRCH025-A current or future cost estimate exist

Hi,
I am getting the error message while doing GR-A current or future cost estimate exist.
And its saying to follow the procedure that you can set the price of a marked cost estimate through the radio button 'Default planned price' and release it by saving.
Please help as where to correct this.
Govind

Dear,
I think you have not updated the Cost Estimate. Please check in Costing view 2 tab of Material Master under Future Price any cost exist for the current period.
Br, Vivek

Similar Messages

  • Standard Cost Estimate Report Comparing Current vs Previous Year

    Hi Everyone,
    Is there a standard SAP report that would provide materials with previous and current year standard cost estimates as found within the Costing 2 view of the material master?
    Thanks,
    Pete

    Hi,
    You need to look into periodic reports. Here is the best one to provide the copmarision between two period -
    S_ALR_87099932.
    Go into the report & select the costing runs taken in two diffrent periods. You will get all the required results of prices for two periods/costing runs.
    Regards,
    Amol

  • K/834 no standard cost estimate and ke435 costing key 000 does not exist

    Hi ,
    scenario as under we have following type of materials
    normal Material that has cost estimate
    Configuarable material
    Material without cost estimate -prices are updated thru MR21 (as some legacy system calculated the price)
    There are many company codes and use one or more above  category of material. further we have common Material type and valuation class.
    we need cost component split to get updated in COPA and for that i create 2 costing key one for normal and other for normal one and developed an enhancement (KEPC) that check whether material is configurable or not. based on that it assign 001 or 002 costing key
    it went well but failed for material that has no cost estimate and got error K/834.
    To tackle same we insert further logic to check for normal material whether cost estimate exist, if yes then assign costing key 001 else ignore it. configurable material logic remain as it is. it working fine for normal and Configuarable material but normal material without cost estimate resulted in error KE435.
    need to know:
    -at first place why system  generates K/834 error for enhancement - earlier we were using assignment rule (KEPC) where we use valuation class and assigned costing key 001, it worked for normal one and ignore configurable one and normal material without cost estimate. I haven't changed costing key rule and exclusive error is not marked .
    - any other way to tackle besides resetting message class from error to warning or changing Materila type or valuation class as that is not acceptable due to other complexity.
    Regards,
    Atul

    Hi,
    It resolved thru enhancement
    Regards,
    Atu

  • Previous cost estimate missing

    Hi All,
    I'm still new in product costing. I have a situation like this :
    Material AAA plant 1111
    Run cost estimate and released :
    - 28.06.2011 = RM147.65
    - 12.08.2011 = RM177.71
    But when I checked in material master (MM03) - I don't see the previous cost which is the June. I only see current cost (August).
    I checked CK13N - for the costing run on June - it's still exist, so It's NOT DELETED, But it does not appear in my material master.
    Please anyone can help me to explain ?
    Regards,
    Melissa

    Hi,
    You can check if the below link helps.
    No future standard cost estimate exists for material * in plant *
    And the given OSS note # 1386066 can help you.
    KInd Regards
    Umapathi G
    Edited by: Umapathi Naidu G on Aug 22, 2011 5:27 PM

  • A current or futre standard price exists for materail

    when i do the stock  movemnet using  MB31 ,101 movement the following error coming
    A current or future standard price exists for material ,mesage no CKPRCH 025
    in material master cost estimated updated
    how to slove the issue

    Dear,
    I think you have not updated the Cost Estimate. Please check in Costing view 2 tab of Material Master under Future Price any cost exist for the current period.
    Br, Vivek

  • Issue with Standard Cost estimates / Material Ledger

    Background:
    We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
    What Happened:
    A new material called PFSW3 was made. This is a FERT. Before production
    could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
    Problem:
    When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
    Internal Investigation:
    My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
    set to price determination 3 in the material master (accounting view).
    Questions:
    To sum this situation up,
    we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
    What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
    How can we close this material this month?
    The future cost estimate is again missing for PFSW3 in March 2007 and I
    fear we are going to face more problems as this material is sold to customers.
    Please respond this is an urgent issue.

    Dear Shumyl,
    Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
    Hope it will be useful.
    Regards,
    Flaviano.

