Copy planning for cost center Runtime error

Dear Gurus,
I am running KP97 to copy planning for cost center.
but I got following runtime error:
===================================================================
Runtime Errors         DYN_CALL_METH_CLASS_NOT_FOUND
Exception              CX_SY_DYN_CALL_ILLEGAL_CLASS
       Occurred on     07.01.2009 at 13:21:25
What happened?
Error in ABAP application program.
The current ABAP program "SAPLGUMD " had to be terminated because one of the
statements could not be executed.
This is probably due to an error in the ABAP program.
What can you do?
Print out the error message (using the "Print" function)
and make a note of the actions and input that caused the
error.
To resolve the problem, contact your SAP system administrator.
You can use transaction ST22 (ABAP Dump Analysis) to view and administer
termination messages, especially those beyond their normal deletion
date.
Error analysis
An exception occurred. This exception is dealt with in more detail below
. The exception, which is assigned to the class 'CX_SY_DYN_CALL_ILLEGAL_CLASS',
was neither
caught nor passed along using a RAISING clause, in the procedure
"USER_REFRESH_RE_EA" "(FORM)"
Since the caller of the procedure could not have expected this exception
to occur, the running program was terminated.
The reason for the exception is:
Class "CL_REEX_COPL_MASTERDATA_CHECK" was chosen during dynamic method call,
but could not be found.
=====================================================================
can anybody give me a hint how to solve the problem?
B.R.
George
Hi all, I searched the SAP notes, and found there is one note NOTE_0000632335 related to copy planning, I installed the note by TCode snote. the KP97 can run now, but for the IDES controling area 1000, I tried to test run copy version 0, period 1 to 12 from Fiscal year 2003 to 2004.
there are many records with error.
shall I ignore the error , unselect the test run and continue?
does anyone have similar experience with IDES R/3 4.71? why cannot I carry out all steps in online document for IDES?
B.R.
George
Edited by: George Pan on Jan 7, 2009 11:39 PM

Hi I checked the error with copying plan data. it's all because of 'plan data already exists'.
so I just ignore the error and continue.
thanks!
George

Similar Messages

  • KO88 - Error when settling for Cost Center AND Auc for the same Internal Or

    Hi Experts,
    We need to configure Investment Internal Orders that could settle to both Cost Center and Auc, but each assignments with different Source Cost Elements
    We did the following:
    1. Created Auc Class
    2. Created Investment Profile "IMOBIL" and assigned to Auc Class, flagging Auc
    3. Created Allocation Structure "CV" with two assignments:
    01, Source = Cost elements 7000000000 to 7999999999, receiver AUC "by cost element"
    02 Source = Cost elements 4000000000 to 4999999999, receiver CTR "by cost element"
    4. Created Model Order, filling the Investment Profile IMOBIL created in step 2.
    5 Created Settlement Profile ZCV0001, assigning Allocation Strucutre CV, allowing CTR and AUC for receivers, default receiver is "FXA", doc type "AA".
    6 Created ORder Type CV01, assigning Settlement Profile ZCV0001.
    When I post only for Asset Expenses (Source Cost element 7, Assigment 01), the settlement through KO88 correctly settles to AUC, and also creates the settlement rule for cost center (i'm using the strategy to create from Responsible Cost Center).
    But when I post for Asset Expenses (cost elements 7, receiver AUC) AND General Expenses (Source Cost element 4, receiver CTR), KO88 generates an error KD506, saying that for Assigment 02 - AUC I didnt define a settlement cost element.
    1. Assignment 02 is not AUC, is CTR;
    2. I flagged "by cost element", so I don't need a settlement cost element. And also, I was able to post to AUC when the source posting was only for cost element 7.
    Did you face any problem like this?
    I cannot find out what is the missing configuration, or if it is a program error...
    Kind Regards
    Mayumi Blak

    Hi Ajay
    I already created Source Structure and assigned to my Setllement profile (so I assigned Allocation Structure AND Source Structure).
    I don't understand when you say that I need to assign the Source Sutrcture in each rule....because the Source structure is in the Settlement Parameters valid for both rules...
    When I post to Asset Expenses only for the internal Order, the 2 rules (CTR and AUC) are created when I run KO88 (but only AUC rule is settled). This is OK.
    The problem is when I post for both General Expenses AND Asset Expenses, the system is not recognizing that I have 2 source structures, neither is findind that for CTR AND AUC the Settlement cost elements are the original cost elements.
    I'm thinking about changing message KD506 to warning, do you know if this can help?
    Kind Regards
    Mayumi Blak

