Configurable preliminary planning

Hello to everybody,
I manage configurable finished products. They have two kinds of characterictics types. Commercial caracheteristichs and functional ones.
By dependencies (procedure) and variant tables I can infer values for functional characteristics values by choosing a specific commercial characteristic.
For example: Commercial characteristics set to X infer Functional charateristic 1 to Y and Functional characteristic 2 to Z.
I have verified the functionality in the simulation of configuration.
My problems is that when I use the demand planning (MD61/MD62) the inferences doesn't function. I use thesupporting configuration points. When I set a value (usage probability) for a commercial charecteristic type the procedures seems not be active and the corresponding functional charatteristics are not derived.
Can anyone explain me why and how to do? MDPV, MDP1 transactions could help me?
Thank's in advance
Luca Pastura

What is the planning strategy you are using for this scenario ?
Thanks,
Ram

Similar Messages

  • ATP check and Check against preliminary planning for prod order

    Hi
        For same material, order type and plant for some orders ATP check is happening and for some orders Check against preliminary planning is happening.I want to know why its happening.
    Regards,
    PradeepM.

    Pradeep,
    What types of orders?  Do you mean SD orders?
    ATP check is defaulted 'on' or 'not on' by the MRP Strategy(OPPS, look for "availability check").  MRP strategy is in turn determined by the MRP strategy group in the plant-level material master.  Assuming, then, that your MRP strategy group contains only one MRP strategy (this is common), then the default check will be set by MRP strategy group.
    ATP check can subsequently be turned on/off other ways in SD, leaving you with either no ATP, or possibly an Availability check against planning.
    So, if you are talking about sales orders, and not PP orders, the most likely place for 'turning off'' the ATP check is with the schedule line category.  A close second culprit is with the requirements class of the SO item.  SD configuration will determine the default requirements type, requirements class, and the default Schedule line category.  Study the sales orders in question in VA03.  Specifically look at the requirements type (procurement tab of SO Item) and the Schedule line category (goto-item-schedule lines).  Then, look at the configuration for
    Schedule line category: OVZ8
    Mapping of requirements type to requirements class :  OVZH
    Requirements class:  OVZ0
    Look at the setting for 'AvC'.  If it is 'on', you will get ATP against product.  If it is off, you will get either an ATP against planning, or no ATP at all.
    If you wish to change the determination of the Requirements type, or the determination of the Schedule line category in SD, you should probably discuss with your local SD functional expert.  A small change here can have many unintended consequences.
    Best Regards,
    DB49

  • Error: Datasource Configuration under planning

    After Successful configuration of
    1) Foundation Services (Hyperion Shared Services)
    2) Essbase administration services
    3) Essbase Server
    4) Hyperion reporting and analysis
    5) Planning -----> Product options, Register with shared services, configure database, deploy to application server (Appache), Product Instance registration.
    I stuck with Datasource Configuration under planning-
    Steps in details---
    cheked on data source configuration and click next
    check create datasource and click next
    datasource name : essdb (my choice)
    datasource Discription : essbase DB (my choice) click next
    select my instance name : plan (from drop down menu) click next
    Select Database : MS SQL server click next
    Database type: SQL
    Port: 1433 (Default)
    Database Details:
    Product: planning
    database : p2DB (new DB, SQL)
    user: p2user (new user, SQL)
    password: ***
    click next
    Essbase server information:
    Sever : my machine name (neeraj-pc)
    user : planning (created new essbase user, external)
    password : ******
    Click next
    Error:
    at java.awt.Component.processMouseEvent(Unknown Source)
    at javax.swing.JComponent.processMouseEvent(Unknown Source)
    at java.awt.Component.processEvent(Unknown Source)
    at java.awt.Container.processEvent(Unknown Source)
    at java.awt.Component.dispatchEventImpl(Unknown Source)
    at java.awt.Container.dispatchEventImpl(Unknown Source)
    at java.awt.Component.dispatchEvent(Unknown Source)
    at java.awt.LightweightDispatcher.retargetMouseEvent(Unknown Source)
    at java.awt.LightweightDispatcher.processMouseEvent(Unknown Source)
    at java.awt.LightweightDispatcher.dispatchEvent(Unknown Source)
    at java.awt.Container.dispatchEventImpl(Unknown Source)
    at java.awt.Window.dispatchEventImpl(Unknown Source)
    at java.awt.Component.dispatchEvent(Unknown Source)
    at java.awt.EventQueue.dispatchEvent(Unknown Source)
    at java.awt.EventDispatchThread.pumpOneEventForHierarchy(Unknown Source)
    at java.awt.EventDispatchThread.pumpEventsForHierarchy(Unknown Source)
    at java.awt.EventDispatchThread.pumpEvents(Unknown Source)
    at java.awt.EventDispatchThread.pumpEvents(Unknown Source)
    at java.awt.EventDispatchThread.run(Unknown Source)
    Kindly suggest steps to cofg correctly

