Authorization for work center /quick create links

Hi all;
I need nondisplay of bupa details:
no Masterdata (no authorization to search/display/create any BUPA), no workcenter, no quickcreate links.
the problem is  I have one  CRM Webclient Business Role and  I should manage this with 2 different pfcg role :
One of them should use workcenter and quick create links but the other should not see them.
I have handled not to search/display/create any BUPA via authorization object but
not to display workcenter and quick create link I need another authorization object..
Is there anybody who knows how can it be done by pfcg role ?
Thanks
belgin

hello  Urvi;
thanks for your helpfull answers.
I have handeled it via UIU_COMP object and following componen name/plug/window name.
COMP_NAME :WCC_SRV_ACC_PRO
COMP_PLUG: DISPLAY
COMP_WIN: MainWindow
regards
belgin

Similar Messages

  • Authorization for Work center, logical links and components

    Hi Gurus,
    Can authorization be given to Work centers, logical links and components.
    Thanks,
    Sarat.

    It can be done using Authorization object UIU_COMP. it has 3 fields :
    Component Name
    Component Window Name
    Inbound Plug
    Note : You can maintain authorizations based on components, WC pages, Direct links groups and direct links but not on views.
    Authorization object for direct links : C_LL_TGT which has 2 field : Logical Link Type and Link Parameter
    Hope this helps,
    Cenk Sezgin

  • ALE/iDoc for Work Center data transfer

    Hello, community.
    I am working on several interfaces for the PP and PM modules using iDocs/ALE.
    One of the requirements is that only created and modified data must be distributed from R/3.
    For Work Centers, we are using basic type LOIWCS02 and message type LOIWCS. We are generating iDocs through transaction POIM, which has two transfer modes: Complete (data for all Work Centers etc.) and Change (only new and updated data).
    The Change Transfer Mode assumes you have set both Change Pointers and Change Documents for the objects to be transfered. Otherwise, it'll work just like the Complete Transfer Mode.
    Our PP consultant told me there is no configuration to generate Change Documents for Work Center data modifications.
    Can anybody give me other opinions? I'll resort to Z-table solutions only if I have no other options.

    Hi Danilo,
    Do you know what the process codes are for
    LOIWCS and LOIROU ?
    Appreciate your help.
    Thanks,
    Gopi.

  • User Exit or DB-Table for Work Center (CR01)

    Hi!
    I have an external software which must be triggered when the user changes a work center in SAP (transaction CR01,CR02). I was looking for an user exit to do what ever is necessary but I couldn't find one.
    So, does anybody know an user exit or BADI for work center?
    Also possible:
    The database table where work center are stored. So I could poll against this table and check if a work center was changed. I found the table SGOSHIST which log all modified objects in SAP. So this could maybe used to check for modified work center, I think.
    Thanks,
    Konrad

    > You can check the BADI definition from transaction SE18,
    > 'LTRM_WORK_CNTR_DTRM', this might be helpful,
    How can I check this BADI. If I use SE18, it doas not exist, buit if I try to create it, the system tells me that it already exists in the SAP Original System... and asks me if I want to create a copy of it! I don't know what to do at this point!
    > Work center details are avilable in CRHD table, you can
    > look for CR* from SE11 transaction,
    I know, but if you change the description of the work center, it is stored in CRTX. there are a lot of CR* tables. It would be helpful to have a table which is updated every time a work center is modified!
    Thanks,
    Konrad

  • Tables for routing (for work center)

    hi friends,
    I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
    i try to get result by using link with PLPO and PLKO.
    in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
    kindly can anybody tell me how to work center.
    thanks & regards
    Bhupinder Singh Kaler

    Hi Bhupi kaler,
    try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
    Best regards,
    raam

  • CO11N: how to perform confirmation entry authorization per work center

    During production order confirmation entry authorization per work center is required however the standard authorization object for the confirmation Is only per plant and order type