  • Table for cost center plan/actual data

    Hello gurus,
            What are the tables to get for cost center wise plan/ actual data? The data which was entered through KP06 was sitting in whcih table?
    regds
    ramachandra

    Hello Ramachandra,
    Actual and Plan Data can be found in COVP view.
    1) For Actuals, you should use the values 04 and 11 to the field WRTTP;
    2) For Plans, you should use the values 01 and 10 to the field WRTTP.
    If you need to get the totals, you should use tables COSP and COSS.
    Hope this help you.
    Cheers,
    Daniel.

  • MIRO Cost Element error for Cost center

    Hi,
    When i am doing MIRO - there are some price variances. System is giving the error to maintain the Cost center for that price differance cost element.
    But i have already maintain the Cost center for that Cost element in OKB9 Transaction. Why the system is asking for Cost center assignment again?
    Kindly help me
    Thanks
    Sunil

    Hi Sunil,
    Maintain the OKB9 settings with valuation area mandatory and dont give business area in the sub-sequent screen. Maintain only Valuation area and Cost center. It will not give any error and it will pull the cost center from OKB9.
    Thanks
    Kishore

  • Copy Detailed planning for cost elements in CJ9BS

    hi PS gurus,
    What is the purpose of selecting this option (Copy Detailed planning for cost elements)? What does it do?
    Many ThanKs
    MM

    Hi,
    In case you have done detailed planning for your project you can specify whether you want to copy the detailed planning data using this check box.Planning done using cost elements is called detailed planning in PS. CJR2 is the transaction to do that. For more details you can hit F1 on the field and check.
    Regards,
    Gokul

  • Error Activity type 502000 not set up for cost center 1000 cc111

    hi all
    While creating a work center (CR01) I need to enter a cost center and activity type for machine hours. However, while entering the activity type the following message appears:
    Message no. CR 061
    You are attempting to assign activity type XXXX to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center xxxxx.
    while creating the activity type in KL01 i have already given * in cc category so it should go for all cc
    What could cause this problem?
    Thank you in advance,
    Kind regards

    Hi,
    Check whether the activity type is maintained at the correct controlling area via KL03. If not, then create the activity type (KL01) in the corresponding controlling area.
    Regards,
    Darrel

  • Actual activity price does not exist for cost center / activity type

    Hi,
    We are trying to upload the time sheet related data(number of hours an employee workred on a project) ect from Non SAP to SAP.
    We have used a customized program and have loaded the data from se38.
    All this HR data will be saved in CAT2
    Later we transfer the time related data into SAP FI/CO using CAT7.
    +When  tested  with a couple of employees time sheets, they got uploaded in SE38 proerly and when transfered it through CAT7 it was properly taking the hour*rate is cost and was reflecting in the respective cost element.
    For a few time sheets in SE38 we were getting an error saying that the cost center(100501)/ activity type(EAT001) does not exist for 2010.
    Hence we have taken, FY 2010, the cost centes and activity types in KP26 and have given the planned Activity as 1. No planned cost in KP06.
    We have run the price calculation forr the FY 2010.
    Then we were able to uplaod the time sheets, but when we tried to transfer the data through CAT7, it throws an error saying no activity price exist for cost center 100501/ activity type EAT001. If I ignore the warning an proceed, no amount is being calculated.
    When uploaded employee time sheets before, all the cost were getting claculated and were entering into  the respective cost elements, but now no amounts are being calculated and it is taking Zero.
    When checked the previous years data i.e, 2009 all amounts are fine, in KSII I can see the activity quantity filled with some numbers in 2009, where from are they comming? I have checked KBk6 nothing was mentioned.
    PLease assit
    Regards,
    shilpa

    Hi
    I never used CAT* though, but the error means that you need to maintain a activity price in KBK6 (Actual price)
    Regards
    Ajay M

