Consumed project materials - inventory in ps ?
dear ps experts,
pl let me know whether projects materials consumed in project (ie., gr against nw pr-po done), can any where the same material shown as projects material inventory (virual)?
currently i am creating the automatic pr-material in network by using "n" item category, po is made against same pr and gr done against po, costs are posted in network, because mov type is 101.
my requirement is i wanted to show as inventory after gr done, is it possible,
why because, i wud like to raise sales order and do pgi and finally billing document.
is this possible or not? how this is achieved.
the above requirement is against customer projects scenario, pl help in guiding how this is possible in ps. my people for raising sales order/billing document, the same project materials are to be available in storage location accordingly pgi is possible.
withough pgi how the sales order/billing document is raised against the customer projects?
thanks in advance
srihari
Hi Ediga,
A results analysis is usually carried out for the billing elements in sales projects. The results analysis data includes the costs and revenues of lower-level WBS elements and activities/orders. For this reason, only the results analysis elements are settled.
When the system derives settlement rules, it generates profitability segments that contain the characteristic values of the WBS elements and the sales orders assigned to them.
Settlement rules and results analysis keys are only ever assigned to billing elements. All other objects are assigned the settlement profile "Do not settle".
Please refer following link for result analysis
http://help.sap.com/saphelp_47x200/helpdata/en/90/ba7048446711d189420000e829fbbd/frameset.htm
Also refer following site for Resource related billing
http://help.sap.com/saphelp_47x200/helpdata/en/59/54fc37004d0a1ee10000009b38f8cf/frameset.htm
Regards
Tushar
Similar Messages
-
Link between Project and Inventory?
Could you please guide me how can i get link from inventory to project?
Hi,
If you want to expense inventory to a project, you can create a transaction type with project enabled.
If you want to capture inventory cost for a project with inventory tracked, then license Project manufacturing, setups the PJM parameteres. Activate the locator control. With all these done, you can transfer inventory to projects.
Make sure you run the project cost collection report and do the import of transactions by running PRC: Transaction import from projects with source inventory.
Regards
Leo -
Is it possible to autocreate requisition from Projects for inventory items
Is it possible to autocreate requisition from Projects for inventory items with destination type of inventory in a non-manufacturing organization?Also how ti budget for inventory items based on actual cost i.e. FIFO cost?
ZeeshanHi Dina,
Hope you are fine and enjoyed the weekend.
Thanks for your help, yes there was an error in the Material Transactions form, i have corrected and PA_TRANSACTIONS interface got updated. I issued the stock to Project and there was'nt any transaction transferred to Projects.
I just want to confirm one more thing, we are using FIFO costing method, if i procure same item for 2 different projects like Qty 1 with Rate 10 for Project 123 on 1st Jan 2010 and then i receive same item Qty 1 Rate 20 for Project 124 on 10 Jan 2010. Then everything will be transferred to Projects and Projects Expediture will be updated with the receiving Transactions.
Now what if, the stock is being issued in the reverse order than it was received. Like I enter Miscellaneous issue for Project 124 first, then as per FIFO rules system will pick Issue rate of 10 because it was received first......Due to this, dont you think its wrong from the system's point of view. Infact it should pick issue rate of 20 because it was received at 20.....
One more thing, While doing Miscellaneous Transaction with Projects enabled, do the Locator Project Number and Source Project Number needs to be same. If No then whats the control that stock received for one project should be issued against that project only.
Your thoughts on this scenario.
Zeeshan -
Projected Stock-Inventory Report for APO
Hi All,
I have to develop Projected Stock-Inventory Report for APO.
I need to fetch data from APO and need to store it in BI for reporting purpose.
Do you have any idea about how to get the required data from APO system?
Where does stock data resides along with projected stock in any SNP aggregate or any table?
Regards,
Krunalkumar RathodHello,
I suppose you mean you want to export the data "stock on hand" in SNP planning book to BW.
This key figure is an auxiliary key figure that calculated by macro. The data is only diplayed in the planning book but not saved to any database table or liveCache.
In order to save it, you can add your own time-series key figure to save the stock on hand. And you'll need to create your own macro to calculate or copy from the auxiliary key figure.