    Hi,
    Yes, you are correct..
    There is no check for  the workcenter, unlike for Network Orders..
    But, you can use the User Exits:
    CONFPP02  PP order conf.: Customer specific input checks 1
    CONFPP03  PP order conf.: Cust. specific check after op. selection
    CONFPP04  PP order conf.: Customer specific input checks 2
    for your own chcks at the time of confirmation..
    Take the help of your ABAPer..
    Regards,
    Siva

  • Change log for work center data

    Hi,
    I was looking for the table where the change header document for the work center is stored.I was able to find a transation CR10 which shows the changes and also the database table CDHRD.
    When I am trying to view the changes that were made to the work center I find that the data does not exist in the tables.
      I was curious to know this as for some transaction the data is being logged in their respective change table but not for Work Center changes.
      Can anyone tell me as to why this is happening.
    What I think is that some changes to the configuration are required in order to log the changes in the database.
    Kindly help.
    Regards
    Varun

    Hi Wolfgang,
    Thanks for the information.
    However i have another question.
    The change table will have data only when it is activated in the configuration menu.
    However is there any other way by which we can capture the previous data for the work center e.g. the changed by field. I want that the names of the users who has changed the wrok center currently and the name of the person who previously made changes to it.
    See if you can help me on that.
    Regards
    Varun

  • Standard IDOC for WORK CENTER Master

    Hi,
    Please suggest the standard IDOC for work center master.
    I have tried PWKC.Got  DUMP when executed.
    Tried on SAP-Market place for help.Suggested not to use PWLC.
    Please suggest alternative.

    Will you please explain in a bit detail if LOIWCS01 or LOIWCS02 are transaction (as i tried to execute) or programs or please explain how to use these.(I executed from command prompt and SE38 but didnt helped)

  • Table for work center..........

    Hi
    Is there any table for work center which shows available capacity v/s utilized capacity......Please revert with your valuable comments
    Rgds

    Hi,
    Check Table RC65L.
    Regards
    Kannan

  • Number Range for Work Center

    Hello All
          Am having a little concern regarding the number range for Work Center, kindly let me know where the number range for Work Center is maintained or from where it is picked up when we are using external no range assignment for Work Centers.
    Regards,
    J K Tharwani

    Thanks Sir for your reply,
            Actually the requirement is the client want that Equipment number must be the same as the Work Center Code, and Work Center code which i have decided is something like 0101001 & if i give the external no to the Equipment then the system doesnt take the same number instead it takes 101001 i.e. it ignores the initial "0" in the work center code. Actually I wanted to see the no range from where the work center numbering is being picked up, but later on i came to know that there is no such no range setting for work center instead it has contol from no range for object type. Shall look forward to your valuable inputs & guidance.
    Regards,
    J K Tharwani

  • Customization Setting for Work center creation

    Dear all,
    What is the Customization Setting for Work center creation? How to do it?

    Hi,
    Here are the few things you can check
    OP40 : WC category
    OP17 : Formula for WC
    Person responsible : Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers >>Define Employees Responsible for Work Centers
    apart from above You can explore more in
    Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers
    Riyaj

  • Why authorization for cost center groups does not worked ?

    hello all,
    I would like to give authorization for a CO report (S_ALR_87013625) based on authorization values : cost center groups.
    But, unfortunately, it doesn't work. I get a message : No authorization for x of x read records.
    Is it only possible to give authorization on standard hierarchy and cost center ?
    Please, help me
    Thanks and best regards

    hi,
    Run the su53 transaction.See what authorization was missing

  • Capacity planning for Work Center

    I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has  a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
    When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
    Any suggestion where to look for?
    The data used for creating the Work Center on Capacities:
    - Capacity Category : 002 Person
    - Other formula: SAP008
    The data used for capacity:
    - Base unit of meas.:H
    - Start: 08:00:00
    - Finish: 17:00:00
    - Capacity utilization: 100
    - No. of indiv. cap.:1
    - Unit: H
    - Relevant to finite scheduling: active
    - Can be used by several operations: active
    - Long-term planning: active
    The data used for creating the Work Center on  Scheduling:
    - Capacity Category: 002 Person
    - Other formula: SAP004
    - Work dimension: Time
    - Work unit: H
    Best Regards...

