Confirmation with errors in calc. actual costs for PM-order

Hi,
We have a PM-order with notifications and good movements that has tecnical completion status and is already settled. So we want to set it with bussines completion status, but an error arises: "Unprocessed future change recs for order 5009385 prevent del. flag/completion"
We already checked for automatic goods receipt pending, backflushes, etc. and the only found is an error record in actual costs calculation (trn. COFC). Looking at this record the message says: "No prices could be determined for object Activity type CONA/900097/PM-100" (message KW 407).
We checked price set for the activity type and cost center and is set for all the periods of actual fiscal year. Then looking at the details for above message, we found the following: "No price could be found for object Activity type CONA/900097/PM-100 with price indicator 7 and value type 4"
The question is: why system is trying to get price for activity type PM-100 with price indicator 7 instead of 3 as usual for our PM-orders? How price indicator is defined from actual PM-order parameters? Any idea?
Regards,
mr.

Hi
Whats your activity type category? I believe it should be 1
Your point is right, price indicator shud be 3 because while confirmation system uses the planned rate.. And price indicator pertains to actual activity price..
Check whether you have calculated or maintaned actual activity price or not in KBK6
Ajay M

Similar Messages

  • Actual Costs for Production Order

    Hi All
      I have a scenerio where they dont want any product costing methods say WIP,Variance calculation & Settlement.
      When the Goods receipt is done for production order the actual costs and the Activity costs to be valuated.
    Regards
    Jayshankar.A

    Hi,
    In our case the Standard price is updated in the material master. For this, you need to create a costing estimate using T-Code CK11N and update & release in CK24.
    When CK11N is executed the standard price is calculated for the material by taking Moving Avg Price of RM (Price indicator V) and the activity costs are calculated as per data given in KP26. These cost components are added and a final cost estimate is prepared, which is updated using T Code CK24.
    the pre-requisites are:
    1. BOM should be maintained.
    2. Routing should be made.
    For executing the same procedure for all the materials, you can use T Code CK40N.
    Hope this is what you were looking for.
    Revert for further details.
    Regards,
    Rohit.

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Actual cost for the Process Orders

    Hi Experts,
    I want to know the actual cost for total one month process orders.
    I can check actual cost for each order in COR2- by entering in to cost analysis.
    But, my request is, where to check actual cost for One perticular product for the total month (ex: 100 Orders) or certain period.
    can eny body give solution by sparing your precious time.
    adv. thanks and regards,
    Anand.M (Hyderabad)

    Hi,
    Try MCRI / MCRY or check the table entries of S027
    Regards,
    Srini

  • Errors arose during actual cost calculation

    Errors arose during actual cost calculation
    No prices could be determinedfor object activitytype company code xxxx , cost center XXXX, activity type XXXX
    Pls let me know immediately friends deperate,
    regards,
    sri

    Hi
    when you gone to the transaction code Kp26 Activity typ price/ planning after give the input press period screen or F6 function key and check what price was maintained for your period 12.
    And even you do one thing go to the transaction code KS02 or 03. Give the cost center and press enter . Then from the meny bar select Environment -> whereused list->.
    And let me confirm how you run the cost estimate for the material
    bye

  • How to analyse actual cost for each operation in Process/Production Order?

    Hi all,
    IN SAP, I know that we can analyze plan cost for Operation in Process Order/ Production Order.
    However, I can not analyze Actual cost for Operation .
    I know the object when I good issue material is ORDER, not OPERATION.
    But, as requirement of users, they want to analyze actual cost for each Operation.
    CAn SAP do this analyze?
    If Yes, What should I do in SAP to have this reports?
    THanks in advance,
    Emily Nguyen

    Hi Emily,
    as I see from one other message that you're using material ledger. Then your expectation is apparently to also see the actual costs of materials in your production order by operation.
    This is not supported. Actual material costs are handed up in material ledger multi-level settlement from one material to the next, bypassing the production orders.
    That means the production order will always contain the material costs valuated at plan price, not at actual price.
    For activity prices that might be better, when you revalue the orders at actual activity prices with CON2. But even there I am not sure that it will always be assigned correctly to the operations.
    There is currently an enhancement in development, the operation level costing. But that will affect more the planned cost side not the actuals. Might be interesting to learn more about your requirements and the use case behind.
    best regards,
                      Udo

