Configure lot size for MRP

Hi Experts,
I would like to configure lot size for 3 monthly, can any one explain me the configuration procedures?
Thanks alot
Rgds,

Hi Vivek,
I copied the Z3 form MB, and changed the no of periods into 3. and there're no difference between material assigned with Z3 or MB.
We haven't activated MRP4 view, do I have to activate that view first to make this happen?
for your additional info, I use MRP type (configured) based on ROP.
Pls help.
Thanks

Similar Messages

  • Default lot size for MRP type

    Hi,
    Can we set default Lot size for MRP type ?
    Regards
    Karthik

    Dear,
    Yes you can do it by creating material master with MRP Pofile.
    First you need to create MRP Pofile in MMD1 where you need to define the LOT SIZE and MRP TYPE which you want then make these value as Fix Value.
    Then Create material master MM01 with this MRP Profile and check your result.
    Regards,
    R.Brahmankar

  • New lot size in MRP view

    Hi ALL
    Any one can suggest how can we configure a new lot size for  MRP view in ECC.
    regards
    Vikas

    Hello Vikas,
    I am not too sure ? Can you not change the field ? It doesnot need any cofiguration on the MRP view level. The value needs to be set
    Thanks
    Amber

  • Is it possible to change the Costing Lot size for preference calculation?

    Hi Gurus,
    Is it possible to change the costing lot size for the preference calculation?
    Reason for my question is: We have all prices on price unit 100
    and we want to use also the price unit 100 for preference calcalation.
    But the preference calculation always take price unit 1.
    Is there any possibility to set somewhere the costing lot size for pref.calculation?
    Thanks
    Regards
    Dieter

    Does really nobody has a hint?

  • Lot size procedure & MRP

    Dear All,
    What is Lot size procedure and how it will affect during MRP run?
    Please provide some example against explanation.

    Suppose,
    Avaialble Stock= 50
    PIR 150 on 25/06 
    PIR 60 on 27/06
    When you run MRP,
                                 Avaialble stock
    PIR 150 on 25/06       100
    Planned ordre 100       0
    PIR 60 on 27/06         60
    Planned order  60        0
    For 1st PIR, The NEt requirement is 50-150=-100, So planned order for 100 is created.
    For 2 nd PIR, the ner requirement is 50-150-60+100= -60, planned order for 60 is created.
    In toto, net requirement = Stock-total requiremens+ Total receipts
    Regards
    Ratan
    Edited by: Ratan on Jun 24, 2009 11:31 AM

  • EX lot size for maximum value

    Hi Could someone answer this, my minimum lot size is 100 and max is 500, when my PIR qty is 90 it will generate planned order for 100 where as when my PIR is 600, i am expecting the planned order qty for 500 but it always the same with minimum lot size, is there any specific reason? using mrp type PD.

    Hi Sprint,
    Well you have to go through with the lot size procedures OK. EX means lot for lot order quantity so it does not consider the MINIMUM lot size OK please check once again OK.
    If you are order quantity is 600 and maximum lot size is 500 then after running the MRP go to MD04 screen you can see there planned orders will be created so there first it will create Planned order for 500 quantity and then there will be another planned order for 100 please check once OK.
    It will consider only maximum lot size OK.
    Regards,
    Madhu.G

  • Lot Size for Split Cost

    Hello,
    My company has just had SAP installed and I am trying to confirm whether there is a  general calculation in SAP or whether it is due to the configuration that has been choosen from our implementor.
    I have costed some materials we have setup as a split cost (choice of either purchased or manufactured) and setup the mixing ratio. I then cost it but SAP generates the Lot size automatically and this can not be changed.
    i.e. 90%:10% split gives a lot size of 280 (252 and 28) and 50%:50% split gives a lot size of 200 (100 and 100).
    Please can you confirm that this is normal and also if it can be overriden?
    Thank you for your assistance

    Hi,
    This is a normal behaviour of the system.
    regards,
    Sayujya

  • Incoming message size exceeds the configured maximum size for protocol t3

    Hi All,
    I've encountered an error as follow:
    weblogic.socket.MaxMessageSizeExceededException: Incoming message of size 50004000 bytes exceeds the configured maximum of 50000000 bytes of protocol t3.
    But the request message is only 3MB, why it is enlarged to over 50M?
    There is a For Each loop section in main flow, is it because for one loop, there will be a copy of request message?
    How to enlarge message size for protocol t3?
    Go to server/protocol and change 'Maximum Message Size' for AdminServer, OSB Servers and SOA servers?
    Thanks and Regards,
    Bruce

