Concept of CO- PA cost center assessment

Hi Experts,
I would like to ask if you could supply me with more info about the concept of cost center cost assessment in COPA. Is this a standard procedure that must done? I am having my 1st SAP implem. and have been preparing too hard to get much info. as I can take about COPA. I have understanding about value fields an characteristics BUT I am having a hard time to understand cost center allo. and why do is there a need to do it (or maybe not). Aren't they supposed to be an automatic process (distribution of figures to COPA reports)? Thanks and I would understand if the question may sound a little unclear.

Hi,
The cost center assessment to copa comes in places only for allocating the common costs.
Generally, we do allocate the common costs from the common cost center to the respective user cost centers in the overhead accounting.
If the need is to recognise the common overheads directly in COPA, then instead of reallocating the costs with in cost center accounting, we directly transfer the costs to copa thru costcenter assessment to copa.
Regards
Sudhakar Reddy

Similar Messages

  • Cost Center Assessment to COPA

    Hi,
    I have done Cost Center assessment to characteristics "Company Code" and "Product". System has even generated COPA documnet for costing based profitability analysis.
    However, in report developed through Report Painter(KE32), the value field for which the assessment got posted is not getting displayed.
    Can any one guide in this regard.
    Thanks in advance
    Sudhakar

    Hi Sudhakar,
    When you do the cost center assessment in COPA, you have given 2 characteristicsi.e product , company code and thru one value field.
    When designing report in ke32 (report) and form ke35(form), we will give certain characteristics, so check what are the parameters has been given in the report, bcz values flown thru copa assessment will be available only in compaby code and product not for any other characteristics. I guess you have characteristics in report other than these two.
    I hope this clarifies.
    Regards
    Rajesh A

  • Error in cost center assessment integration with FI

    We just upgraded our test system with support pack SAPKH50020 and when we test cost center assessment, we are getting the error message "For document type SA, an entry is required in field Reference"
    The same process is working in our production system, which is under support pack SAPKH50010.  We are using the same doc type, and the configuration for this doc type is the same as in our test system. 
    OSS told us that the only solution is to change the doc type configuration or use a user exit to populate the Reference field.    However, I don't understand why this process is working in the old support pack and not in the new one.    
    Has anybody encountered the same issue?  If so, how was it resolved?  
    thank you,
    Lanny

    Hi Phaneendra,
    Thank you for your response.  But the real question is why is this process different between support pack SAPKH50010 and SAPKH50020.   In support pack SAPKH50010, we also uses document type SA with reference field required, but the cost center assessment is able to post to it without any customization.    Now, in support pack SAPKH50020, this no longer works.    So I'm just wondering if any of you have encountered similar issue after upgrading the support pack. 
    thanks
    Lanny

  • Table where cost center assessment cycle details are saved

    Hi,
    Can anybody tell me what is the table where Cost center assessment cycle details like sender cost center,receiver cost center, assessment cost element, SKF etc... are saved?
    Regds,
    Bijay

    Hi,
    Look at the T81* tables.
    Regards,
    Eli

  • Cost center assessment in new GL and classic GL

    HI ALL
    I want to double check one thing. When you run cost center assessments in classic GL, the system will make entries in GLPCT table for PCA with assessment cost element. But when you got migrated into NEW GL then system will not make any entry in FAGLFLEXT table with assessment cost element. These assesments have no effect on PCA module. If I want to reflect the effect of costcenter assesments in PCA in new GL , where can I check for that?....Is there anyway to acheive this without activating both classic and new gl PCA?
    Thanks
    Steve

    Hi,
    If you have defined variant for real time integration and it has "Cross profit center" checked and this variant is assigned to company code, then FI-CO reconcilation posting will be posted in each of the profit center.
    One can have a single account for all reconcilation posting or different FI-CO recon account can be used for each bussiness process / for each assessement cost element using substitution.
    FI-CO reco account is visible in the FAGLFLEXT and hence can be displayed in report.
    Regards
    Chetan.

  • Cost Center Assessment - cost element type 42

    Hi dear All,
    I got issues running KSU5 to allocate planned costs under cost element type 42. we were expecting that all planned costs (primary and secondary(cost element type 42)) could be allocated by credit cost center (actual). only primary costs are being allocated.
    Scenario:
    cost center planning (kp06) 1000 currencies in primary cost element in cost center A
    running planning assessment - KSUB: cycle uses assessment cost element (type 42): sender cost center A, receiver cost center B (all planned values). assessment cyles posts 1000 currencies from CC A to cost center B
    planning in cost center B (primary cost elements through kp06, 500 currencies) total planning 1000 from previous assessment  with CE type 42, and 500 from cc planning in a primari CE.
    by the period end closing, tcode KSU5 (allocation actual) is running. new cycle created, based on planned values (origini not actual, but planned amounts).
    we were expecting to allocate 1500 currencies from cost center B to cost center C (using 100% and through assessment cost element)).
    result: credit actual cost center B = 500 currencies debit actual cost center C = 500 currencies.
    1000 currencies pending on cost center B (planned).
    do you know why SAP is not allocating the 1000? even if those 1000 were planned in cost center B by assessement, a new allocation cycle should be able to post them or not?
    thank you for your outcome.

