Cn55n - project definition description

Hi PS experts,
In CN55n report, i am not getting field display of Project Definition Description, kindly help or
is there any other report, where sales documents with Project Definition & Project Definition description. This report is very useful for our projects team & also middle management team. But without project definition description, we are not able to identify which customer project is this, as we maintain the customer name in project definition description.
please advise
regards
Srihari

this is standard behaviour in SAP - CN55N gives description for the sales order line item - so if you want to use description then enter the customer description in the sales order lne item and not in the project defintion description
also you must never use description or text fields for data like customer number - not a good practice
why don't you use the partner function and add the customer in your project properly and use the report CNPAR
alternatively use the user defined field to enter customer number and use SQVI / ABAP query to write a report from both PS and SD tables

Similar Messages

  • CJ20N Create Project Definition

    Hi,
    I have a requirement in which we have to change the project definition description (PRPS-POST1) while creating the project itself it means after creating and then if we save description should get changed.
    Please let me know if there is any use exit available for the same.
    Any ips will be appriciated.
    Rgds,
    Rag

    Why are you more specific to go with user exit only ?
    If exit is what you are looking for then it was provided to you in earlier thread.
    CJ20N User Exit
    Then why did you raise a new post again?

  • How to Get project definition and description  by WBS element

    Hi All,
    Is there any way to get  project definition and description  by providing WBS element.
    Please help .
    Salman Zahir

    Hi,
    These r the tables
    PRHI Work Breakdown Structure, Edges (Hierarchy Pointer)
    PROJ Project definition
    PRPS WBS (Work Breakdown Structure) Element Master Data
    RPSCO Project info database: Costs, revenues, finances
    MSPR Project stock
    Thanks,
    Anitha

  • Passing Project Definition number to a Workflow through milestone

    Hi Experts,
    I have created a Project in CJ20N and i am triggering a workflow using a milestone when the activity is realesed.
    The workflow is used to send email. In the workflow in start conditions i have given the BOR for milestone. The workflow is getting triggered correctly and everything is working fine.
    Now i want to pass the Project definition number and Description to the Workflow.
    Can anyone provide any help on how to achieve this ?
    Thank You,
    Radhika .

    Solved it myself.......

  • Needs the table from which "project definition" field is to be extracted

    Hi,
    As a requirement in BW, we have to add the new field project definition in the BW cube 0COOM_C02(description of the cube:- CO-OM: Costs and Allocations Project (Delta Extraction)).For this, we have to add the same in all the data sources related to this cube.
    Data sources under this cube are:
    0CO_OM_CCA_9 (Cost Centers: Actual Costs Through Delta Extraction)
    Take any one of the data source and search that in the R/3 side tcode RSA6, double click and you will find the entire structure (fields) for that data source.Double click the extract structure appearing above it to find the technical details of each field.
    Now we have to add the field project definition in the data source.For extracting the same, we have to write the logic which will extract the value of project field from a table.
    We dont have any problem in writing the code but
    Our requirement is that during coding, from which table we should extract the value ? and also on what basis?(means what should be the selecting criteria for populating that field) .
    If you want any information on these data sources, do reply me.
    Thanking you in advance,
    Tarun Brijwani.

    The cube is related to module
    Financials Management & Controlling----->Controlling----->Overhead Cost Controlling

  • Custom Fields added to Project Definitions transaction (CN42N)

    In the Project Definitions Overview transaction (CN42N), it was requested that we add custom fields to table PROJ.  The fields added were Responsible Analyst Name/Analyst No. and Responsible Accountant Name/Accountant No.  We have created two Z tables, one for the Responsible Accountant info, and one for the Responsible Analyst info.  These Z tables have been populated with the necessary data, no problems.  The Issue is that in table PROJ, only the Responsible Account No., and Responsible Analyst No. is displayed, and not their respective Names.  Why are they populated in the Z table but not in table PROJ?

