Cost Center in populating in GR/IR Clearing Account at MIRO Posting

Hi,
I am working in 4.7 EE version. We created one Service Order(purchase order) and gave account assignment as Cost Center and Business area. Then we created service entry sheet wrt to service order and accepted the service enry sheet. System automatically created MIGO document in back end. At the time of posting Invoice Verification wrt service entryshee/service order (purchaseorder), system is populating cost center in GR/IR clearing account.
Give me some idea how the cost center is populating in Balance Sheet GL A/c (GR/IR Clearing A/c).
Regards
Sudhakar

hi
i think d havnt tried the tcode i had given
it is to attach the cost element account to the costcenter
it  is understandable for a  sap consultant that we can`t  assign gl account to the cost center
i think u have not tried the solution so plz dont make any comment on any ones experiance
ur required help and i tried to help u
this is not the way to talk with anyone
use ur own logic before asking questions and also replying for answers
sorry for helping u
kunal

Similar Messages

  • Problem when change bank clearing account for payment posting.

    We recently changed the bank clearing account for payment posting (program PC00_M99_PPM). But I found out because the config can only be changed but not delimited on payroll side, the program errored out when it retro back for an employee to the old clearing account.  So what am I supposed to do to fix this problem?
    Have anyone ever handled this problem before and could please throw some light on it?
    Thanks in advance.
    Johnson

    hi
    check following
    1. Check in OMWD, whether Valuation grouping code "0001" ia ssigned to Ur plant
    2. OBYC - If you have assigned GR/IR Clearing A/c to WRX then check whether you have maintained it with combination of valuation class and GL A/c
    If yes then maintain only GL A/c w/o valuation class OR maintain one entry with valuation class empty and GL A/c
    check following
    Error in service entry sheet
    Re: Error in ML81N
    http://sap.ittoolbox.com/groups/technical-functional/sap-acct/grir-clearing-account-wrx-doesnt-recover-gl-account-2224137?cv=expanded
    http://sap.ittoolbox.com/groups/technical-functional/sap-log-ps/problem-while-posting-service-entrysheet-in-ecc-60-version-1483547?cv=expanded#
    regards
    kunal

  • No modvat clearing account in Miro

    hai,
    Iam not able to find the modvat clearing account in Miro.The postings are as below
    In migo:
    RG23A bed DR
    RG23A AED DR
    RG 23A SED DR
    MODVAT CLEARING A/C CR
    In miro:
    vendor a/c cr
    gr/ir a/c dr
    RG23A bed dr
    RG23A AED dr
    RG 23A SED dr
    In MIRO instead of rg23a bed,aed & sed , i have to get modvat clearing account.
    Please somebody help me.

    Logistic General >>Tax on Goods Movement >> India >> Specify Excise Accounts per Transaction Type
    GRPO Credit CENVAT clearing account
    GRPO Debit CENVAT on hold account
    GRPO Debit RG 23 AED account
    GRPO Debit RG 23 BED account
    GRPO Debit RG 23 ECS Account
    GRPO Debit RG 23 SH ECS Account
    GRPO Debit RG 23 NCCD account
    GRPO Debit RG 23 SED account
    The mainatin the G/L in OB40 as per the A/c key maintain against your condition type JMOP, JEC1,JECS .
    I feel after doing these above setting ur problem will be resolved.
    Biswajit

  • ABAVN - Cost Center Not populated

    Hi,
    I am going to post some Asset Retirement entry from ABAVN  Tcode. Once I simulate the entry, its not populating Cost Center. I want to post into the Cost Center also.
    Please provide me some help how post the entry with the Cost Center.
    Thanks

    Hi,
    Why don`t you go to the Cost Element master record (KA02) of the cost account which your retirement transaction type is addressing. Check in tab Default Acct Assignment, whether there is another account assginment (internal order for example) defaulted for your cost element. Alternatively, you could put the cost center you want as a default for your cost account here.
    KR,
    Severina

  • Cost center not populated in Purchase requisition for a third party order

    Hello,
    We are currently testing the Third party order flow which includes :
    1. Creation of a sales order with item category TAS
    2. A purchasing contract is maintained for a sales order item at the schedule line level.
    (In the purchasing contract, account assignment is already maintained for each contract item, meaning a G/L Account and a cost center).
    3. Automatic creation of the Purchase requisition when the sales order is saved.
    >> The account assignment is not copied from the contract to the Purchase requisition. Do you know why and how I can do that ?
    Thanks
    Best regards
    Benjamin

    Hi Palani,
    if i am not wrong This WBS in location or additional tabs are used for settlement purpose. For PR creation by maintenance Orders can have Order number as account assignment.
    Please reply
    Thanks
    Sunil