A good way is you can create a macro by copying the "stock balance" macro and just change the stock on hand key figure to your own time serires key figure. Then when you need the data, you can run the macro in background job. By doing this, the stock data will be saved to the time series key figure. Then you can extract it from liveCache as normal key figures.
Please notice the time-series key figure must be assigned to correct aggregates in an SNP planning area.
Best Regards,
Ada -
Project Materials and Normal Material as a part of Sales Order
Dear Sir,
Can any body tell me d scenario when I can create Project material and Normal materials in the same sales order ?
My requirement is that I am using milestone billing. But this is applied for 1st 2 milestones only. For the rest it is delivery related billing.
So my solution is to create project material for milestone billing and actual materials for delivery related billing. So in delivery it will pick from my project stock with 601 Q movement type.
I cannot test this scenario in SAP due to some technical problem. Can anybody plz tell me that I can do this in Std SAP ?
Thanks for co-operation
Regards
KeshavDear Keshav,
Probably you need not create two materials. Create a "Z" item category group and assign it in the material Sales org 2 tab. Under "Assign Item category Group" in SD configuration, you need to map the sales Document type, Item category group and Default item category. Have default item category as TAN and Manual item category as TAO. ( please choose the default as per your need). Once you are in the sales document, have TAN item category for the line item for which you require Delivery related billing and TAO for the line item for which you require milestone billing.( You can change the default item category ..which defaults based on your configuration). Double click and notice that now a billing plan tab appears for the item relavant for Milestone billing.
I think you also have to configure the schedule line category so that the project stock is picked up while delivery. Please take help from your SD consultant.
Warm regards,
Srinivas Potluri -
I want to send the cost of manufactured items to a Project/Task .
Still I want to issue these items from inventory using a Sales Order (Sales Shipping).
Billing shall be from the Project.
Can we do the above cycle?
In another scenario, what if I want to bill from the Sales Order?Dina Rotem@Hi,
You will have to enable project manufacturing if you want to collect manufacturing cost on a project. Once you create a project, add this project to a project manufacturing organization through a PJM responsibility. Once you associate project and PJM org you will be able to put the PJM organization in the sales order line created on a Project sales order in Oracle OM. Also, mention the project number in that sales order.
Once this sales order is shipped, run the cost collection program and it will bring in the manufacturing costs to project.
Hope it helps
Regards
Kaushal -
Project wise Inventory Management
Hello
My client is in construction business. Following is the existing business process he follows :
1. Material is procured from the vendor and receive in inventory and then o demand it is released from the inventory to site of the project. (this scenario occurs rarely)
2.Material is procured from the vendor and send directly to the site of the project.
Note : One Project can have more than 1 site.
Please let me know how to map the above process in best manner.
thanks
TomasHi Tomes......
As I mentioned, you can issue the material through Goods Issue via only one document but as you want toi maintain it more that one site create a UDF called Location/Site and you may manage goods issue onr row per site.
Let say if you want to issue material under project XYZ have three sites A, B And C
And Qty as 10 Nos/Kgs on Site A with Project XYZ, 20 Nos/Kgs on Site B with Poject XYZ and 15 Nos/Kgs on site C with Project XYZ
So OpenGoods Issue document and select itms on first line and select site in UDF as A and you can find Project column also activate it through Form Setting, there you select XYZ and give qty as 10Nos/Kgs.
Second line and select site in UDF as B and you can find Project column also there you select XYZ and give qty as 20 Nos/Kgs
Third line and select site in UDF as C and you can find Project column also there you select XYZ and give qty as 15 Nos/Kgs....
I guess this way you can manage Inventory management Proejct with different site wise under one Goods Issue document. And same is applicable for all the marketing docs......
Regards,
Rahul -
Pay on Receipt for project enables Inventory Item.
Dear all,
We have this Pay on receipt scenario enable for all the procuement transaction, but while creating Receipt for Inventory Items which is Project specific Invoice in not created in the system. Can any one help regarding this why only with Inventory related project Item its not creating Invoice working fine for expense scenarios.CAn you please provide additional information,on
whether the records are interfaced to AP interface tables?
