During production order confirmation entry authorization per work center is required however the standard authorization object for the confirmation Is only per plant and order type
Hi,
Yes, you are correct..
There is no check for the workcenter, unlike for Network Orders..
But, you can use the User Exits:
CONFPP02 PP order conf.: Customer specific input checks 1
CONFPP03 PP order conf.: Cust. specific check after op. selection
CONFPP04 PP order conf.: Customer specific input checks 2
for your own chcks at the time of confirmation..
Take the help of your ABAPer..
Regards,
Siva
Similar Messages
-
How to track chnages done to a work center in past
Hi all,
How to track chnages done to a work center in past.
I have tried Cr10 t cdoe, when i input plant and kept all other fields blank,and still it is not generating any output.
Am i missing anything,is ther any other tcose or table,pls guide
Thnx
HKRHi,
1) You have to activate Change document indicator in the Transaction OP40 for the Workcenter categories.
2) And for what are all the fields you wanted to capture the changes, for those data elements you have to ensure that change document is activated in the data dictionary.
These are the pre-requisite for getting change documnets for the work centers.
Regards,
R.Loganathan -
ACE Module: How do I confirm that sticky is working?
Greetings,
I have implemented stickiness using source and destination IP address. It doesn't seem to be working consistently. When a client connects to the VIP, I see the connection when I do 'show conn' but when I do 'show sticky database' the database is empty. I've used multiple forms of the 'show sticky database' including but not limited to 'show sticky database client ipaddress', 'show sticky database type ip-netmask both', etc. Am I looking in the right place? Are there other commands that I can use to confirm that stickiness is working?
Thank you,
barbHi Barb,
As a first step in troubleshooting your issue of stickiness you can issue the following command:
sh resource usage all. The output should look as follows:
sticky 118303
The 11803 is the current amount of sticky entries in use.
Do it before you attempt a sticky connection and see what the count is.
Then attempt a connection and do the command again and see if the count has increased.
If it has than the feature is working. If not than you may have a configuration issue.
Please post your configuration of the sticky and the policy map associated with it.
Hope this helps.
thanks.
Jack. -
How to Assign Person (Personnel Number) without work Center
Dear All,
How to setup personnel number in order not using general and internal work center in operation service order area?
if i use work center, it make HRD site and payroll will be damage
please help me if you have any solution?
Thanks
Rendra Rizkidear all,
When i tried to use co11n , the earning appearence :
You want to confirm a network/order of the order type FEN1. However, this order type is allocated to an order category whose confirmation is not intended in this transaction.
You try to confirm a network using a transaction intended for confirming production orders. Since networks and production orders are assigned to different order categories, the system issues an error message.
so i still can't use this tcode, do you have any?
Thx -
How to print a RFQ from buyer work center
Hi everyone,
We are unable to find out why there is no action to print a RFQ (or RFI) from the buyer work center. There is no option for it Under the action LOV. How could it be done without returning to Forms screen and even there what is the concurrent programs to print it if it exist ?
Regards,
JeanHi Jean,
Check this MOS note...it should be helpful.
"How To Make Print Options Available In Action Menu In Oracle Sourcing [ID 738244.1]".
Thanks
-Arif. -
How to assign Asset number to PP work center -reg
Hi,
When we create PP Work center through CR01 can we assign the asset number ?
or while creating asset number through AS01 can we assign the PP Work center ?
Our major issue is
FI : ASSET
PM:Equipment
PP: Workcenter
we are not able to link . we need to have same cost center for all the three . but as of now we dont have the link for the three and what ever cost centers we assignsystem is accepting
how to solve this ?
i could not find any fields in work center either to assign asset or equipment ?
only in equipment i can give PP work center but how it links all the three Asset , Equipment and Work center ?
regards,
madhu kiran.HI
In euipment you can assign the PP work center and from the asset AS02/AS03 go to environment > additional amster data > you can get the cost center assigned to asset fro this you can relate the cost center to all three.
Hope it will help u
Rgds
Anupam Sharma -
Authorization for work center /quick create links
Hi all;
I need nondisplay of bupa details:
no Masterdata (no authorization to search/display/create any BUPA), no workcenter, no quickcreate links.
the problem is I have one CRM Webclient Business Role and I should manage this with 2 different pfcg role :
One of them should use workcenter and quick create links but the other should not see them.
I have handled not to search/display/create any BUPA via authorization object but
not to display workcenter and quick create link I need another authorization object..
Is there anybody who knows how can it be done by pfcg role ?
Thanks
belginhello Urvi;
thanks for your helpfull answers.
I have handeled it via UIU_COMP object and following componen name/plug/window name.
