Cost Centers for Work Centers

Dear All,
In our senario we have defined 30 Work Centers required.   here the Activity are only for 2 (labour, Mechaine Hr).  In KP26 we have to maintain the Standard Price.   How can we build a logic in this.  Can we create 30 Cost Centers.  Y becoz each end eavery work center have the different price for Labour.  for EX;
WC1 - 150 Labour Cost
WC2 - 180 Labour Cost
WC3 - 190 Labour Cost
Like this we have to calculate.  I hope it is required to create 30 Cost Center to assaign wot Wrok Centers.  Here we are going to KP06.  We have a standrd pirce to calculate.
Regards

Dear Raj,
IF the business is interested in capturing using different cost centers means then you can create individual cost center and
assign it to the work center and define the rates in KP26.So only one activity type will be there but different cost center.
The otherway is creating multiple activity types say LABH1,LABH2....and creating different rates for the activity type ans same
cost center combination in KP26.But here the challenge is you have to assign the activity types properly under costing tab
against the formulas.
Check and revert back with your queries.
Regards
Mangalraj.S

Similar Messages

  • PP costing Formula for  work center

    Hello Experts
    I am having issue to set up formula for given below case,
    I have on my work center three parameters, x time (unit: Hr) and   Y Power (unit:kw).
    i want to multiply both the parameters and get the answer in terms of energy Z  (unit: kwh) paramenter.
    so i already define activity type unit with KWH.
    for example:
    From Routing: 
    work center: 1111,
    x: 10
    Y: 20
    so Z= X*Y
           = 10hr * 20kw  = 200kwh
    So which would i apply formula for all 3 parameters to get result 200 kwh? Do i need to assign 3 different formula to X,Y,Z   or   1 formula direct to Z?
    Sooner response highly appreciated
    Thanks
    Nixal

    Dear Nixal,
    Assume this 10 hours is for some base quantity and this value gets changed based on operation(order quantity) means,you can
    check with standard SAP formula SAP006 = Machine * Operation quantity / Base qty.
    In case if the duration 10 hours is for any operation quantity means,then there is no relation between base quantity and
    operation,so you have to assign a formula which has only duration alone.
    Likewise you can decide and select the suitable formula and use the formula key in the costing tab to calculate the cost based on
    the formula selected.
    Regards
    Mangalraj.S

  • Actual costs posted to work order without maintaining costing variant

    hi,
    i havent maintained costing variant for work order(maintenance order) type i used to create the work order. so when i posted goods issue, how does the actual costs get posted with out maintaining the costing variant for work order type. what is the role of costing variant configuration in work order type settings.
    thanks,
    monica

    Hi monica,
    Costing variant forms the link between the application and Customizing, since all cost estimates are carried out and saved with reference to a costing variant. The costing variant contains all the control parameters for costing.
    The configuration parameters are maintained for costing type, valuation variants, date control, and quantity structure control.In costing type we specify which field in the material master must the price be updated,
    In valuation variant we specify in what order the system should go about accessing prices for the material master planned price, standard price, moving average price etc. Further which is the price which should be considered for activity price. How the system should select BOM and routing.
    assign points if useful
    Regards
    Genie

  • Costing Formula SAP_09 for Work centers

    Hi Gurus,
    In OP51, we have a PARAMETR (for work centre formula) SAP_09 . It picks values from a Filed  "MGVRG" . I am not able to trace where this filed comes from in a Rtae routing or Work centre.
    Can somebody please advice me where MGVRG comes from  .
    Your fast reponse would be apprciated
    THNX in ADvance

    Assigned to PP thread

  • Issue in updating Cost Centers for Employees

    Hi All,
    1.     Is it necessary that infotype 0000 & 0001 needs to be in synchronization i.e. both the infotypes should contain same no. of records?
    2.     Is it necessary to assign cost center to both the position and the employee in infotype 0027 for Payroll purpose or either of one assignment is sufficient? What is the purpose of assigning cost center to a position & cost center to an employee in infotype 0027
    3.     We have assigned cost centers to positions & all the employees via infotype 0027. Now I have a situation that the company has created new cost centers as per their business line with effect from Jan 2011. How do I update these new cost centers to position as well as all the employees?
    If I assign new cost center to all the positions thru PO13 from 01.01.2011 than system delimits the record in infotype 0001 so now there is 1 record in infotype 0000 & 2 records in infotype 0001. For example an employee is hired on 01.03.2009 with cost center A assigned to his position & in infotype 0027. Now if I assign new cost center B to his position than the system delimits hiring record in infotype 0001. So now there are 2 records in infotype 0001 i.e. 01.03.2009 to 31.12.2010 & second is 01.01.2011 to 31.12.9999. If I do the assignment of new cost centers only in infotype 0027 then system posts the payroll result to old cost center rather than new cost centers. How to resolve this issue?
    Regards,
    VG

