Cost benefit analysis for using XI 3.0

Hi,
Does anyone have a cost benefit analysis document for using XI 3.0 versus developing point to point interfaces ?
I need something that can easily justify and sell the idea of using XI over going down the custom path for point to point development of interfaces.
Kind regards
Colin.

Good day Colin.
You question is like trying to guess the next day stock qouats...
There are many parameters that combined together and not all of them are constants infact...most of them are variables.
The issues are vary from lets say:
1.  COBOL programmers payments needed to support and maintain you current AS400 special written applications and interfacing...
2.The number of system you want to integrate in your organization buisness scenarios..
3.The monitoring capabilities currently available in your organization in the Spagethi architecture.
4.Predicting the growth of your comapny and adding Buisness partners systems...
5. Trying to estimate the re-using of XI-allready-writen-interfaces (not possible... )
6.The duplicated data and data incosistancy in your IT enviorment before XI and after XI...
So my friend,I belive this imaginary generic document of TCO can't be created...
Good luck with your project
Nimrod
If it helps you I've recently asked an ABAP programmer
how long it will take him to develope a simple File to IDoc scenario....he said that including design documents and testing Aprox. 8 days.
I belive i can do the first one in 5 days and the second in 50% of that time...
Message was edited by: Nimrod Gisis

Similar Messages

  • Project Plan for KM/ Cost Benefit Analysis document for KM

    Is there a template Project Plan Document available for KM?
    Is there a Cost Benefit Analysis document available for KM, that lists the advantages of KM, things like what are the Cost Benefits of Implementing KM? etc.
    Any help is greatly appreciated.
    Regards,
    Bharath

    Good day Colin.
    You question is like trying to guess the next day stock qouats...
    There are many parameters that combined together and not all of them are constants infact...most of them are variables.
    The issues are vary from lets say:
    1.  COBOL programmers payments needed to support and maintain you current AS400 special written applications and interfacing...
    2.The number of system you want to integrate in your organization buisness scenarios..
    3.The monitoring capabilities currently available in your organization in the Spagethi architecture.
    4.Predicting the growth of your comapny and adding Buisness partners systems...
    5. Trying to estimate the re-using of XI-allready-writen-interfaces (not possible... )
    6.The duplicated data and data incosistancy in your IT enviorment before XI and after XI...
    So my friend,I belive this imaginary generic document of TCO can't be created...
    Good luck with your project
    Nimrod
    If it helps you I've recently asked an ABAP programmer
    how long it will take him to develope a simple File to IDoc scenario....he said that including design documents and testing Aprox. 8 days.
    I belive i can do the first one in 5 days and the second in 50% of that time...
    Message was edited by: Nimrod Gisis

  • Sample of cost/benefit analysis of data warehouse

    Greeting!
    I am currently doing a research on data warehouse kindly give me a smple of a cost/benefit analysis.
    Looking forward for your immedicate response.
    e-mail me at "[email protected]"
    Thank you and God Bless!
    very truly your,
    Benedict

    Good day Colin.
    You question is like trying to guess the next day stock qouats...
    There are many parameters that combined together and not all of them are constants infact...most of them are variables.
    The issues are vary from lets say:
    1.  COBOL programmers payments needed to support and maintain you current AS400 special written applications and interfacing...
    2.The number of system you want to integrate in your organization buisness scenarios..
    3.The monitoring capabilities currently available in your organization in the Spagethi architecture.
    4.Predicting the growth of your comapny and adding Buisness partners systems...
    5. Trying to estimate the re-using of XI-allready-writen-interfaces (not possible... )
    6.The duplicated data and data incosistancy in your IT enviorment before XI and after XI...
    So my friend,I belive this imaginary generic document of TCO can't be created...
    Good luck with your project
    Nimrod
    If it helps you I've recently asked an ABAP programmer
    how long it will take him to develope a simple File to IDoc scenario....he said that including design documents and testing Aprox. 8 days.
    I belive i can do the first one in 5 days and the second in 50% of that time...
    Message was edited by: Nimrod Gisis

  • How can I do a cost / benefit analysis with new "share anything"?

