I am trying confirmation of production order (co15) but at the time of saving the order i get error message that" field selection for movmt type 261/acct 790000 differ for cost center(010), i have ckecked g/l account also all are perfect so plz let me know where i am wrong?  final product is in batch.
Regards,
jaiswin.

Hi
It seems some filed selection problem related to the movement type 261 and the G/L account combination.
Go to SE38 - in the Program field write RM07CUFA-- Execute--Enter the movement type  company code and G/L account-Execute-Additional Account assignments G001- Cost center
There cost center should be optional entry.. please check the fields there.
Regards
Bala

Similar Messages

  • How to check the Production order exits

    Hi Experts
    Modification to processing of Command Orders & Tickets
    We require a modification to the processing being performed on sales data originating from the Command Concrete system and potentially from other systems yet to come online (e.g. Pinkenba Cement plant).
    The Sap process involved is ZINT_INBOUND_POLLING and within that, ZINT_CSTPORD_ROUTINES.
    The problem
    Currently there is an assumption that every sales order (and its deliveries) will include a product which is made to order, i.e. for which a production order will be required.
    In ZINT_CSTPORD_ROUTINES, a check is made to identify the production order linked to the sales order. If there is no such production order (usually because of the customeru2019s credit status) then processing of the ticket is terminated.
    This assumption would fall down if an order was to be raised (in Command) on which there is no concrete material. For example, if we sold a bag of pigment or a screed to a customer. In this case the item would be sold from stock and there would be no need for a production order.
    The solution
    In the routine which checks for the existence of a production order, modify the code as follows:
    Inspect each item on the sales order
    If (and only if) there is at least one item with a category of u201CZTACu201D then check for a production order, otherwise process the order in the usual manner.
    ----  ZINT_CSTPORD_ROUTINES -
    *&      Form  process_inbound_data
          Create prod. orders from ticket data extracted from the COMMAND
          system. Note that large portions of the code in this routine
          have been copied from the retired ZPPU_COMMAND_PRODUCTION
          interface program. This was done (1) because the old code works
          and (2) to save development time.
         -->T_ZINT_IDATA  Internal table of interface data
         -->T_ZINT_PARAM  Internal table of interface parameters
         -->T_ZINT_MSLOG  Internal table of messages
         -->P_ZINT_ID     Interface ID
         -->P_ZINT_TY     Inteface type
         -->P_ZINT_IS     IDOC group for interface
         -->P_ZINT_DL     Flag: delete IDOC group when complete
         -->P_ZINT_AL     Flag: run in standalone mode
         -->P_ZINT_NW     Flag: do not log warning messages
         -->P_ZINT_SQ     Interface sequence number
         <--P_ZINT_RC     Return code (<>0=>error)
    form process_inbound_data  tables   t_zint_idata structure zint_idata
                                        t_zint_param structure zint_param
                                        t_zint_mslog structure zint_mslog
                               using    p_zint_id    type      zint_id
                                        p_zint_ty    type      zint_ty
                                        p_zint_is    type      zint_is
                                        p_zint_dl    type      zint_dl
                                        p_zint_al    type      zint_al
                                        p_zint_nw    type      zint_nw
                                        p_zint_sq    type      zint_sq
                               changing p_zint_rc    type      zint_rc.
    program is continuing .............
    I WANT TO WRITE A CODING HERE **********************
    CHECK IF PRODUCTION ORDER REQUIRED
              IF NOT THEN GO TO PERFORM UPDATE DATA
      if production order required then check
                    for each item on sales order item list
                          with item category = 'ZTAC' then
                                     return true
                                next
                                  end function
        if there is no production code
               these has to be check from VBAP TABLE field VBELN and PSTYV (ZTAC,ZTAN Etc)
      select * from Vbap WHERE VBELN = '00000269951' and VBAP.PSTYV = 'ZTAC','ZTAN' Etc
    No production order?
        elseif lva_prodord is initial.
          clear v_messg.
          call function 'CONVERSION_EXIT_ALPHA_OUTPUT'
            exporting