Does they error out?
Do review the MOS note "ERS Invoices Rejected In Payable Open Interface Due To Project Related Data in AP Interface Tables (Doc ID 1359013.1)" -
Project related Inventory "misc transaction" accounting
Hi Friends,
Can any expert explain me that where from the system will determine the accounting information, when we create a "project related miscellaneous transaction" (issue/receipt) from inventory and import into Project module (ver 11.5.10.2).
Thanks in advance.
SuryaHi
When user enters a Misc transaction he has to update the field Account on the Transaction form.
That would be the debit account of a misc issue transaction, The system will creadit the material valuation account of the Inventory organization (based on setup).
Dina -
List of materials inventory - using ALV
REPORT Z_LIST_MATERIALS.
TYPE-POOLS: SLIS.
TABLES:MARC, MARD, VBAP, LIPS, EKPO, VBFA, EKBE, MARM, VBBE, MARA, MBEW.
SELECTION-SCREEN BEGIN OF BLOCK SEL WITH FRAME TITLE TEXT-001.
SELECT-OPTIONS: S_WERKS FOR MARC-WERKS, " Plant
S_MATNR FOR MARC-MATNR, " Material
S_MTART FOR MARA-MTART. " Material Type
SELECTION-SCREEN END OF BLOCK SEL.
PARAMETERS: P_VARI LIKE DISVARIANT-VARIANT. " ALV Variant
CONSTANTS: FORMNAME_TOP_OF_PAGE TYPE SLIS_FORMNAME VALUE 'TOP_OF_PAGE'.
DATA: BEGIN OF INV OCCURS 100,
WERKS LIKE MARD-WERKS, " Plant
MATNR LIKE MARD-MATNR, " Material
MTART LIKE MARA-MTART, " Material Type
STPRS LIKE MBEW-STPRS, " Standard Price
AVAIL LIKE MARD-LABST, " Available
LABST LIKE MARD-LABST, " Unrestricted use
INSME LIKE MARD-INSME, " Quality Inspection
RETME LIKE MARD-RETME, " Returns
TRANS LIKE MARC-UMLMC, " Stock in transit (calculated)
UMLMC LIKE MARC-UMLMC, " Stock Transfer (plant)
UMLME LIKE MARD-UMLME, " Transfer (SLoc)
WESBS LIKE EKBE-WESBS, " GR Blocked Stock
TRAME LIKE MARC-TRAME, " Stock in transit
SPEME LIKE MARD-SPEME, " Blocked
KWMENG LIKE VBAP-KWMENG, " Sales orders
LFIMG LIKE LIPS-LFIMG, " Scheduled for Delivery
MENGE LIKE EKPO-MENGE, " Open Purch. Orders
VALUE LIKE MBEW-SALK3, " Stock Value (Calculated)
MEINS LIKE MARA-MEINS, " Unit of measure
END OF INV.
DATA: FIELDTAB TYPE SLIS_T_FIELDCAT_ALV,
HEADING TYPE SLIS_T_LISTHEADER,
LAYOUT TYPE SLIS_LAYOUT_ALV,
EVENTS TYPE SLIS_T_EVENT,
REPNAME LIKE SY-REPID,
F2CODE LIKE SY-UCOMM VALUE '&ETA',
G_SAVE(1) TYPE C,
G_EXIT(1) TYPE C,
G_VARIANT LIKE DISVARIANT,
GX_VARIANT LIKE DISVARIANT.
INITIALIZATION.
REPNAME = SY-REPID.
PERFORM INITIALIZE_FIELDCAT USING FIELDTAB[].
PERFORM BUILD_EVENTTAB USING EVENTS[].
PERFORM BUILD_COMMENT USING HEADING[].
PERFORM INITIALIZE_VARIANT.
AT SELECTION-SCREEN ON VALUE-REQUEST FOR P_VARI.
PERFORM F4_FOR_VARIANT.
AT SELECTION-SCREEN.
PERFORM PAI_OF_SELECTION_SCREEN.
START-OF-SELECTION.
PERFORM GET_MARD.
PERFORM GET_UNIT_OF_MEASURE.
