COPA document in ETO (Engineer to Order) Scenario with milestone billing

Hi All
I have some issue in COPA document generation in ETO Scenario.
In ETO scenario, we have following important points
--- Milestone billing (30 % downpayment, 60% on shipping and remaining 10% with closing invoice) in the Billing plan.
--- We have dropship ment kind of scenario where the Purchase requisition is created while creation of Sales order.
--- While GR for PO whill be statistical and we will be booking COGS in GR
We have an issue in COPA document while billing. The quantity field is not getting updated.
Please help.
Regards
Neeraj Bhardwaj

Hi,
  Is this the same functionality as Revenue Recognition in SD ? In that case please refer note note 619498.
regards
Waman

Similar Messages

  • Copa document for free of charge orders not relevant for billing

    Hi all,
    when we create the shipment costs of the samples goods the systems give us this error: ME083 "Entre Profit. segment".
    The mistake is related to the missing profitability segment in the sales order of samples goods there are not valid for the billing.
    How can we generate a profitability segment for free of charge sales orders not relevant for the billings?
    The Item Category is not relevant for the billing and we can't modify it.
    Thanks in advance.
    Best regards.
    Matteo

    Hi Sanil,
    unfortunatly we can't create the billing. Due to fiscal requirements only sales orders and delivery exist.
    We can't generate an invoice even with zero value.
    The SD item category is not relevant for billing, so in the sales order no profitability segment is generated.
    This is the standard functionalty of SAP, but we need to generate a profitability segment in the sales order because the shipment cost need it (transportation module of SAP).
    All the other SD flow (sales orders with invoices) run already well.
    Thanks
    Matteo

  • Engineer to Order Scenario-Target Costs and Stock Valuation

    I have got a query  pertaining to Engineer to  Order Scenario. A production order has been created with WBS element as the account assignment .Its a valuated project stock scenario, with configurable material. As per SAP standard behaviour  and my limited knowledge, the Goods Receipt for FERT/HALB happens according to either of the four strategies:
    •     Standard Price ( if there exists one)
    •     Customer Exit COPCP002
    •     Sales Order Cost Estimate
    •     Preliminary Order Cost Estimate for prod order
    However ,I have come across a case where although a preliminary order cost estimate exists for the production order, the system is not able to determine target costs. As a result the entire variance is posted as remaining variance at the time doing a variance calculation on the production order. Moreover at the time of Goods Receipt for FERT material,the system passses an entry Price diff A/c -Debit to Cost of Production, instead of debiting Inventory  and crediting cost of production(Price Control is S, no standard price exists for the material)
    Thus my query is :
    1) In case of Engineer to Order Valuated Stock Scenario where prod order is created with reference to WBS element, how is the standard price (or target costs for version 0) determined
    2) Under what situation at the time of goods receipt ,will an entry " Price diff A/c Dr & cost of production-Credit will be posted, instead of  Inventory A/c being debited?
    Awaiting a reply
    -Regards
    Amit Kulkarni

    Hi Amit
    the easy answer first: The standard price is just taken out of the material segment without WBS assignment. That means if you maintain a standard price in the accounting view of the material master for the material number + plant that will be the fallback to be used. That will at least reuslt in a inventory posting, instead of pure price differences (against a price of zero)
    Why your production order cost estimate could not be derived I cannot say. But he first startegy will be to search for the cost estimate to the WBS. Is there not something in the project system to perform a project costing and save it? in that case that will be searched and used for the order target cost and inventory posting.
    best regards,
                      Udo

  • Sales order with milestone billing

    Hi,
    We are migrating sales orders with milestone billing to ECC 6.0 system.   There are line items in the sales orders in the billing plan which have been completely billed.  For line items which have not been billed, there is billing block which flows from the WBS element attached to the line item.
    We want to transfer the sales orders to the new system with same status of billing completed for the line items for billing dates which have been billed.  This will ensure that billing is not done again in the new system for these billing dates.
    Kindly guide as to how we can achieve this.
    Regards,
    T Saravanan

    Hi,
    We are moving the orders from ECC 6.0 system to ECC 6.0 system only.
    The challenge is to that customer wants the orders with milestones  completely billied as it is in the system.
    When we bring the orders to the new system, how to ensure this status for milestones which have already been billed.
    Regards,
    T Saravanan

  • COPA document for free of charge orders

    Friends,
    We are using free of charge orders (ZFD) with Item category ZKLN. I understand COGS will be updated during delivery and no accounting is posted during billing. Also I thought no COPA document is generated but in our case it is generating a COPA document posting COGS. Client doesn't want this.  Can you guide me where this setting is to make sure no COPA document is generated for  free of charge orders.
    Thanks in advance