              input  = lva_filemat
            importing
              output = lva_filemat.
        No production order found - log a warning message.
          concatenate 'Production Order not be found for'
                      'Command order' lva_cmdord
                      'Material'      lva_filemat
                      'Customer'      lwa_02-customer
            into v_messg separated by space.
          perform write_log_entry
            tables t_zint_mslog
            using  'E' 'ZINT_CSTPORD_ROUTINES'
                       'FIND_SAP_PRODORD'
                         v_messg
                         p_zint_nw
                         lwa_01-ticketnumber.                " RJS
          continue.
        endif.
    Production Order WAS found... Continue creating IDOCS
        lwa_hdrlevel-postg_date = lwa_01-ticketdate.
    Obtain the storage location parameter value.
        read table t_zint_param with key zint_fn = 'LGORT'.
        if sy-subrc ne c_noerr.
          perform write_log_entry
            tables t_zint_mslog
            using  'E' 'ZINT_CSTPORD_ROUTINES'
                       'PROCESS_INBOUND_DATA'
                       'Parameter LGORT is missing from ZINT_PARAM'
                       p_zint_nw
                       lwa_01-ticketnumber.                " RJS
          exit.
        endif.
        loop at l_it_05 into lwa_05
          where ticketnumber = lwa_01-ticketnumber.
          clear lwa_gm_item_create.
          lva_filemat = lwa_05-material.
          if lva_filemat eq lva_prodmat.
            concatenate 'Command ticket-' lwa_05-ticketnumber
              into lwa_hdrlevel-conf_text.
            lwa_hdrlevel-conf_quan_unit = lwa_05-unitofmeasure.
            lwa_hdrlevel-yield          = lwa_05-quantity.
    check whether the confirmed value + current delivery value is equal *
    the production order qty. If the production order value is less
    than the total delivered value, set final conf indicator  and clear
    reservations
            lva_wemng = lva_wemng + lwa_05-quantity.
            if lva_wemng < lva_psmng.
              lwa_hdrlevel-clear_res      = c_false.
              lwa_hdrlevel-fin_conf       = ' '.
            else.
              lwa_hdrlevel-clear_res      = c_true.
              lwa_hdrlevel-fin_conf       = 'X'.
            endif.
            move: 'Z1BP_PP_HDRLEVEL' to t_idoc_data-segnam,
                  lwa_hdrlevel       to t_idoc_data-sdata.
            append t_idoc_data.
            clear lva_formmat.
            lva_formmat                   = lwa_05-material.
            lwa_gm_item_create-material   = lva_formmat.
            lwa_gm_item_create-plant      = lwa_03-plant.
            lwa_gm_item_create-ref_date   = lwa_01-ticketdate.
            lwa_gm_item_create-prod_date  = lwa_01-ticketdate.
            lwa_gm_item_create-move_type  = '101'.
            lwa_gm_item_create-spec_stock = 'E'.
            lwa_gm_item_create-sales_ord  = lva_saleord.
            lwa_gm_item_create-entry_qnt  = lwa_05-quantity.
            lwa_gm_item_create-entry_uom  = lwa_05-unitofmeasure.
            lwa_gm_item_create-orderid    = lva_prodord.
            lwa_gm_item_create-move_mat   = lva_formmat.
            lwa_gm_item_create-move_plant = lwa_03-plant.
            lwa_gm_item_create-mvt_ind    = 'F'.
            clear t_idoc_data.
            move: 'E1BP2017_GM_ITEM_CREATE' to t_idoc_data-segnam,
                  lwa_gm_item_create        to t_idoc_data-sdata.
            append t_idoc_data.
          else.
            clear: lva_loggr,
                   lva_formmat.
            lva_formmat = lwa_05-material.
            select single loggr into lva_loggr from marc
              where matnr = lva_formmat
              and   werks = lwa_03-plant.
            if sy-subrc ne 0.
              clear v_messg.
              No logistics handling group - log a warning message.
              concatenate 'No logistics handling group for material'
                           lva_formmat
                          'in plant'
                           lwa_03-plant
                into v_messg separated by space.
              perform write_log_entry
                tables t_ldata
                using 'W' 'ZINT_CSTPORD_ROUTINES'
                          'PROCESS_INBOUND_DATA'
                          v_messg
                          p_zint_nw
                          lwa_01-ticketnumber.                " RJS
              clear lva_loggr.
            endif.
            if lwa_03-satsur eq 'T'.
              lwa_e1edl21-lprio = 30.
            else.
              lwa_e1edl21-lprio = 20.
            endif.
          else.
            if lwa_03-satsur eq 'T'.
              lwa_e1edl21-lprio = 10.
            else.
              lwa_e1edl21-lprio = '  '.
            endif.
          endif.
          lwa_e1edl21-berot = lwa_04-driver.
