Cost center upload LSMW, missing company code field

I am planning on doing an LMSW with a custom recording to load cost centers.
The input file has a field for company code.
I do not see company code anywhere in the screens of KS01.
Now what?
Thanks,
Jeff

Hi Jeff,
The company code is linked to the contolling area in table TKA02.
So in your porgram query this table to get the corresponding controlling area for the company code.
Kind regards,
Robert

Similar Messages

  • Company code field in cost center master data

    I am trying to create some cost centers, but noticed that the company code field is not available for entry in the cost center master data. In other words, the company code field does not appear or is hidden. My understanding is that an entry in company code field in cost center master data is mandatory. Can someone advice as to what setting is missing?

    Hi MG,
    Appearance of the field "Company Code" in cost center master data depends on the following point...
    In Controlling Area settings in OKKP, if you have opted for single company code, then, whatever the cost center you create under this controlling area is obviously belongs to that company code only. So, system will not display the filed "Company Code" in cost center master data.
    If you have opted for cross-company code controlling in OKKP settings, then, when you create a cost center in that controlling area, then the system will give the field "Company Code" in cost center master data so that in which company code you need to create the cost center.
    I hope u got it...
    Srikanth Munnaluri

  • Company Code field now shown in Cost Center Master Data

    Hi
    I am new, I configured CCA. Created Controlling area and versions. When I created a cost center company code field not shown. I think one cost center assined to a one company code but in cost center master data Company code field not shown. I want to cost center company code specific. I using ECC6
    Pl help.

    Hi,
    When you will assign additional company codes, the cost centre created now, by default will be assigned to the existing company code, and for the new one - you will have to define cost centres again. So, everything is fine, do not worry.
    Regards,
    Eli

  • LSMW - Cost Center Upload

    Hi Gurus,
    Any idea on what BAPI should we use on uploading Cost Center using LSMW? Currently we are using a BAPI with the following characteristics:
    Business Object    BUS0012      Cost Center
    Method                   CREATEMULTIPLE
    Message Type       COSTCENTER_CREATEMULTIPLE
    Basic Type             COSTCENTER_CREATEMULTIPLE
    Unfortunately on step  4 - Maintain Structure Relations, we are encountering an error "No target structures could be found" upon executing it. It seems that the selected bapi has no export parameter/structure.
    Any suggestions for the approach should we use?
    Thanks and Regards,
    Jay

    Hi,
    Check the below links.
    LSMW Cost Center creation using BAPI BUS0012
    http://wiki.sdn.sap.com/wiki/display/ABAP/ListofBAPI%27s
    Hope this helps.
    Regards,
    Satish Kanteti

  • Profit center and company code field in Internal order type (KOT2)

    Dear Experts,
    I want to bydefault profit center and company code in ordertype customization.
    Profit center and company code field in Internal order type (KOT2)
    regards
    RR

    Hi
    1. Create a Model Order in KOM1
    Enter the Comp Code and PC and other fields you want and save it
    2. Enter this Model order in your Internal Order Type in KOT2... Transport this change to production client
    3. Next time when you create an IO, PC and CC will be populated by default
    br, Ajay M

  • Actual Cost Component Split for cross company code transfers.

    Hi,
    My issue is as follows.
    Production process spans across 2 company codes.
    Goods are produced in production company code, transferred (via stock transport order) to marketing company code and sold to customers from marketing company code.
    Stock transport order follows sales scenario i.e.. marketing company code creates purchase order for goods from production company code and production company code bills marketing for the goods.
    Actual costing / Material ledger is implemented in both company codes.
    We would like to roll-up (transfer) actual cost component split from production company code to marketing company (in a similar way as in product cost planning in cross-company scenario).
    However, due to the fact that the transfer between the companies is in fact a "sales" the goods in marketing company code are seen as externally purchased and the only cost component we can create is based on PO conditions. But we want to get the info about production cost component split.
    Once again this is for ACTUAL cost component split.
    I would be grateful for any ideas.
    Thanks,
    Szymon

