Component scrap at material level

Hello,
We have some packing materials for which the component scrap % is always the same, wathever the line or the process. Today this value is maintained in the BOMs, as recommended.
For theses material, in case of a change of this value, we have to update all the BOMs, more than 350 for instance for the need we have know. As far as we know, there is no standard transaction to update this value in mass (CS20 don't provide this).
My question is the following: in such cases, wouldn't it make more sense to maintain the component scrap % directly in the MRP4 view of Material MD, and to delete (or replace) the value in the BOMs?
If yes, then can you ensure that it doesn't affect the costing process, more precisely that the scrap % will always be taken into account by the costing run, even if maintained at material lelvel?
If not, do you know about a transaction to update the component scrap in the BOMs?
Thanks a lot for your help!

Hi JJ,
Question 1 what is LSMW?
LSMW(Legacy System Migration Workbench) is the Tcode for uploading/editing master data which are of small size,if huge data then master data are uploaded using BDC
Question 2
if there are discrepancy on MRP4 and BOM scrap % system will take the BOM value rather than MRP4?
Yes system will first search whether any scrap % value is maintained in BOM,if yes it will consider only this else the one maintained in MRP 4 view of the material master-you can check it
Question 3
can this plan of mine be precise if we run costing that the scrap % declare in MRP4 material master will be taken into account, even if it is maintained at material master?
Yes if you delete the value maintained in BOM ,then it will take value from the material master & hopefully it should not cause any problem in cost calculation as it will pick from here(MRP4)
Revert if you have further query
Reward points if useful
Regards,
SVP

Similar Messages

  • Component scrap in material costing

    Hi all,
    my question concerns component scrap (or scrap in general) in material costing (only in cost estimate). in the bill of material (BOM) we maintain the field component scrap.
    e.g.  we use 100 pieces according BOM and component scrap is added with 10% --> then 110 pieces are calculated. This is SAP standard and works so far!
    Is it possible to avoid or disable this function. This would mean that in my example only 100 pieces are calculated despite the filed component scrap (10%) is maintained??
    are there any user exits or Business Add In's?
    Thanks in advance!

    Hi
    Similar post was there in forum a couple of weeks back.. you can search itfor more details
    The answer to your question is NO... thats not possible.. you either maintain 2 BOMs - one for costing (w/o scrap) and one for production with scrap
    You link the costing BOM with your qty determination structure in costing variant so that costing BOM is considered for costing
    But it is cumbersome.. Every time one updates the production BOM, they have to manually go and update the costing BOM as well
    Ajay M

  • Component scrap and post material for production

    Hi guys,
    If we maintain component scrap in material master data. e.g.:10%. when we need 1000pcs "A", we will buy 1100pcs.
    But, when we post "A" for production, we only want post 1000pcs.
    Is there some method to achieve this?
    Thanks
    Dan

    Hi Dan,
    Create another material say " X "  assign this material in the Bom as component also by-product .In this way you can post
    1000 for production and  100 pcs under by -product during confirmation .
    jayavimal

  • Entering individual component scrap values with CEWB

    Gurus,
    Am dealing with a list of 20 materials used in 15 different BOMs. At my clients after the anual budget definition process is complete, the component scrap is reviewed and needs to be changed in some BOMs. Each material has an INDIVIDUAL value. CEWB only allows to massively change all the materials with ONE value. Is it possible to specify one individual value by material in this t code ?
    Material A -> Component scrap 5%
    Material B -> Component scrap 4,5%
    Material C -> Component scrap 3,5%
    etc.
    I don't want to use the component scrap in the material master as it would affect all the BOM usage and this should only be changed in the budget and production BOMs.
    Am starting to think only LSMW will do it...
    Thanks for your help,
    Olivier

    Hi,
    If it is only 15 BOM means, it is better you can make the changes manually. That will be the easiest and the simple way. As per your example the % of the scrap is not the same, it is varying. In LSMW you can't maintain different scrap %.
    Regards,
    V. Suresh

  • Repetitive Component Scrap for MTS scenario using MFBF transaction

    Hi,
    We are trying to replicate the functionality of posting a backflush document to process Repetitive material component Scrap for MTS scenario with BOM explosion using MFBF transaction into a custom RF program.
    We tried to use 'BAPI_REPMANCONF1_CREATE_MTS' to backflush the Scrap for the above scenario. But it did not help. And no other BAPI's exist. BDC'ing the transaction doesn't help as it contains Table Controls and lot of subscreens an dit is highly volatile for a RF screen.
    In view of above restrictions, we are not able to find a solution of how to implement the above functionailty in a RF program.
    Can someone please help us in this regard.
    Thanks.

    Any Body plz ? .. Even I need this.

