Constructions Industry - Use of SO BOM

Hi,
We are using ECC 6 and my client is a constuction company.
The company is using SAP material no - material type DIEN and this is entered during SO creation.
We dont keep any inventory as the nature of the business is construction/service.
For example - we have SO - Construction of 2Storey Building  - Material No = C2S
There is a template that constitute the activity being done for C2S ( ie: Excavation, Pilling, BackPilling etc) which has its corresponding cost equivalent.
The sum up cost of the activity is the SO price which include some mark up.
At the moment, this activity is manually calculate and outside of SAP.
My client now want to incorporate the template/activity with cost  to SAP - the intention is that- when a Sales Order coming in. The template will automatically captured for that  order with the corresponding price et..
Not sure but it seems the concept is to activate the BOM.
Pls consider me as totally newbie on BOM, i understand its concept but i dont know how it will be done through SAP setting..
Appreciate if i got the right approach and value all the help of how to achieve it in SAP.
Thanks in advance.
She

Hi She,
The requirement detailed by you is a typical requirement, which most of the customer wants irrespective of industry. This requirement cannot be and should not be addressed in SAP logically. The reason being that the cost of procurement will vary. In the example of Construction industry, labour price will vary from place to place withing same city, other charges like electricity consumed will also differ based on service provider, if the site is not easily approachable by regular or large teucks / containers, the cost of transportation will vary, and so on.....  This is a part of wish list a client will always have, but it is important to draw a line, beyond which even a development should not be proposed. The value will as it be required to be entered manually on most occasion, as there will be no standard price of procument.
Even if a thought is given for Development, the impact of development on the system, volume of added master data, time to be considered to trigger the event during transaction, feasiablity and system performance also require to be considered.
Regards,
Rajesh Banka

Similar Messages

  • Material master codification & inventory mgmt- construction industry

    Hi,
    I am designing the process for a client in the construction industry. The implementation will include integration with PS module. The client is working on different projects and the materials requirement for each project differ from the other.
    Example:
    Though i may have pipe at a broad level, the requirement of pipes is based on the diameter of pipes and this would ideally form multiple material codes.
    I want to know, if any of you have come across such a scenario where creation of material master to the lowest level of specification will be very tedious. And also the same material specification may not be used in more than a project.
    But at the same time, the client wants to track his inventory based on the specifications of pump received and issued / consumed.
    thanks

    hi,
    would appreciate any help on this.
    thanks

  • Construction Industry Variation Orders?

    I am working for a construction company. We are using SAP ecc6 (EHP5).
    We have service purchase orders which represent contracts with suppliers. The purchasing documents are subject to release and the number of release codes depends on the value.
    We have a requirement to handle "Variation Orders" against this contract and the variation should also be subject to release procedure on its own value. We have added complication that we can have negative value variations.
    Each variation should have an associated print document detailing the value of the variation.
    Does anybody know of any functionality to handle variations in construction industry?
    thanks
    Kevin

    CIS remains a part of OPSF and will be available with the launch of 11.5.2
    There has been talk of this being absorbed
    into the core product but as far as I am
    aware this is still only talk.
    The only part, so far, of OPSF which has
    gone core in release 11i is Gross Based VAT.

  • Material Groups for Construction Industry

    Dear All,
    I would like to know some examples of material groups which were used in Construction Industry.  Please provide some examples.
    Regards,
    S.Suresh

    Hi Suresh,
    Some of the material groups for construction industry is follows
    Cement, Steel (May be two as Structural steel, Reinforcement steel), Aggregates (like sand, blocks, flyash, gravel, metal etc), Admixer chemicals, Plumbing material, Sanitary material, Scaffolding material, Doors, windows & ventilators, Paints, Pipes & fittings etc.
    Thanks & Regards,
    VB

  • Use of Alternate BOM in Plant Maintenance

    Hi All,
    Please let me know the use of Alternate BOM in SAP PM.
    Sundar

    From SAP Help.
    The BOM structure is reflected in the different technical categories of BOM provided in the PM system:
    Simple BOM
    The first BOM that you create for a technical object or material has no defined technical category and a simple structure. It is described as a "simple BOM".
    Variant BOM
    Variant BOMs have a more complex structure. They are used to group together several BOMs to describe different objects that have a high proportion of identical parts.
    Multiple BOM
    Multiple BOMs have the most complex structure. They are used to group together several BOMs to describe one object, for which different combinations of materials are used for different production methods. Multiple BOMs are usually used in production planning and have little or no use for plant maintenance.
    Note: There is no concept of Alternative BoM for PM.