PERFORM GET_MARC.
PERFORM GET_EKPO.
PERFORM GET_LIPS.
PERFORM GET_VBAP.
PERFORM GET_OPEN.
PERFORM GET_PRICE.
END-OF-SELECTION.
PERFORM BUILD_LAYOUT USING LAYOUT.
PERFORM WRITE_OUTPUT.
*& Form INITIALIZE_FIELDCAT
text
-->P_FIELDTAB[] text *
FORM INITIALIZE_FIELDCAT USING P_FIELDTAB TYPE SLIS_T_FIELDCAT_ALV.
DATA: L_FIELDCAT TYPE SLIS_FIELDCAT_ALV.
fixed columns (obligatory)
CLEAR L_FIELDCAT.
L_FIELDCAT-TABNAME = 'INV'.
L_FIELDCAT-FIX_COLUMN = 'X'.
L_FIELDCAT-NO_OUT = 'O'.
L_FIELDCAT-FIELDNAME = 'WERKS'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'MATNR'.
APPEND L_FIELDCAT TO P_FIELDTAB.
totalized columns
CLEAR L_FIELDCAT.
L_FIELDCAT-TABNAME = 'INV'.
L_FIELDCAT-SP_GROUP = 'A'.
L_FIELDCAT-DO_SUM = 'X'.
L_FIELDCAT-FIELDNAME = 'LABST'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'INSME'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'RETME'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'UMLME'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'WESBS'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'SPEME'.
APPEND L_FIELDCAT TO P_FIELDTAB.
columns with different description
L_FIELDCAT-FIELDNAME = 'KWMENG'.
L_FIELDCAT-SELTEXT_M = 'Sales Orders'.
L_FIELDCAT-SELTEXT_S = 'Sales Or'.
L_FIELDCAT-SELTEXT_L = 'Sales Orders Qty'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'LFIMG'.
L_FIELDCAT-SELTEXT_M = 'Sched. Delivery'.
L_FIELDCAT-SELTEXT_S = 'Schd. Del'.
L_FIELDCAT-SELTEXT_L = 'Scheduled for Delivery'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'TRANS'.
L_FIELDCAT-SELTEXT_M = 'Stk. in transit'.
L_FIELDCAT-SELTEXT_S = 'Stk. trns'.
L_FIELDCAT-SELTEXT_L = 'Stock in transit (sum)'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'AVAIL'.
L_FIELDCAT-SELTEXT_M = 'Available'.
L_FIELDCAT-SELTEXT_S = 'Avail.'.
L_FIELDCAT-SELTEXT_L = 'Stock Available'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'MENGE'.
L_FIELDCAT-SELTEXT_M = 'Open Orders'.
L_FIELDCAT-SELTEXT_S = 'Open Ord'.
L_FIELDCAT-SELTEXT_L = 'Open Purchase Orders'.
APPEND L_FIELDCAT TO P_FIELDTAB.
columns not displayed
CLEAR L_FIELDCAT.
L_FIELDCAT-TABNAME = 'INV'.
L_FIELDCAT-SP_GROUP = 'A'.
L_FIELDCAT-NO_OUT = 'X'.
L_FIELDCAT-FIELDNAME = 'MEINS'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'UMLMC'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'TRAME'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'STPRS'.
APPEND L_FIELDCAT TO P_FIELDTAB.
L_FIELDCAT-FIELDNAME = 'VALUE'.
APPEND L_FIELDCAT TO P_FIELDTAB.
ENDFORM. " INITIALIZE_FIELDCAT
*& Form BUILD_EVENTTAB
text
-->P_EVENTS[] text *
FORM BUILD_EVENTTAB USING P_EVENTS TYPE SLIS_T_EVENT.
DATA: LS_EVENT TYPE SLIS_ALV_EVENT.
CALL FUNCTION 'REUSE_ALV_EVENTS_GET'
EXPORTING
I_LIST_TYPE = 0
IMPORTING
ET_EVENTS = P_EVENTS.
READ TABLE P_EVENTS WITH KEY NAME = SLIS_EV_TOP_OF_PAGE
INTO LS_EVENT.
