hi all,
is it possible to display and compare different project versions for material components in different COLUMNS? i want to be able to view the data for each version in a different column.. currently i can view the different data per version but it is arranged  by ROW but i want to know if its possible to have different layout/report showing the different versions in separate columns
Thanks in advance..
Edited by: Ramesh on Sep 15, 2008 5:58 AM

hi,
thanks but this is not the report im looking for.. i wonder if its possible to show a report similar to CNMM or CN53N wherein the different project version data can be displayed side by side as columns?
again, thanks in advance and regards..

Similar Messages

  • How to create new version for material

    Hi expert,
    Can anyone please guide me step by step on how to create new version for material and vendor? Please also mention transaction and details step by step.
    Thanks

    HI,
    Do you mean to have version management for purchasing documents?.
    Best Regards,
    Arminda Jack

  • Is there any way to Authorization Management for Material Components?

    Hello every body
       Is there any way to Authorization Management for Material Components? 
       For example  i want to create , delete , modify  Material Components,how i can Authorization Management ?
       Enhancement or IMG or other ways?
                                                                                    thanks

    Alas, no, not in VBA.
    Regards, Hans Vogelaar (http://www.eileenslounge.com)

  • How can I change the language interface of Firefox 4 Beta to English (on Swedish OS)? Can only find different language versions for 3.6.8.

    How can I permanently change the language interface of Firefox 4 Beta to English?
    Computer is running on Swedish Windows XP.
    Found that the advice on similar questions is to install the language version of the desired language on top of the current version but I haven't found different language versions for 4 Beta, only 3.6.8.
    Have also tried to change general.useragent.locale (about:config) to en-US but to no avial.

    Hello,
    If somebody has installed the multi-language package is there a possibility the language to be changed without reinstalling the browser?
    Best regards,
    Yuli

  • Use of different production versions for MRP and costing

    Dear PP Gurus ,
    We have a scenario in which there are multiple production versions for a particular product .The MRP run as welll as costing run considers only the production version 0001.
    We would like the system to consider different production versions for MRP and costing ..that is 0001 for MRP and 0005 for costing .
    Is this possible ... if yes ...Kindly suggest the config and master settings for this to happen .
    Ram ~

    Dear Ramakrishna,
    For doing the costing for a specific production version use CK11N,under quantity structure tab key you
    can assign the prod.version which is to be used for costing purpose.
    While taking MRP if you want to consider the particular Prod.version,assign the demand to the
    correct prod.version under schedule line tab in MD61.
    Otherwise the system always picksup the first prod.version for MRP.
    One more alternative is you have to lock the other prod.versions if you want the system to consider a
    particular prod.version.
    Check and revert back.
    Regards
    Mangalraj.S

  • Query to compare different Plan versions in CCA

    My requirement is to create a Cost Center query that compares two different plan versions, selected by the user with different time periods. We do not use any SEM functionality and are in version 3.0B.
    There is a standard R3 report but this gives a total figure and does not split the figures by periods.
    Does anyone know a Business Content query that can resolve this issue?

    Hi ,
    Instead of going for a business content query u can go for a formula variable using replacement path and assign the required values for the output and in that by using the customer exit with the help of abapers
    Hope this will be a clear solution to ur problem
    Pls assign full points if answer is satisfied
    Regards ,
    Subash Balakrishann

  • Setting different JDK versions for Different webapp in Tomcat

    Hi All,
    I have 2 web-applications in Tomcat 5. Now for Java I have j2sdk1.4.2 & j2sdk1.3..
    Now One of my application needs j2sdk1.4.2 while other can run only with
    j2sdk1.3.. (This is an old project & there are java class package norms - like every class should be in a package to import it now. But earlier it was not strict).
    Means this is absoulte for me to run one application with version 1.3 while other with 1.4.
    But I can set Java_Home env. varibale only once. How can I tell my each web-application to take thier own jdk version in compiling & running.
    Is this allowed in J2EE/Web-Containers.
    Please suggest if there is any such setting which makes it possible.
    THanks you all in advance...
    Manoj :confused:

    wouldn't matter if you could.
    The package enforcement is NOT something from J2SDK 1.4 but from the version of Tomcat used.
    Each Tomcat instance will use the same JVM for all webapps running inside it. You'll need a separate Tomcat instance of an older version for the older webapp (or better yet change it around to the new rules).