    details of configtool_err (Hyperion-> Logs--> Config)
    (Dec 05, 2008, 06:03:22 AM), com.hyperion.planning.HspDSRdbPanelManager, ERROR, Relational Database Connection Failed:= :[Hyperion][SQLServer JDBC Driver][SQLServer]Login failed for user 'p2user'.
    (Dec 05, 2008, 06:15:12 AM), com.hyperion.planning.HspDSRdbPanelManager, ERROR, Relational Database Connection Failed:= :[Hyperion][SQLServer JDBC Driver]Error establishing socket to host and port: 220.226.46.164:1433. Reason: Network is unreachable: connect
    (Dec 05, 2008, 10:10:06 AM), com.hyperion.planning.HspDSRdbPanelManager, ERROR, Relational Database Connection Failed:= :[Hyperion][SQLServer JDBC Driver][SQLServer]Login failed for user 'p2user'.
    Regards
    Kumar N

  • Configuration of Planning fails on new Db server.

    Hi guys,
    I want to reconfigure my EPM system 113 to new Db server machine but with old databases,(restored from old Db machine)
    All components were configured well, except Planning.
    Here is scenario,
    I have 3 system as,
    A : EPM 11.1.1.3
    B : SQL server 2005
    C : SQL server 2008
    Now I want to upgrade DB so I Import all databases from "B" to "C" then at the time of re-configuring EPM system with system "C",
    Every components were configured properly but at the time of configuration of work-space in configurator Database connection is pointing towards Planning database.
    so I changed it to work-space database and configured it get succeeded but after that I tried to configure Planning it get failed.
    any idea? Do I missed any step?
    Here is the log content,
    "configtool.log" File:-
    (Jun 11, 2012, 04:10:25 PM), com.hyperion.planning.ConfigToolUtils, DEBUG, Getting CSS instance
    (Jun 11, 2012, 04:10:25 PM), com.hyperion.css.CSSSystem, DEBUG, 20:3502:Missing file HSSLogger.properties.
    (Jun 11, 2012, 04:11:32 PM), com.hyperion.planning.HspDBConfigurator, ERROR, Error happened: 20:3008:Failed to connect to native directory.
    (Jun 11, 2012, 04:11:32 PM), com.hyperion.cis.config.wizard.RunAllTasksWizardAction, ERROR, Error:
    com.hyperion.cis.config.ProcessingException
         at com.hyperion.planning.HspDBConfigurator.configure(HspDBConfigurator.java:209)
         at com.hyperion.cis.config.wizard.RunAllTasksWizardAction.executeDbConfigTask(RunAllTasksWizardAction.java:658)
         at com.hyperion.cis.config.wizard.RunAllTasksWizardAction.execute(RunAllTasksWizardAction.java:202)
         at com.installshield.wizard.RunnableWizardBeanContext.run(Unknown Source)
    Regards,
    Narayan

    You do know that 11.1.1.3 is not supported with SQL Server 2008, 11.1.1.4 supports SQL Server 2008
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Variant configuration on planned orders, missing dependencies rules