  • How to run GR55 reports in background for cost center hierarchies

    1.  I have been asked by our users to create batch jobs to run in the background for some GR55 reports, that can then be sent directly to cost center managers via email.
    I have figured out the process to do this as long as the cost center manager only needs to see a single cost center at a time.  However, if they are in charge of multiple cost centers, we also want to send them a summarized report using the hierarchy we have set up.  I can't seem to make this work, as the job only seem to recognize the last cost center in the group and the report is for that cost center.
    Example.  cost centers 100, 200 and 300 belong to hierarchy abc.  If I run the job just for cost center 100 it is fine.  But if I have a variant to run hierarchy abc, or even if I use the range 100 to 300, all I get is a report for cost center 300.
    We cannot use BW because we only have revenue in BW.  I am being asked to make this work from standard R/3 within the GR55 realm of reporting.
    2.  In addition, the report selection criteria includes two separate plan/forecast versions.  They need to update these each month prior to running the reports and sending them out.  I looked at the variables associated with the versions and tried to set them up with default values that I hoped would update automatically so that they don't have to manually change 50 or so variants each month.  But I don't see any dynamic variables that I can use to have the system make that change without going into each variant individually.
    3.  There is another piece to this equation as well.  There is another report they want sent out in batch, but it is several pages wide in SAP and several pages long.  So when you run it in batch and either spool it or get it sent as an email, it is very ugly in the formatting due to all the page splits horizontally and vertically.  If anyone knows how to get the report to stay together like it would if you had excel integration turned on, it would be very helpful.  I have tried running it with that integration turned on, but the jobs are set up with user batch_mgr and not my id, so it isn't working well.  The batch_mgr id is just a system id, not a dialog id.  We also don't want the jobs set up with a regular user id because if people leave, then the jobs all need to be changed.

    Kim,
    I may have options for issues 1 and 2. In case of 3, what I can tell you is I understand the concern, but this is what  typically happens in some standard CO reports that are not ALV compatible, I don't think there is not much  there to do unless you add some custom code for the output.
    In regards to point 1, yes,  I have noticed that this happens in some standard and custom reporting, not sure what is going on. I came up with a work around that  made the trick for my client in a similar scenario; which is editing the cost center groups. For instance, instead  of having the group set as a range from 100 to 300,  the groups are have  listed the cost centers, 100, 200 and 300. Obviously, the disadvantage of  this option is  that it would require a bit of more cost center group maintenance.
    In regards to point 2,  I understand from your note  that your users already have set up selection variants for the report. One option for you is to get the help from a developer to create a custom period variable and tiny program that runs in batch every month that would update that variable accordingly. Once that's done, you may have to update at least once, the selection variant  attributes to change the period to a selection variable, so everytime from that point of time forward that the variable gets updated,  it will be ready with the right value for every selection variant that uses it.
    Hope this helps.
    GG

  • Getting an error while configuring VMM for System Center 2012. error - An internal error has occurred trying to contact an agent on the WIN-NTJU8CNU server: : . Ensure the agent is installed and running.