  • How to maintain production version for material and how it will work

    Dear Friends,
                          i  have created alternative bom for a material , My FG is having two  RM1 and RM2. like below, 
                    FG --->RM1
                    FG---->RM2
    i created alternative BOM. how it will fetch raw materils from BOM while doing production confimation.  what is meant by production  version and how to configure that. how it will work
    regards
    RK

    Dear Raja karthik,
    1.Production version is a combination of BOM & Routing in Discrete scenario & in REM scenario its a
    combination of BOM & Rate routing/Routing.The same can also be created only containing the BOM incase if it is going to be
    used for a sub-contracting purchase info record.
    2.Production version is a method or technique which's is used to produce a material.
    3.A Material may be having one or more than one production version.
    4.Production version can be differentiated by using either the validity date or Lot size range.
    5.Say For Eg: Prod.Version1 --> Alt BOM1 & Routing1
    Prod.Version2---> Alt BOM2 & Routing 1.
    6.It has the status Locked and unlock.We can lock it when it is to blocked for any usage purpose.
    6.Generally its created using T code MM02,by selecting MRP4 view and clicking on Production version key.
    7.It's a master data in REM scenario.
    8.Production versions can also be created using T code C223 for more than one material.
    9.Planned independent requirements can be created production version specific in MD61.
    Regards
    Mangalraj.S

  • Different plan version for some scenarios in MSS

    Hi guys,
    Some scenarios of the MSS need to be referenced to another plan version different than the current active.
    Then, I'm trying to configuring my Object and Data Provider with the requisites needed. The issue is that how can I tell the system that the plan version is another one??
    Any idea??
    Thanks for your answers.

    Firstly, try to check whether the correct smartform is getting picked or a different form is getting picked. TO identify, set soft break-point inside your program lines or use SF_TRACE.
    If it is still picking the same smartform, and it is not showing your changes.. then goto form attributes and check whether it is translated to all languages or not?
    I guess, because of one of the above two problems it is not displaying your form correctly.
    Regards,
    SR

  • Import tablespace failed due to different release version for 10g

    I try to exp tablespaces from 10.2.0.2 (Enterprise Edition, UNIX) to our test server 10.2.0.1 (express eidtion, linux) with transportable tablespace, when import the tablespaces, get the following error:
    Export file created by EXPORT:V10.02.01 via conventional path
    About to import transportable tablespace(s) metadata...
    import done in AL32UTF8 character set and AL16UTF16 NCHAR character set
    import server uses WE8MSWIN1252 character set (possible charset conversion)
    export client uses US7ASCII character set (possible charset conversion)
    export server uses UTF8 NCHAR character set (possible ncharset conversion)
    . importing SYS's objects into SYS
    . importing SYS's objects into SYS
    IMP-00017: following statement failed with ORACLE error 721:
    "BEGIN sys.dbms_plugts.checkCompType('COMPATSG','10.2.0.2.0'); END;"
    IMP-00003: ORACLE error 721 encountered
    ORA-00721: changes by release 10.2.0.2.0 cannot be used by release 10.2.0.1.0
    ORA-06512: at "SYS.DBMS_PLUGTS", line 2004
    ORA-06512: at line 1
    IMP-00000: Import terminated unsuccessfully
    I have done the transportable tablespace between 2 test servers before, which are both on the 10.2.0.1. It's done sucessfully at the same target server (LINUX, XE edition). So this is the 1st time I get into this problem. Does anyone know that I can have the express edition upgrade/apply patches so that it will be on 10.2.0.2? Or is there anything I can try to import the tablespace from 10.2.0.2 to 10.2.0.1?
    Thanks,
    Hongmei

    Due to no patchset for XE edition, I try to import the tablespace to another LINUX server with EE edition, which is 10.2.0.2, I thought I should be ok for this time. But I get the same error again. I have applied the patches set for 10.2.0.2, and I have followed all steps in the poststeps. Do I miss somthing? Why it still mention it's 10.2.0.1. Thanks for your help. I attached the output here:
    Import: Release 10.2.0.2.0 - Production on Mon Jul 21 09:20:57 2008
    Copyright (c) 1982, 2005, Oracle. All rights reserved.
    Connected to: Oracle Database 10g Enterprise Edition Release 10.2.0.2.0 - Production
    With the Partitioning, OLAP and Data Mining options
    IMP-00002: failed to open /tmp/3tbsp_exp.dmp for read
    Import file: expdat.dmp > /tmp/3tbsps_exp.dmp
    Export file created by EXPORT:V10.02.01 via conventional path
    About to import transportable tablespace(s) metadata...
    import done in US7ASCII character set and AL16UTF16 NCHAR character set
    import server uses WE8ISO8859P1 character set (possible charset conversion)
    export server uses UTF8 NCHAR character set (possible ncharset conversion)
    . importing SYS's objects into SYS
    . importing SYS's objects into SYS
    IMP-00017: following statement failed with ORACLE error 721:
    "BEGIN sys.dbms_plugts.checkCompType('COMPATSG','10.2.0.2.0'); END;"
    IMP-00003: ORACLE error 721 encountered
    ORA-00721: changes by release 10.2.0.2.0 cannot be used by release 10.2.0.1.0
    ORA-06512: at "SYS.DBMS_PLUGTS", line 2004
    ORA-06512: at line 1
    IMP-00000: Import terminated unsuccessfully
    Here is the imp -help output (top lines), it looks like the 10.2.0.2 version:
    $ imp -help
    Import: Release 10.2.0.2.0 - Production on Mon Jul 21 09:58:56 2008
    Copyright (c) 1982, 2005, Oracle. All rights reserved.