    Dear Gurus,
    I`m facing a strange situation here. After MRP run, de material is corrected explode, but is not considering a procedure in a specific dependency rule. Instead of making the correct UoM calculation for convertion, the system is just considering the dimension of the item, and not the formula on the dependency rule.
    If I simulate the process under CU50, the explotion works fine, but, on planned order creation, the information is completely wrong.
    If does anyone have a clue on this, I`ll be glad to to give some points.
    Kind regards to all
    Oliver Formicola

    Hi Oliver.
    where is this OD assigned. Is it on the header level or lower level ? There is a restriction when it comes to MRP.
    When you create a planned order (MD11) the items are configured ie object dependencies are run only the ones attached to the items, the od's assigned the profile arenot run. Additionally , please review note 546516 that has explaination on the fields if you are using.
    Please provide more explaination if that doesnot help
    Thanks
    Amber

  • Problem in configuring Hyperion Planning Data Source configuration.

    * I have configured all the components of Hyperion Planning except Data Source Configuration. The problem is when i provide server name, username and password when the system prompts to enter the essbase server information, the system gets hang and does not respond. I am stuck in this step (data source configuration) and cannot move forward.*
    Please help me out???

    make sure given credentials are correct are not.

  • Configuring Integrated Planning

    Hi All,
    We are planning to configure BI - IP.
    The server available is SAP NetWeaver 2004s ( Abap + Java ).
    Support Packs :
    SAP_ABA               700      0014   SAPKA70014   Cross-Application Component
    SAP_BASIS            700      0014   SAPKB70014   SAP Basis Component
    PI_BASI      2005_1_700      0014   SAPKIPYJ7E    PI_BASIS 2005_1_700
    SAP_BW                700      0016   SAPKW70016  SAP NetWeaver BI 7.0
    BI_CONT                703      0012   SAPKIBIIQ2    Business Intelligence Content
    If any one configured, please advice that the above status will be sufficient to configure or any thing else required.
    Also, Please provide the steps for configuring.
    Regards,
    Venu

    self

  • Mail Server Configuration in Planning

    Hi,
    We have installed all the Hyperion Products and developed a planning application.
    Now we want to configure the mail server.
    Do we need to run the Configuration Utility for mail server configuration or any other way to configure the mail server?
    while running the configuration utility, if we use the existing RDBMS tables instead of dropping or creating new table....our application will retain or will it cause any problem to our exsting application?
    Thanks,
    Naveen Suram

    Hi,
    If you just talking about the email functionality within planning then you can set it up in planning itself.
    Log into the application as an admin owner, administration > application settings > enter SMTP server in the Email Server section. save.
    File > Preferences > Enter Email-address and Enable E-mail notification.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Configuring Dial-Plan in CME

    Have to configure the dial-plan in CME version 10
    Is ther any kind of timer setting as in Call Manager to wait for all the
    digits and to route the call properly
    If user dial 0 to reception
    if user dial 024 to internal extension
    if user dial 02433 to other site going through the voip-dialpeer
    Can We do this please help

    For sccp phones under Telephony Service for sip phone I guess under voice register global
    This is the max time to wait for another digit 
    timeouts interdigit (telephony-service)
    To set the interdigit timeout value for all Cisco IP phones in a Cisco Unified CME system, use the timeouts interdigit command in telephony-service configuration mode. To return to the default value, use the no form of this command.
    timeouts interdigit seconds
    no timeouts interdigit
    Hope it helps

  • How do I configure Dial-plan redundancy - Priority

    Hello
    I am setting up Dial Plan to single Destination PREFIX to 2 seperate gateway (not under my control).
    1st Gateway as 8 PSTN line
    2nd Gateway has 4 PSTN line
    how do I configure my cisco 3620 gateway that will allow me to route calls to 1st Gateway as long as all 8 PSTN lines are available.
    I know if you configure preference under dial plan like the one below
    dial-peer voice 88021 voip
    destination-pattern 8802T
    session target ivp4:x.x.x.x
    preference 10
    dial-peer voice 88022 voip
    destination-patter 8802T
    session target ipv4:y.y.y.y
    preference 9
    but this does not work as long as IP network is fine. I need as solution that will allow me to route calls to 2nd gateway if PSTN interfaces are all full/busy
    These 2 destination gateways are not under my control therefore, I can't request them to use my gatekeeper.
    Any other solution that I can try in my gateway
    Faisal