    I am trying to figure out the best action for my 82 year old mother.  She is currently and has been on a special contract, something like 65+ plan (don't know the exact plan name).  She pays $29.95/ month with 200 anytime minutes.  Her current contract ends in March 2013.
    She is moving to an assisted living facility on July 8th where her only phone will be wireless and she will need much more than 200 minutes per month.  Several weeks ago, (prior to the “share anything plan” was announced), I told her it might be best to switch to the $50 / month unlimited everything PREPAID plan.  She needs to replace her ancient phone which is 6+ years old, and she doesn't need text or data, (wouldn't be able to figure it out anyway).
    Does she need to do something before June 28th?  Will the $50 per month prepaid plan be affected with the new “share anything” plan?  All of her friends and family are on Verizon.  I can't figure out a cost/benefit analysis because I don't know all the variables.  Is it more cost effective to pay an early termination fee and switch prior to June 28th to a different plan?  She will be using a lot more minutes beginning in July than what her current plan provides.
    Please help with suggestions.  My mom is counting on me and I'm counting on you.  Thanks.

    When you say her only phone will be wireless, I assume that you mean "cellular".
    Is cellular her best option? What about a landline only option with a wireless phone? That way she can still carry the phone with her wherever she is within her home. If she is going to start using "much more than 200 minutes per month" only because she is giving up her current landline, I would assume that the vast majority of her calling minutes take place within her home.
    I guess one question is "will the increase in her calling plan be greater than the cost of the landline she currently has, or would it be cheaper to keep the landline and her current plan?"
    Another question is what "need" does she have for cellular? Will she be out "alone" often if she is moving to an assisted living facility? If not, does she need the availability of cellular? If you are worried about her being out "alone" and getting "confused", will she be too "confused" to make use of a cellular phone?
    In an assisted living facility, the building "could" interfere with her ability to actually receive a cellular signal within her home. Is this going to be a problem, since it seems her current calling habits have her sending/receiving the majority of her calls within her home.
    I ask these questions from experience as my 92 y/o grandmother is also living in an assisted living facility and only has a landline phone with no cellular phone. She chose to give up her cellular phone 7 yrs ago when she moved in.
    These are just a few questions to consider before switching over to strictly cellular.

  • Batch Management - Cost Benefit Analysis

    Hello experts
    My client is evaluating batch magmt in their mfg operations.The key requirement/driver is material traceability.
    They would like to know what is the impact of using batch mgmt in terms of adiotional resources,transaction and maintenance as such.
    Does anybody has insights/material on this.
    Many thanks
    Gaurav

    Hi,
    please mention the manufacturing products then we can decide to go for BATCH or not
    some of the benefits of using Batch Management is
    1. Traceablity of  the material up to the end product.
    2. First IN first OUT principle can be adopted.
    3. Additional resources  is not required.
    4. storage space needed in  more
    5. if the company is having  EXCISABLE the somewhat complicated only
    Regards
    Ganesh

  • Cost-benefit apple tv vs cable

    Has anyone done a cost-benefit analysis for Apple TV vs cable. Obviously, this will be different for cable offerings in each locale, which can be smoked out, sometimes with difficulty. On the ATV side, I'd like to know what are the costs for the various offerings.
    Thanks

    ATV hoping for two HDTV ports to enable running the cable thru the DVR plus
    For what purpose?  DVR's are for live content?  You can watch contant on ATV any time you want and can fast forward rewind etc already.  Copying it to DVR, if you even can, would just require you wait an hour while the show is copied to the DVR to watch it.  Instead of just watching it instantly any time you want.
    maybe Apple and the cable providers using their creative minds to come up with a one-stop shopping setup whereby one can grab just one remote and do the job.
    This is already an opption.   Logitech has remotes that will do this.  Their setup is pretty involved, but once you have it working it is really nice.

  • Results analysis for sales orders- actual costs/ revenues - (kka3-kkak)

    Hi, i have a problem when I execute the individual results analysis for sales orders (kka3) I can see actual revenues and actual costs, however when I execute the collective processing (kkak) for the results analysis I don´t see these (actual revenues and costs). Is it normal? How can I see these in the collective processing?