  • ERROR: tax/calc: Build failed for . . .in variant "default": Used component

    Hi Friends,
    Could anyone help me in find the way to get rid of the above error.
    I have installed and configured the JDI, and created a sample DC with java as mentioned in the help in the NWDS.
    I created the DC, i have created Java package, but when tried to build the DC, i am getting the following :
    "<i><b>
    Nov 14, 2005 3:36:26 PM /userOut/Development Component (com.sap.ide.eclipse.component.provider.listener.DevConfListener) [Thread[ModalContext,5,main]] ERROR: tax/calc: Build failed for deloitte.dc.com/tax/calc(mydeloitte.org_MYDELOITTECOMPONENT_1) in variant "default": Used component not found: sap.com/tc/bi/bp/javaLib</b></i> "
    Please help me in this regard. Thanks for your time.
    Thanks,
    RP

    Seems like the SAP_BUILDT SCA is missing from your track. Did you check-in and import all three SCA's (SAP_BUILDT, SAP_JTECHS and SAP-JEE)?
    See http://help.sap.com/saphelp_nw04/helpdata/en/ab/6760b8d7b64b6eb74052eb5bdf1405/frameset.htm for more info.
    Message was edited by: Pascal Willemsen

  • Actual Costing for three companies

    Hi Experts,
    We are implementing SAP for 3 manufacturing companies, there are intercompany operations.
    My question is: We must perform the Actual Costing (CKMLCP) for each one or for all?
    Thanks in advance for your help!
    José Luis

    Hi MMR,
    My 3 companies belong to the same Controlling Area.
    I understand that, first I have to select only Plants of 'Company Code 1' in CKMLCP and continue with the process of actual costing.
    Then, in other Costing Run, Plants of 'Company Code 2' and finally in other costing run, Plants of 'Company Code 3'.
    Is it ok?
    Thanks in advance.
    José Luis

  • DAG - Backup failing on 1 DB only with error - The Microsoft Exchange Replication service VSS Writer instance ID failed with error code 80070020 when preparing for a backup of database 'DB012'

    Hi Board,
    i´ve search across the board, technet and symantec sites but did not found a hint about my problem.
    we drive a 2 node DAG (Location1-Ex1-mb1 
    Location2-exc1-mb1), on SP2 RU4 patchlevel with 40 Databases.
    Since some time the backup of one - and only one DB - is failing with these events, logged on the Mailboxserver on which the passive DB is hosted.
    Log Name:      Application
    Source:        MSExchangeRepl
    Date:          28.09.2012 00:37:17
    Event ID:      2112
    Task Category: Exchange VSS Writer
    Level:         Error
    Keywords:      Classic
    User:          N/A
    Computer:      Location1-Exc1-MB1
    Description: The Microsoft Exchange Replication service VSS Writer instance 1ab7d204-609a-4aea-b0a7-70afb0db38de failed with error code 80070020 when preparing for a backup of database 'DB012'.
    Followed by
    Log Name:      Application
    Source:        MSExchangeRepl
    Date:         
    01.10.2012 03:33:06
    Event ID:      2024
    Task Category: Exchange VSS Writer
    Level:         Error
    Keywords:      Classic
    User:         
    N/A
    Computer:      Location1-Exc1-MB1
    Description:
    The Microsoft Exchange Replication service VSS Writer (Instance 42916d80-36c1-4f73-86d0-596d30226349) failed with error 80070020 when preparing for a backup.
    The backup Application - Symantec Backup Exec 2010 R3 – states, this error
    Snapshot provider error (0xE000FED1): A failure occurred querying the Writer status.
    Check the Windows Event Viewer for details.
    Writer Name: Exchange Server, Writer ID: {76FE1AC4-15F7-4BCD-987E-8E1ACB462FB7}, Last error: The VSS Writer failed, but the operation can be retried (0x800423f3), State: Stable (1).
    Symatec suggests within http://www.symantec.com/business/support/index?page=content&id=TECH184095
    to restart the MS Exchange Replication Service – BUT the mentioned eventID
    8229 isn´t present on any of the both Mailboxservers.
    The affected Database is active on Location2-Exc1-Mb1 Server and in an overall healthy state. I found during my research, that below Location2-Exc1-Mb1 Server, there are not removed shadow copies present!
    This confuses me, since all Backups are normally taken from the passive copy of a Database.
    So my questions to the board are:
    * Does anyone is facing similar issues?
    * Can someone explain why snapshots are present on the Mailboxserver hosting the Active Database, whilst the errors are logged on the passive one?
    -          * Does someone know the conditions, why shadows copies remain and
    aren´t removed in a proper manner?
    What can cause the circumstance, that only 1 DB is facing such issues?
    Any suggestion is welcome!
    BR
    Markus