    Hi,
    First thing is when your are saving number are you also saving description from your Ztable to proj table zfields for description?  For this I assume you have also added description field in  PROJ table.
    Also I am wondering why you want to store description in PROJ table. You have number in PROJ table  and when ever or where ever you want you can pick description from Ztable. This will help to maintain consistency in logng term.
    Say  for example today you have description  ABC PQR XYZ in Ztable and while saving this description will be saved in PROJ. Later due to some reaosn you changed description to ABC UVW PQR in Ztable. Now you see the description will be different in PROJ and Ztable. Hence I would just maintain number in Proj and get description always from Ztable. Hope this makes sense.
    Enjoy SAP.
    Pankaj

  • (ABAP-FI)How to get project definition from agiven WBS element

    Hi,
    I have to update some columns of PRPS table relating to a WBS element.
    While using  BAPI_BUS2054_CHANGE_MULTI it wants project definition to be passed as an input parameter.
    Is there any means to know project definition for  a given WBS element of PRPS table.
    Thanks in advance.
    Regards,
    Sourya Prakash.

    Hi,
    why don't you display table PRPS in SE11 to see what fields you have there? It's not that hard to see that there is a field PRPS-PSPHI with description "Current number of the appropriate project". Yes, there is a link from WBS element to project definition.
    Cheers