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • MMPV - is Cost center assessment possible after closing period in MMPV?

    Hi,
    We are performing MMPV for April, which will close automatically postings for February. As far as I know MMPV opens and closes periods for MM postings only. Is that true?
    I would like to perform Cost center assesment and CC assessment to COPA for february after I run MMPV. Will the system allow me to do that or due to the fact that february is closed in MM it won't be possible.
    Thanks for your help,
    Regards,
    Karol

    Hi
    What you feel is right as MMPV related to close the period for material document positing . To run the assessment cycle (KSU5) Co and Fi periods are required to be kept open.
    If the answer is helpful kindly assign points
    Thanks & Regards
    Mahesh

  • Need to take cost center assessment cost to product

    Dear All,
    We have product costing activated in our system. We are taking Raw material , packing material cost from Material master. where as activity cost based on different activity type defined on relevant work center / resource based on certain formula.
    Now for some other expenses like power / utility cost, we have created assessment cycle, through which we assess the cost to relevant cost centers based on certain base (SKF).
    Now our business requires this cost to load on product cost which is laid on cost centers through assessment.
    Pls suggest the way to achieve the same through product costing.
    Thanks & Regards,
    Taral Patel

    Dear Ajay,
    Thanks for reply.
    As per my understanding below mentioned points I need to consider for costs which is coming on cost center through assessment (based on SKF) as I want to take them to my product :
    I need to create seperate activity types for those expenses which I want to take onto my product.
    I need to assign them onto my work center / resource.
    I need to create a Splitting Structure in OKES and assign respective secondary cost element to the relevant above newly created activity type.... With this, the amount in secondary cost ele would be divided by the relevant activity type ONLY
    (Choose splitting rule/method as "!2" i.e. Activity Qty in OKES)
    I need to assign my production cost centers (through which I want to transfer cost to my product) to this splitting structure in OKEW.
    I need to map sec. cost ele. of above created act. type to co. comp structure.
    Suppose I have one power plant at my plant campus. I am distributing this power cost to my 4 different plant (existed on campus) on their respective cost centers Ctr1, ctr2, ctr3, ctr4.
    Now as per above understanding when I can see this newly created activity cost to my product cost?
    For that I need to assess power cost to all 4 plants and then running my product cost with these newly created activity types?
    Pls correct me in my understanding.
    Thanks & Regards,
    Taral Patel

  • Cost Center Assessment to G/L

    Hi Gurus,
    Is there any easy way of Assessing Cost Center balance to Balance Sheet account? We're in 4.6C I don't see G/L account as receiver in my Assessment cycle segment? I know we can assess C.Ctr to Internal Order which can settle to B/S account or do it manually but I'm wondering if there is any easy way? Any help would be rewarded appropriately!
    Thanks in Advance

    Hi,
    No it is not possible to transfer to GL Account from Cost Center. Assessment functionality is with in CO Module. In Internal Orders it is settlement and in Settlement Profile we can have GL Account as a receiver.
    I am wondering what is the Business requirement for assessing it to GL Account?
    Thanks
    Murali.

  • Cost Center Assessment to Cost Hierarchy based on Actual Consumption error

    Assessment is set up:
    SENDER:   Cost Center: Overhead Expenses (values in expense accounts)
    RECEIVER:  Top Node of Cost Object Hierarchy  (material consumption has been posted to two objects - related account has value and quantity fields)
    Segment is set up:
    Sender Rules: Posted Amounts
    Share:100%
    Actual value origin
    Receiving tracing factor:
    Receiver rule: Variable Portions
    Var. portion type: Actual Consumption
    No Scaling
    Assumption is that "Var. portion type: Actual Consumptions" means the quantity in the consumption account on the receiver from the inventory posting.     Is this true?
    Edited by: Chris Gibson on Apr 13, 2010 11:56 PM

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Cost center assessment

    Gurus,
    please clariffy.. Urgent
    When I am creating assessment cycles, if I add ( in segments) senders are Cost elements and cost centers together what is going to happen? How the cost is going to be distributed? After running assessments, how do I check the values  and how do I differentiate them whether they are from cost centers or from  elements? 
    if I give combination of both cost elements and cost centers, what is the relationship should exist between them ?
    regards
    kumar

    Hi
    Cost Centers are the cost collectors and cost elements are the cost carriers.
    When you add cost elements and cost centers as senders you define that the cost that are available in the cost centers are carried to other cost objects via the cost elements.
    Hope it helps
    Good Luck
    Hari