    I agree with Ajay that this is not really a wise thing to do but, as it happens, my current client asked me to do the same thing recently. 
    I suggested to them that we keep the postings to CO-PA, but exclude them from reports by using the Item category as a report selection criteria (could even be hard-coded into the selection criteria so the user is unaware of it). That way you don't lose the data and it can still be reported if anyone ever requires it.
    Unfortunately, they didn't accept my suggestion so I had to exclude the CoGS postings from CO-PA. I did this by using the valuation enhancement  COPA0002 (EXIT_SAPLKEAB_001). The code in the exit just says that where the Item category is for a free sale (ZTANN in our case), set all value fields to zero.
    An alternative, if you can have a unique billing type for these "sales", would be to use the "Reset Value Fields" settings in config (KE4W). In that case, you wouldn't need to use the exit.
    Hope that helps.
    Regards,
    Marc

  • No accounting documents posted for Make to Order Scenario

    Hi!
    We are following the make to order scenario, but for product costing following product cost by order.
    When goods receipts/goods issue are posting ( movement types: 101E & 601E), there are no accounting documents got generated.
    can you suggest any one what I have to do?
    I am OBYC settings are ok.
    regs,
    ramesh

    Hi
    Check the account assignment category in the PO and check for the relevant GL account assignment.
    It is purely the assignment.
    Also check the field status settings for the movement types.
    Reg
    Suresh

  • Need no document flow update for sales order create with reference

    Dear All.
    We would like to have the ability to create a sales order with reference to another sales order, and have the document flow of the sales order not updated.
    Unlike the case of a standard create with reference where the documents are linked, in this case there is no relationship between the documents.  The first document is just acting like a template for the remaining documents, to save time during order entry.
    We have turned off update of document flow at the line item level.
    But I don't see a way for us to turn this off at the header (document level).  So wondering if there's another way to turn this off, or possibly through user-exit or VOFM requirement?
    Has anyone else done this?
    I think that CRM has this functionality, but we're still entering orders through ERP-SD.
    Many Thanks!

    Hello Colleague;
    The issue you have reported is SAP standard.  The checkbox "Update Document Flow" (V_TVCPAAP-UPFLU) controls document flow at item level.  If this checkbox is set to blank, there will be no document flow at item level.
    However, the document flow cannot be completely turned off - if the 'update document flow' indicator is blank, you will still see an entry in the document flow, but there will be no update to table VBFA (Sales Document Flow) and the document flow of the predecessor will not be updated at item level (no record in VBFA at item level).                                                                               
    The reason is that the system checks VBAP (Sales Document: Item Data) for fields VGBEL (Document number of the reference document) and VGPOS (Item number of the reference item) for values.  You will always have document flow information on header and item level in the successor because it stores this information in table VBAP.                                                                               
    Related with this issue, you can find a Note 53383 for your review.
    I hope it can clarify the case.
    Regards
    Ruy Castro

  • Sales order with milestone billing in real estate scenario

    dear Sir;
    My client is in real estate buisness; typically the process is sales order-mile stone billing. my client requirement is that they wants to change the sales order value in between milestone.
    for ex: if sales order value is Rs 100 and they done billing of Rs20 by milestone billing, they wish to change the order value to Rs 80.
    currently we are following process like reversing all the billing doc and posting and change the sale order value and re billed it.
    please suggest some suitable solution.
    regards
    Ashish

    Dear Friend,
    This can be done by configuring billing plan in SAP SD.
    Go through the following links.
    Configuration of Milestone billing / Periodic Billing
    Billing plans
    Thank you,

  • Customer Retrun Scenario with out billing (Invoicing)

    Hi Expert,
    We have customer return scenario in quality, As per SAP standard practice inthis senario sales order created, sales order delivery with pgi and billing happen for this order and material sent to customer. If any defect arises at customer end then retrun sales order will create and will follow standard procedure sales along with quality process.
    But in our case std case also appliable with one diffrent case like Sales order created against customer. Sales order delivery with PGI and delivery note is sent to customer. Product is sent to customer site and this product is certified with third party (Govt) which is having legal requirement.
    If this product meet to specification then only billing will take place for this product by client. this is case will be used only in subsidary case. 
    if this product fails to meet legal product specification then client need to replace this product to customer with new part. can you guide us how to handle this scenario from quality perspective.
    Best Regards,
    Dev

    For above standard process you can do PGI inspection (insp type 10), that should be not an issue in this case.
    Now when you send this item to customer and if it doesn't meet specified spec requirement then you can create customer complaint notification in system and in this notification you can map all required steps as task. Even from this notification through "action box" you can generate inspection lot also if testing required for replaced part.
    So map your req with customer complaint quality notification to meet quality requiremnts.