COMP_NAME :WCC_SRV_ACC_PRO
COMP_PLUG: DISPLAY
COMP_WIN: MainWindow
regards
belgin -
Authorization for Work center, logical links and components
Hi Gurus,
Can authorization be given to Work centers, logical links and components.
Thanks,
Sarat.It can be done using Authorization object UIU_COMP. it has 3 fields :
Component Name
Component Window Name
Inbound Plug
Note : You can maintain authorizations based on components, WC pages, Direct links groups and direct links but not on views.
Authorization object for direct links : C_LL_TGT which has 2 field : Logical Link Type and Link Parameter
Hope this helps,
Cenk Sezgin -
How To Get Value PRD No TO Work Center NAME
Hi Guru
i created Zreport the Parameter are P_AUFNR TYPE AFKO-AUFNR OBLIGATORY ,
P_ARBPL TYPE S022-ARBPL OBLIGATORY .
Currently i am doing
i enter any Production Order No and Work Center are entering Manually .
i want
after entering Production No User Press Enter Button
and Work center display automatically on F4 Help Related that Production No.Hi amit,
You acn use event At selection-screen on help request.
In this you can use following function module to get screen field value.
CALL FUNCTION 'DYNP_VALUES_READ'
EXPORTING
dyname = sy-repid
dynumb = sy-dynnr
TABLES
dynpfields = lt_dynpread
depending on this value of prod ord on scrren you can restrict next F4
hope this will help.
Thanks Dhiraj. -
How to create a copy of a Work-Center?
Dear Experts,
in SAP CRM 7.0 i have made a copy of the Work Center SRV-MD. The name of the copy is: ZSRV-MD. The most important data can be found in the following table:
Workcenter Standard Workcenter Copy Logical Link Destination ID Component
SRV-MD SRV-MD SRV-MD-WC SRV-MD-WC WCC_SRV_ACC_PRO
SRV-MD ZSRV-MD ZSRV-MD-WC SRV-MD-WC WCC_SRV_ACC_PRO
I want to use both Work-Center for the same Role. My problem is that I want to define for both workcenter different Logical Links. But when I change the links on the first workcenter it is changed too for the other one.
Do I have to create a Z-Component to avoid that? The problem might be that the same Destination ID is used which is leading to the same Component?
Best Regards
OliverHi Experts,
under:
Customer Relationship Management -> UI Framework -> Technical Role Definition -> Define Work Area Component Repository
I have defined a a new Target-ID (ZSRV-MD-WC) for the created Z-Component: ZWCC_SRV_ACC_PR (Copy of WCC_SRV_ACC_PRO).
Then under:
Customer Relationship Management -> UI Framework -> Technical Role Definition -> Define Navigation Bar Profile
I have created a new Logical Link with the following data:
Logical Link ID: ZSRV-MD-WC
Type: B Work Center
Target ID: ZSRV-MD-WC
This Logical Link I have assigned to the Z-Work-Centre:
Work-Center ID: ZSRV-MD
Logical Link: ZSRV-MD-WC
But the problem is that the system still is calling the Standard Component WCC_SRV_ACC_PRO. In which method I can make a debug or look for the problem? -
How can I confirm the automatic updater of revoked certificates is working?
There is a
Microsoft security advisory from a few weeks ago about fraudulent certificates. In the advisory it says it is revoking India's NIC authority certificate and for systems running Windows 7 that are using the automatic updater of certificates that no action
is needed.
I don't know if I'm running the automatic updater of certificates. I tried installing the referenced
KB2677070 but it says "The update is not applicable to your computer." And I don't see it listed as an installed update for this computer.
I went into certmgr.msc and I don't see India's NIC certificates listed as untrusted.
I'm running Windows 7 SP1 x64. How can I tell if I'm running the automatic updater of revoked certificates and how can I confirm that it's working? How can I see what certificates the automatic updater has revoked?Hi,
afaik these updates are just coming in over Windows update. Your KB2677070 might be superseeded ba another update, or included in a rollup you installed.
quote from
http://technet.microsoft.com/en-us/library/cc734054(v=ws.10).aspx : You can verify that the Automatic Root Certificates Update component is working properly by using a Web browser to open a Web site that requires the Automatic Root Certificates Update
component. When you open this Web site, a new root certificate is downloaded from the Microsoft Windows Update Web site. If the certificate is downloaded successfully, Event ID 1 in the Microsoft-Windows-CAPI2 event source will be written to the event log.
Note that if not explicitly turned of, the update is attempted and events are logged as described in http://technet.microsoft.com/en-us/library/cc733922(v=ws.10).aspx
MCP/MCSA/MCTS/MCITP -
Transfer data after Network Confirmation to another Work Center?
Hi all,
let me explain my problem:
I've defined an activity with 3 activity elements(work). Every activity has it's own Work Center.