    This will work. The clal will be routed to the first gateway with prefernce 9 and then if the call fails, the call will be routed to the second gateway with prefernce 10.
    The only trick is the call has to fail with an error message which will tell the gateway to hunt. For example user busy will not cause the gateway to hunt. No cirucit or channle, no resource, no route to destination etc will all make the gateway hunt.
    You can on the other hand use advanced busyout on the remote gateways to tell the originating when the interfaces are busy.
    Taimoor

  • Trouble configuring Dial Plan in CallManager 7.1.3

    Hello all.
    Been trying to make my internal phones to communicate to the PSTN line through a VIC2-2FXO card on my Cisco 2911 router.
    Problem is that in past tests, I managed to configure CME to direct PSTN call through an FXO card, but it was a different scenario. I had at the time a Cisco 2801 router with CallManager Express installed on its flash, and an FXO card same as this one.
    I could also configure my scenario using SDM and other Cisco tools (graphical) which I can't now, because this Cisco 2911 won't accept SDM 2.5 to be installed.
    Anyway, I have my phones communicating with eachother internally, both the IP phones, SIP softphones and 2 analog phones connected to the network through a VG202 voice gateway.
    I'm here to ask for your help on the best way, or which steps i have to pass in order to allow my communications to be delivered to the exterior of my organization.
    I already tried all that I could find, and understand, such as Route Pattern, Application Dial Rules and several others, but still no luck.
    Can anyone help me with some guidelines on what I need to configure, or point me on some good documentation about this?
    Thank you in advance.

    Hi
    Since you are using FXO ports, I would normally configure the gateway as a H.323 router. This config should be familiar to you if  you have played with CME previously.
    Basically you would need carry out these steps:
    1) Configure dial-peers pointing to your FXO ports on the gatway (here I'm assuming you want to dial 9 for an outside line, so change the 9 if you use something different - also use whatever voice port numbers you have on your gateway):
    dial-peer voice 1 pots
    destination-pattern 9T
    port 0/0/0
    dial-peer voice 2 pots
    destination-pattern 9T
    port 0/0/1
    2) Set the ports to use PLAR to route any incoming calls to an internal extension:
    voice-port 0/0/0
    connection plar 1234                    (set an internal extension where I have 1234)
    3) Configure dial-peers pointing to CCM for inbound calls to the number you are sending the calls to:
    dial-peer voice 10 voip
    session target ipv4:x.x.x.x            (CCM IP address)
    destination pattern 1234
    codec G711a
    no vad
    4) In CCM, add the gateway as a H.323 gateway. Set:
    Device name: IP address of the gateway.
    Device Pool: something suitable or default
    Inbound Calling Search Space: Set to a CSS including your internal phones, or leave at if you haven't configured partitions
    5) In CCM, add a route pattern to match your dial-peer. E.g.
    Pattern : 9!
    Partition : a partition which your phones have in their CSS, or if you haven't configured CSS/Partitions
    Gateway or Route LIst : your H.323 gateway
    Leave other properties as-is for now.
    This should then allow anything you dial starting with 9 to be routed to the gateway, which will then strip the 9 and send the call out.
    This is a very basic setup.... there's a world of other stuff you may want to do, but it should get you started...
    Regards
    Aaron
    Please rate helpful posts

  • Error "SYSTEM FAILURE: - NULL" while configuring Planning 9.3

    Hello,
    I have installed Hyperion System 9 Planning 9.3.0.1 on Windows 2003 Server. SQL Server 2003 is the database. I have installed Shared Services 9.3 and Hyperion Administrative Services as well. System 9 BPM Architect has also been installed.
    My problem is, when I try to configure the " Data Source Configuration" under Planning. I am able to get to the page " Select the options for managing the Datasource"
    Create Datasource
    Next
    Datasource Name : Testdsn
    Datasource Description: Testing the DSN
    NextAs when I do the above procedure and click Next, I get Error " SYSTEM FAILURE: - NULL".
    Please any help in this regard is appreciated.
    Thanks in advance. :)