          move: 'E1EDL21'   to t_idoc_data-segnam,
                lwa_e1edl21 to t_idoc_data-sdata.
          append t_idoc_data.
          lwa_e1edl55-qualf = '001'.
          lwa_e1edl55-refnr = lva_saleord.
          move: 'E1EDL55'   to t_idoc_data-segnam,
                lwa_e1edl55 to t_idoc_data-sdata.
          append t_idoc_data.
    Loop at materials - create delivery entry for each
          loop at l_it_05 into lwa_05
            where ticketnumber = lwa_01-ticketnumber.
            clear t_idoc_data.
            lwa_e1edl24-matnr = lwa_05-material.
            lwa_e1edl24-werks = lwa_03-plant.
            lwa_e1edl24-vfdat = lwa_01-ticketdate.
            lwa_e1edl24-lfimg = lwa_05-quantity.
            lwa_e1edl24-vrkme = lwa_05-unitofmeasure.
            lwa_e1edl24-lgort = t_zint_param-zint_fv.
            clear lva_loggr.
            lva_formmat = lwa_05-material.
            clear lva_loggr.
            select single loggr into lva_loggr from marc
              where matnr = lva_formmat
              and   werks = lwa_03-plant.
            if sy-subrc ne 0.
            No logistics handling group - log a warning message.
              concatenate 'No logistics handling group for material'
                           lva_formmat
                          'in plant'
                           lwa_03-plant
                into v_messg separated by space.
              perform write_log_entry
                tables t_ldata
                using 'W' 'ZINT_CSTPORD_ROUTINES'
                          'PROCESS_INBOUND_DATA'
                          v_messg
                          p_zint_nw
                          lwa_01-ticketnumber.                " RJS
              lva_loggr = 'BBIN'.
            endif.
            if lva_loggr is initial.
              move: 'E1EDL24'   to t_idoc_data-segnam,
                    lwa_e1edl24 to t_idoc_data-sdata.
              append t_idoc_data.
            endif.
          endloop.
          clear: lva_xabln,
                 lva_vbeln,
                 l_vbfa.
    Matching ticket against a Delivery?
          select single xabln vbeln into (lva_xabln,lva_vbeln) from likp
              where xabln = lwa_01-ticketnumber.
          if sy-subrc = 0.
    If found, does this delivery match the sales order?
            select * from vbfa into l_vbfa
              where vbelv = lva_saleord
              and   vbeln = lva_vbeln.
              exit.
            endselect.
          endif.
    No matching delivery found, or Matching delivery, but for other Sls Ord
          if lva_xabln is initial
          or ( lva_vbeln <> space and l_vbfa is initial ).
            if not lva_saleord is initial.
              perform create_delivery_idocs tables t_zint_mslog
                                            using  s_idcgp
                                                   lwa_01-ticketnumber
                                                   p_zint_nw.
            else.
              concatenate 'Error finding a Sales Order for ticket "'
                          lwa_01-ticketnumber
                          '" reprocess the file AFTER'
                          ' the sales order issues have been fixed'
              into        lva_outtext.
              perform write_log_entry tables t_zint_mslog
                                      using  'E'
                                             'ZINT_CSTPORD_ROUTINES'
                                             'PROCESS_INBOUND_DATA'
                                             lva_outtext
                                             p_zint_nw
                                             lwa_01-ticketnumber. " RJS
            endif.
          else.
            concatenate 'Command Ticket "'
                        lwa_01-ticketnumber
                        '" has already been processed into delivery "'
                        lva_vbeln
            into        lva_outtext.
            perform write_log_entry tables t_zint_mslog
                                    using  'I'
                                           'ZINT_CSTPORD_ROUTINES'
                                           'PROCESS_INBOUND_DATA'
                                           lva_outtext
                                           p_zint_nw
                                           lwa_01-ticketnumber. " RJS
            refresh t_idoc_data.
          endif.
        endif.
        refresh t_idoc_data.
    Write out all messages collected so far
        perform update_data tables t_zint_mslog
                            using p_zint_id p_zint_ty.
      endloop.
    Write out all messages collected so far
      perform update_data tables t_zint_mslog
                          using p_zint_id p_zint_ty.
    endform.                    " process_inbound_data
    Thnaks
    Regards