    Hi Udo / Szymon.
    I have a question about this issue.
    In the sap help  about multiple valuations / group costing:
    http://help.sap.com/saphelp_46c/helpdata/en/7e/cb848443a311d189ee0000e81ddfac/content.htm
    Its not clear if this can roll up the Actual CCS? or what it do? My question is because i read the documentation of  bussiness function: LOG_MM_SIT,and also the book *Actual Costing with The SAP Material Ledger*
    states that we can handle the rollup of actual cost component split inter-company only with this BF active.
    Could you clarify about this?
    thanks!!
    Arturo.
    Group Valuation
    Goods movements between affiliated companies not involving intercompany profits are processed using the group view. This view determines the actual cost of goods manufactured for the group, and does not include any intercompany profits. You can, however, display internal profits as delta profits in the legal and/or profit center views.
    When you define cost components, you can specify that internal profits between company codes and/or profit centers are shown in detail in the cost component split. You activate these delta profits for the group valuation in the attributes of the cost components.
    For each cost component structure, there can only be one cost component under which the delta profit is shown. This means that neither the legal view nor the profit center view can have more than one cost component for the delta profit.
    To cost multiple values, you define a costing type for each valuation approach in Customizing for Product Cost Planning. You use the costing type to specify which valuation approach you require. You define each costing type in a new costing variant and carry out a cost estimate with this costing variant.
    Group Costing and Multiple Valuation Approaches
    In-Depth Detail of the Value-Added Chain: Partner Cost Component Split
    You can display in detail the costs of materials and services of every company department in the value-added chain for every stage of the production process. The partner can be traced for every material used. To do this, you define a partner version, which enables the value-added portions of each manufacturing level to be displayed in detail. For further information about this, see Partners and Direct Partners.
    The group cost component split can be displayed according to your partner definition. You can display the cost structures of the partners hierarchically according to your requirements, such as the company code segments on the highest level and the plant or profit center segments underneath.
    To display partner cost component splits, define a partner version in Customizing and enter it in the costing type.

  • Excise dta upload from one company code to other

    hi
    Balances in Excise Registers like RG 23 A, RG 23 C and RG 1 will be upload from one company code to other. what is the process. in which table it is available.

    Hi,
    Excise upload from one company code t another means its almost implementation in that respective company code. Do the intial entry of stock balances with 561 movement type and update the registers. For finished product RG1 register will update with 561 movemet type. Closing Balances for RG23A Part-II & RG23C Part-II & PLA registers before going live, to be updated directly in SAP table J_2IACCBAL . Use LSMW for upload.  Please check below link for detailed upload. Hope ths will resolve your issue. Thanking you.
    Excise Registers Part1 & Part2
    Edited by: Padmasri Garapati on Sep 30, 2011 9:32 AM

  • Usage of Company code field in the Change Request for Company

    Hi,
    Would like to know the usage of - Company code field in the UI for Change request for Company.
    1. If a new Company is created, can i assign the company code directly in the UI, will the assignment also replicated to backend in this case?
    2. In case of new Company creation, is it possible for multiple company code assignments?
    3. Is it possible to to pick the existing Company from the F4 list in the CR and assign the company code in the CR? How about the replication work in this case?
    Please share your comments, Thank you.

    Thanks Sanjay.
    Just to summarize and a bit more specific, here is my understanding:
    1. (a). You have mentioned that we can assign new company code also - does this mean i can select            a company code which is not in the F4 list? In such case, how will be the assignment                   replicated? It should ideally create a company code in the backend before the assignment is           processed.
        (b). Usually, if a new company code is created in backend, i need to load that in to MDG tables                 such that it will be active in MDG F4 list, for Company assignments in the Change request.
    2.      Understood
    3.      In the Change request, if i pick existing company from F4 values and edit company related data,          it will be replicated accordingly.
             In the same CR, if i give some value in the company code data, the replication will result in one          more assignment added to the company, so as on date, SAP has given the option of only                    additional assignments to the existing assignments.

  • Urgent: Maintain std cost for plants under different company codes

    Hi all,
    Company code(s)/Plant(s): C1/P1, C2/P2, ..., CnPn
    BOMs and Routings are maintained under P1. I believe that unlike BOM routing can't be made available across plants. So how does one maintain std cost across plants under different company codes?
    Thanks.

    Hi,
    You have to maintain individual BOM, Routing and varaint for all plants.
    Best Regards
    Ashish Jain

  • Authorization objects which contain company code field

    Hi,
    We are looking for list of Authorization objects which contain company code field for Audit. The listing should have Role, Authorization obj and the <b>company code and values</b>.
    Is there any we can query this info.
    Thanks,
    Sam
    Message was edited by: Sam

    Hi,
    You can use the follwing
    in USR12 table
    in USOBT table (but you get the details for the Auth Obj in the Tcodes and their field values.
    But as far as my knowledge goes you will get all the Auth Obj with Company code field
    Caution: If there are some objects in not check or are which are not in any tcodes then they will not be captured.
    But they are very less I guess and so i think you can capture most of the Auth Obj I guess
    Message was edited by: Manohar Kappala

  • How to activate company code field on selection screen of report pc00_m40_f24q ?

    Hello,
    Client is upgrading form ECC 6.0 ehp3 to ECC6.0 ehp7 . The report is generated according to the company code ,but after upgrade the company code field got disabled. Can any tell what might be the reason for this?
    Regards,
    Yashika

    Go to SE38 - Pass program name HINCF24Q- select - attributes - click on display - click on HR report category - click on F7 - click on CTRL+F1 - allowable selection criteria - click on F5 - add company code from the drop downs and then check.
    Once resolved close the thread as well.
    Regards
    Venkatesh

  • Can it be  a seperate cost component structure for each company code?