  • SAP best Practice for Construction industry in GCC countries

    Dear Pals
    Pleas let me now the link for the SAP Best Practice document for Construction industry in GCC countries.
    Thanks & regards
    Rajaram

    Hi,
    Try the link gien below:
    http://help.sap.com/bp_bl603/BL_AE/html/index.htm
    Regards,
    Amit

  • SAP Best Practices for Building construction industry

    Hi All:
    Is there any best practices available in the building/house construction industry? Can you please guide me through that?
    Thank you.
    Regards,
    - Rohan

    Yes they do
    Look here:
    http://www.simplysap.com/sap-news/sap-articles/sap-adds-60-offerings-family-of-sap-best-practices.htm
    http://www.sap.com/industries/eng_construct/index.epx
    http://download.sap.com/download.epd?context=D6B5CC86EFFB6EF10CE24BDC2B076371A3E006D336E32EFF63C3CD11CF5450FDA274E617019330E191ABE803C04F532DCFB4A0F8A50E3F32

  • CS15 - where used in specific BOMs?

    cs15 can become ridiculously large.
    instead of returning parts that have been reused for years in so many BOMs...what is a good way to restrict a where used list to only return BOMs in a specific material?
    part XYZ is used in 300 BOMs, but only want to see the main BOM 12345 and any BOMs under it where this part is used.

    Dear Straz,
    Do you mean to say the report should show only the main assembly(say For Eg the FERT material )
    alone?
    In CS15 after executing the report,click on change layout for adding the field for Level,then you click on
    filter and select at which level you need the report.
    Otheriwse you have to go for a Z report and you can use this Functional
    module,CSEP_MAT_BOM_SELECT_WHERE_USED or CS_WHERE_USED_MAT and you in the
    output you can identify the specific one's using material type or passing these values to MARA table.
    Check and revert back.
    Regards
    Mangalraj.S

  • Weather Career Change is advisable from Non IT to SAP after 10 years of experience in Construction Industry

    Hi,
    I have 10 years of experience in construction industry.My area of expertise is in project management.I before 5 years I have a strong desire to work in IT industry. But not able to get a chance.But I need a career profile change to IT industry. So I choose to do SAp ps leaning *** certification from authorised training partner.  module.please suggest
    1. whether this is advisable.
    2. Whether I need to resign from my current job.
    3. What salary I can expect from SAP job profile, as my current salary is 7 to 8 lacs.
    4. Whether I will get a job immediately after certification.
    5. Howmuch SAP PS certification Job requirement in market.
    Please advise.
    Thanks,
    Priyadarshan

    Hi Sama,
    Kindly go through below link and  all you questions will be answered.
    Career Center
    Regards
    D.Singh

  • Construction Industry Scheme (CIS)

    Construction Industry Scheme (CIS) was part of the Oracle Public Sector Financial module. According to Oracle this is now included as part of Oracle Financials v11i. Can anyone confirm that the CIS functionality is included in 11i? Has anyone been involved in implementing CIS functionality in 11i?
    Thanks

    CIS remains a part of OPSF and will be available with the launch of 11.5.2
    There has been talk of this being absorbed
    into the core product but as far as I am
    aware this is still only talk.
    The only part, so far, of OPSF which has
    gone core in release 11i is Gross Based VAT.

  • Reg: Construction Industry Blue print

    Hi Experts
    I need User Manual, BBP & con.docu for construction industry.
    also i would liketo know which cost planning is appropriate one.
    How to link with SD
    clinent requres subcontracting cost month wise.
    pl help me in the above aspects
    Thanks
    kumar

    Hi,
    It may help you.
    http://help.sap.com/saphelp_sm40/helpdata/EN/45/f6da633a292312e10000000a11466f/content.htm
    Regards
    Chandra