    Thanks
    Thread closed

  • Goods Issue Control & confirmation control for Production Order.

    Dear ALL,
    Please let me know how to control,
    1) Unauthorised consumption of component quantities in excess of quantity defined in BOM?
    2) Posting of Confirmation (At operation Level) against production order for which no components have been issue?
    3) Posting of goods receipt against production order for which no components have been issued or no confirmations have been posted?
    4) Posting of goods reversal quantity in excess to issued quantity.
    Regards,

    Prashant,
    Not all the requirements you mentioned can be controlled in Standard SAP system. For some of the requirements you could configure User status (Tcode :BS02).
    exmaple :
    Posting of Confirmation (At operation Level) against production order for which no components have been issue?
    SET user status XX on Business  transaction : Release that forbids CONF.
    SET another user status YY on Business transaction : Goods movement that allows confirmation.
    With this kind of tricky user status you can control/prevent some transactions in production order till certain transactions are done.
    I know this is not the ideal solution but I have used it for various purposes to meet certain business needs.
    Hope this helps you.
    Thanks,
    Ram

  • Enhancement for Co11(Production order confirmation)

    Hi all,
    i am creating a Production order with 4 line items  (TC : Co01),
    i am confirming by the TC : Co11,
    when i press the SAVE button the 4 line items which are there in the confirmation order should be saved in my Ztable.
    Is there any Enhancement or user-exit which full fills my requirement.
    NOTE : My Ztable should be updated only after the Standard program saves the data.
    Regards,
    Rama Krishna.K

    Hi.. The following are the exits available for tcode co11.
    Exit Name           Description
    CONF0001            Enhancements in order confirmation
    CONFPI01            Process order conf.: Calculate cust.specific default values
    CONFPI02            Process order confirmation: Customer spec. input checks 1
    CONFPI03            Process order conf.: Cust. spec. check after op. selection
    CONFPI04            Process order conf.: Customer specific input checks 2
    CONFPI05            Process order conf.: Cust. spec. enhancements when saving
    CONFPI06            Process order confirmation: Actual data transfer
    CONFPM01            PM/SM order conf.: Determine cust. specific default values
    CONFPM02            PM/SM order confirmation: Customer specific input checks 1
    CONFPM03            PM/SM order conf.: Cust. spec. check after op. selection
    CONFPM04            PM/SM order conf.: Customer specific input check 2
    CONFPM05            PM/SM order conf.: Cust. specific enhancements when saving
    CONFPP01            PP order conf.: Determine customer specific default values
    CONFPP02            PP order conf.: Customer specific input checks 1
    CONFPP03            PP order conf.: Cust. specific check after op. selection
    CONFPP04            PP order conf.: Customer specific input checks 2
    *CONFPP05            PP order conf.: Customer specific enhancements when saving*
    CONFPP07            Single Screen Entry: Inclusion of User-Defined Subscreens
    CONFPS01            PS confirmation: Determine customer specific default values
    CONFPS02            PS confirmation: Customer specific input checks 1
    CONFPS03            PS confirmation: Customer specific check after op. selection
    CONFPS04            PS confirmation: Customer specific input checks 2
    CONFPS05            PS confirmation: Customer specific enhancements when saving
    For your requirement you can use, CONFPP05            PP order conf.: Customer specific enhancements when saving
    regards,
    Padma
    Edited by: Padmashree RamMaghenthar on Jul 21, 2009 4:39 PM