  • Reorganization of Cost estimates

    Dear All,
    Please help in knowing the difference between "Reorganization of Cost Estimates" & "Revaluation" of a product having standard price in material master.
    In a nutshell, why "Reorganization of Cost Estimation"(CKR1) is to be done before "Price change" (MR21).
    Hope that my query is clear.
    Thanks
    Nikesh Patel

    Nikesh,
    1. Reorganization of cost estimate means deletion of cost estimate, by using the transaction code CKR1 you can delete the current cost estimate, marked (future) cost estimate. It is advisable to do the CKR1 before any goods movements for that material.
    Generally this will perform when the business realized that released cost estimate is wrong.
    2. MR21 will use to update the standard price for the materials. when you update the price as per the new standard price your inventory will evaluates at that time there is an accounting entry if your new standard price is greater than old standard price.
    Inventory dr to Revaluation inventory cr.
    The above GL accounts will trigger as per the OBYC--> UMB settings.
    Please let me know if you need any further help.
    Regards,
    Ravi

  • Ck11n create a cost estimate

    Hi guys
    Could you provide the solution please….
    SAP P01 – Transaction code <b>CK11N create a cost estimate doesn't’t use the planning exchange rate for inter company purchased items
    Client a dev d2 16 example of it – part f00008537012, plant CA12 – this is using the M rate instead of the P rate
    Regards,
    Prudhvi

    You might be using special procurement key for the component in the BOM, which is sourced from inter-company.
    During the calculation of the cost estimate of the material, the system reads the price from the cost estimate of the component in the supplying plant. The priority of the future, current or previous cost estimates are set up in the transfer strategy (or transfer control)  for cross-plant (t-code OKKM).
    What are the currencies involved in your case?

  • We cannot do std cost estimate every month in ML

    HI
    Can we do std cost estimate whenever required with changed price,
    can i change the price in material master -how
    regards
    sowmya

    Hi,
    We can do std cost estimate once in a month. If we want to do multiple times in a month we should reorganise the material cost estimate using CKR1.
    We can change the material master price for a material with out standard cost estimate using MR21.
    If standard cost estimate exist, use CKR1, the use MR21.
    Regards,
    Rijo Paul

  • Urgent- Marked cost estimate

    Hello,
      Kinldy let me know how to delete a previosuly marked cost estimate , i am re running the costing run but it's failin at costing point sayin it;s already marked but we did never released it first time.
    plese let me know,

    You have to use the Re-organization through CKR1. But be cautious of this transaction if you are using in production. If you forget to do a proper selection, you may have to repent, as it may wipe out the whole cost estimates that supports the already released cost .
    Be patient and restrict as much in selection Choose the material, plant and select future cost estimate.

  • Automatic cost estimate while transferring to accounting.

    While Posting billing Document from SD to FI, I am getting error as mention below
    " The system tried to read the product cost estimate for product 20000050 using the costing variant aZPC4 and the costing version 01.
    However, the product cost estimate has the status KF, which means that it contains errors. Therefore the cost estimate is not valid."
    When we try to do the cost estimate manually then it estimates without errors.
    Waiting eagerly for your replies,
    Ariel Desa

    First, you need to make sure you cost the material without errors (the status will then be KA)
    Then you need to mark and release (*please see note below)  your cost using transaction CK24. The status will then change to FR.
    (*PS: If your system is setup to read Future Cost Estimates, you only need to mark the Cost Estimate and not release it.)
    You can now release your Billing to FI.
    Cheers.