    Company Code No 1 Setting:
    Company Code XXXX with Chart of accounts X(Quantity + Value updation in material type)
    In the existing company code(XXXX) ,Cost component structure is defined as
    All company code---->All Plants----> All Costing Variants -
    >Cost component Structure AA
    Company Code No 2 Setting:
    Scenario:
    Now  I am creating a new company Code YYYY) which is  is allowed  for quantity updation  alone and  trying to create a product cost collector to carry out Production confirmation through Repetetive manufacturing (."Error = Cost object component split costed with Value of Zero"
    Can it be possible to have a seperate cost component structure for each company Code?
    Company Code YYYY with Chart of accounts Y which is different from Company code 1(Quantity  alone in material type)
    If possible ,Can anybody provide a procedure to do the configuration of Cost Component structure

    Hello,
    As I understand your question, All the thing which are releted to costing are done only at the controlling area level not at company code.
    As your req diffrent cost componenet for diffrent company code is depend up on how you define the controlling area.
    Hope it will clear you
    Regards
    Ravi

  • KP06 Cost Center Upload-How to do

    Dear Experts,
    Please Let me know how to upload Cost center Plan through KP06-Urgent

    Hello,
    You cannot postphone go live till the books of accounts being audited. You do not know how much time it will take. What you are trying to do is bringing the books from your legacy data to ERP, in other system you packing from one bag to another bag. The following information is useful to you.
    Hello,
    Broadly I will divide data uploading process into two categories.
    1. Master data (GL accounts, customers, vendors, assets, cost elements, cost centers, profit centers etc.)
    2. Transactional Data (Open Items for customers and vendors, GL line items, Cost Center planning, profit center plan data load etc.)
    In the first case mostly you can use LSMW, if you are conversant. The following document is useful to you.
    http://www.scmexpertonline.com/downloads/SCM_LSMW_StepsOnWeb.doc
    Note: No template is suitable for you, because, your configuration is different and their configuration is different, field status of various fields must be different. Therefore, follow the above document and start from fresh with recording. Recording is more or less sufficient for master data.
    In the second case, you create 5 Offsetting accounts + one main offsetting account.
    1. Vendor Offsetting Account
    2. Customer Offsetting Account
    3. Asset Offsetting Account
    4. GL Offsetting Account
    5. Stock Offsetting Account
    At the end of the day, the total balances within these accounts must be ZERO. Make ZERO these accounts and transfer the balance to MAIN offsetting account. Once you have done this, make sure you have blocked all these accounts.
    Technically, in second case, you should take help from ABAPer to write BDC, particularly in case if your entries are having different line items. For example your first document is having 5 line items and second document is having 10 line items, in such case LSMW recording will not work. You can depend on some standard SAP programs to map the LSMW. If you are not conversant with how to map, then you can refer the following document posted by Naimesh.
    /people/naimesh.patel/blog/2008/08/14/lsmw-with-rfbibl00
    Still, if you are not able to map, then there is no other way, you need to depend on ABAPer for uploading the transaction data through BDC. He / she will create a program and a customized transaction code for you and provide you the format. You may have to help the ABAPer with your requirement what you are exactly looking to upload.
    Hope this is informative and let me know if you need any further information.
    Regards,
    Ravi

  • Internal order for AUC with cost center - 'Please Select proper plant code'

    Hi All,
    User is getting error 'Please Select proper plant code', while inserting 'cost center' in field 'Responsible CCtr' for new Internal order which is for AUC.
    In Devlopment server also when we try to create asset through internal order we get same error.
    For your information this is new Plant, profit center and cost center for which we are trying to create internal order for AUC.
    If we try to post without Cost centre entry is saved. But we want to add cost center.
    Please help to resolve.

    Hi,
    If it is a custom message then please check whether any Validation or USer exit is maintained for the IO master data. If yes, then update the cost centre accordingly.
    Regards
    Sreekanth

  • Create Customer at POS and upload to different company code

    Hi Experts
    Client Requirement is like this
    Two company codes are here e.g. company code BP01 and BP02
    BP01 has one store
    BP02  has three store
    Now Customer is create at POS Server at any store .
    here we can create customer with respect to any one company code
    Same customer want to  buy goods from both company code and can get rewards points
    question
    so cutomer has to extend in other company code and has to update to each POS SERVER which located in each store 
    how to handle this scenarion
    regards

    Hi Hanumant,
    Assuming if customer, buys some item from CCode BP02 regularly, then you can create the customer on the POS application (like SAP POS..), and append the POS Customer master (re-use any text field) with information of other company code where the customer wishes to deal with).
    The customer master will be passed using inbound idoc, on to the IS Retail Server in the HO.
    Now at HO level a the customer can be extended for multiple company code ..in this case BP01 manually or by an automated program, which will monitor the specific field (coming from the new customer master idoc from POS) , if it detects contents, it reads the same and extend the customer as per mentioned ccode.
    So next time onwards , using outbound doc , customer master can be updated to all locations for that customer. Similarly the loyality point, can be accumulated based on the purchases made per Ccode.
    Regards,
    Anirban Roy