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Automatic TECO of a Production order

    Dear All,
    Once i do confirmation of last operation ie Goods movement as Final confirmation then
    Production order status should change from REL to TECO automatically.
    Pls guide me how to achieve this?
    Thanks

    Dear Mangalraj & Sabrine,
    Tried with BADI Workorder_cofirm order workorder_save.
    After final conf while clicking SAVE system is not returning
    DLV before saving. DLV comes after saving.
    ABAPer says no return code of DLV.
    Pls suggest some other USEREXIT or BADI
    It's urgent req of my Client
    Thanks

  • GR qty showing less than production order confirmation qty

    Hello Experts,
    Greetings.
    My issue is while doing production order confirmation(CO12),for some materials it shows less GR quantity than the confirmation qty.I m wondering how it can be possible?
    What could be the problem?
    Plz advice.
    Thanks
    Nitin

    Confirmed qty of each operation and delivery qty at the header are two different fields.   Confirmed qty will be the same with the yield to conf. during confirmation.  Whereas, the GR qty is equal to the total sum of quantity received from the order. 
    Check whether during confirmation you create auto GR or not.  If yes, then check the COGI t-code.  There might be some error log of goods receipt in there.  If no, then check GR qty in document goods movement compared to confirmed qty during confirmation.
    Hope it helps.

  • User Exit : Co11n Production Order

    Hi All,
       I am having scenario in which user can do partial/full completeion of order.
    1. First i am creating Production orders through CO01.
    2. I am using trx CO11n for confirmation.
    3. I am using MB31 for relese of these orders.
    Now my requirement is that during Co11n only i want to call MB31 through exit and want to perform partial/full confirmation.
       Please suggest me any useful exit.
    With regards,
    Pravin

    Hello Pravin,
    There are couple of exits available in Co11n however u need to be careful while giving call to MB31 as both the transactions are very critical and any one failing can create problem. u will have to critically test the program once developed. One major issue which u are going to face is in case MB31 goes through and CO11n fails then what do u do with MB31 which is already commited. Think abt these issue and then take a decision.
    CONFPP01 PP order conf.: Determine customer specific default values  
    CONFPP02 PP order conf.: Customer specific input checks 1            
    CONFPP03 PP order conf.: Cust. specific check after op. selection    
    CONFPP04 PP order conf.: Customer specific input checks 2            
    CONFPP05 PP order conf.: Customer specific enhancements when saving  
    CONFPP06 PP Order Confirmations: Actual Data Transfer                
    CONFPP07 Single Screen Entry: Inclusion of User-Defined Subscreens

  • User Exit for Production Order confirmation with CO15

    Hi All,
    what User Exit I should use when validating batch when we do Production Order confirmation with CO15.
    Not when we create or release a Production Order.
    Will reward,
    mindaugas
    Edited by: Mindaugas Kazlauskas on Jan 30, 2008 5:03 PM

    Hi
    The Follwing Userexits available:
        Transaction Code - CO15                     Enter Production order Confirmation
    Enhancement/ Business Add-in            Description
    Enhancement
    CONFPP01                             
      PP order conf.: Determine customer specific default values
    CONFPP02                               
      PP order conf.: Customer specific input checks 1
    CONFPP03                              
       PP order conf.: Cust. specific check after op. selection
    CONFPP04                             
        PP order conf.: Customer specific input checks 2
    CONFPP05                               
       PP order conf.: Customer specific enhancements when saving
    CONFPP06                               
       PP Order Confirmations: Actual Data Transfer
    CONFPP07                               
       Single Screen Entry: Inclusion of User-Defined Subscreens
    CONFPS01                              
       PS confirmation: Determine customer specific default values
    CONFPS02                               
      PS confirmation: Customer specific input checks 1
    CONFPS03                             
        PS confirmation: Customer specific check after op. selection
    CONFPS04                              
       PS confirmation: Customer specific input checks 2
    CONFPS05                              
       PS confirmation: Customer specific enhancements when saving
    CONF0001                               
      Enhancements in order confirmation
    CONFPI01                              
       Process order conf.: Calculate cust.specific default values
    CONFPI02                               
       Process order confirmation: Customer spec. input checks 1
    CONFPI03                              
       Process order conf.: Cust. spec. check after op. selection
    CONFPI04                               
       Process order conf.: Customer specific input checks 2
    CONFPI05                              
       Process order conf.: Cust. spec. enhancements when saving
    CONFPI06                              
      Process order confirmation: Actual data transfer
    CONFPM01                             
        PM/SM order conf.: Determine cust. specific default values
    CONFPM02                             
        PM/SM order confirmation: Customer specific input checks 1
    CONFPM03                               
    PM/SM order conf.: Cust. spec. check after op. selection
    CONFPM04                              
       PM/SM order conf.: Customer specific input check 2
    CONFPM05                              
       PM/SM order conf.: Cust. specific enhancements when saving
    If it is helpful rewards points.
    Regards
    Pratp.M