    Hi Lenora,
    I´ve encreases VSS / Exchange Backup Log levels to expert, before starting
    those things i´ve all tried now:
    - Backup from passive DB (forced within Symantec Backup Exec)
    - Backup from active DB (forced within Symantec Backup Exec)
    - Backup from passive DB without GRT enabled (forced within Symantec Backup Exec)
    - Backup from active DB without GRT enabled(forced within Symantec Backup Exec)
    All those attempts failed.
    But brought some more details - the backup against the active DB states, that there is still a backup in progress and therefore this backup is cancelled by VSS.
    The Solution was, that i´ve needed to restart the Exchange Replication Service on the Mailbox Server hosting the passive DB.
    Backups are working again on all DBs!
    THX for your replys.
    Best regards
    Markus

  • How to Post Actual Costs for Overhead

    Hi All,
       Kindly let me know the steps or T-Code as to how to post the actual costs for the Overheads.

    Hi
    Use the t.code KGI2 and post the actual costs for the Overheads.
    Award points if it is useful.
    Thanks & Regards,
    A.Anandarajan.

  • Failed to decrypt protected XML node "DTS:Password" with error 0x8009000B "Key not valid for use in specified state

    we have developed packages to do the followings
    Extract data from DB2 Source and put it in MS Sql Server 2008 database (Lets Say DatabaseA).From MS Sql Server 2008 (DatabaseA)
    we will process the data and place it in another database MS Sql Server 2008 (DatabaseB)
    We have created packages in BIDS..We created datasource connection in Datasource folder in BIDS..Which has DB2 Connection and both Ms Sql Server connection (Windows authentication-Let
    say its pointing to the server -ServerA which has DatabaseA and DatabaseB).The datasource connections will be used in packages during development.
    For deployment we have created Package Configuration which will have both DB2 Connection and MS SqlServer connection in the config
    We deployed the packages in different MS SqlServer by changing the connectionstring in the config for DB2 and MS SqlServer...
    While runing the package we are getting the following error message
    Code: 0xC0016016     Source:       Description: Failed to decrypt protected XML node "DTS:Password" with error 0x8009000B "Key not valid for
    use in specified state.". You may not be authorized to access this information. This error occurs when there is a cryptographic error. Verify that the correct key is available.
    ilikemicrosoft

    Hi Surendiran,
    This is because the package has been created by somebody else and the package is being deployed under sombody else's account. e.g. If you are the creator then the package is encryption set according to your account and the package setup in SQL server is
    under a different user account.
    This happens because the package protection level is set to EncryptSensitiveWithUserKey which encrypts
    sensitive information using creator's account name.
    As a solution:
    Either you have to set up the package in SQL server under your account (which some infrastructures do not allow).
    OR
    Set the package property Protection Level to "DontSaveSensitive" and add a configuration file
    to the package and set the initial values for all the variables and all the connection manager in that configuration file (which might be tedious of-course).
    OR
    The third options (which I like do) is to open the package file and delete the password encryption entries from the package. Do note that this is not supported by designer and every time you make changes to the connection managers these encryption entries come
    back.
    Hope this helps. 
    Please mark the post as answered if it answers your question

  • Actual costs for laboratory exams / Material Ledger

    Hi Experts
    I have a doubt for actual cost scenario for laboratory industry.
    My  background is for product cost for consumer goods, specially food companies, so this is a new segment for me.
    This laboratory has baseline version, no service/production order, it means all material consumption goes to cost center and they use activities to send costs from cost center to cost center.
    They have BOM for all exams (finished product). They only run CK40N for standard costs but they don't have actual cost (material ledger - CKMLCP) implemented.
    This is the issue: they want actual cost for every exam in the way we have for consumer goods industry.
    So they can analyse profitability for product (exam) x customers.
    I wounder if the same industry actual cost scenario can be applied to this business segment or if there is a special SAP solution for this segment.
    The main issue is the stock, there is no stock, it´s service. I believe we could change the account in BSX key (OBYC) for some P&L accounts but I´d like your opinion/experience.
    I hope you help me to  clarify these doubts
    Thanks in advance.

