Hi,
We are performing MMPV for April, which will close automatically postings for February. As far as I know MMPV opens and closes periods for MM postings only. Is that true?
I would like to perform Cost center assesment and CC assessment to COPA for february after I run MMPV. Will the system allow me to do that or due to the fact that february is closed in MM it won't be possible.
Thanks for your help,
Regards,
Karol

Hi
What you feel is right as MMPV related to close the period for material document positing . To run the assessment cycle (KSU5) Co and Fi periods are required to be kept open.
If the answer is helpful kindly assign points
Thanks & Regards
Mahesh

Similar Messages

  • Error in cost center assessment integration with FI

    We just upgraded our test system with support pack SAPKH50020 and when we test cost center assessment, we are getting the error message "For document type SA, an entry is required in field Reference"
    The same process is working in our production system, which is under support pack SAPKH50010.  We are using the same doc type, and the configuration for this doc type is the same as in our test system. 
    OSS told us that the only solution is to change the doc type configuration or use a user exit to populate the Reference field.    However, I don't understand why this process is working in the old support pack and not in the new one.    
    Has anybody encountered the same issue?  If so, how was it resolved?  
    thank you,
    Lanny

    Hi Phaneendra,
    Thank you for your response.  But the real question is why is this process different between support pack SAPKH50010 and SAPKH50020.   In support pack SAPKH50010, we also uses document type SA with reference field required, but the cost center assessment is able to post to it without any customization.    Now, in support pack SAPKH50020, this no longer works.    So I'm just wondering if any of you have encountered similar issue after upgrading the support pack. 
    thanks
    Lanny

  • Cost Center Assessment to COPA

    Hi,
    I have done Cost Center assessment to characteristics "Company Code" and "Product". System has even generated COPA documnet for costing based profitability analysis.
    However, in report developed through Report Painter(KE32), the value field for which the assessment got posted is not getting displayed.
    Can any one guide in this regard.
    Thanks in advance
    Sudhakar

    Hi Sudhakar,
    When you do the cost center assessment in COPA, you have given 2 characteristicsi.e product , company code and thru one value field.
    When designing report in ke32 (report) and form ke35(form), we will give certain characteristics, so check what are the parameters has been given in the report, bcz values flown thru copa assessment will be available only in compaby code and product not for any other characteristics. I guess you have characteristics in report other than these two.
    I hope this clarifies.
    Regards
    Rajesh A

  • Concept of CO- PA cost center assessment

    Hi Experts,
    I would like to ask if you could supply me with more info about the concept of cost center cost assessment in COPA. Is this a standard procedure that must done? I am having my 1st SAP implem. and have been preparing too hard to get much info. as I can take about COPA. I have understanding about value fields an characteristics BUT I am having a hard time to understand cost center allo. and why do is there a need to do it (or maybe not). Aren't they supposed to be an automatic process (distribution of figures to COPA reports)? Thanks and I would understand if the question may sound a little unclear.

    Hi,
    The cost center assessment to copa comes in places only for allocating the common costs.
    Generally, we do allocate the common costs from the common cost center to the respective user cost centers in the overhead accounting.
    If the need is to recognise the common overheads directly in COPA, then instead of reallocating the costs with in cost center accounting, we directly transfer the costs to copa thru costcenter assessment to copa.
    Regards
    Sudhakar Reddy

  • Table where cost center assessment cycle details are saved

    Hi,
    Can anybody tell me what is the table where Cost center assessment cycle details like sender cost center,receiver cost center, assessment cost element, SKF etc... are saved?
    Regds,
    Bijay

    Hi,
    Look at the T81* tables.
    Regards,
    Eli

  • Archiving cost center line items for current period

    Hi,
    I was not able to archive & delete the cost center line items for current period.I was succesfull in deleting the past line items of the last periods.
    Raj

    Hi Rajesh,
    I think SAP help says that the period for which you are planning to delete or archive data may have to be locked.
    Check the following links:
    For Archiving
    http://help.sap.com/saphelp_47x200/helpdata/en/8d/3e55ec462a11d189000000e8323d3a/frameset.htm

  • Reserval of Assessment Cycles for closed periods - FAGLGA15

    Hello,
    We have assessment cycles in closed periods which we want to reverse / repost in current period.  We are using ECC New GL functionality.  Tcode KISR does not seem to recognize Assessment cycles created with FAGLGA1* .
    Suggestions / options to achieve the end result, please.
    Regards
    Jayesh.