    1. Yes. It should be. But in your case this is an exception. It will still work even if the 0000 and 0001 don't have the same number of records.
    2. You should only use it0027 if an employee is charging costs to two or more cost centers. You can define here the cost centers where they are charging and the percentage of division between cost centers
    If you dont have scenarios like this, DO NOT use this infotype.
    For assignment of cost centers to employee (Infotype 1) or to positions (via PO13). You should only use one method. If you are assigning the cost center manually in IT0001 during hiring then you don't need to enter the cost center in the positions.
    If you are entering the cost center in the Positions objects, then configure the system so that everytime you do hiring actions (or maintain infotype 1) the cost center assigned to the position is inherited in the infotype 1's cost center field.
    Don't assign it to both Infotype 1 manually and the position at the same time, using this method, you'll eventually have data inconsistencies.
    For you issue regarding the delimitation of the IT0001, this is ok. This is standard, the infotype 1 is delimited since you have a new cost center assignment for the succeeding period.  You don't have to create an Action record since there was no employee movement, only change in cost center assignment. (which is the purpose of the Action infotype-- to record employee movement)
    It won't mess with your payroll, your infotype 1 just have an extra record.

  • Commitment line items for cost centers - KSB2

    Hi all,
    -     PO#450118888
    -     Client is working in transaction code KSB2 (Commitment line items for cost centers)
    -     Client states that PO shows a different amount or that line item 2 does not show at all in KSB2.
    Please guide me what is the solution for this and where I need to check
    Thanks and Regards,
    Kumar

    Hi Beatriz Amezua ,
    For displaying plan line items for cost center - KSBP and for display of individual plan document : KABP
    RKP6 means "Planning Activity Dependent Costs"
    Like in FI module, the business transaction have been codified and the list you can find in KANK transaction , mention your controlling area, menu -- Groups --  Display Groups
    Srikanth Munnaluri

  • Ceating Sets for Cost Centers in GS01

    Could someone please guide me in the steps to take for creating a set for cost centers so when DP90 (Billing Request fro service order) is generated it looks at all cost centers...
    I went to GS01 created a name of Cost Center used table AD01ATTR and field KOSTL...enterered the from value XXX and the to value as XXX...
    This does not seem to be working....am i missing something?  Your direction would be greatly appreciated

    Hi,
      Try using table CCSS
    Mu

  • Report for cost centers when using MVT 261

    Guru's,
    Most of the request for material for our storerooms are done through a work order and issued out using MVT 261. We're trying to find a report that shows the cost centers used when using MVT 261. I've tried using MB51 and MVT 261 but no cost centers populate. When I use MB51 and MVT 201 for reservations created manually there's no problem, all cost centers are populated.
    Thanks
    Eric

    Hi,
    The movement 261 is for Issue to Order & no issue to Cost Center, hence you have the problem.
    You will get only the order number is case of 261.
    Regards,
    Prashant

  • Alternative hierarchy for cost centers

    Hi all,
    Due to reporting needs I have to work on two cost centers hierarchy at the same time. So I decide to use the alternative hierarchy which is a copy of the standard one. I've seen on help.sap.com that it was possible to copy the standard hierarchy, and to modify this new alternative hierarchy.
    My problem is that the system doesn't let me modify the alternative hierarchy, I can't delete, replace or add any cost center.
    Thanks in advance for your return.
    Pascal

    Hi Mary,
    thanks for this reply. I have already created the alternative hierarchy by KSH1, to replicate the standard hierarchy (let's call it CENTRAL), so my new hierarchy (let's call it ALTERNATIVE) is all the same in comparison to the previous one. After the copy the two contains the same cost centers groups, and inside the nodes the same cost centers. For the year 2008, I need to move cost centers in the ALTERNATIVE from one node to another one, so I could compare node by node the 2008-CO postings with 2007-CO postings.
    The central point is that my cost centers perimeter is altered every year and I need to compare two cost centers hierarchies at the same time.
    Hope this reply is more precise.
    Regards Pascal

  • ALE Link for cost centers

    Hi,
    I need to send the cost centers from one system to another. I want to use BD16 (IDOC) for the same but both these systems have different controlling area. BD16 works only when both the sender and receiver have same controlling area.
    Can you please suggest me how can I still transfer the cost center to another system which has different controlling area?
    Thanks
    Chhavi

    Hi,
    Based on your post, I think you should have the INBOUND IDOC configuration in the legacy system done.
    My suggestion is:
    1. Find the process code for the INBOUND IDOC, there should be a FM binded with this process code
    2. Usually, SAP INBOUND IDOC FM will have enhancement in side, in other word, user exits
    3. Once you found the exits, you may implement the code to switch the controlling area to the right one
    On the other hand, considering the cost centers are master data, you may try the change pointers.
    As I remember, there are some convertion rules you could set up.
    Cheers,