  • Cost Center Error while releasing Billing document to Accounting

    Hi SAP Gurus,
    Our user raised an issue that when he had released billing document to accounting, the system threw error message
    "Cost center xxxx (CO area)/xxxx(Cost center) does not exist on date 11/16/2011". Message No. KI 222.
    But the cost center xxxx does not exist in the system at all. The user does not want to create the cost center eirther. Cost center was not entered in Sales order, Delivery and Billing. I have checked 'Default account assignement' (OKB9) settings, Default account assignment in cost element master record and assignment of cost center to sales organization (OVF3). But cost center xxxx was not configured in the above settings. I have checked validations/substitutions, user exits and BAPIs, there is nothing specific to the cost center. This is not a cross-company code scenario. I have made field status to optional for cost center. But still the problem persists. Accounting document did not get generated because of the above mentioned error message. User applied SAP notes 315350. But it did not resolve the issue.
    Would anyone let me know 'why the system showed the cost center xxxx that does not exist, while releasing the billing document to accounting'?
    Thanks in advance.
    Best Regards,
    K.S.K

    Hi Friend,
    I think this link help for you
    Cost center XXXX does not exist on 15.09.2010.
    or check the OVF3

  • Cost center not committed on shopping cart,  for account assign cat "Asset"

    Hello,
    We are implementing extended classic scenario in SRM 5.0 with ECC 6.0 backend.
    While creating a shopping cart in SRM, in the cost assignment tab when we select an account assignment category as “Asset", and then try to enter a value in the cost center in the basic details of cost assignment, it is not getting committed to shopping cart screen. The cost center field value is lost when we move to the next screen for ordering the shopping cart. For the asset related purchases, we are using main account assignment category as "asset" and it also requires cost center, because while the asset master record is being created in R/3 for these items,it requires the cost center. We also using internal order. So for the account assignment category "Asset", the other account assignment fields that can be entered are cost center, internal order and one custom field called "project code".
    We have created this user-defined field in the cost assignment tab in the shopping cart, purchase order and confirmation documents in SRM in accordance with the OSS note 672960. We have implemented BBP_CUF_BADI_2 & BBP_DOC_CHANGE_BADI, BBP_DOC_CHECK_BADI for the shopping cart object.
    Can someone please help me with this issue?
    Thanks,
    Krupa

    thanks Ramakrishna and Yann for your prompt reply..
    Ramakrisha,
      I know that for assets, SC requires asset number and G/L is automatically derived from the corresponding asset class from the backend. In our case, we are putting dummy asset number in shopping cart and this asset number exists in R/3. But we are not generating asset creation during shopping cart creation but we are doing it during the PO creation in doc change badi. During this asset generation you also need cost center on the asset record. So we have added cost center field for Asset account assignment category and I can see it in the details of account assignment. But when I enter this cost center on shopping cart, it doesnot get committed, it disappears when I order the shopping cart.
    Does anybody have any clue why this might be happening?
    Thanks,
    Krupa

  • Cost center not appearing for G/L (Balance account) while posting

    I have created symbolic account 1300, accrued leave pay with account assign type as F.
    I hvae assigned the relevant G/L to this symbolic account under 'assign balance sheet accounts'
    However while posting, the relevant cost center assignment is not captured next to the G/L account.
    The cost center is correctly maintained in IT0001 and is displayed for the other expense accounts. But is missing for all balance G/L accounts.
    Please guide
    Ally

    Hi Ally,
    I have similar requirement, can you please let me know what did you changed in the Posting Variant.
    Your help is much appreciated, and rewrded. Waiting for your reply.
    Thanks,
    Janga K.

  • Cost center not appearing while settling to GL Account using AIAB

    Hi
    There is one AuC 100000019.  There are two values: Rs.10000 and Rs.145500
    Now i want to settle it to GL account using AIAB.
    In AIAB under Category field, i gave GL (i.e. GL account as Category). Then i mentioned GL Account as settlement receiver. Then i double clicked on the settlement rule line and specified cost center (same as assets)
    While settling using TCOde AIBU, it gave error, and asked for CO object. I do not know why its not picking cost center even though i specifically gave the cost center.
    Please let me know what can be done
    Thnx
    Deepak

    Hi Deepak,
    What was the resolution here? I know the implementing Note 744194 does not fix this issue. I am thinking 2 possible scenarios:
    1. If the cost center for AuC settlement to GL is going to be the same each time, then a GL account can be specifically setup for the purpose of this settlement and the Cost Center can be defaulted via OKB9.
    2. If the Cost Center differs, then as you mentioned: It cannot be defaulted.
    I am encountering the same issue, please share anything that you can.
    Thank you,
    Yhuss

  • Foreign currency valuation for GR/IR clearing account is repeatedly posting

    While executing foreign currency valuation (program SAPF100) through T code F.05 the following fields are selected for the spotted rate valuation for currency type 10.
    A)     Valuate G/L account open items
    B)     Evaluate  GR/IR account (GR/IR clearing account is selected)
    C)     Valuate customer open items  
    After execution the valuation postings are repeated  in GR/IR FC valuation Balance sheet adj account while the postings in other accounts occur only once.
    GR/IR FC valuation Balance sheet adjustment account is configured in OB09 for GR/IR account for respective currency type and local currency.
    What could be the reason for repeated postings in FC valuation account?