IF SY-SUBRC = 0.
MOVE FORMNAME_TOP_OF_PAGE TO LS_EVENT-FORM.
APPEND LS_EVENT TO P_EVENTS.
ENDIF.
ENDFORM. " BUILD_EVENTTAB
*& Form BUILD_COMMENT
text
-->P_HEADING[] text *
FORM BUILD_COMMENT USING P_HEADING TYPE SLIS_T_LISTHEADER.
DATA: HLINE TYPE SLIS_LISTHEADER,
TEXT(60) TYPE C,
SEP(20) TYPE C.
CLEAR: HLINE, TEXT.
HLINE-TYP = 'H'.
WRITE: TEXT-101 TO TEXT+23.
HLINE-INFO = TEXT.
APPEND HLINE TO P_HEADING.
CLEAR TEXT.
WRITE: 'User: ' TO TEXT,
SY-UNAME TO TEXT+6,
'Date: ' TO TEXT+25,
SY-DATUM TO TEXT+31,
'Page: ' TO TEXT+50,
SY-PAGNO TO TEXT+56.
HLINE-INFO = TEXT.
APPEND HLINE TO P_HEADING.
ENDFORM. " BUILD_COMMENT
FORM TOP_OF_PAGE *
FORM TOP_OF_PAGE.
CALL FUNCTION 'REUSE_ALV_COMMENTARY_WRITE'
EXPORTING
IT_LIST_COMMENTARY = HEADING.
ENDFORM.
*& Form INITIALIZE_VARIANT
text
FORM INITIALIZE_VARIANT.
G_SAVE = 'A'.
CLEAR G_VARIANT.
G_VARIANT-REPORT = REPNAME.
GX_VARIANT = G_VARIANT.
CALL FUNCTION 'REUSE_ALV_VARIANT_DEFAULT_GET'
EXPORTING
I_SAVE = G_SAVE
CHANGING
CS_VARIANT = GX_VARIANT
EXCEPTIONS
NOT_FOUND = 2.
IF SY-SUBRC = 0.
P_VARI = GX_VARIANT-VARIANT.
ENDIF.
ENDFORM. " INITIALIZE_VARIANT
*& Form F4_FOR_VARIANT
text
FORM F4_FOR_VARIANT.
CALL FUNCTION 'REUSE_ALV_VARIANT_F4'
EXPORTING
IS_VARIANT = G_VARIANT
I_SAVE = G_SAVE
IMPORTING
E_EXIT = G_EXIT
ES_VARIANT = GX_VARIANT
EXCEPTIONS
NOT_FOUND = 2.
IF SY-SUBRC = 2.
MESSAGE ID SY-MSGID TYPE 'S' NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ELSE.
IF G_EXIT = SPACE.
P_VARI = GX_VARIANT-VARIANT.
ENDIF.
ENDIF.
ENDFORM. " F4_FOR_VARIANT
*& Form PAI_OF_SELECTION_SCREEN
text
FORM PAI_OF_SELECTION_SCREEN.
IF NOT P_VARI IS INITIAL.
MOVE G_VARIANT TO GX_VARIANT.
MOVE P_VARI TO GX_VARIANT-VARIANT.
CALL FUNCTION 'REUSE_ALV_VARIANT_EXISTENCE'
EXPORTING
I_SAVE = G_SAVE
CHANGING
CS_VARIANT = GX_VARIANT.
G_VARIANT = GX_VARIANT.
ELSE.
PERFORM INITIALIZE_VARIANT.
ENDIF.
ENDFORM. " PAI_OF_SELECTION_SCREEN
*& Form GET_MARD
text
FORM GET_MARD.
SELECT MATNR WERKS LABST INSME RETME UMLME SPEME
FROM MARD
INTO CORRESPONDING FIELDS OF INV
WHERE MATNR IN S_MATNR
AND WERKS IN S_WERKS.
COLLECT INV.
ENDSELECT.
PERFORM FILTER_BY_MATERIAL_TYPE.
ENDFORM. " GET_MARD
*& Form FILTER_BY_MATERIAL_TYPE
text
FORM FILTER_BY_MATERIAL_TYPE.