    Hi,
    I am trying to install "System Center 2012 - Virtual Machine Manager by Using a Pre-Configured VHD".
    I downloaded install guide & the binaries from http://www.microsoft.com/en-us/download/details.aspx?displaylang=en&id=10712
    I have followed the installation document & getting an error while configuring VMM for System Center 2012.
    error details from log file given below:
    01:12:24:VMMPostinstallProcessor threw an exception: Threw Exception.Type: Microsoft.Carmine.WSManWrappers.WSManProviderException, Exception.Message: An internal error has occurred trying to contact an agent on the WIN-NTJTNEJ1UCN.mydomain.com server: : .
    Ensure the agent is installed and running. Ensure the WS-Management service is installed and running, then restart the agent.
    01:12:24:StackTrace:   at Microsoft.Carmine.WSManWrappers.ErrorContextParameterHelper.ThrowTranslatedCarmineException(WsmanSoapFault fault, COMException ce)
       at Microsoft.Carmine.WSManWrappers.WsmanAPIWrapper.RetrieveUnderlyingWMIErrorAndThrow(SessionCacheElement sessionElement, COMException ce)
       at Microsoft.Carmine.WSManWrappers.WsmanAPIWrapper.Invoke(String actionUri, WSManUri targetUri, Hashtable parameters, Type returnType, Boolean isCarmineMethod, Boolean forceResponseCast)
       at Microsoft.Carmine.WSManWrappers.AgentManagement.AssociateLibrary(WsmanAPIWrapper wsmanObject, String CertificateSubjectName, String& ExportedCertificate, ErrorInfo& ErrorInfo)
       at Microsoft.VirtualManager.Setup.VirtualMachineManagerHelpers.AssociateAgentServer(String fullyQualifiedServerName)
       at Microsoft.VirtualManager.Setup.VirtualMachineManagerHelpers.AssociateDefaultLibraryServer()
       at Microsoft.VirtualManager.Setup.VirtualMachineManagerHelpers.SetupLibraryShare()
       at Microsoft.VirtualManager.Setup.InstallItemCustomDelegates.PangaeaServerPostinstallProcessor()
    01:12:24:InnerException.Type: System.Runtime.InteropServices.COMException, InnerException.Message: There is a time and/or date difference between the client and server.
    01:12:24:InnerException.StackTrace:   at WSManAutomation.IWSManSession.Invoke(String actionUri, Object resourceUri, String parameters, Int32 flags)
       at Microsoft.Carmine.WSManWrappers.MyIWSManSession.Invoke(String actionUri, Object resourceUri, String parameters, Int32 flags)
       at Microsoft.Carmine.WSManWrappers.WsmanAPIWrapper.Invoke(String actionUri, WSManUri targetUri, Hashtable parameters, Type returnType, Boolean isCarmineMethod, Boolean forceResponseCast)
    01:12:24:ProcessInstalls: Running the PostProcessDelegate returned false.
    01:12:24:ProcessInstalls: Running the PostProcessDelegate for PangaeaServer failed.... This is a fatal item.  Setting rollback.
    01:12:24:SetProgressScreen: FinishMinorStep.
    01:12:24:ProcessInstalls: Rollback is set and we are not doing an uninstall so we will stop processing installs
    I have completed MSSQL server configuration and while configuring VMM the below error displayed in the wizard:
    An internal error has occurred trying to contact an agent on the WIN-NTJTNEJ1UCN.mydomain.com server: : .
    Ensure the agent is installed and running. Ensure the WS-Management service is installed and running, then restart the agent.
    I have checked that the following services are running:
    1) Verified WS-Management srvice 2) MSSQL server + MSSQL (agent)  3)SC VM Manager Agent  4)  Windows management instrumentation .
    I have joined the VM (on which installing SC VMM) in a domain(as per install guide) and installing VMM using domain account & it is in local Administrators group.
    Also I would like know if there is any stand alone SC VMM installer. If yes then please let me know the installer location & install guide.
    thanks.
    ====

    Have you installed AppController on the same machine with VMM?

  • How to write a validaton rule for Cost Center and plant in PO

    Hi,
    I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    Thanks
    Sunil

    >
    Sunil Pal Raj wrote:
    > Hi,
    >
    > I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    >
    > But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    >
    > Thanks
    > Sunil
    Check OKC7
    Regards,
    Indranil

  • Purchase Order For Cost Center

    Hi,
    1. Please explain as I am trying to create a PO and i gave Account type: K(Cost center). I got the following error
    "Create Account 140000 as a cost element in controlling area 4000 "
    How can i solve this problem. I actually created a cost center : 4000. How to assign a cost element to controlling area.
    2.Is it Necessary to maintain the G/L A/c while procuring for Cost center??
    Or Cost Center is Sufficient ??

    HI Kapil,
    For any accounting entry you need to define a General Ledger Account where the details (Amount) of the transaction will be stored.
    Just by maintaining cost centre will not help in completing any transaction involving accounts. So you need to  maintain G/L account in the controlling area of your company code.
    You can use T Code FS00 to create new G/L account in the chart of accounts.
    In the edit cost element Tab you can give the cost center that you want.
    I hope this helps.
    thanks
    rahul goel

  • BPS retraction part for Cost center accounting

    hi All
            Can any body help me regarding the retraction part for cost center accounting bw-bps, how the retraction is exactly done . when part is where the data
    comes sits in bw and R/3 .
    how exactly plan data sits in r/3 what is the relation
    while extrating the data into the bw, what is procedure for extracting in to the transactional cubes
    prs