  • Error when create project definition and 2 wbs by bapi BAPI_PROJECT_MAINTAI

    Hello everyone,
    I have to create project definition and 2 wbs, I use function BAPI_PROJECT_MAINTAI but I have the error:
    "WBS element 0033.3332.01.R already exists" but that wbs it's created.
    This is my code.
    data:
             I_WBS_ELEMENT_TABLE type BAPI_WBS_ELEMENT occurs 0 with header line,
             I_WBS_ELEMENT_TABLE_UPDATE type BAPI_WBS_ELEMENT_UPDATE occurs 0 with header line,
             I_PROJECT_DEFINITION like BAPI_PROJECT_DEFINITION,
             I_PROJECT_DEFINITION_UPD like BAPI_PROJECT_DEFINITION_UP,
             I_METHOD_PROJECT type BAPI_METHOD_PROJECT occurs 0 with header line,
            E_MESSAGE_TABLE like BAPI_METH_MESSAGE occurs 0 with header line,
            RETURN type BAPIRETURN1,
            lv_index    LIKE bapi_method_project-refnumber.
    lv_index = 1.
    I_METHOD_PROJECT-OBJECTTYPE = 'ProjectDefinition'.
    I_METHOD_PROJECT-METHOD = 'Create'.
    I_METHOD_PROJECT-OBJECTKEY = '0033.3332'.
    I_METHOD_PROJECT-REFNUMBER = lv_index.
    append I_METHOD_PROJECT.
    lv_index = lv_index + 1.
    I_METHOD_PROJECT-OBJECTTYPE = 'WBS-Element'.
    I_METHOD_PROJECT-METHOD = 'Create'.
    I_METHOD_PROJECT-OBJECTKEY = '0033.3332.01'.
    I_METHOD_PROJECT-REFNUMBER = lv_index.
    append I_METHOD_PROJECT.
    lv_index = lv_index + 1.
    clear I_METHOD_PROJECT.
    I_METHOD_PROJECT-OBJECTTYPE = 'WBS-Element'.
    I_METHOD_PROJECT-METHOD = 'Create'.
    I_METHOD_PROJECT-OBJECTKEY = '0033.3332.01.R'.
    I_METHOD_PROJECT-REFNUMBER = lv_index.
    append I_METHOD_PROJECT.
    clear I_METHOD_PROJECT.
    I_METHOD_PROJECT-OBJECTTYPE = space.
    I_METHOD_PROJECT-METHOD = 'Save'.
    I_METHOD_PROJECT-OBJECTKEY = space.
    I_METHOD_PROJECT-REFNUMBER = space.
    append I_METHOD_PROJECT.
    I_PROJECT_DEFINITION-PROJECT_DEFINITION = '0033.3332'.
    I_PROJECT_DEFINITION-DESCRIPTION = 'Training project'.
    I_PROJECT_DEFINITION-PROJECT_PROFILE = 'ZAF0001'.
    I_PROJECT_DEFINITION-COMP_CODE = '0033'.
    I_PROJECT_DEFINITION-RESPONSIBLE_NO                  = 1.
    I_PROJECT_DEFINITION-APPLICANT_NO                    = 1.
    I_PROJECT_DEFINITION-PLANT  = '033A'.
    I_WBS_ELEMENT_TABLE-PROJECT_DEFINITION              = '0033.3332'.
    I_WBS_ELEMENT_TABLE-WBS_ELEMENT                     =  '0033.3332.01'.
    I_WBS_ELEMENT_TABLE-DESCRIPTION                     = 'WBS 1'.
    I_WBS_ELEMENT_TABLE-RESPONSIBLE_NO                  = 1.
    I_WBS_ELEMENT_TABLE-APPLICANT_NO                    = 1.
    I_WBS_ELEMENT_TABLE-COMP_CODE                       = '0033'.
    I_WBS_ELEMENT_TABLE-PROFIT_CTR                      = '0033A99999'.
    I_WBS_ELEMENT_TABLE-PLANT  = '033A'.
    append i_wbs_element_table.
    clear I_WBS_ELEMENT_TABLE.
    I_WBS_ELEMENT_TABLE-PROJECT_DEFINITION              = '0033.3332'.
    I_WBS_ELEMENT_TABLE-WBS_ELEMENT                     =  '0033.3332.01.R'.
    I_WBS_ELEMENT_TABLE-DESCRIPTION                     = 'WBS 2'.
    I_WBS_ELEMENT_TABLE-RESPONSIBLE_NO                  = 1.
    I_WBS_ELEMENT_TABLE-APPLICANT_NO                    = 1.
    I_WBS_ELEMENT_TABLE-COMP_CODE                       = '0033'.
    I_WBS_ELEMENT_TABLE-PROFIT_CTR                      = '0033A99999'.
    I_WBS_ELEMENT_TABLE-PLANT  = '033A'.
    append i_wbs_element_table.
    PERFORM fill_update_flags USING    'BAPI_PROJECT_DEFINITION_UP'
                              CHANGING I_PROJECT_DEFINITION_UPD.
    PERFORM fill_update_flags USING    'BAPI_WBS_ELEMENT_UPDATE'
                              CHANGING I_WBS_ELEMENT_TABLE_UPDATE.
    append I_WBS_ELEMENT_TABLE_UPDATE.
    append I_WBS_ELEMENT_TABLE_UPDATE.
    CALL FUNCTION 'BAPI_PROJECT_MAINTAIN'
      EXPORTING
        I_PROJECT_DEFINITION               = I_PROJECT_DEFINITION
        I_PROJECT_DEFINITION_UPD           = I_PROJECT_DEFINITION_UPD
      TABLES
        I_METHOD_PROJECT                   = I_METHOD_PROJECT
        I_WBS_ELEMENT_TABLE_UPDATE         = I_WBS_ELEMENT_TABLE_UPDATE[]
        I_WBS_ELEMENT_TABLE                = I_WBS_ELEMENT_TABLE[]
       E_MESSAGE_TABLE                    = E_MESSAGE_TABLE
    write: / 'Finish'.
    *&      Form  FILL_UPDATE_FLAGS
    FORM fill_update_flags USING    value(p_ddic_name)
                           CHANGING p_struc_upd.
      DATA: lt_dd03l LIKE dd03l OCCURS 0,
            ls_dd03l LIKE dd03l.
      DATA: s(40), c(40), sc(80) TYPE c.
      FIELD-SYMBOLS: <s>, <c>, <sc> TYPE ANY.
      TRANSLATE p_ddic_name TO UPPER CASE.
      SELECT * FROM dd03l INTO TABLE lt_dd03l WHERE tabname = p_ddic_name.
      s = 'P_STRUC_UPD'.
      ASSIGN (s) TO <s>.
      LOOP AT lt_dd03l INTO ls_dd03l.
        ASSIGN ls_dd03l-fieldname TO <c>.
        ASSIGN COMPONENT <c> OF STRUCTURE <s> TO <sc>.
        <sc> = 'X'.
      ENDLOOP.
    ENDFORM.                    " FILL_UPDATE_FLAGS
    Please help me!
    Thank you!
    Edited by: kishan P on Sep 10, 2010 9:37 AM