    Could be one of these possibilities:
    1) Controlling Area set is wrong
    2) You're input parameters are insufficient to get that sales order. Check Order Type etc you input in the main screen
    3) The master data is wrong which is not allowing the link to the Sales Order. You would have to check each field thoroughly.
    You will have to probably do a lot of checks before you resolve this. This isn't normal btw....you should see all Sales Orders
    Assign Points if useful....

  • Best practices for using the 'cost details' fields

    Hi
    Please could you advise us to the best practices for using the 'cost details' field within Pricing. Currently I cannot find the way to surface the individual Cost Details fields within the Next Generation UI, even with the tick box for 'display both cost and price' ticked. It seems that these get surfaced when the Next Generation UI is turned off, but cannot find them when it is turned on. We can see the 'Pricing Summary' field but this does not fulfill our needs, as some of our services have both recurring and one-off costs.
    Attached are some screenshots to further explain the situation.
    Many thanks,
    Richard Thornton

    Hi Richard,
    If you need to configure dynamic pricing that may vary by tenant and/or if you want to set up cost drivers that are service item attributes, you should configure Billing Tables in the Demand Management module in 10.0. 
    The cost detail functionality in 9.4 will likely be changed to merged with the new pricing feature in 10.0.  The current plan is not to bring cost detail into the Service Catalog module.

  • RTP-Analysis for Time-of-Use Interface

    Dear Experts;
    we configured the AMI nodes "Time-of-Use Interface" and in a new interval permissible rate, we enabled the RTP category:
    01 Bill EDM Profile Values with TOU Interface. Billing went well, we did create on-peak, off-peak and mid-peak KWH consumption buckets.
    But I am wondering, where I can find in the billing doc EA22 - tab "RTP-Analysis", like it shows up for EDM RTP interfaces?
    Which configuration are we missing? Where can we see, how billing allocated the hourly consumption values to the different consumption buckets?
    Any help is highly appreciated.
    Thank you ,
    Tom

    Hey Vipin;
    thanks for the follow up. what I wanted to ask is after the buckets and the bill doc is created:
    - I have my profile 1/1/ - 1/31 = 1000 KWH.
    - I have my AMI TOU interface in the rate 01 Bill EDM Profile Values with TOU Interface.
    - I got a bill doc 1/1 - 1/31, with 3 lines - stating 200 KWH on-peak; 300 KWH mid-peak and 500 KWH off-peak.
    --> great!,but in EDM - RTP billing, in the bill doc (EA22), you will see another tab called  "RTP-Analysis", that exactly shows me, which interval values (date; time & consumption) was used for on-peak vs off-peak vs mid-peak.
    So, my question is, where do I find such a Analysis for AMI TOU ? Which config are we missing?
    I would like to see a validation in SAP for the sum of the 3 buckets.
    I actually did a manual comparison based on a calendar and Excel to figure, whether SAP AMI TOU was correct with the consumption in the 3 buckets (200 KWH on-peak; 300 KWH mid-peak and 500 KWH)...
    Thanks,
    Tom

  • Most cost efficient computer for a server using these specs

    I want to know how important processing power and internet connection are when talking in terms of using multiple java socket threads that receive messages from various clients at once..
    I need a computer that can hold as many of these threads at once while at the same time I dont want it to be to costly.. For example it sounds like a waste to get a 3Gz processor and a super internet connection when I can likely do practically the same amount of threads with maybe a 2Gz processor and the same internet connection..
    So how important are each of these factors? Can anyone suggest a machine that would be able to handle plenty of threads for a nice price? I'm looking for a high Thread/dollar ratio :)....
    Brian

    For chat, maybe not that much. The whole thing is likely to be driven purely by I/O from the users. I mean, the majority of packets sent to/from the thing would be expressing short texts messages typed by humans. Unless you're expecting a large operation, I would expect that this wouldn't be very taxing on your systems. What number of users are you expecting?
    Offhand, the thing that glares out of me from your desciption is that you have a single server for pairing people up and (presumably) as a load manager for the chatroom servers. If that server goes down, you're in trouble. If I were you I'd consider adding some redundancy there. Any money might be best spent building up the cluster and making certain that there's plenty of redundancy to go around. For that matter, how many data centers do you have?
    It also occurs to me that you might need a lot of disk space, depending on how much logging you want to do and whether you need to do some kind of session recovery after failures. Also are you storing user profiles for matching the people up? Do you have an external database server that you didn't mention? How much redundancy there?
    There are services whose job is to hit servers and see what the response time is and whether they're up (they'll page you if they go down). That could be another good use for money, rather than specific hardware upgrades.
    Generally it's very difficult to predict this kind of thing in advance, and a good profiling system and an architecture that will let you easily upgrade in response to problems is a good thing. Also lots of testing and load simulation is handy.
    Hope this helps.