    I think there is some issue with the process, normally vendor/customer reconciliation account or some liability assets related account which has impact due to foreign currency rate changes needs to be revaluated. I don't understand why you have set up foreign currency valuation for GR/IR account, these are intermediatory account which reflects in system between for example GR and IR.
    I also think that you need more information on foreign currency valuation, basically it happens on a particular key date and gets reversed on key date + 1, because revaluation is only required on a key date for reporting purposes. on the next day it get reversed and actual loss or profit on foreign currency only gets booked on realization.
    Hope this helps!!!
    Murlidhar Khatri

  • PO item Number in Cenvet clearing account during MIRO

    Hi,
    IN CENVET clearing account assigment field the PO item number capturing worngly. already substitution rule is assigned.
    if MIGO done for 4 &5th line item . IN MIGO its capturing Item number as 00004 & 00005. But in MIRO its showing as 00001.
    Kindly help to resolve this issue
    Regards,
    preethi.

    Moved from sales forum to MM forum
    G. Lakshmipathi

  • Screen not clearing once after MIRO POSTING

    Hi Expert
    We done Enhancement in Miro, This enhancement working but once posted the document, screen will clear but in this process after posting the doc everthing as it is, screen is not clear.
    Please give me a solution
    Thanks
    Mani.S
    Edited by: smanimba1 on Oct 11, 2011 10:57 AM

    Hi  ,
    Check whether  Posting is done properly  or Not  . There might be some error left   to be cleared   in your Enhancement  .
    regards
    Deepak.

  • Cost center assignment of GRIR clearing account

    Hello Expert,
    There is a purchase order assigned to an asset.  the cost center K8071 is maintained in the asset. Later, the cost center is changed to K8410. Normally this cost center will always be determined from the asset. But in goods receipt (MIGO) and invoice verification (MIRO) , the wrong cost center K8071 is derived for GRIR clearing account. Can i get any help from you how to solve this issue? Thanks a lot!
    Best Regards,
    Ou Qin

    Hello,
    the cost center is really assigned to GRIR clearing item. It is standard system design.  if checking GRIR line item, the cost center is filled for invoice verification of asset PO.  Seems the function of derivation exists bug.  Can any one know how to  fix such error before? Thanks!
    Best Regards,
    Ou Qin

  • Asset cost center assignment missing in purchase req or purchase order

    Has anyone else ever encountered this? 
    When we create a purchase requsition for assets, the cost assignment is determined from the existing asset. Most assets bring over the cost center into the account assignment. A few do not.  FMDERIVE shows the cost center populated when tracing. When you exit the derivation trace, the cost center is missing from the purchase requeistion or purchase order line item.  Any ideas? 
    PS: THis happens whether or not the asset has an entered serial number.
    Any thoughts of what to check are appreciated.
    Bob

    No, our FMDERIVE defaults Funds Center from Cost Center, which IS occurring, and, as stated above, the cost center appears correctly as expected on the FMDERIVE trace screen.. 
    Added info: In our test system we have reconfigured the ME51N entry screen to allow manual input of the cost center.  It is STILL automagically cleared during the save/validation process.
    Thanks for your question!
    Bob

  • Default Profit Center to Bank Clearing Account

    Hi All,
    Currently, our company is one company code to one bank account and one bank account use by different profit centers ( Bussines Units) . Our reporting ( Balance Sheet / Profit & Loss ) is by Profit Center Level.
    1. Default Profit Center to Bank Clearing Account.
    - we cannot create cashflow report by profit center, because bank clearing account is default by profit center. 
    2. Not default Profit Center to Bank Clearing Account
    - We got Profit Center 9999 / P9999 issues on Bank Clearing Account.
    Should we default Profit Center on Bank Clearing Account ?
    Thank You
    Alex Lee

    Hi Alex,
    If you are using 4.7 or ECC 5.0 then you needs to maintain Default profit Center for Balance Sheet G/Lu2019s through T. code 3KEH and 3KEI, else if you are working with ECC 6.0 then you need to maintain default profit center for Balance Sheet G/Lu2019s through T. code FAGL3KEH and for Profit and loss related G/Lu2019s / Cost elements profit centers derivation rule can be maintained through T. code OKB9 accordingly.

Maybe you are looking for

  • Pages User Interface

    Does any one else find Pages (08) user interface a pain to use? I have used Word for a long time and am used to having most of the functions clearly displayed up front in the icon bar. Pages hides functions under multiple menus in the Inspector menu.

  • Returning apps to Apple Store

    I need to get all of my purchasesd apps except for music return to Itune store for refund because it is useless and it costs money. How can I do this without these steps that you guys show me?

  • Paragraph-level Optical Margin Alignment

    InDesign CS2 (4.0.5) on Mac (10.4.11) - shortly upgrading to CS4 Maybe I'm missing something here, but I can't figure out the sense of having Optical Margin Alignment at "Story" level. I have a layout with a story that runs across several pages. With

  • TKIP or TKIP w/ 128 bit WEP?

    Can someone explain the difference between the cipher TKIP and the cipher TKIP w/ 128bit WEP? I thought you got a key when you selected TKIP... Thanks in advance. David Beaver

  • Workflow for Mail to MRP Controller

    Hello Experts I am configuring to activate workflow for mail to MRP controller, I am not able to activate event linking. Does any one know how to activate linking? Any help is appreciated. Here is configuration path SPRO  -  Materials Management  -