    Hi,
    Please try creating the project definition and then call the FM again to create the WBS.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4c/226a7246e611d189470000e829fbbd/frameset.htm
    Hope it helps.
    Sujay

  • Transaction Data for Project Definition & WBS Element of Project System(PS)

    Hi all,
       We want to install the Project Systems and the requirement is to report on the following fields:
    Project Definition  (Project Definition   PROJ     PSPID)
    Project Definition  (PS Short Description PROJ     POST1)
    Project Definition  (System Status  CNJ_STAT     STTXT_INT)
    WBS Element         (Project Type       PRPS     PRART)
    WBS Element         (Short ID             PRPS     POSKI)
    WBS Element         (Person Responsible     PRPS     VERNR)
    WBS Element         (Company Code     PRPS     PBUKR)
      R/3 Table Names and Field names are in brackets.
      0PROJECT_ATTR & 0PROJECT_TEXT are DataSources of 0PROJECT Master Data.
      0WBS_ELEMT_ATTR & 0WBS_ELEMT_TEXT are DataSources of 0WBS_ELEMT Master Data.
      How can I find the transaction data for those above fields, PLEASE ?
      Thanks in advance.

    Hi
    Kindly check the following data sources:
    0PS_CLM_CST ( Costs of a Claim)
    0PS_CSH_NTW ( Network plan payments)
    0PS_CSH_NWA ( Payments on network plan process)
    0PS_CSH_WBS ( Payments on WBS element)
    0PS_DAT_NTW ( Network dates )
    0PS_DAT_NWA ( Dates network operation)
    0PS_DAT_PRJ ( Date project )
    0PS_DAT_WBS ( WBS Element Dates)
    0PS_NAE_EVA ( Progress in Network Activity Elements)
    0PS_NTW_EVA ( Progress in Networks)
    0PS_NWA_EVA ( Network Activity Earned Value)
    0PS_ORD_EVA ( Order Earned Value)
    0PS_WBS_EVA ( Earned Value WBS Element)
    hope this helps!
    best regards,
    Thangesh

  • Grey field for project definition and WBS element

    Dear all,
    I have created a project and WBS element in CJ01. Now I go via CJ02 to the change mode and the project ID and WBS element ID is not greyed out. But I would like that the system shows these key fields as not changeable anymore, only fields like description should be changable. Can you please tell me, which customizing step I missed to get the grey field for project ID/WBS element ID?
    FYI  I do not use a project mask to create the project.
    Thanks for your answer.
    Heidi

    Hi Heidi ,
    I don't think you can grey out the Project Definition and the WBS Element fields after the creation .
    If you want to restrict the users to change the Proj definition and WBS , a better way is through
    Authorization objects and restricting only specified users to change the WBS
    Kish

  • How to find next number range for project definition in tcode CJ20N

    Hai Experts,
          Please help me 'How to find next number range for project definition in tcode "CJ20N". I was trying in function module NUMBER_GET_NEXT. Is it right function module? If its right what input i need to give for this tcode and for the field project definition?
    Note: I searched in forum before posting, but couldn't find the solution.
    Thanks
    Regards,
    Prabu S.

    Hi,
    For project defination internal number is assigned by system.
    When you saves's project then system allocate one number to project defination, you can view it,
    SE11 >>> table  PROJ >> Click on contents >>> execute,
    here you will get your project defination & number is assigned to project defination.
    kapil

  • How to block reusage of archived Project definition and WBS element numbers

    Dear All,
    We have archived our projects using the TC SARA and the Project definition and WBS elements numbers no more exist in tables PROJ and PRPS etc.. When I now try to create a new project, the system proposes the next open number or allows to enter a number which is the same as one of the archived projects. But in our organization we cannot reuse the Project definition and WBS element numbers (even if it is archived) as a rule.
    Can anybody guide me what are the possibilities to block or avoid the reusage of the numbers of archived project definition and WBS elements in a fool-proof way? 
    Thanks and regards