    Hi,
    Are you sure you re using SQL Server 2003? I thought only 2000 and 2005 were supported.
    Whats in the Configtool.log under Hyperion\Common\Config\Log?
    Seb

  • 11.1.2 Planning Configuration options

    Configuring 11.1.2 on my Win 2008 Dev box and got to a menu I am not sure what to check
    In EPM Configurator for Planning I have a window talking about Enabling each licensed product and shows
    Capital Expenditures Planning
    Public Sector Planning and Budgeting
    Workforce Planning
    I know the Public and Workforce are additional licenses on top of planning, is Capital Expenditures also? We just have a license for 'Planning' and the documentation is not to specific as to what option to select if any
    JTS

    Hi,
    Yes they are all separately licensed, have a read of the price list :- http://www.oracle.com/us/corporate/pricing/price-lists/business-intelligence-price-list-071347.pdf
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Configuration Requirement for Integrated Planning in BI 7.0 with JAVA Addin

    Hi,
    We have BI 7.0 with Java Add-in installation newly migrated to Unicode.
    BW consultants (I am BASIS Consultant) want to use "Integrated Planning".  I already checked IMG link of it & JCO destinations mentioned there are not in J2EE engine.   Even I am not able to create b'cos current setup is not on SLD.
    I would really appreciate your help on below queries :
    1) Can I configure Integrated Planning without using SLD ?
    2) Do I need to install BI JAVA to running Integrated Planning ?
    3) Do I need to install EP & EP Core ?
    I already checked most of SDN thread but sorry couldn't able to get answer to above questions.   I have checked SAP Notes : 901022, 919850, 917950.
    Your early reply would be highly appreciated.
    Thanks & Regards,
    Narsing.

    Hi Balaji,
    Thanks for information.   One thing to update with JAVA/JAVA addin portal core components gets installed.   So I didn't installed EP.  
    Now Integrated Planner is working fine.
    Thanks for your help.
    Best Regards,
    Narsing.

  • Steps to configure Planning Overview iView in MSS.

    Need help with steps to configure/implement Planning Overview iView in MSS. I have done necessary configs in Define Attributes for planning overview in Customizing for ECM in R/3.
    I have worked in ECM ECC 6.0 with employee based approval processes and now working on enh package4.
    Thanks
    Prav

    Hi Vivek,
      Thanks for taking time and answering. So, how do I integrate the Org Chart iVIew with these Position Profile and Organizational Unit Profiles pages? We do not need all the iViews that come with these pages. We only need the following
    Position Profile
    - Employee Group/Subgroup
    - Holders
    -Organizational Unit Profiles
    -Organizational Unit Search
    -Position Holders
    Thanks
    Preet

Maybe you are looking for

  • Iphone 5s cannot call out any calls, but still can receive incoming calls and sms

    Hi anyone experiencing this problem? After buying iphone 5s less than 2 months which I never did in the past, I could no longer make any phone calls out, yet i still can receive incoming calls and data. Could someone kindly assist in this? 

  • My bill has gone haywire. Why God, why?

    Uh so yea. I'm the son of my dads contract and I hate to see him upset and such. Now I don't want a sob story and all but my dad recently finished a contracting job and hasnt found a job for a month now. It's kinda scary. Anyways yea when I got my iP

  • Saving a fillable form in Adobe 7.0 Reader

    Hi, I created a fillable form in LiveCycle, and distributed through the company. If other people read it with adobe 7.0 reader they are unable to save it with the data still in it what am I missing, I have tried changing the security settings within

  • Problem with mod(x,y) in Eval y=f(x) VI

    I can't seem to get mod to work in the Eval y=f(x) VI.  I entered "mod(x,20)" for a formula and get error -23001 "Syntax error of parser".  If I instead use "x-20*floor(x/20)" which should be the exact same thing, it works - no error.  Any idea what

  • Hidden Photos and Web Galleries

    Looks like if you have an event with contains some hidden photos and you publish the event to a web gallery, the hidden photos also get published. Is there any say to prevent these from being published? Thanks.