LOOP AT INV.
CLEAR INV-MTART.
SELECT SINGLE MTART
INTO INV-MTART
FROM MARA
WHERE MATNR EQ INV-MATNR
AND MTART IN S_MTART.
IF SY-SUBRC EQ 0.
MODIFY INV.
ELSE.
DELETE INV.
ENDIF.
ENDLOOP.
ENDFORM. " FILTER_BY_MATERIAL_TYPE
*& Form GET_MARC
text
FORM GET_MARC.
LOOP AT INV.
SELECT SINGLE UMLMC TRAME
FROM MARC
INTO CORRESPONDING FIELDS OF INV
WHERE MATNR EQ INV-MATNR
AND WERKS EQ INV-WERKS.
IF SY-SUBRC EQ 0.
INV-TRANS = INV-UMLMC + INV-TRAME.
MODIFY INV.
ENDIF.
ENDLOOP.
ENDFORM. " GET_MARC
*& Form GET_EKPO
text
FORM GET_EKPO.
DATA: WESBS LIKE INV-WESBS,
SHKZG LIKE EKBE-SHKZG,
MEINS LIKE EKPO-MEINS,
LMEIN LIKE EKPO-LMEIN.
LOOP AT INV.
CLEAR: WESBS, SHKZG, MEINS, LMEIN.
SELECT YWESBS YSHKZG XMEINS XLMEIN
INTO (WESBS, SHKZG, MEINS, LMEIN)
FROM EKPO AS X JOIN EKBE AS Y
ON XEBELN = YEBELN
AND XEBELP = YEBELP
WHERE X~MATNR EQ INV-MATNR
AND X~WERKS EQ INV-WERKS
AND X~LOEKZ NE 'L'.
IF SHKZG EQ 'H'.
MULTIPLY WESBS BY -1.
ENDIF.
IF MEINS NE LMEIN.
PERFORM CONVERT_UNIT_OF_MEASURE CHANGING INV-MATNR MEINS WESBS.
ENDIF.
ADD WESBS TO INV-WESBS.
ENDSELECT.
MODIFY INV.
ENDLOOP.
ENDFORM. " GET_EKPO
*& Form GET_LIPS
text
FORM GET_LIPS.
DATA: LFIMG LIKE INV-LFIMG.
LOOP AT INV.
CLEAR: LFIMG, INV-LFIMG.
SELECT OMENG
INTO LFIMG
FROM VBBE
WHERE MATNR EQ INV-MATNR
AND WERKS EQ INV-WERKS
AND VBTYP EQ 'J'.
ADD LFIMG TO INV-LFIMG.
ENDSELECT.
MODIFY INV.
ENDLOOP.
ENDFORM. " GET_LIPS
*& Form GET_VBAP
text
FORM GET_VBAP.
DATA: KWMENG LIKE INV-KWMENG.
LOOP AT INV.
CLEAR: KWMENG, INV-KWMENG.
SELECT OMENG
INTO KWMENG
FROM VBBE
WHERE MATNR EQ INV-MATNR
AND WERKS EQ INV-WERKS
AND VBTYP EQ 'C'.
ADD KWMENG TO INV-KWMENG.
ENDSELECT.
INV-AVAIL = INV-LABST - INV-INSME - INV-KWMENG - INV-LFIMG.
MODIFY INV.
ENDLOOP.
ENDFORM. " GET_VBAP
*& Form GET_UNIT_OF_MEASURE
text
--> p1 text
<-- p2 text
FORM GET_UNIT_OF_MEASURE.
LOOP AT INV.
SELECT SINGLE MEINS
FROM MARA
INTO INV-MEINS
WHERE MATNR EQ INV-MATNR.
MODIFY INV.
ENDLOOP.
ENDFORM. " GET_UNIT_OF_MEASURE
*& Form GET_OPEN
text
FORM GET_OPEN.
DATA: BEGIN OF XTAB OCCURS 10, " Open orders table
WERKS LIKE EKPO-WERKS,
LGORT LIKE EKPO-LGORT,
MATNR LIKE EKPO-MATNR,
MENGE LIKE EKPO-MENGE,
MENGK LIKE EKPO-MENGE,
END OF XTAB.