  • Different l&f for similar components

    I want to apply a unique look and feel to the jtabbedpane we are using for our main navigation. The rest of the tabbedpanes would have the applications global look and feel. Is this possible? I only know how to set the l&f using the UIManager and I believe that is system wide...
    Thanks

    I found this example on creating a customized jtabbedpane and ui delegate. Looks like I'll go this route:
    http://www.javafaq.nu/java-bookpage-17-3.html

  • How to see different views created for material

    hello sap gurus
    How to see, under which all views the material has been created?
    Points will be given
    Thanks in advance
    Vijay

    Hi
    The no of views to be opened when you create a material in MM01 depends on the Material type
    BY changing the material types the views can be changed
    IMG->logistics general>Material Master>Basic settings>Material types-->Define attributes of material types
    Here only the settings is done
    Raja

  • How to compare the simulation version

    Dear Experts,
    For Operative Projects we can create Simulation Versions (CJV1 / CJV4) & Project Version (CN72).
    We can compare different Project Versions with Operative Project (S_ALR_87013539 / 38).
    Similarly can we compare Simulation version with Operative Project?
    OR can we see plan cost report for simulation version?
    Please guide.
    Rajesh

    Hi,
    Simulation versions are not meant for comparison purpose. You can use Project versions for that, which are snapshots of project at that point of time.
    Simulation versions can be used to analyse 'what-if' conditions and for quotation ie pre-order analysis. Before receipt of sales order, you can create simulation project and do cost planning for quotation purpose. After receipt of sales order, this project can be made operative. In case of loss of project, you can delete simulation.
    Another case can be during execution you want to check "what happens if" kind of conditions. you can transfer operative project to simulation version, simulate reqd condition. If results are desirable, you can copy the simulation version onto current project or alternatively delete simulation.
    Regards

  • Transparent table for project version data

    hi,
    i created project versions..
    now i want to create customized report showing material components for different versions..
    however i dont know the table names/fields required..
    can someone tell where i can find it? thanks in advance..
    also it is possible to create report of material components using report writer?
    thanks a lot..

    Thanks Venkat,
    however, is it not possible to create report for material components in report writer?
    when i tried to create a library for report writer for table VSRESB_CN it has error saying "Table VSRESB_CN is not installed in report writer"..
    thanks in advance

  • Copy Project to different CO Version down to activity level

    We have tried to copy a project from one CO version to another using transaction CJ9B, but it only copies to the WBS element level.  Is there a transaction that will copy a project to a different CO version that included components down to the activity level?
    Thanks, Rae

    In Cost Planning for CO version 0 (Plan version 0) in CJ40 you are planning costs at WBS level, not at activity level.
    So where the question of copying activity cost come?
    Activity costs come at activity level planning, not in plan version level.
    Which as mentioned can be copied by simulation version, project version.
    SSanjay

Maybe you are looking for

  • Flat file to be sent in email

    Hi all, I have a requirement where I need to send a message from XI as a flat/text file but in email. AFAIK, in the Mail receiver channel, we can send only XML files (email body or attachment), right ? And if I use File receiver channel, then it will

  • Why is the loading icon staying on?

    I have just got the ipad air 2. Its all been backed up from my old ipad 2. Whenever I go back on the homepage, the loading icon in the top left hand corner is continually on. Can anyone advise please?

  • Documents in Microsoft Word format

    Appleworks would be wonderful if it was just easy to read and save documents in Word format, or spreadsheets in Excel format. Are there any plans to add this capability that anyone is aware of?

  • Anyone tried the new Weblogic Scripting Tool (WLST)?

    Has anyone tried using the new WebLogic Scripting Tool (WLST) that was recently posted on the dev2dev WebLogic Utilities site: http://dev2dev.bea.com/resourcelibrary/utilitiestools/adminmgmt.jsp It looks to be a handy tool that is built upon jython a

  • Solution manager - Tracking service message's Status.

    Hi Friends, COuld any one u help me to find out the way to Track the status of service messages in solution manager. the status will be initialy : open. then   in process then etc... i need track the dates when the status became open to in-process. R