    This post could give you some info:
    CCA Retraction with BW BPS
    Hope it helps.
    Regards

  • Activity Type ENGINE not set up for cost center

    Hi all,
    Currently, we have set up a work center in our system, which has the following intergration:
    - Controlling Area --> TECH
    - Cost Center --> TECH001
    - Activity Type --> ENGINE
    - Plant --> PN01
    - Work Center --> PL01
    Based on the above, the work center PL01 has the relationship of where Activity Type ENGINE and Cost Center TECH001 are linked together, where Cost Center is tied to Controlling Area TECH.
    However, when a user tried to create General Task List (Trxn IA05), under Work Center PL01 and Plant PN01, and inserted Activity Type ENGINE in Operation item. It gives the following error:
    Activity Type ENGINE not set up for cost center
    I have also checked KP26 that everything is setup correctly.
    Please can someone shed some light on the above?
    Many thanks and regards,
    Patrick
    PS: Full point guaranteed for helpful answer.

    Hi all,
    I have solved the issue by changing the Start Date of the Work Center. Now everything works well.
    cheers,
    Patrick

  • F4 help is not available for cost center in Confirmation

    Hi
    We are working on SRM 4.0
    During the Confirmation of services through WEB portal   ( F4 ) option is not available for Cost Center
    Through GUI ( Backend) we are able to see the Values in Drop down , but when we select them un able to copy them to Confirmation screen.
    Through Web front end F4 help also not appearing.
    We have applied the OSS Note 935201 in spite of which, it is not working
    please give me inputs on it.
    Regards,
    Neelima
    Edited by: S Neelima on Dec 9, 2009 4:54 AM

    Any inputs???
    Regards,
    Neelima

  • Activity Type set up for cost center

    Hi All ,
               While creating a task list i m getting a message
    Activity type is not set up for cost center in the year 2008
    Message no. CR062
    How could i set the activity type for cost center? Plz tell the procedure.
    regards
    sunil
    Edited by: sunil gupta on Sep 19, 2008 10:12 AM

    Dear Sunil,
    Check out this,
    1.Create a Cost center using T code - KS01.
    2.Create an activity type using T code - KL01.
    3.Assign the Rates for an activity type & cost center combination using T code KP26.
    4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate
    under Fixed price and set value as 2 for distribution key and plan price indicator as 3.
    5.After performing this ,while creating the work center ,this combination of activity type & cost center
    should be assigned.Then while creating routing/task list this work center can assigned for performing
    operations.
    Check with this & revert back if you need any further help.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Photoshop Elements 11 Organiser does not start from the welcome screen

    Having installed Photoshop Elements 11(Windows 7)  I cannot open the Organiser from the welcome screen. It can be opened via the Editor but few of the thumbnails are shown as pictures rather as empty squares. The situation does not improve with time

  • Issues using multiple load-config files with ant

    Hello, Not sure if this is the correct place... I am creating an ant build script to compile our flex application. I am trying to use the default flex-config by doing <load-config filename="${flex.sdkPath}/frameworks/flex-config.xml"/> and project sp

  • Using MacPro and PC Laptop -- sharing same itunes library on External Drive

    Hi guys, my main computer is a Early 2008 MacPro with Lion installed on it. I have iTunes 10.5 and all my music is classified witht that version of iTunes. But all my music is actually stored in an external 1GB WD Passeport HD. Thing is I have a dj g

  • Can't see Solaris X86/SPARC Agents for 12c

    I've ran the manual updates and automatic updates and the only agents i can see in the repository are still the linux x86 and X64 agents. Is there any way to manually load the agent to the repository so we can start testing the deployment? I see the

  • How export  tables with metadata_only but without initial??

    Hi, I use this sentence: expdp DADM/pass SCHEMAS=DADM      DIRECTORY=DPUMP_DIR      DUMPFILE=dadm_sd30052011.dmp      LOGFILE=dadm_sd30052011.log      CONTENT=METADATA_ONLY      INCLUDE=TABLE:"IN ('CBTCERR','CGDASID') But, when i import dadm_sd300520