RANGES: L_WERKS FOR MARD-WERKS.
LOOP AT INV.
REFRESH XTAB.
CLEAR: XTAB, L_WERKS.
MOVE INV-WERKS TO L_WERKS-LOW.
CALL FUNCTION 'MB_ADD_PURCHASE_ORDER_QUANTITY'
EXPORTING
X_MATNR = INV-MATNR
X_MEINS = INV-MEINS
X_ELIKZ = SPACE
X_LOEKZ = SPACE
TABLES
XTAB = XTAB
XWERKS = L_WERKS.
MOVE XTAB-MENGE TO INV-MENGE.
MODIFY INV.
ENDLOOP.
ENDFORM. " GET_OPEN
*& Form GET_PRICE
text
FORM GET_PRICE.
LOOP AT INV.
SELECT SINGLE STPRS
FROM MBEW
INTO INV-STPRS
WHERE MATNR EQ INV-MATNR
AND BWKEY EQ INV-WERKS
AND BWTAR EQ SPACE.
IF SY-SUBRC EQ 0.
INV-VALUE = INV-STPRS *
( INV-LABST + INV-INSME + INV-TRANS + INV-SPEME ).
MODIFY INV.
ENDIF.
ENDLOOP.
ENDFORM. " GET_PRICE
FORM CONVERT_UNIT_OF_MEASURE *
text *
--> P_MATNR *
--> P_VRKME *
--> P_QUANT *
FORM CONVERT_UNIT_OF_MEASURE USING P_MATNR P_VRKME P_QUANT.
DATA: UMREZ LIKE MARM-UMREZ,
UMREN LIKE MARM-UMREN.
SELECT SINGLE UMREZ UMREN
INTO (UMREZ, UMREN)
FROM MARM
WHERE MATNR EQ P_MATNR
AND MEINH EQ P_VRKME.
IF SY-SUBRC EQ 0.
COMPUTE P_QUANT = ( P_QUANT * UMREZ ) / UMREN.
ENDIF.
ENDFORM.
*& Form BUILD_LAYOUT
text
-->P_LAYOUT text *
FORM BUILD_LAYOUT USING P_LAYOUT TYPE SLIS_LAYOUT_ALV.
P_LAYOUT-F2CODE = F2CODE.
P_LAYOUT-ZEBRA = 'X'.
P_LAYOUT-DETAIL_POPUP = 'X'.
ENDFORM. " BUILD_LAYOUT
*& Form WRITE_OUTPUT
text
FORM WRITE_OUTPUT.
SORT INV BY WERKS MATNR.
CALL FUNCTION 'REUSE_ALV_FIELDCATALOG_MERGE'
EXPORTING
I_PROGRAM_NAME = REPNAME
I_INTERNAL_TABNAME = 'INV'
I_INCLNAME = REPNAME
CHANGING
CT_FIELDCAT = FIELDTAB.
IF SY-SUBRC <> 0.
WRITE: 'SY-SUBRC: ', SY-SUBRC, 'REUSE_ALV_FIELDCATALOG_MERGE'.
ENDIF.
CALL FUNCTION 'REUSE_ALV_LIST_DISPLAY'
EXPORTING
I_CALLBACK_PROGRAM = REPNAME
I_STRUCTURE_NAME = 'INV'
IS_LAYOUT = LAYOUT
IT_FIELDCAT = FIELDTAB
I_DEFAULT = 'A'
I_SAVE = G_SAVE
IS_VARIANT = G_VARIANT
IT_EVENTS = EVENTS[]
TABLES
T_OUTTAB = INV.
IF SY-SUBRC <> 0.
WRITE: 'SY-SUBRC: ', SY-SUBRC, 'REUSE_ALV_LIST_DISPLAY'.
ENDIF.
ENDFORM. " WRITE_OUTPUT
by: akshatHi ,
User transaction MC.9 it will show inventory , value etc as per yor requirement.