  • Target sost calculation not considered Current cost estimate in KKBC_ORD

    Hi All,
    We have an case wherein it observed that target cost calculation on SFG is wrong
    in KKBC_ORD where system does not considered the current cost estimate.
    We have all the necessayry customisation in place for Target cost version 0 for current cost estimate.
    Below is detailsed case.
    1 Process Order created in Dec 2011
    2 Price Released to Mat master  on 01.01.2012
    3 Goods movement,Operation confirmad Material Issues, FG qty delivered @ std cost 0n 04.01.2012
    4 Order Technically completed (TECO)
    5 KKS1/KKS2 will be done at month end.
    We know that In Process order, after deliver of FG the target cost on FG is not getting calculated,target cost will be updated only after calculating variance. it does
    not calculate after delivery of finished goods, On Execution of KKS1/KKS2  variance will be calculated the target cost on FG and will be updated.
    In process  order (COR3 --> Cost analysis) Target cost ,Actual cost and Planned cost are calculated based on the following:
    Total Plan Cost = Std Cost the material required to Produce X Planned Qty of the required material
    Target Cost = Std Cost the material planned to Produce X Std Qty of material required to produce, for Produced Actual Qty
    Actual Cost = Std Cost the material planned to Produce X Actual Qty of material consumed, for Produced Actual Qty
    The variance is calculated on SFG and assemblies based on the difference between actual and target cost in KKBC_ORD. During creation of process order, the plan cost
    will be updated with the valid standard cost upon the creation.
    The target cost on SFG and Assemblies is only generated when there is good receipt from production order into inventory.
    The target cost is generated using the valid / recent costing run for the correspondence SFG in KKBc_ORD.
    All other target costs showed in COR3 (Menu Go to > Costs > Analysis) or KKBC_ORD before doing KKS1/2 is only statistical- However in our case Traget cost calculated
    on SFG in KKBC_ORD not relevant with current cost estimate.
    However Actual cost and Planned cost Calculated correctly.
    Actual Cost= Current Standard costof the materilal(5.624,88)X Actual Qty (13.693)=77.021,48
    Planned cost= Std Cost the material required to Produce (6.572,12) X Planned Qty (12.415)= 81.592,87
    However Target cost is not considering the current cost estimate;It should be - Current Standard cost of the materilal(5.624,88)X Target Qty(13.958,124)=78512.07.
    But Errorneously Target cost is showing 67.383,59 which causing unfavorable variance to standard.
    It should be 78512.07-77.021,48= 1490.59 favourable var to standard in KKBC_ORD.
    Any help,suggestion and input would be highly appreciated.
    Thanks with Regards
    Subrata

    hi
    target cost is your standard cost* actual confirmed quantity, not the standard quantity required
    the variance calculated will be always  the actual debit to the production order- actual credit of the production order
    your actual credit  for the process order is  std cost* actual quantity delivered to the inventory= Current Standard costof the materilal(5.624,88)X Actual Qty (13.693)=77.021,48
    actual debit to the process order is total actual cost which you can see in COR3 report .
    By the way for which period you have calculated variance, target cost will be calculated based on that months standard cost
    krishna

  • Restrict revaluation of existing stock after cost estimate

    Hi experts,
    Our users are having Finished goods in Standard price. I understand that there will be automatic posting in FI for updating existing inventory value once we release cost estimate. However, the users do not want this update.
    Any chance that we can execute cost estimate, still release price to use for the new period but no inventory value update for existing inventory?
    Thanks in advanced!!
    Best Regards,
    Jacqueline

    Hi
    I think it may not possible, However, release of cost estimates for not for inv val can be done.
    regards,
    satya

  • Diffrence B/w Standard,Modified,Current Cost estimates...

    Hi
    What are the diffrences between Standard(PPC1), Modified (PPC2) and Current (PPC3) Cost Estimate and why is only one estimate allowed to update price. How are these three estimates useful...
    Thanks
    Sivaram

    Hi
    What are the diffrences between Standard(PPC1), Modified (PPC2) and Current (PPC3) Cost Estimate and why is only one estimate allowed to update price. How are these three estimates useful...
    Thanks
    Sivaram

  • CK40N Error Message : CK 771 "Future standard cost estimate is locked"

    Hi Gurus,
    Good Day!
    May i request your expertise regarding this matter. During the release of costing run, some of the materials had an error. Please see below example. I am wondering what might have caused this and what happened as 2 days after, this error was not encountered anymore after trying to release again.
    Msg.typ     Material     Plnt     Area     MsgNo     Message Text
    E     35001405     SC01     CK     771     Future standard cost estimate is locked
    E     360000659     SC01     CK     771     Future standard cost estimate is locked
    E     360000671     SC01     CK     771     Future standard cost estimate is locked
    E     360000684     SC01     CK     771     Future standard cost estimate is locked
    Appreciate your feedback.
    Please let me know if there are any further information needed.

    Costing date is from 08-Feb-2011 to 31-March-2011.
    Note that this is the costing date set to all materials but only few had the error.
    Appreciate your response.
    Let me know if there is anything more needed.