    Hi,
    1) After setting -Dweblogic.MaxMessageSize to 25000000
    <BEA-000403> <IOException occurred on socket: Socket[addr=ac-sync-webserver1/172.24.128.8,port=9040,localport=36285]
    weblogic.socket.MaxMessageSizeExceededException: Incoming message of size: '25002240' bytes exceeds the configured maximum of: '25000000' bytes for protocol: 't3'
    at weblogic.socket.BaseAbstractMuxableSocket.incrementBufferOffset(BaseAbstractMuxableSocket.java:174)
    2) After setting -Dweblogic.MaxMessageSize to 50000000
    <BEA-000403> <IOException occurred on socket: Socket[addr=ac-sync-webserver2/172.24.128.9,port=9040,localport=59925]
    weblogic.socket.MaxMessageSizeExceededException: Incoming message of size: '50000400' bytes exceeds the configured maximum of: '50000000' bytes for protocol:
    't3'.
    And even after setting various values for -Dweblogic.MaxMessageSize , issue weblogic.socket.MaxMessageSizeExceededException was observed.
    To overcome the issue set Manual Service Migration Only as after several experiments and replicating the issue it was found out that in case of no available pinned services, must set the migration policies of the migratable targets on "Manual Service Migration Only".
    And once it is corrected; it was noticed that weblogic.socket.MaxMessageSizeExceededException issue also resolved.
    WebLogic Server can fail over most services transparently, but it's unable to do the same when dealing with pinned services.
    Pinned Services : JMS and JTA are considered as pinned services. They're hosted on individual members of a cluster and not on all server instances.
    You can have high availability only if the cluster can ensure that these pinned services are always running somewhere in the cluster.
    When a WebLogic Server instance hosting these critical pinned services fails, WebLogic Server can't support their continuous availability and uses migration instead of failover to ensure that they are always available.
    Regards,
    Kal

  • Configuring Packet size for IDOCS on outbound Side

    Folks,
    Can we configure the packet size for idocs on the onutbound side of the Adapter ?
    Manish

    Hi Manish,
    It is posible if all 1000 idocs are of same Idoc type.
    Jus go and change the occurene of Idoc in the XSD as 1..Unbounded. SO that your the message can hold multiple Idocs.
    But let me clarify here, if you send 1000 idocs from R3 , it will come to XI as one-by-one. There is no mechanism to get 1000 idocs at a time. So you need to collec all the idocs and then send it.
    Just have quick look into this
    Packaging IDOCs - SAP R3(IDOCs) -> XI -> Flat File
    Regards,
    Moorthy

  • Lot Size Planning for Procurement

    Hi  guys
    In our company we work with minimum lot sizes for procurement, and we need to configure minimum lot sizes for procurement in the SNP optimization run. It´s posible to do it in SNP, pls can someone tell me how to configure this in SNP?
    David

    Hi David,
    I am glad to hear that.
    Regarding your performance issue: it is very usual to have long runtime when using discrete model.
    The complexity of this model is much higher than a linear problem; so the optimiser takes time to find THE optimal solution.
    However there is a lot you can do to make it better:
    1. Split your model: instead of running 1 big optimiser, run serveral smaller one in parallel.Ensure your model are all independant (e.g. no common product or resource)
    2. Use decomposition: (product/ time/resource; based on your scenari) to simplify the porblem, hence speeding the solution.
    3. Set a maximum time
    You do not have to wait for THE optimal solution. The optimiser can sometime very quickly find a very good solution; the last hours are spent "fine tuning" it. Potentially, you might not be able to see the difference between a 4h job and the 15H one).
    Hence SAP advises to set a maximum runtime when working with discrete model.
    The question is how to define this maximum time to optimise the ratio solution quality / runtime.
    Answer: test it, check the result. Be aware that perfomrance testing for the optimiser can take a while.
    4. fine tune you optimiser setting
    There is a couple a finetuning that can be done to improve performance, especially for discrete model.
    I will not be able to help you woth that.
    As far as I am aware only the SAP optimiser team has the expertise to help here.
    I strongly recommand to contact them; their help is often invaluable. They will also help you to define the 3 first points.
    I hope this will help you.
    Thanks and Regards
    Julien

  • Lot size calculation for Purchase order

    Hi all,
    I want to purchase Labels which comes in lot qty such as in lot of 100,200 etc.
    For that particular items i want to do mandatory qty lot size in PO when buyers places the purchase order.
    Can anybody tell me How i can map that lot size for the particular item.
    Regards,
    Anant

    Hi,
    You can done it with change Material Master.
    Enter MM02 t-code, enter your material code and select MRP1 view.
    Here maintain Rounding value as 100 in material master.
    After when your create purchase order system put quantity as 100, 200, 300 etc.
    Regards,
    Mahesh R.

  • Table for Lot size.......

    Hi All,
         I am an ABAPER. I have to create a Lot size Review Report. In which transaction will i find the Lot size key, Lot size description and MRP Controller.
    Thanks,
    Ibrahim

    Hi,
    Happy new year,
    U can get the lot size  and mrp controller details in MARC table.
      U can get the details in MRP 1 view of material master(which also has the lot size description)(t'code:mm01  /02   /03)
    Regards
    Edited by: Hemanth Krishna.Rai on Jan 7, 2009 2:59 PM

  • Min max lot size time based for use with SNP and PPDS

    Hi all, Is there anyway to set up time based min and max lot sizes? ie we want to have a Max lot size which is small for use with the first 3 months of our plan which starts life in SNP and then converts to PPDS and into blocks for block planning, but months 4 to 36 we want to leave as large max lot sizes as there is no need to have the small max lot sizes for the different horizon.
    As far as I can see there is only a material/plant lot size  and Max lot size and no way to have a different setting in a different time period.
    Thanks
    j