  • User Exit For Production Order Confirmation Using CO15 or COGI

    Hi all,
    I need user exit for the production order confirmation so that i can set
    AFPO-ELIKZ and AUFM-ELIKZ (delivery completedu2019 status flag) to Blank......
    Thanks

    hi,
    check these exits.
    CONFPP01                                PP order conf.: Determine customer specific default values
    CONFPP02                                PP order conf.: Customer specific input checks 1
    CONFPP03                                PP order conf.: Cust. specific check after op. selection
    CONFPP04                                PP order conf.: Customer specific input checks 2
    CONFPP05                                PP order conf.: Customer specific enhancements when saving
    CONFPP06                                PP Order Confirmations: Actual Data Transfer
    CONFPP07                                Single Screen Entry: Inclusion of User-Defined Subscreens
    CONFPS01                                PS confirmation: Determine customer specific default values
    CONFPS02                                PS confirmation: Customer specific input checks 1
    CONFPS03                                PS confirmation: Customer specific check after op. selection
    CONFPS04                                PS confirmation: Customer specific input checks 2
    CONFPS05                                PS confirmation: Customer specific enhancements when saving
    CONF0001                                Enhancements in order confirmation
    CONFPI01                                Process order conf.: Calculate cust.specific default values
    CONFPI02                                Process order confirmation: Customer spec. input checks 1
    CONFPI03                                Process order conf.: Cust. spec. check after op. selection
    CONFPI04                                Process order conf.: Customer specific input checks 2
    CONFPI05                                Process order conf.: Cust. spec. enhancements when saving
    CONFPI06                                Process order confirmation: Actual data transfer
    CONFPM01                                PM/SM order conf.: Determine cust. specific default values
    CONFPM02                                PM/SM order confirmation: Customer specific input checks 1
    CONFPM03                                PM/SM order conf.: Cust. spec. check after op. selection
    CONFPM04                                PM/SM order conf.: Customer specific input check 2
    CONFPM05                                PM/SM order conf.: Cust. specific enhancements when saving
    use the exit which contains both structures AFPO,AUFM.

  • Table name& field name for production order  & operation confirmation

    Hi All,
              I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
    Thanks and Regards,
    PSS