    Hi:
    If your CO allocation has some external postings (like GL or fixed assets) or generating some intercompany documents, then it needs FI to be open also. It happens sometimes if the allocation goes external so it would need fI period to be open also. If FI is close but CO is open, it would only work for CO specific allocations and others would error out.
    Please check the cycle/segment which is in error. If it is suppose to hit FI, then FI (OB52) and CO (OKP1) periods should be in sync.
    Thanks.
    Rahul

  • Cost Center Assessment - cost element type 42

    Hi dear All,
    I got issues running KSU5 to allocate planned costs under cost element type 42. we were expecting that all planned costs (primary and secondary(cost element type 42)) could be allocated by credit cost center (actual). only primary costs are being allocated.
    Scenario:
    cost center planning (kp06) 1000 currencies in primary cost element in cost center A
    running planning assessment - KSUB: cycle uses assessment cost element (type 42): sender cost center A, receiver cost center B (all planned values). assessment cyles posts 1000 currencies from CC A to cost center B
    planning in cost center B (primary cost elements through kp06, 500 currencies) total planning 1000 from previous assessment  with CE type 42, and 500 from cc planning in a primari CE.
    by the period end closing, tcode KSU5 (allocation actual) is running. new cycle created, based on planned values (origini not actual, but planned amounts).
    we were expecting to allocate 1500 currencies from cost center B to cost center C (using 100% and through assessment cost element)).
    result: credit actual cost center B = 500 currencies debit actual cost center C = 500 currencies.
    1000 currencies pending on cost center B (planned).
    do you know why SAP is not allocating the 1000? even if those 1000 were planned in cost center B by assessement, a new allocation cycle should be able to post them or not?
    thank you for your outcome.

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Cost Center Assessment to G/L

    Hi Gurus,
    Is there any easy way of Assessing Cost Center balance to Balance Sheet account? We're in 4.6C I don't see G/L account as receiver in my Assessment cycle segment? I know we can assess C.Ctr to Internal Order which can settle to B/S account or do it manually but I'm wondering if there is any easy way? Any help would be rewarded appropriately!
    Thanks in Advance

    Hi,
    No it is not possible to transfer to GL Account from Cost Center. Assessment functionality is with in CO Module. In Internal Orders it is settlement and in Settlement Profile we can have GL Account as a receiver.
    I am wondering what is the Business requirement for assessing it to GL Account?
    Thanks
    Murali.

  • Cost center assessment in new GL and classic GL

    HI ALL
    I want to double check one thing. When you run cost center assessments in classic GL, the system will make entries in GLPCT table for PCA with assessment cost element. But when you got migrated into NEW GL then system will not make any entry in FAGLFLEXT table with assessment cost element. These assesments have no effect on PCA module. If I want to reflect the effect of costcenter assesments in PCA in new GL , where can I check for that?....Is there anyway to acheive this without activating both classic and new gl PCA?
    Thanks
    Steve

    Hi,
    If you have defined variant for real time integration and it has "Cross profit center" checked and this variant is assigned to company code, then FI-CO reconcilation posting will be posted in each of the profit center.
    One can have a single account for all reconcilation posting or different FI-CO recon account can be used for each bussiness process / for each assessement cost element using substitution.
    FI-CO reco account is visible in the FAGLFLEXT and hence can be displayed in report.
    Regards
    Chetan.

  • Change currency in cost center report - possible?

    Hi all!
    I have a question regarding currency in cost center report (transaction s_alr_87013611).
    I have created one controlling area with currency SEK. I have allocated several company codes to this controlling area, for example Sweden, France,  Germany etc. I have also created different cost centers and allocated them to the company codes. All cost centers in ever company code have the same currency allocated as for the company code. For Germany currency EUR is allocated to the cost center, to the company code but SEK is allocated to controlling area.
    When I run cost center report reporting currency is SEK. Is there a possibility to change the settings in the report to view cost center currency instead?
    Many thanks in advance!
    BR Åsa

    Hi,
    Yes, it's possible. Use RPC0 transaction to set the currency of the report to object currency.
    Regards,
    Eli