  • How to use Analysis for Exel in SSO ?

    Hello,
    For the moment we have only few users which use Analysis for Excel because they have to enter their login & password.
    We'd like to install Analysis for Excel for a larger population.
    Do you know how to implement SSO in Analysis for Excel (as in BO Web) ?
    Thank you in advance
    Regards,
    Nicolas

    Hello Nicolas,
    Use the following steps :
    Step 1
    Locate the File “global.properties”
    Drive:\SAP BusinessObjects\Tomcat6\webapps\BOE\WEB-INF\config\custom
    The following values should be present:
    vintela.enabled=true
    idm.realm=Domain Name (u can get the name from C:\Windows\Krb5.ini)
    idm.princ=SPN User
    idm.allowUnsecured=true
    idm.allowNTLM=false
    idm.logger.name=simple
    idm.logger.props=error-log.properties
    Step 2:
    Locate the file “web.xml”
    D:\SAP BusinessObjects\Tomcat6\webapps\dswsbobje\WEB-INF
    Uncomment the Kerberos Proxy Filter and the Kerberos Filter sections to enable Kerberos SSO for Windows Active Directory (secWinAD) authentication. The following options must be specified (the rest are optional)
    idm.realm = SPN user (the same as the default_realm specified in the Krb5.ini file)
    idm.princ = SPN User (the same as specified for idm.princ in the global.properties)
    idm.keytab = (the same as specified for idm.keytab in the global.properties )
    Please note, if you are using the hardcoded password set in Tomcat's Java Options do not make any changes to the keytab lines in the web.xml
    Step 3:
    Backup and edit Drive:\Tomcat6\webapps\dswsbobje\WEB-INF\classes\dsws.properties by setting kerberos.sso to 'true' Restart Tomcat
    KR,
    MD

  • Why you are increased my cost for using photoshop from € 19 .99 to € 30.74 I'm still student, what I have to do to pay €19.99?

    why Adobe have increased my cost for using photoshop from € 19 .99 to € 30.74 I'm still student, what I have to do to pay €19.99?

    I wonder if it is the full CC package, and he has a special Student/Teacher price?  He'd be paying way more than 50 Euros otherwise.  I pay NZ$53 a month for the full package, and we a now doing OK in Oz and NZ, but I believe price gouging still goes on in Europe.
    Nice to hear from you to Gene.  Have you had any rain over there yet?  We saw some of the LA fire footage on our news last month.  The drought map link you sent me a while back is still showing Extreme for your area!     I don't know if this might help?  http://www.ehow.com/how_5519447_perform-raindance.html    You can see exactly what my weather is now.  NZ Met Service has enabled a link to the BBC WOW site, so we can link our own weather stations.  That's me center top, but you need to zoom in to the right side of the map from this link.  It's been 'kin hot today!
    Blenheim Weather - NZ Weather Forecast Blenheim from MetService.com

  • Production order: Cost analysis for each operation ?

    Hello,
    i want to select the detail plan costs (Setup, Labor, Machine) for each operation in a production order. Unfortunalety i found only the plan costs as summary for all operations. Only the time activities are available for each operations.
    Can anyone help me ? If you have any suggestions, please let me know!
    Best regards,
    Michael

    Dear,
    Why do you want the cost for closed order?
    Order with Closed Status:
    1. No more costing can be posted to that order(s). No more good movements and confirmation can be posted to order with CLSD status
    2. The order can not be changed if it has CLSD status
    3. There should not be any open PR for the Production order before setting CLSD status
    4. Order balance should be zero before setting the CLSD status.
    Else you can do this with Transaction BS22 (System Status: Maintain).
    Select the system status I0046 by double-clicking.
    Set the business transaction  'Permtd' for costing object.
    I will not recommended to change the SAP standard setting.
    Regards,
    R.Brahmankar

  • Advance Analysis for Microsoft Excel  How end user will use this  ?