    Hi,
    Please activate the capacity requirement in Capacity tab in CNR2.
    Thanks..

  • PP work center capacity and link in Equipment master

    Dear All
    My client has five equipments which he is clubing them into one work center with five capacities. In equipment master i have given for respective equipments i have given PP work center locations but when i create a maint order for one equip then in planning the capacity avalability is affecting the entire work center for ex if the total work on one equip is 12 hrs then only 8 hrs of capcity should be deducted for to day and 4 hrs for tommorow but in plannig all 12 hrs are getting deducted in todays capacity itself.
    Pls give some inputs from your experiances
    Thanks and Regards
    Pankaj

    Hi,
    Even if we have more than One Equipments in the same work center, PP-PM integration will work.
    This is the standard scenario in any Process Industry or in case of an Assembly line of a Automobile manufacturing industry.
    So it should work. Please check the following points again,
    1. Assignment of Work Center to Equipment Master
    2. System Condition - '0' Not in Operation in Both header as well as against Individual Operations (in Work Order for that Equipment)
    3. Work Order has been released.
    4. Same Work Center is used in Routing and the same is Planned for a period.
    If we have all the above points right, then while dispatching the Production Order system should show the Period of block and should shift/plan the PO accordingly.
    Regards
    Sam

  • LSMW for Work center text

    Hi Experts,
    Im developing LSMW to upload the Work center text(TCode CA10).
    I did tried on Direct input -> program /SAPDMC/SAP_LSMW_IMPORT_TEXTS in LSMW. The uploading process was done successfully but it <u>can not</u> be used in Master Recipe assignment(TCode C202). Reason due to the direct input program doesn't has <u>Work center short text</u>. FYI, the Work center short text is entered during the Work center text creation via CA10 first screen.
    And i did tried on CA10 manually, work center text only <u>can be used</u> in TCode C202 when it is created <u>with short text key in at CA10 first screen</u>. While for the Work center text that created <u>without</u> short text key in, system will prompt <u>error</u> when i try to assign the Work center text into C202.
    Thus, i may need you advice. In LSMW other that direct input,is there any BAPI or IDOC available for the Work center text upload?
    Please comment.
    Thanks in advance.

    Hi SKK,
    Thanks for you reply.
    I did tried on FM SUBMISSION_PROCESSING, and found:
    It is being trigger online, whereby i need to key in the text manually.
    Since my requirement is mass upload, hence that is impossible for me to execute the FM to key in the text manually.
    Do you know there is any other FM/BAPI/IDOC that can perform the <u>Work center Short and Long text</u> in background mode?
    Please comment.

Maybe you are looking for

  • Drive plays CD's but not DVD's

    I have a HP 4520s with a hp CDDVDW TS-L633N, the drive will not play a DVD or a PC DVD Rom Game but will play a CD, I have checked regional settings and checked the drivers and updates, the device manager says the drive is working corectly, the movie

  • Auto font size for textfield by javascript

    Hi there.  I got the following script for a textfield in a fillabe PDF.  Th length of the textfield is 150.  It is required that if the text is > 100, the text size will be set to point 8, otherwise it will be point 12. var tf = this.rawValue; if (tf

  • Updating to 1.1

    When updating my BB link it starts to unzip and informs me that " Error changing to Unzip to folder" then crashes.  I have looked into Winzip and uninstalled and reinstalled the program, so don't think the problem lies there.  Please help

  • How to insert audio track?

    how do you insert an audio track into garage band to edit? thanks

  • Clone drive to move to bigger drive

    I finally made the move from 10.3.7 to 10.3.9, and I am unable to make backups with Carbon Copy Cloner like I used to. Is there any other cloning software - free, please - available? All I want to do is copy my drive so I can then go back and reparti