Normally a worker uses transaction CN25 or CN48N to enter a Network Confirmation by typing in Network, Activity and Element.
After this he types in his Personell Number and the Actual days or hours and confirms it.
If the user takes for example too much days and confirms it, normally i've to correct the Network Confirmation by using transaction CN29 and tell worker to retry his Confirmation. (Because there are only allowed maximum X hours...)
Is it possible to transfer this too much days to another Work Center by using an transaction???
Is it possible to transfer this entry to another Work Center???
Im not a Cost Specialist, please let me note if there are any Threads which discribe the same Problem...
Thanks for any Answer...
Regards,
Tobi DHello Virendra,
thanks a lot for your answer.
First of all... There was a mistake in my explanation-it's not I've defined an activity with 3 activity elements(work) it's I've defined a network with 3 activity elements(work).
In our Company every Activity has it's own Work Center. I meant the Identification and view selection in Project Builder (CJ20N) tab Internal --> General Section and here: Work center.
Well, i think my main problem is that i do not know how to correct Network Confirmations without using the delete transaction CN29. For example: Worker confirms on Work Center of Activity A with CN25 oder CN48N, but should confirm on Work Center of Activity B.
Regards,
Tobi D -
Hi, we assigned 6 parameters like setup, machine etc in work center. Same work centers used in prod orders. While confirming against prod order and operation no in co11n screen, only 3 parameters were displayed where as we set 6 parameters in work centr. Please advise how to display all parameters mentioned in work center in co11n screen.
Dear Raju,
1) For this you need to settings in OPK0
2) For ur confirmation profile double click it
3) Now under are selection for second option take 0310 ( activity 1 to activity 6 )
4) Now click on default tab, for all 6 services there should not be any ticks
5) then click on Preview, now system will show all 6 parameters
5) then save & back & execute CO11N, u can see 6 parameters
Regards
Madhu Kumar -
How to incorporate the quantity formula in work centre
I have to incorporate the quantity in work center. if i m using a formula of operation quantity but it is giving me the error that u can only use the formula which has been defined as origin 2. can any one guide me how to incorporate the quantity formula in work center,
The situation is this my client asked me to incorporate the GR quantity as activity type, is there any provision in the system to incorporate the activity as standard value of workcentre i hav used the standard parameter provided for GR quantity but it has the dimension of time while every thing produced at my client location is either is KG or in Carton..
kindly guide me to resolve the issue.........Hi,
Create a Parameter "ZQUN" with Dimesion as "Mass" and standard value init "KG" and assign this parameter to a formula and assign the formula in the work center, define the standard quantity initially, at the time of final confirmation enter the actual GR quanitity.
Pls get back for any clarification -
How to specify when the authorization check is to be performed
How to specify when the authorization check is to be performed declratiely for
any webapplication.
There is Direction object argument as part isAccessAllowed method of AccessDecesion
class which can have either of the three values i.e. POST, PRE, & ONCE. Ijust
wana know how can we declaratively set this direction value for any Web Resource
in weblogic server 8.1 security
-Subhash"Subhash Chopra" <[email protected]> wrote in message
news:3e9c5805$[email protected]..
>
How to specify when the authorization check is to be performed declratielyfor
any webapplication.
There is Direction object argument as part isAccessAllowed method ofAccessDecesion
class which can have either of the three values i.e. POST, PRE, & ONCE.Ijust
wana know how can we declaratively set this direction value for any WebResource
in weblogic server 8.1 security
The containers always call the isAccessAllowed method with no direction so
Once is passed
to the providers. There is no way to set the direction that the containers
use.
-Subhash
Maybe you are looking for
-
Help! I deleted the spring looking os X ....
It is supposed to be in the dock next to the trash. If I remember right it is a shortcut to Tiger stuff but I can't remember what. I haven't missed it yet but what was it and how do I put it back?
-
Aperture 3 : Pics managed or referenced : how can I find out ?
Hello, can someone please explain how I can find out if my prictures in the Aperture libary are referenced or managed ? Regards Andreas
-
Setting format in new Premier Pro
I recently downloaded the trial version of Premier Pro CC and noticed in setting up a project it never required input for file size (1280 x 720, etc.). Is that something "new" or did I miss a step? Thanks. Mac
-
RE2000 can't establish connection and can't be reset
Last week I bought two Linksys RE2000 Wireless Extenders. I manually configured them with the RJ45 cable provided and the lights were solid green. Both worked perfectly until I had to reconfigure my router. I had to reconfigure the Extenders as well,
-
NI DC Power Soft Front Panel Error - 200247
Hello All, I am having trouble opening the ni DC power soft front panel. The error message I repeatedly am seeing is below: When I try to run the vi mentioned in the error above, the same error occurs: How can I go about getting my soft front panel t