  • Need to take cost center assessment cost to product

    Dear All,
    We have product costing activated in our system. We are taking Raw material , packing material cost from Material master. where as activity cost based on different activity type defined on relevant work center / resource based on certain formula.
    Now for some other expenses like power / utility cost, we have created assessment cycle, through which we assess the cost to relevant cost centers based on certain base (SKF).
    Now our business requires this cost to load on product cost which is laid on cost centers through assessment.
    Pls suggest the way to achieve the same through product costing.
    Thanks & Regards,
    Taral Patel

    Dear Ajay,
    Thanks for reply.
    As per my understanding below mentioned points I need to consider for costs which is coming on cost center through assessment (based on SKF) as I want to take them to my product :
    I need to create seperate activity types for those expenses which I want to take onto my product.
    I need to assign them onto my work center / resource.
    I need to create a Splitting Structure in OKES and assign respective secondary cost element to the relevant above newly created activity type.... With this, the amount in secondary cost ele would be divided by the relevant activity type ONLY
    (Choose splitting rule/method as "!2" i.e. Activity Qty in OKES)
    I need to assign my production cost centers (through which I want to transfer cost to my product) to this splitting structure in OKEW.
    I need to map sec. cost ele. of above created act. type to co. comp structure.
    Suppose I have one power plant at my plant campus. I am distributing this power cost to my 4 different plant (existed on campus) on their respective cost centers Ctr1, ctr2, ctr3, ctr4.
    Now as per above understanding when I can see this newly created activity cost to my product cost?
    For that I need to assess power cost to all 4 plants and then running my product cost with these newly created activity types?
    Pls correct me in my understanding.
    Thanks & Regards,
    Taral Patel

  • Cost Center Assessment to Cost Hierarchy based on Actual Consumption error

    Assessment is set up:
    SENDER:   Cost Center: Overhead Expenses (values in expense accounts)
    RECEIVER:  Top Node of Cost Object Hierarchy  (material consumption has been posted to two objects - related account has value and quantity fields)
    Segment is set up:
    Sender Rules: Posted Amounts
    Share:100%
    Actual value origin
    Receiving tracing factor:
    Receiver rule: Variable Portions
    Var. portion type: Actual Consumption
    No Scaling
    Assumption is that "Var. portion type: Actual Consumptions" means the quantity in the consumption account on the receiver from the inventory posting.     Is this true?
    Edited by: Chris Gibson on Apr 13, 2010 11:56 PM

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Changes in stock value of the material even after closing period

    The client closes the accounts every month end. Say they close the books of accounts for the month of Jan’07 on 31st Jan 2007. After closing the account they are running MC.9 to know the stock value of different plants for the previous month. i.e.  for the month of Jan’07. But every day when the client runs the MC.9 they found some differences in the stock price & quantity.
    For better understanding, consider they close the period on 31st Jan. When they run the MC.9 on 2nd Feb it shows the value say 100$ and qty of 100. When we run the same report on 4th Feb the value got changed to say 98$ and qty remain same. Again when we run on 6th Feb the value is changed again to say 102$ and stock is 100.
    We checked the MB51 with posting date & entered date. We could not find any back posting.
    What could be the reason for the  variation in the stock price & qty ? Any pointers will be highly appricated.

    Hi Venkat,
    Your previous posting talked about variation in stock value and now you are saying that there are changes in stock qty also. So the better option would be to check those material which has variation and compare them with other standard reports to get a solution. Export the list of material to an excel sheet and compare them with that of the other reports. This would help you to find the materials which has changes and you can narrow down to the root cause. Once you get the material then u can go by posting date and find the movements.
    Hope this helps. Reward if u find it useful.
    regards
    Anand.C

  • Cost center assessment

    Gurus,
    please clariffy.. Urgent
    When I am creating assessment cycles, if I add ( in segments) senders are Cost elements and cost centers together what is going to happen? How the cost is going to be distributed? After running assessments, how do I check the values  and how do I differentiate them whether they are from cost centers or from  elements? 
    if I give combination of both cost elements and cost centers, what is the relationship should exist between them ?
    regards
    kumar

    Hi
    Cost Centers are the cost collectors and cost elements are the cost carriers.
    When you add cost elements and cost centers as senders you define that the cost that are available in the cost centers are carried to other cost objects via the cost elements.
    Hope it helps
    Good Luck
    Hari