  • Make to Order Scenario Process Flow

    Hi Friends -
    I am looking for simple Make to Order scenario with BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    Pls correct me if I my process flow is wrong or requires modification.
    I will appreciate if you can validate the above process flow and guide me to execute the same in the system.
    Pls help me on configuring the system and setting up the materials and related master data for the same.
    Thanks in advance
    Purnendu

    Dear GSL - Pls check the following details
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - 0004, and General Item Category group as 0004 ( Make to Order / Assembly).
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6 When I try to create a Sales Order for the finished material it is giving message
    Configuration not possible for material 747 : Reason 3 --> Help
    Message no. V1360
    Diagnosis
    This may have been caused by one of the following:
    1. The configuration profile for the material allows or requires the bill of materials to be exploded during order processing. However, a plant has not been specified in the item.
    2. The configuration profile of the material allows or requires the bill of materials to be exploded during order processing, but the order quantity in the item must be greater than 0.
    3. A configuration profile has not been maintained
    or
    A configuration is not permitted for the material
    or
    4. The configuration profile of the material allows or requires the bill ofmaterials to be exploded during order processing. However, the system could not determine a date because important data is missing from the item (see incompletion log).
    This message is also coming in the Incompletion log f the sales order.
    I have not checked the Configurable Indicator for the material in the Basic Data 2 view of the materials master, but still the message related to Configuration is coming.
    Pls help e on this.
    Thanks and warm regards
    Purnendu

  • COPA document is not generating for import sales billing document.

    Hi Gurus,
    At the time of billing i got an error that condition type is not assigned to COPA. I assigned the condition type in KE4I and the entry posted but no COPA document generated.
    Why the COPA document not generated?
    Is there any link between billing type and COPA? if yes, then where we link the same to copa!
    Note:- COPA document is generating for other billing documents.
    What are the criterias for system to determine the generation of COPA documents?
    It is urgent.
    Regards,
    Ramakanta

    Hi ,
    I am really very much appreciate your cooperation for the issue.
    When i try the same through KE4S in test run system is showing the below lines.....
    Number of billing documents read:                        1
    Number of line items to be transferred:                  0
    No. of billing doc. items already transferred:           0
    Number of billing docs with errors:                      0
    Note:- Number of line items to be transfered  0  then there is nothing to transfer to COPA.
    Please suggest.

  • COPA DOCUMENT IN STOCK TRANSFER SCENARIO-INTRA COMPANY

    HI,
    Currently in our current organisation in  case of STO we are fallowing Stock Transport Order with Delivery via Shipping but without Billing.
    It was  creating GI/GR/Delivery Document along  while PGI.However no COPA document creating. Business want to charge some cost for movement of good between plant like freight/ service fee, which they want to flow COPA in STO scenario.
    The data to post in COPA would include:
    - Period
    - Year
    - Period/Year (this is a separate field in COPA)
    - Sales Organization
    - Company Code
    - Product (Material or "SKU")
    - Plant ("Site") - (This will be the RECIEVING site, where the product ends up at)
    - dollar values for the four new conditions we are creating
            - Freight In/ Management Fee
            - Accessorial/Fuel
    We DO NOT want to post the following data from MM into COPA:
    - Cases (volume)
    - Weight
    Please suggest me how to proceed further to take this challange.
    Regards,
    Lokanath

    Normally freight & service charges if incurred would be loaded into the stock value of the receiving plant.
    However if you want to post them to COPA you have to post these values to P&L by making necessery changes in MM pricing procedure and making the respective GL accounts as cost elements and assign them in OKB9 to a Prof Segment.

  • How to identify difference between Configure To Order (CTO) and Engineer To Order (ETO) items

    Hi All,
    We are working on Oracle Database 10g
    We have to develop a code which involves Configure To Order (CTO) and Engineer To Order (ETO) items.
    Can anyone advise is there any table and the corresponding column in the database which will help identify if an item is a CTO or ETO.
    Regards,
    Shruti

    Shruti,
    Have you checked eTRM website? -- http://etrm.oracle.com
    Please also see (How To Find the VIEW or TABLE That Populates a Form So That a 'Custom Report' Can Be Created Using Same VIEW or TABLE (Doc ID 604772.1)).
    Thanks,
    Hussein

  • Consignment stock, make to order scenario

    Hi
    We have a material which produce make to stock and make to order also.
    In case of make to stock its fine. But when we are testing make to order then following is system behavour.
    Action     Mvt Type     Accounting Document               
    GR     101     No Accounting Document               
    Consignment     631     Finish Inventory     Dr      at Standard Price     
                        Consignment Inventory Change (VKA)     Cr
    PGI     633     COGS     Dr      at Standard Price     
                        Finish Inventory     Cr
    My question is why not accounting document is generated at the time of GR 101 in case of make to order scenario.