    Hi ,
    I am working in Advance Analysis for Microsoft Excel Reporting tool,  Now i am working in my system , how the end user will interact with this report ?
    Is there any link is there , we need to send them  or they will also open this from the system only ??

    Hello Guru BI,
    Advance Analysis is only for micorsoft excel. You can check with your contact at SAP (TQM / Sales Representative) to check other solutions to have analysis on Web.
    For the Analysis Office the only way to have informations at the web is like described at the latest reply.
    For new solutions on web you can check the following links that have a brief describe of the web solutions:
    http://www.sap.com/solutions/sapbusinessobjects/large/business-intelligence/reporting-analysis/analysis-olap/index.epx
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e07439f8-ba1c-2e10-98a8-f8d552eb31ff?quicklink=index&overridelayout=true
    http://download.sap.com/download.epd?context=2D1D4DC34C0587B40660C12B4FD45C056D1BBE530E157D0EB6F2D54F126F520566AE5C5190940F14133BABCD0BF7DA7DCA12BBEC6228CDB1
    Thanks
    Diego Ferrary

  • Result analysis for sub-items on SD-order

    Hello,
    I would like to know, whether also the document flow for subitems is being checked while executing result analysis.
    Example:
    We have got an SD order, a higher-level item and a sub-item.
    Both of them have assigned the same result analysis key. Within this key it is defined in customizing (OKG3), that the Sales Order Structure is A-"Summarize Plan and Actual Data of Subitems on Highest Item"....so the result analysis for the sub-item is being performg via the higher-level item.
    The higher-level positions is already completed - the delivery is made and also the invoice is created.
    The sub-item is not completed - neighter delivery is made nor the invoice.
    While executing the result analysis for the higher-level item, the status FNBL (final billing) is recognized and all cost are settled from WIP to CO-PA.
    As far as I know, the document flow should be checked withitn the result analysis and based on this the status should be recognized.
    Therefore It seems, that only the document flow from the higher-level item is being checked. If also the document flow from the sub-item is checked, there would be no way to get the status FNBL as the sub-item is not complete.
    Is it SAP standard delivered behaviour?
    Thanks in advance
    Peter

    Thanks Waman,
    I have tried to delete the result analysis key from the sub-item, but still the same result in result analysis...
    Could you tell my the consequences from the 1A setup from the note? It is adviced withitn the note to not use the 1A setup. But we use this and it works fine. Just some messages during the result analysis, that it could not be performed for sub-items, but this has no influence on the values.
    Regards
    Peter
    Edited by: Peter Jankech on Jun 9, 2010 8:57 AM

Maybe you are looking for

  • Backup restoring procedure in system9

    anybody has documents or links which talks about backup / restore complete system9 products . ?

  • Error message "cannot connect to server"

    Often I get an error message "cannot connect to server" when I want to connect to acrobat.com directly from a .pdf document in order to upload it . Is it possible that there is some security issue involved, e.g. that the document is protected somehow

  • Lync 2013 Error - Certificate could not be published in the database associated with User Services Cluster

    Hi Lync gurus, I have a weird issue: Just installed a Lync Standard 2013.  Everything works except I keep getting this error in Log: every 30 minute or so. First an Error:  Event 47067 A server did not respond to HTTP request Server lyncserver.domain

  • Php-5.3.4-2 no longer has pdo.so moudle, is this ok?

    Hello, I updated my php from php-5.3.4-1-i686.pkg.tar.xz to php-5.3.4-2-i686.pkg.tar.xz after words I started getting warnings about not being able to find pdo.so. Is this ok? Should I do anything about it? I may not need it at all, but I thought I h

  • Outlook 2010 - new prompting for password

    After installing Office 2010 Beta and working fine for about a month and a half, Outlook started prompting for a password.  The machine is on the domain so the Outlook did not prompt before.  If you cancel the prompt, everything seems to work fine.