Regards
Hari -
Sale of consumed Maintenance Materials
Hi
Gurus, pls give ur valuable input for the below my Requirement.
our Plant people consumed one material say ( consumable). Against the Maintenance order tat material is issued to maintenance dept. and they used it. after tat the used item, ( it can be sale material) our client is wanted to sale . sale material which will be different group like scrab
how to do the above process
waiting for your reply
Regards
CharlesDear,
S u are right,and i can understand the process,
wat i have to do for this,
created one maintenance order, and goods issue for ( X material ) through movement type 261 & which we want to sale the scrab (material Y) is get back to stores by movement type 262 against same maintenance order no.
am i right ?
Regards
charles -
Monitoring of materials used in projects
hi,
we use projects for construction projects..
at start of projects, we have list of all materials needed for the project (from estimating department)
during the project, materials and qty have changes due to variations and wrong estimates
at the end of project, the actual materials used is different from initial estimates..
now what i need is how to best maintain/monitor/track the materials at the beginning, during and after the project in terms of variance and change in materials and quantities..
any input would be appreciated..
thanks in advance..Hello Ramesh
I understand your response on the plan version, but rather than a plan version, have you considered a project version.
I have used this technique before when I want a snapshot of the project at the time of release so that I can compare changes to the dates at time of approval (effectively my baseline) against the current scheduled dates as the version dates would not be able to be changed or rescheduled.
I did not have material ordered from projects so I cannot say whether the material/price is also captured in the version snapshot.
You may need to develop custom reports to read the project version that is stored to compare against the current active/operating version.
Regards
Stuart -
Report to list Inventory transactions according to their Project Code
Dear Experts,
Is there any standard report in SAP to list the Inventory transactions according to different Projects?
If not, please advice me on the query that is necessary for it.
Much Thanks!
Warmest Regards,
ChinhoHi!
You can use Inventory Posting List Report under Inventory Reports.
Click Expand option on the same and select your project and inventory documents there. -
Projects Inventory Destination PO Charge Account
Hi,
Can anyone tell me, where does the PO Charge Account defaults from in case of a Project related PO with Inventory Destination.
Does it default from the Cost Group attached to the Project using PJM ?
Or does it default from the Inv Org Level ?
Regards,Charge Account comes from Inventory Org setup and for receiving as well, In case of projects
for Inventory Items - -> It comes from inventory org setup , if you define project mfg setups as cost group as Project and Inventory and transfer of accounting to Gl (from projects or Inventory) based on the options you set the accounting is derived
for Non Inventory Items @ PO - Charge account, generally you customize the workflow PO:Default Account generator to derive the accounts
same in case on REQ as well
hope this answers
Best Regards
Krishna -
Slow moving items report for project stock
Hi ALL,
We are using project stock to manage all of our inventory. As the standard slow moving items report (MC46) does not contain project stock (special stock Q), we would like to develop a report then. "Slow moving" should be identified by material, plant, storage location and WBS.
Has any had this experience? What's the main data logic for this report?
Thanks a lot!!Dear,
Do One thing.. First goto MB5B - stocks on posting date and select to display only special stock indicator Q (Project). By this you can abstract all Project materials. Save the output into Excel. (The main aim is first abstract the project stock materials into a list with a suitable transactions - MB5B or MB52).
Then run MC50 or MC46 using these materials saved in excel file.
Try this.
Regards,
Syed Hussain.
Maybe you are looking for
-
Spinning wheel of death while using photoshop, chrome and spotify
I have a fairly new MacBook Pro which – on a bad day – keeps showing me 5x a day the spinning wheel of death for about 15 min, then it catches up again. the programms which are mostly unresponsive are photoshop, Chrome, spotify, skype. I tried lots o
-
Dear Frndz, I have to create a PO for a material against a vendor. In my Material master I have given H (Orgin) as my valuation category. I have assigned valuation types(which includes my vendor also) for this Valuation category. Now when I create a
-
Any tool like pkgtool2 exists for simple packaging
I have used pkgtool2 [from Slackware] and know enough to get by with making TGZ out of a tree and some about making RPMs if there a tool in the works for simplfying package building ?
-
Read from a file(integers)
I have a data.txt file like: 40 2 4 5 How can I read those four integers from the file? Thanks
-
Backup / sync icon remains red