    Hi
    MTO has 3 scenarios in it. (I think you either fall in Scenario 1 or 2)
    1. Where the Qty of Prod order is tagged to sales order upon GR from prod order....
    The valuation in this case happens at the std cost (CK11N).... Every thiing remains same as in MTS... You get variance as well
    2. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Valuated stock)
    This is not recommended by SAP and should be chosen only in rare cases...
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate is done when sales order is created...
    GR is valuated at sales order cost estimate... Variances are calculated based on this cost and actual cost incurred..
    PGI and Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    3. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Non Valuated stock)
    This is recommended by SAP
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate can be done when sales order is created...
    GR is Non valuated... No Variances are calculated because GR is non valuated
    Production Order settles upon sales order.. hence, actual cost goes to sales order...
    PGI does not generate accounting doc because stock is Non Valuated
    Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    These are the 3 possible scenarios in MTO... There might be a slight variation in Consignment scenario.... I am nt sure if the "No Accounting doc" situation at GR is OK or not
    Regards
    Ajay M

  • COPA Documents not getting posted - Doc with unauthorized busi.trans SD00

    Dear Experts,
    COPA Documents are not getting posted, although billing /accounting documents are getting posted
    We are getting the below error message,  when KE4ST is executed
    Kindly share your inputs for this issue
    Document with unauthorized business transaction "SD00"
    Message no. KE/AD604
    Diagnosis
    Document 6000000026 cannot be transferred to Profitability Analysis (CO-PA) because the business transaction"SD00'"(Billing document) is not profit-related.
    System Response
    The document is not posted to CO-PA.
    Procedure
    If you decide that the document does contain data relevant to CO-PA and that it therefore should be posted to CO-PA, change your Customizing settings accordingly. Otherwise you can ignore this message.
    Advance Thanks,
    Sanjai

    Hi,
       1. First please check if COPA is active in the system i.e. tcode KEKE
       2. Then check if operating concern is active in tcode KEA0
       3. If so then check if billing document has an account assignment to PA segment. If not then maybe you have changed the account assignment in OKC9.
       4. If all the 3 conditions above are satisfied then you need to check if this is a made-to-order scenario (MTO). A made-to-order scenario can be identified in COPA in that the billing doc will have an account assignment to a sales order in addition to a
    PA segment (field vbap-kzvbr = 'E' and vbap-vbelv = sales order no).
      If the above conditions are satisfied then from a COPA point of view it is a MTO. In this case the invoice will be assigned to the sales order and will not be directly transferred to COPA. With the order settlement the costs and the revenues (invoice) will then be posted to COPA.
    regards
    Waman

Maybe you are looking for

  • Music Library unavailable to iTunes after HD disconnected accidentally

    iTunes app on MacBook Pro with Western Digital external HD (music stored on HD). OS 10.6.7 & iTunes up to date. External HD disconnected from computer while iTunes was running.  Now iTunes cannot find the music.  New iTunes Libraries are created each

  • Reg: CJ40 Cost Planning overall_Data transfer using BDC

    Hi, Is it possible todo transfer using BDC Prog for CJ40 cost planning overall. here in period im getting table control. if anybody give me sample BDC code for this CJ40. thanks in advance. Hema Edited by: hema prabakaran on Dec 10, 2008 1:23 PM

  • Optical Drive indicate "You have inserted a blank DVD"

    When loading software on my MAC the program froze during the analysis phase. I closed/ended the program and then re-loaded the disc and now it keep saying.. "You've added a blank disc, how would you like to proceed"... I've checked the disc and every

  • Start up J2Me application on the mobile device when the device is swtiched

    Hi, Does anybody know how to start the Midlet when the handset is switched on ? I have one J2ME application installed on the mobile. I got to start the application automatically when the device is switched on. Thanks in advance Mamatha

  • How to get iPhone 3GS Composite Video output to work

    I have a iPhone 3GS with the latest 3.x FW (Updated 2/6/2010). I bought a Apple Composite video cable which lists iPhone 3GS as a supported product: MB129LL/B (one with 30 pin dock connector, composite, audio L&R, USB, power adapter). When I connect