    Hi John,
    As you know, in the product master, the lot size maintenance is time-independent, so that obviously can not be used for your scenario. As per my understanding, to meet this using standard functionality, you can maintain multiple product specific t-lanes (for STRs) and PDSs (planned orders) with required lot size ranges and validity dates (for short or long term horizon). But, again since the validity of t-lanes and PDSs will not be automatically rolling forward so the updating the validities will be a challenge.
    The other option could be to enhance the heuristic functionality at lot size selection step while creating order.
    Regards,
    Umesh

  • Lot size

    The parents material lot size is fixed lot size , child component lot size is 2 week lot size.  ( ie. 2 week = 10 Days ).
    question:
    If the demand for parent material in month,after MRP run the dependent requirement for child component also getting generate only one planned order.
    What are the possibilities if the parent demand in month, child requirement is needed in weekly basis .Any chance to get the child requirement in weekly by changing lot size or any other possibilities.

    Hi,
    Thanks for your answer. if we change the lot size for dependent material to weekly , biweekly or fixed etc....
    The dependent req. will generate according to the lot size that is absolutely correct. but planned order or purchase req. will create according to the parent demand (ie .Adding of dependant req. what ever falling with in the lot size period and for that quantity planned order or purchase req. is getting created )
    Actually my requirement is for the each dependent requirement one planned order should get generate .

  • Lot Size "WB - Weekly Lot Size"

    Dear All,
    I have selected lot size "WB - Weekly Lot Size" for a material.
    The Planned week start day is Monday in planned calender.
    If i run MRP for the above maintained material it is not flowing the requirment and it is not combined on Monday, it is throing on Tuesday, Thursday and all the other day including MOnday also.
    Why is this system is not throwing correctky the requirment on every MOnday.
    Is there settings need be done to get this.
    Your valuable answer will be appreciated.
    Regards,
    Nagaraj S

    Please read SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d282c44af11d182b40000e829fbfe/frameset.htm
    Please check your settings in SPRO:
    SPRO > Production > MRP > Planning > Lot-Size Calculation > Check Lot-Sizing Procedure
    ...here you can check "Scheduling" field (V439A-TERBV) of lot size "WB". And you can check also field V439A-LGTER.
    F1 help for the field:
    Scheduling for period lot sizes in short-term area
    This indicator defines the time in the period the system is to create the availability date or the start date for the lot for period lot-sizing procedures.
    The availability date is the date on which the material, including the goods receipt processing time, is available again. In the MRP list, the availability date is equal to the MRP date.
    In in-house production, the start date is the order start date, in external procurement the start date is the release date.
    The following procedures exist:
    Availability date equal to requirement date
    Availability date at period start
    Availability date at period end
    Start date at period start
    Planned order start date at period start and availability date at period end
    With this setting, the in-house processing time in the material master record is ignored.
    Note
    The following is valid in all cases:
    If the start date lies in the past, the system switches to forward scheduling. The following example illustrates how the system procedes:
    The period start is Monday and the period end is Friday. The planned delivery time is 8 days. The indicator for determining the date is set to, "availability date at period end".
    Today is Monday, a requirement is planned on Wednesday. The system has to schedule forwards. As the system works using date determination, today's date is not selected as the start date. Instead, the system determines the next period end, and uses backward scheduling to calculate a start date that does not lie in the past. This means that the end date was planned for the Friday of next Week.
    Edited by: Csaba Szommer on Aug 5, 2010 9:32 AM
    Edited by: Csaba Szommer on Aug 5, 2010 9:35 AM

Maybe you are looking for

  • External Hard Drive changed permissions to 'read only'

    I have been searching everywhere for a solution to this with no luck, so I figured I would start my own post and see what comes of it. Computer: iMac Intel 24" /3.0ghz/4gb ram/1TB WD hard drive External Drive giving me issues: Western Digital 1.5TB (

  • Not just a yellow tint!

    my iphone 3g screen has a brighter yellow light on the right side of the screen(top right corner to bottom right corner) it's like a column of yellow light and it only appears over black backgrounds.... is it normal??

  • FTP logon issues on IIS 7 using Windows Server 2008 R2

    Hi, I'm currently experiencing issues when trying to log on to an FTP server I created using Windows Server 2008 R2. The FTP web site has Enabled both Anonymous and Basic Authentication. On the Authotization Rules it has enabled Allow All Users and A

  • I have 170 go of memory left on my hard disk but it tells me that the disk is full and I can't save anything. What to do?

    I have a Macbook pro and a new hard disk was installed last march. Today, I have a message telling me that my disk is full and that I can't save anything. But when I checked my disk to see if I have any space left, it shows 170 go of free space!!! I

  • How to import a DVD

    I want to import my paid for DVD's onto my computer just like you would import a cd to put on an ipod. The apple service guy said he could not tell me how because it is not in their software agreement at apple, so I'm hoping someone can help me. Basi