    Hi there,
    CORU(R/3 Application development: PP Confirmations )
    AFFW       Goods movements with errors from confirmatio
    AFRC       Table of planned changes to conf.: Automatic
    AFRD       Default values for collective confirmation 
    AFRH       Header information for confirmation pool   
    AFRP1      Table of planned changes to conf.: Automatic
    AFRP2      Table of planned changes for confirmation: B
    AFRP3      Table of planned changes for confirmation: C
    AFRP4      Table of planned changes to confirmatn: Data
    AFRU       Order completion confirmations             
    AFWI       Subsequently posted goods movements for conf
    TAFWD      CORU: Messages that are not interpreted as e
    TCORD      Table for field-dependent check routines   
    TCORU      Parameters for order confirmations         
    TCORV      Table with Routines for structureing variabl
    TCORW      Confirmation: Window Control               
    TPARU      Control parallelized confirmation processes
    TPRRU      Control table for process chain for confirma
    TPRRUT     Text table for process control of confirmati
    TRUGS      User status caused by deviation            
    CO(R/3 Application development: PP Production orders )
    AFBP        CIM order: Batch print requests            
    AFFL        Work order sequence                        
    AFKO        Order header data PP orders                
    AFPO        Order item                                 
    AFVC        Operation within an order                  
    AFVU        DB structure of the user fields of the opera
    AFVV        DB structure of the quantities/dates/values
    FAPW        Index of production-/issuing plant for produ
    FTIND       Missing parts index                        
    ORDCOM      Communication control Operation download   
    T024F       Production scheduler                       
    T399X       Parameters dependent on order type         
    T441C       Profile - availability check               
    T441CT      Texts for Profile "Display Availability Chec
    T490        Transactions PP - orders - order category  
    T496B       CIM order: Assigning document types to refer
    T496D       CIM: Destination/lists/spool parameters per
    T496F       CIM order: Form description of the list    
    T496K       CIM order: Entity table of possible table id
    T496N       CIM order: List descriptions               
    T496P       Print PP documents: Determination of output
    T496R       Print PP shop papers: Report control       
    T496T       Print PP shop papers: Transaction control  
    T496V       PP Print: Default Value for Printing Online
    T496Z       CIM order: Table-controlled table access   
    TC32        Assigning subscreen to processing location 
    TC34        Allocating operation to object type for the 
    TC62        Sequence of detail screens when processing h
    TCO01       Sequence/operations control in logicstics or
    TCO03       CIM order: Texts for TCO01, Description of o
    TCO04       Table for controlling the screen sequence gr
    TCO05       CUA status depending on panel, trans. type, 
    TCO06       Exclusive functions for PP orders           
    TCO09       CIM order: Text IDs of objects in orders    
    TCO10       Valuation variant for order costing         
    TCO11       Control table for production orders - availa
    TCO12       Control table production orders - stock dete
    TCO36       PP orders: Control table for calling up pop-
    TCO41       CIM order: Default values for generating ope
    TCO43       PP-SFC order profile                        
    TCO43T      Description of production scheduler profile 
    TCO60       Sequence keys for input facility and verific
    TCO61       Sequence key for PP orders                  
    TCO62       Defining screen sequences for input facility
    TCO63       Sequence of detail screens when maintaining 
    TCODB       Database fields development class CO per ord
    TCOF        Profile for missing parts info system       
    TCOFF       Profile for Missing Parts Info System: Displ
    TCOFFT      Texts for Missing Parts Info System: Display
    TCOFG       Profile for missing parts info system: crite
    TCOFGT      Texts for Missing Parts Info System: Criteri
    TCOFK       Texts for functions in milestones/trigger po
    TCOFS       Profile for Missing Parts Info System: Sort
    TCOFST      Texts for Missing Parts Info System: Sort Cr
    TCOFT       Texts for Missing Parts Info System        
    TCOKO       Constants for PP orders                    
    TCOKT       Account assignment categories for order    
    TCOP        Field selection profile                    
    TCOPS       Field selection profile                    
    TCOPT       Description of Profile for Field Selection 
    TDUMMY      Dummy structure of a table for READ with VER
    TRUG        Reason for variances in completion confirmat
    TRUGT       Text describing the reason for a variance in
    TXPR1       XPRA control - missing parts info system   
    Regards
    Hemant G

  • Booking Costs after closing Production order

    Hi all,
    There is a production order for which all components have been issued, plus GR done. Finally all variances were calculated and settlement completed. This is an MTO order.
    Now I need to know how to book additional costs against this order for the following scenarios:
    1. Time booking
    2. Addition of a materials (Users forgot to add a material, but on the shop floor it was consumed)
    What would be the most logical business solution for the above two situations. Do we need to reverse settlement in such a case or not?
    Plus additionally I would like to know why does KKAX show WIP costs on production orders already settled and closed?
    Thnks
    Regards,
    G. Coelho