    One Workaround:
    Use T code OPSJ and lock the project coding mask. Doing this you can not use this mask any more.
    But you want to continue using the mask but with different numbers. Not sure how this can be acheived. lets wait for others view
    Regards
    Sreenivas

  • Short Dump while using BAPI_PS_PRECOMMIT to set Project Definition Status

    Hi All,
    I am getting a short dump while using BAPI_PS_PRECOMMIT for setting the Project Definition status..
    The requirement is to create a Project Definition and then set its status to REL from CRTD. For this purpose i am using the BAPI's in the following sequence :
    1. BAPI_PS_INITIALIZATION
    2. BAPI_PROJECT_MAINTAIN
    3. BAPI_BUS2001_SET_STATUS
    4. BAPI_PS_PRECOMMIT
    5. BAPI_TRANSACTION_COMMIT
    The Proj Def creation is happening successfully in step2. Interestingly, when I debug the program and stop at PRECOMMIT BAPI the program does not give a dump. I have also tried to give COMMIT WORK / WAIT FOR n SECONDS after BAPI_BUS2001_SET_STATUS, to give BAPI sometime for DB update but nothing seems to be a permanent solution.
    Please give your views on a solution for this problem..
    Thanks & Regards,
    Somil

    Can you please check how to post code in SDN ...
    I cannot read your code properly

  • Creation of project definition and wbs element

    I want creation of project definition and wbs element upto 4 level using bapis.
    i am using transaction cj27,cj01,cj02
    which function module to use for this??

    Hi,
    to create project definition with customer fields the BAPI you should use is : BAPI_BUS2001_CREATE
    to create WBS elements with different levels and specific fields the BAPI you should use is BAPI_BUS2054_CREATE_MULTI
    these bapi must be used in the sequence of call :
    BAPI_PS_INITIALIZATION
    BAPI_BUS2001_CREATE / BAPI_BUS2054_CREATE_MULTI
    BAPI_PS_PRECOMMIT
    BAPI_TRANSACTION_COMMIT
    before using the bapi, you must apply OSS note :
    637345 - Syntax error with enhanced PS tables
    i sent you the oss note to your mail
    please reward points if helpfull.

  • How to populate WBS element and Project definition in Additional Tab

    Hi,
    I have a 2 requirements
    1) we need to populate WBS element and Project definition of an order in PM
    IW 32 trasnaction (Additional data tab).
    2)Also i need to program settlement rules in CJ02 for WBS elements .
    How do i approach ?  when i do manually it is taking the values in IW 32 when the status is released.
    So i think first we need to chnage the Status from Created to released and then start working on step 1 and Step 2
    Kindly suggest.
    Thanks,
    Pradeep.

    Problem one solved ......
    Basically we need to put the status of WBS elememnts and then write a BDC for additional data tab.
    Looking into issue 2......

Maybe you are looking for

  • Valuation with material cost estimate: error with product "117122"

    Hi people, We have the error: ===================== Valuation with material cost estimate: error with product "117122" Diagnosis In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate. In o

  • Binary trees in Java

    Hi there Do you have any suggestions about how to implement trees or binary trees in Java? As far as I know there are already some libraries for that, but I don't know how to use them. Was trying to get some implementation examples but I'm still very

  • TS4185 My friend can't here me if she calls or I call her, but input levels are good ere

    Anytime my friend tries to call me from her mac or ipad, she cannot hear me talking. The same occurs when I call her, she can't hear me then either. I check my input levels for internal mike and all looks good. Also, preferences under facetime is gho

  • Different elements in two 1 D array

    Helloo I am having two 1 D arrayes. one array consists of r values and other theta values. For example (See attachement) , I want to take the two r values for same theta values and so on fro other tetha valules. how is this possible? Thanks Nghtcwrlr

  • My iPad will not launch photon

    My iPad also will not install certain apps or show screenshots of those apps in the app store. How do I fix this???