  • Cost center assessment to CO-PA using Variable portions in receiver rule

    Hi Experts,
    Could you please explain how to use variable portions as receiver rule. An example will be very helpful. I have got theory in help documents but could not get
    through it....request for an example.
    I am using fixed amounts as sender values and using variable portions as receiver rule.
    In receiver tracing factor - I am using value field / key fields as say example VV075 (actual cash discount). I also mentioned record type and plan/actual indicator
    in receiver tracing factor screen. I also mentioned data in receiver weighting factor screen.
    Still if I execute KEU5, system says no receivers found.
    I checked and found there are values for VV075 for the record type and plan / actual indicator combination selected.
    Where could be the problem.
    Request to explain variable portions with example.
    Thanks in advance.
    DSK

    Hi,
    Thanks for the reply.
    There is no error in other segments. I already checked it...and also in KE24 there is data for the combination of value field, record type, plan/actual indicator and period selected. That is not an issue.
    I feel some set up in using the variable portions is missing. This is the first time using variable portions.
    Thanks.

  • Functional Area derivation as obligatory checkbox in Cost Center distribution cycle?

    Dear All,
    We are using Cost of Sales accounting with FI-CO online integration. Derivation of Functional Area for Cost Center assessment cycles is an obligatory indicator. Nevertheless I may create Cos Center distribution cycles without this option (what affects FI-CO online integration). Can anybody explain a system logic behind it?
    Can I set Functional Area derivation as an obligatory checkbox for Cost Center distribution cycles too?
    Bartlomiej Seidel

    Hi,
    I have searched for any useful note, but without result so far. The point is that any new distribution or assessment cycle (cost centers) in our company must work with Functional Area derivation (than FI-CO online integration works correctly). With our current SAP setup I must select this indicator for every assessment cycle - it is obligatory. But is not obligatory for distribution cycles - and I don't know why?
    I would like to protect everybody from crating distribution cycles without FA derivation indicator (like it works now for assessment cycles).  How may I do it?
    Bart

  • Assigning overheads to Cost collector using cost center assessments

    Dear All,
    I want to assign admin and selling overheads to product cost collectors for different products using cost center assessment.
    I am creating the cycle for assessment and in the receiver objects i am not able to get product cost collectors. In the order field, i am able to see only the internal orders but not the product cost collectors(or the PCC number).
    Could anyone please tell me how to assign product cost collector in the receiver objects in the assessment cycle.My senders are cost centers(admin and sales).
    Thank you very much in advance.
    Regards,
    Vishnu
    VST-IT.
    Please... somebody answer my query.

    Thank you for replying.
    If you go to order field and select the order type RM01. Here we can see the order numbers for product cost collectors. We can assign this cost collector number in the distribution cycle as receiver. after we post, when we go to the cost collector in kkf6n, we can see the amount posted through distribution in the costs of the cost collector.
    My question is why the same functionality is not possible using assessment.

  • CO: Statistical reposting from NWA to Cost Center

    Hi Gurus,
    My client expecting the travel expenses statistically post to Cost Center which would not affect the true posting to NWA. Is there any transaction allow us to achieve that. I've tried with the Manually reposting of cost, not sure the reposting will write off the amount in Network activity or not. Please advice.
    Rgs, Michelle

    It seems to me like an accounting and business misunderstanding of the business process.  When you do the Goods issue to the Cost Center it means that the Cost Center is consuming those materials, they are issues to "production process" and in this case you naturally debiting the P&L account (with a cost element category 1). 
    If your concept is about "designated Cost Center stock" this means simply moving materials between two stock locations that has no impact in financial accounting.  There is no such thing in standard SAP as designated Cost Center stock.
    You can have a special stock for SD order and for WBS-element (project stock), and in this case it is reflected with a BS account (and a cost element category 90) at WBS-element.
    If you need designated "Cost Center" stock you have two possible options:
    1. Create a storage locations
    2. Create a project and utilize a designated project stock (having "mapped" your WBS-elements to Cost Centers)
    BR
    Paulo

Maybe you are looking for

  • Getting error while running javamail from servlet

    i am getting the following error when i am using authentication for java mail how to solve it.?? javax.servlet.ServletException: Error instantiating servlet class mailservlet      org.apache.catalina.authenticator.AuthenticatorBase.invoke(Authenticat

  • DC Replication

    Dear All, Curently I am having two sites as Site A and Site B Site A is having DC1 and DC2 in which DC1 is PDC and DC2 is ADC Site B is having DC3 is ADC Due to some issue DC1 FSMO roles transferred to DC2 and DC3 has replicated the information succe

  • Ipod manager internal error message any help

    I have just recieve my "repaired" iPOD and I am trying to put all my music back on but it keeps asking for an update, however when I try and update I get the "ipod manager internal error" message anyone have any clues as to what I do to solve this

  • PDF in iBook

    I am an Engineer and need to take some pdf files (refrigeration charts, tables and other stuff to check) with me and I would like to access them on the iPad. Is there an pdf viewer or can they be opened in iBook? Any help would be appreciated

  • Bullets Converting to Middle Dot:/

    When I import text from Word into Indesign CS6 the bullets keeps converting to "middle dot". How do I fix this without having to select each bulleted list and manually changing it?