  • Construction industry doubt

    Hi friends,
    my company is in the construction industry and are implementing ecc6.  they make buildings and facilities for the oil and gas sector.
    the general process is that we receive a RFQ from the client, we bid and if we win the bid will be issued a PO.
    i wanted to know what will be the SD process(correct me if i am wrong), which i presume will be
    inquiry, quotation, sales order with DIP with WBS assignment which will create a WBS in PS or will it be a that once a project structure and WBS once created in PS will create SAles order?
    Regards,

    Steps to be followed in Construction industry......
    1. Once you received the PO u have to create Quotation in T Code VA21.....
    2. Then Create Project Structure in PS Module (which includes all WBS elements).
    3. Assign WBS element to Sales order Item. (PS module will create WBS, only assignment of WBS has done in SD
    4. Create Sales Order With the Ref to Quotation.
    5. Create Billing Document.
    Thanks & Regards,
    Ratish

  • Use of Sales BOM to force ATP against Bulk Material?

    Background:
    Our business was recently acquired, and we have migrated to the parent company's R/3 system.  In our previous MRP system (R/2), we planned, produced, and shipped a single bulk Material ID in Trucks, Rail Cars, Flexi-Bags, and Iso-Tainers.  In the new system, specific Material IDs are now required for each of these modes.  However, we do not store the inventory in these modes, nor do we wish to plan at this detailed level.
    Considered So Far:
    Initial suggestion was to use A.T.O. to look through a BOM and automatically create production orders for each customer order. However, this seems to add additional complexity that we do not really need, and makes changing order dates more challenging (have to move both the order and the accompanying Prod. Order).
    Desired Outcome:
    Order is entered and priced based upon the mode-specific Material ID, but inventory is relieved from the Bulk material.  In our previous R/2 system, there was a field on the material master called "Std.Prod." which stood for Standard Product Link.  We used it for synonymous products where we produced and inventoried under one name, but sold under several different names.  The customer materials were set up as type SALE and referenced the inventoried material, set as type FINI, in this Std. Prod. field.  Thus, at the header level, the user saw the SALE material, but for planning and at the batch level, the system showed the FINI.
    Options?
    I am told that, due to the amount of custom coding and user exits surrounding outputs and interfaces to EDI and other external systems, the use of Material Determination would require too much testing and potentially too much development work.  But, is it the best / correct solution to the problem?  Because right now, I don't have the ability to perform ATP against the inventoried Material, so nothing confirms.  Would the use of a 1 to 1 Sales BOM offer anything different?
    Many Thanks in Advance,
    J.P.

    Hello JP
    Material Determination (MD) works with Consignment orders, only you need to assign a MD procedure to the requisite sales document type in config ( TO code OV14). Product substitution, which is a specialized form of MD, makes use of special item cats like TAX and TAPS or TAPA and TAN for main and substitute items respectively, but you can always make copies of them and use them with consignment orders also in conjunction with item category usages like PSHP. PSEL, PSA1 and PSA2. There could be resultant issues, but unless you test you won't know them all.
    Your second question about 'Sale would go against the finished good (Truck / Rail material) while the production costs go against the Bulk', brought a new realization in me. You are ordering, pricing and delivering Truck or Rail materials, but those requirements have to be converted to Production orders for bulk material, so from a Sales and Distribution (SD) point of view you  don't need anything extra, therefore work with you Production Planning (PP) consultant to convert the requirements at  PP end?? May be without resorting to MD or BOMs in Sales, you can work with your PP consultant and with standard config or custom development, you may realize your desired outcome.
    Also as long as cost is maintained in the sales Material (Truck for example)  with due regard to the additional costs in converting Bulk to truck, you should be fine. Follow the example below:
    Standard cost of 1 ton , say X, is stored in Bulk Material master.
    Now if there is no additional cost and you just load the bulk material into a truck and if a Truck is 10 ton, then Truck material would have 10X in its material master for cost.
    But if there is some other material  and/or  labor involved in converting bulk to Truck and their cost is y, then you will have (10x+y) in your truck material. Also it is worthwhile to capture the additional cost in the Production/Assembly order via components and operations.
    Your problem is not insurmountable, but you need to assemble a team of SD. PP, MM and CO experts to design an integrated solution for you.

  • How to use BAPI_MATERIAL_BOM_GROUP_CREATE for BOM change?