    Dear Rupesh,
    I don't think so there will be any std.report in PS module to show plan vs actual cost of material component.
    For looking plan vs actual cost in PS having many std reports but they don't show for material component.
    I think for this you need to develop a Z report which will show Plan vs Actual cost of material component.
    In CN52N report (Component overview report) you can add two fields one is for plan cost & other for actual cost.This can be one of possibilty you can try.Otherwise develop a new Z report for the same.
    For this you need to take yr abaper's help.
    Regard's
    Sandeep

  • Total actual cost for a given PM Order

    hello all,
    how do i get total actual cost for a given PM order (in IW33 under cost tab we have total actual cost)..
    is stored in table or do i need to use any function module.....
    thanks in advance....

    Hi Vinay,
    You can use the following logic for extracting the Actual cost of a PM order.
    Pass the Order No (AUFNR) in Table AUFK and fetch the Object number (OBJNR).
    Pass OBJNR value in table COEP.
    You can get the actual cost of the order in COEP table.
    Please mark this as correct if it resolves your issue.
    Regards,
    Joydeep

  • Sales order costing - tracking of actual costs at sales order item level

    Hi
    We are going with sales order costing for services
    Service material is non-valuated hence the scenario is non-valuated sales order stock
    PP module is not implemented.
    I am having following questions
    1. How to track the actual costs at sales order item level? Is Internal order/CO production order is required to be created for the same?
    2. Can I do activity confirmations directly from cost center to sales order item.
    3. Can Raw material is issued directly against sales order item.
    4. Is Sales order is a real or statistical account assignment object?

    dear friend,
    please look here:
    http://help.sap.com/saphelp_47x200/helpdata/EN/42/d7248ab27111d19e9a080009b0db33/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/EN/90/ba6cfb446711d189420000e829fbbd/frameset.htm
    reagrds,

  • Actual cost of Production Order settled to Fixed Assets

    Dear all,
    My client is doing in-house production of moulds (internal order suggestion is not accepted by the client) for which
    they have the following
    1. BOM
    2. Machine hour
    3. labour
    4. overhead etc
    5.plan value
    6. actual value
    Can i settle the actual cost of production order to Fixed Asset ?
    If yes
    what are process kindly give me if any process other then the below
    1.production order created
    2. settlement profile - FA is settlement optional
    3. allocation structure
    4. Asset created
    5 define asset in settlement rule
    Kindly give me your valuable input
    regards
    elango

    Hi,
    Although i am not CO expert , please check with your FICO consultant who are expert before make the final call.
    During settlement to a G/L account or a fixed asset, the system ignores additional account assignments that were manually specified in the distribution rule.
    Based on what i know .
    you can stipulate that settlement may be made to cost centers and orders, but not to fixed assets.
    The Settlement profile is something that you need to create a settlement rule to settle the actual costs of a sender object.
    About the Settlement rule is something that  contains the distribution rules for the sender. It will define how the way to settle the cost.
    Allocation Structure
    In the settlement structure you combine the primary and secondary cost elements into groups, in which debits are then posted to the sender objects. For each group, you specify whether (for settlement to a given receiver type) settlement is performed
    by cost element or using a settlement cost element.
    For example, you might use settlement cost elements:
      To document the purpose of an order (such as, repairs or maintenance)
      To reduce data volumes (you can combine a number of debit cost elements
    under one settlement cost element).
    TQ

Maybe you are looking for

  • Why is my apple id not showing when I try to download something?

    whenever I try to download something to my iPad, it shows up with a different apple id and password. Granted, the ids are in the same house, but there are two different devices with different apple ids. the ipod has one and my ipad has the same apple

  • Installation impossible sur ce disque

    Bonjour, Cela fait plusieurs versions de flashplayer que l'installation me dit "installation impossible sur ce disque" lorsque j'utilise l'utilitaire d'installation. J'ai tout essayé avant, et j'ai désinstallé, essayé d'utiliser un autre disque, mais

  • Wireless profiles problem

    I'm hoping that Phrakture and Dibblethewrecker see this.  I'm setting up a Thinkpad X20 with a Cisco 350 wireless card.  I grabbed the dibble-modified wireless script, and set up a new wireless-profile.  I repeatedly get the message on booting that t

  • How to refresh tags in PSE8 Organizer

    If I update a tag or change a rating, outside of the Elements Organizer, for example in CS4 Bridge, Windows Explorer or a photo editor, how can I get the PSE8 Organizer to recognise the updated IPTC information? Can I get it to re read the file infor

  • Change wireless password b209

    i have a photosmart plus b209a-m and recently changed my WEP key. now my printer won't connect b/c it's on the old key, and i can't figure out how to update it. i've checked the forums and can't find a thread for changing the wireless password for my