  • Component Scrap in CS15

    Hi everybody
    in CS15 output screen, we can find out component scrap. If there are same component in one BOM, SAP only display one data of componets. meanwhile I cann't find out any role. everybody can explain?
    Regards
    Henry

    Hi,
    In CS15, when you enter material & execute on next screen where you enter Plant, usage etc. on top right side you will find output tab under which you have check box of Variable List.So tick that so check box so another field of Display will appear in that you choose required display profile which suits your need.
    Further what do you mean by role in CS15. I dont think any role etc is contained in it.It is just exploration of the particular material which is used in which BOMs.
    Hope this helps.
    Regards,
    Tejas

  • Component Scrap % in a BOM

    In t-code CS03, I see a field called Component Scrap % under the Item screen (when I select an item).
    Techncal help shows the field in Structure RC29P-AUSCH.
    What DB table and field holds the value that I see on-screen?

    The following tables come up when you do a where-used on the data element for this field. Maybe one of them?
    MARC                             Plant Data for Material
    MARC_TMP                         File for Incorrect Data in Direct Input
    MDIP                             Material: MRP Profiles (Field Contents)
    MDSM                             Simulative dependent requirements
    MVRC                             Cross-version fields for MARC
    RESB                             Reservation/dependent requirements
    STPO                             BOM item
    VSRESB_CN                        Version: Reservation/Dependent requirements

  • Component scrap queries

    Hi all,
    We have maintained component scrap of 10% in the material master.
    So if we create 100 PCS of header production order, component qty is 110. 10 pcs of scrap generated is sold outside.
    There is a scrap material maintained in system. We want 10 pcs of that scrap generated should be in stock.
    How can we get the stock of component scrap when we run the production order cycle.
    Please reply.
    Ragards,
    S Sudhir.

    Dear
    To address this business process you need to maintain the Scrap in BOM with -ve quantity then that scraped we can move to scrap storage location with movement type 551.So that you will be able to sell this scrap seprately.
    Once you have entered scrap in CO11N material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order.
    You can post component scrap as byproduct using 531 movement type if u want ot reuse the scrap. Further action is you have confirmed the scrap quantity now you need to post in some storage location either to order or to the GL account of the material. Both are possible from MB1C. Maintain some storage location and post the scrap.
    By doing scrap in CO11N, material qty will consume from stock but scrap material you can not see in any where.
    Normally in production no one can do scrap.
    And also in every company they want to calculate monthly scarp qty.
    To achieve the above doing component scrap it will not use.
    Follow this method to get rid of your problem.
    1. Confirm all the qty as yield qty in CO11N or CO15. ( ok + scrap)
    2.Create one separate str location for rejection.
    3.Physically you know the how much rejected qty. Move that qty from accepted str location to rejection str location by using MB1B 311 mvt.
    4. Now yield qty will reduce.
    5. Check in MB51 with mvt type 311 with corresponding period, you came to know how much quantities are rejected.
    6.By 551 mvt materials people scrap that rejected qty.
    7. In this no need to create any extra material for scrap.
    8. No need to change in BOM assigning negative qty.
    9.No need to create Byproduct.
    If you want separated cost of scrap then you need to define it is as co-product then it possible with joint production costing. Co Product, In turn you need to setup the percentage, of cost sharing.
    In case of Co-product costs are settled with a apportionment structure. In case of By-product the price of this by-product is credited to the order or the material stock account of the lead material being manufactured. Co-Product are defined as BOM Components/Items with negative quantities.When BOM is created for FERT , you can see one indicator in COMPONENT DETAILS screen for co-product. You need to define the co-products with this special indicator .
    Stock transfer from storage location to storage location (in the plant) is also possible.
    Hope this will be useful
    Regards
    JH

  • Component scrap factors in Planning

    I am using component scrap factors for planning example being lets say finished material = M1 and component is C1. For every 1 M1 I need 1C1 but with a +ve yield of 10% which means for planning 100 M1 I need only 90 C1. I do not want to put in the BOM that 1 M1 REQUIRES 0.9 C1. I want to use some kind of component scrap to do the yielding. I am not able to use a -ve component scrap factor in SAP.
    Can anybody tell me what the best solution to this problem would be?
    thanks

    Dear,
    You are talking about the RM and not Finished product. There is nothing called yield for RM.
    Yield in the case of FP is you suppose to produce 100 TO, and you are expecting a scrap of 10%, hence your actual yield is 90. If you produce more than that it is + Ve yield, if you produce less that it is -ve yield.
    With resocet to RM, you planned to consume 100 TO, but your expecting a scrap of 10%, hence you require to plan 110. In case if you comsume 90, you can get the report in CCOIS, requirement qty and withdrawl qty. This will reflect in costing as less costed to produce 100 TO of FP
    I hope you are clear,,please come back.