    Hi All-
    I would like to know how to use the BAPI - BAPI_MATERIAL_BOM_GROUP_CREATE to change an existing BOM? I know other available function modules for changing BOMs, but I would appreciate if someone tell me how to use the above BAPI. I heard we can use this to change the BOM.
    Points will surely be awarded....
    THanks
    M A
    Edited by: Shakir on Jul 15, 2008 4:29 PM

    hi,
    data :  TESTRUN LIKE BAPIFLAG,
    CALL FUNCTION 'BAPI_MATERIAL_BOM_GROUP_CREATE'
       EXPORTING
         TESTRUN = TESTRUN
       TABLES
         ITEMASSIGNMENTS = ITEMASSIGNMENTS
         SUBITEMASSIGNMENTS = SUBITEMASSIGNMENTS
         TEXTS = TEXTS
         RETURN = RETURN
         MATERIALRELATIONS = MATERIALRELATIONS
         SUBITEMS = SUBITEMS
         ITEMS = ITEMS
         VARIANTS = VARIANTS
         BOMGROUP = BOMGROUP
       EXCEPTIONS
         OTHERS = 01.

  • Help on scenario in Real estate/Construction industry with PS,SD,MM modules

    Dear Gurus,
    Iam into implementation of a Real estate/Construction company (FI/CO,SDMM<PS modules). But we are NOT using SAP RE-FX or Homebuilding solutions (HBS).
    My Client's business scenario goes like this.
    There are two broad divisions:
    Residential properties:
    They are going to build 840 flats (divided into 14 blocks with 15 floors in each block) with amenities like club house, parking facilities etc. The flats will be sold to customers.
    Commercial Properties:
    Commercial building is divided into 60000sqft for hotel construction and 40000 sqft for retail space which includes 2 small theatres.
    The commercial complex will be retained by the client.
    Three types of residential properties will be built
    1. 4 blocks of 2 bedroom flats
    2. 5 blocks of 3 bedroom flats with 2 toilets attached which will be termed as 2+1.
    3. 5 blocks of 3 bedroom flats.
    When the customer is enquiring about the FLATS, i have to check the availability of the same.How to do this?
    Iam considering the flats as FINISHED GOODS, So How do I get those into the stock without doing intial entry using 561?( no PP module here)Is is possible to relate the stock through PS module?
    Please give your valuable ideas on this.
    Regards,
    Anbu

    Hi
    From the requirement and design planned, your each flat will be different material. If this is so then whatever material is blocked or not for sale or closed or open you can define te material sales status accordingly. hence if the status is other than released then they will give error and that information will be useful.
    If u have lot of flats which are look alike and hence any allocation of flat to any customer is ok then product allocation cab work.
    Product allocation can work good when the material has characteritics of interchangeablitily and standardization.
    No flat can be same. Eventhough u have same sq ft area same the location according to vastu and east west direction etc criteria will be unique and hence using product allocation wil result into any one flat being allocated to customer which is not desirable.
    hence according to me you can have materials with different status and that will suit ur purpose.
    Reward if helpful
    Kind Regards
    Sandeep

Maybe you are looking for

  • Umlauts in Safari not displayed correctly

    My motherlanguage is German, therefore most websites I visit are in German. In the recent days a problem with Safari came up: umlauts (ä, ö, ü, Istead there is something like ü) and other German-specific letters (ß) are not displayed correctliy, eve

  • OAS Startup OWS-08820: Unable to start oassrv process 'oassrv'.

    Dear OAS Product Manager, Oracle fellows & Developer Guys, I am using Win NT 4.0 Server, Servie Pack 5 (1280) on Intel Pentium III 550MHz PC - 256MB ram. 8GB Hard Disk 1 with C,D,E,F drives and another 4GB Hard Disk with G,H drives, all with FAT.(I h

  • Use of group by and having clause

    hi frnds can anybody explain me the use of group by an having clause in select state ment

  • Problem With NOTIF_CREATE

    Hi gurus,      Can someone tell me wheter there is a problem with std T-Code NOTIF_CREATE in SAP Solution Manager 7.0 ?     I´ve succesfully configured Service Desk, but when I execute this Transaction, I can´t assign System/IBase to the support mess

  • Need Help Adding Network Printer

    I am trying to add a network printer on a Solaris (Sun OS 5.6) system. I am doing this using lpadmin as outlined in volume 2 of the system admin guide. The printer appears on the system, but when I try sending a print job, I get the message 'Segmenta