    Dear Mr.Godwin ,
    Let me explain you the various stage when you add extra material/Time  in a production order :
    1.Good Issue aginst production order reservation completed  -Status GMPS  but operations are not Confirmed -CNF
    2.Production Order Final Confirmation done  but Final Issue Indicator not marked or Clear Reservation not marked  at that time .Through MIGO you can issue the extra material if they are added in the Production Order -Componenet Overview .
    All the cost will be shown as variance in Production Order -Cost anaysis -Select Costing trend -Select required field for information .
    3.You can add extra hrs only in CO11N not any other Txn based on the Define Confirmation Parametre set up -OPK4 (not over or under delivery tolerence in general valid settings )
    4.You can add extra material just after order is Created (CRTD), Relased(REL)  at Componenet-Overview -select line itm and assing at operation with item categoery L
    You can't add extra material and Time in the following state in production process :
    1.Goods Issue with Final Issue Indicator -GMPS
    2.Production Order Technical Complete for settlement -TECO
    3.Production Order Confirmation done -CNF with clear reservation .
    4.Production Order is under Settlement process duing the month end or order by order .
    Best option what we follow :
    1.Update the Production Order with fresh item which are physically issuesd from Store in SAP  to capture in the same reservation nuber
    2.Compare COO2-Dcuments Goods Movement  and MB25-Open reservation for production order , which are required to issue through MIGO.
    3.Perform MIGO for the fresh item which are added in the production order .
    4.Follow BackFalshin of compoenent during CO11N if you have Back Falshing activated in MMR/Work Centre
    5.Apply Enhancement for production  order confirmation to avoid the issue .
    CONFPP01            PP order conf.: Determine customer specific default values 
    CONFPP02            PP order conf.: Customer specific input checks 1           
    CONFPP03            PP order conf.: Cust. specific check after op. selection   
    CONFPP04            PP order conf.: Customer specific input checks 2           
    CONFPP05            PP order conf.: Customer specific enhancements when saving 
    CONFPP06            PP Order Confirmations: Actual Data Transfer               
    CONFPP07            Single Screen Entry: Inclusion of User-Defined Subscreens 
    Hope this will be usefull  for your requirement
    Regards
    JH

  • Open Production Order

    Hi have to create a report that has open sales order , open po , open pur req , open planned order and open Production order.
    I need the logic for OPEN PRODUCTION ORDERS.
    The status of the production orders are maintained in JEST Table .
      I need logic to elimate the completed production orders during my selcet . Since JEST Table has multiple entries and for some orders that are released the 'DELV'  status wil not be maintained at all at that time.
    I wil really appreciate your help , if you can tell me how to emliminate the completed production orders during my select query to get the open prod orders.
    Is there any fun moduel or bapi that wil give the Open prod orders ?? or any std report that gives open PO??
    Thanks

    for this you can use the Function STATUS_TEXT_EDIT , for this pass Objnr (get the objnr from AUFK table using the production order) it will give you the status in the LINE exporting parameters.
    Import parameters               Value
    CLIENT                          100
    FLG_USER_STAT
    OBJNR                           QM000200000010
    ONLY_ACTIVE                     X
    SPRAS                           EN
    BYPASS_BUFFER
    Export parameters               Value
    ANW_STAT_EXISTING
    E_STSMA
    LINE                            OSNO NOTE   "this is the status text
    USER_LINE
    STONR                           00
    if line CS 'DELV'
    "ignore the Order
    endif.

  • Error while raising Production Order

    Experts
    I get an error for a particular Item while raising a PRODUCTION ORDER
    'Location Input does not match the warehouse location of Item'
    I work in SAP B1 2007B - PL 18
    It will be great if someone can give me the reason/solution for the above ERROR.
    REGARDS
    KARTHIK

    Hi,
    Parent item and child items warehouses location should be same.......
    Regards
    Deepak Tyagi

  • How to find out the list of Production orders created for sales orders

    Dear All,
    Our company wants to generate a report for a List of Materials sold out in a particular Product Hierarchy. Along with that we want to know the list of Production orders created for the sales orders.
    How to identify the production orders which are created based on Sales orders.
    Kindly suggest.
    Regards,
    Mullairaja

    Check these threads
    [Sale Order & Production Order|Sale Order & Production Order;
    [Re: Linking Production Order against a Sale Order MRP run|Linking Production Order against a Sale Order MRP run;
    thanks
    G. Lakshmipathi

Maybe you are looking for