  • Documentary Batches with Batch Management at Material Level

    Hi,
    We have configured batch managment at the material level, and turned on for our materials. This applies to all plants that a material is extended to. Problem is that some plants don't have capability to (or do not need to) trace individual batches. So a "Generic" batch number approach is usually used in those few plants - but this of course still requires that the "Generic" batch number be supplied in all transactions. Some of those plants have just a more limited requirement of batch traceability (e.g. just at receipt or despatch, but not anything else like physical inventory).
    The functions of Documentary Batches seem most appealing. However, according to documentation, and in our tests, it seems that the batch management setting will always suppress the documentary batch functions in a plant, even if we only want generic batches.
    Does anyone know how to allow documentary batches for certain plants to override the "Batch at Material level" setting? P.S. We are not able anymore to re-configure the batch to material-plant level.
    FYI - I have searched Forums, Wiki, Support portal, SAP Help and Release Documentation.
    Cheers,
    Jeff

    hello Gurus,
    Can any body Download OSS note 41715  for me from Marketplace as i dont have access so please.
    regards,
    ninad

  • Difference between assembly scrap and component scrap

    Dear All,
    What is the use and difference between assembly and component scrap ?
    Regards

    Dear,
    Please go through this page, you will understand clearly
    http://wiki.sdn.sap.com/wiki/display/ERPLO/Scrap+Calculation
    if satisfied, plz close all your other open threads too. Thx

  • Vendor evaluation at material level

    Hi friends,
    I have one requirement from client. A vendor supplies many materials. My client want to get report of vendor rating of the vendor for each material and material groupwise.
    Can this objective can be achieved?
    Please suggest.
    Regards

    Hi,
    When you run Vendor Evaluation (for all criteria), sysytem keeps log of all material level points the Vendor has achieved. You can view the same in transaction ME64.
    Regards,
    Prashant

  • Batch determination at material level.

    Hello SAPians,
    I have a question about the batch management at material level.
    i have maintained batch determination policy at material level in system conversions also get done... now my problem is here ,i want to reassing it to plant level.. please help me in this becoz system is not supporting me as it showing the error that this implementation is not yet done in system...
    even i tick the batch determination in MM03 purchase view it is not allowing me ... and one more i did this in development server but it is assigned to all means dev, qlity as well to production servers...
    which field i forgot to maintain please clarify me..
    Waiting for the response.
    Regards,
    Ninad Kshirsagar

    hello Gurus,
    Can any body Download OSS note 41715  for me from Marketplace as i dont have access so please.
    regards,
    ninad

  • Restrict Authorization at Material level during production confirmation

    Hi SAP Gurus,
    I would like to ask if its possible to restrict authorization at Material Level during production confirmation.
    Our scenario is we have SFG and FG which are handled by different group of people but it has the same Order Type. Now we want to restrict authorization such as one department can only confirm SFG and the other department can confirm FG only.
    Is it possible to set authorization at material type or production scheduler level. IF not possible, is there other way except creation of new Order Type?
    Thanks,
    Raymond

    Hi Raymond,
    DO you mean I should create a customized table for this?
    Yes
    Are there no standard way?
    As per my knowledge, you can control through production order type, so you need to create seprate order type for this
    Thanks,
    Sankaran

  • Report at material level from Quantity pending

    Hello experts,
    I have the following issue, we need a Reporting to show at material level (The report, has to see like /SAPTRX/EE_OVD_LIST, i mean a list), the quantity pending for Goods receipt, by example in the case of a procurement scenario, and the quantity (at material level) pending for Departure in the case of a delivery in a transportation scenario .
    I mena by example, the material 1234ABC has pending for GR 400 Units from P.O. 4500100 and GR 300 Units from P.O. 4500250.
    I analyzed the following transactions without obtaining the expected result:
    u2022     /SAPTRX/EH_LIST.
    u2022     /SAPTRX/EH_SET.
    u2022     /SAPTRX/EH_LIST_STAT.
    u2022     /SAPTRX/EH_LAST_EVT.
    u2022     /SAPTRX/EE_OVD_LIST.
    u2022     /SAPTRX/EE_MON.
    u2022     /SAPTRX/EVM_STATUS.
    u2022     /SAPTRX/ER_MS_LIST.
    u2022     /SAPTRX/LOCKED_PROC.
    u2022     /SAPTRX/LOCKED_PSET.
    u2022     /SAPTRX/EMJOBS.
    u2022     /SAPTRX/ASAPLOG.
    u2022     /SAPTRX/CONS_CHECK.
    Which transaction can be used to achieve this goal?
    Thanks and best regards,
    Juliá

    Hi Mahantesh ,
    Try this:
    Take two more KFs in the cube.
    1) Creation Date as KF
    Type: Date
    Exception aggregation : First value
    Aggregation reference : 0material.
    2) Issue Date as KF
    Type: Date
    Exception aggregation : Last value
    Aggregation reference : 0material.
    In the query take 0material in rows and above 2 KF in the columns (May be , here , you need restriction also. 'Creation Date as Characterstic' > 01.01.1000 ,Issue Date as characterstic' < 31.12.9999 )
    With rgds,
    Anil Kumar Sharma .P