  • How to Mass change cost centers for assets

    Dear All,
    I have change the cost centers for about 1500 assets. I am not sure if there is an easy way to do it. Is there any way to get this list in excel and upload?
    I am using ECC 6.0 (I think CATS could not be used.. but I might be wrong). Thanks in adv for your help.
    SD

    Hi
    I hope the above given suggestions will not fullfill your requirement,
    Do follow the below steps for carrying out mass change of cost centers in asset master data.
    Enter t.code-AR01 - Generate
    Enter your Co.code and the assets numbers for which the cost centers have to be changed and execute.
    In the next screen select Create worklist (CntrlShiftF8)
    Give the worlist a Name and select-Change asset w/o dialog (bulk change) and press enter,from the next pop up select create Substitution,where you will be taken to creation of Substitution rule.
    Write a Substitution as per requirement and assisn the same to your company code.
    Where  you will be prompted with a message "Work queue XXXXXXXX added".
    Now enter into AR31 - Edit and release the woklist and see that your mass change of cost centers is carried out.
    hope this might help you in doing mass change of cost centers in asset master record.
    Good Luck
    Hari

  • Work center with two cost centers

    Hello,
    I have one work center. I can produce two different products on it. For one product the costs should go to cost center 1. For the othe product the costs should go to cost center 2.
    How can I realize this scenario?
    Kind regards.

    Dear,
    IF you have to take care of capacity planning and scheduling, then you need to use  only one WC and having two WC will not serve the pirpose.
    Generaly you cannot assign WC to 2 different cost center unless the period is different.
    Then the only solution is let the cost get posted to 1 common cost centre. Then at the month end distribute the cost to 2 different cost centers depending on then qty produced.
    This is the one laternative we are following.

  • Multiple cost centers linked to one work center

    Hi all,
    is it possible to link multiple cost centers to one work center ?

    Dear Bjorn,
    1.For the same work center its possible to assign only cost center at a time or say for a validity period.
    2.Its possible assign different cost ccenter for the work center for different validity periods,provided the
    rates are also define properly in KP26.
    3.One cost center can be assigned to multiple work center.
    4.Its possible to define different rates for the same cost center and activity type combination only
    for different periods.
    3.Same activity type may be having different rates for a different cost center combination.
    4.Only one cost center can be valid for a work center.
    5.Same cost center may be linked to many work centers.
    Check and revert back.
    Regards
    Mangalraj.S

  • CATA for all cost centers

    Hi experts!!
    I have the following problem:
    t-code CATA works just fine if we select the cost centers one by one, but it dows not work if we do not give any cost center on the selection screen, so that it selects all.
    Any ideas????
    Please help!!!
    Thank you all in advance!!!

    Hi,
    Yes, in CATA no need to select cost centers, once you run this t code , if you have any entries for that cost center it will run for that all cost centers and posted hours to that Cost center.
    Try it it may help.
    Thanks

  • Currency in 'Cost Centers: Actual/Plan/Variance' report for specific user

    Hi there CO people, I'd like to ask about currency settings in CO S_ALR_87013611 report (Cost Centers: Actual/Plan/Variance)
    The question is ... where can I define the currency in which report output should be displayed?
    I've got such situation, that amounts for USER_X are displayed in CURR_X currency, whilst for USER_Y amounts in report are displayed in CURR_Y currency.
    Could You tell me some tip? Or give some literature-track to follw? I'd be thankful for help. Greetings. P.

    USER_X -> TCode: RPC0 -> Tab: Report currency -> Tick 'Objeck currency' (Before was: 'Controlling area currency')
    now USER_X has got the same currency as USER_Y
    That solved my problem
    Greetings

Maybe you are looking for

  • Installation problem :- SAP 4.7 on Linux RHEL 4

    Hi, I am installing SAP 4.7 SR1 on Linux   RHEL Sever 4 on Test system which have one remote window desktop. I have successfully installed central instance by using the putty from remote desktop. But while installing Oracle 9.2 from remote desktop I

  • Need suggestion to display smooth animation

    Hi. Recently i am doing a project for a simple game and in the game a imageicon must move from one Point to another Point smoothly by itself. To make such movement, i used swing.Timer class with repaint method and it works ok, but one thing keeps bot

  • How to pass the java object into the spring controller

    Hi Friends When I hit the url at the first time my call goes to the spring controller and sets the userDetails objects in the modelAndView.addObject("userDetails", userDetails.getUserDetails()) and returns the userDetails.html page. if I click any li

  • Validating  duplicate entries in form level

    Hi I want to validate records whether its duplicate here i am inserting to a table and want to check whether its existing in another table and if not i need to enter the data.I return the following code but its returning error.I already removed the d

  • Class jsp_servlet. mybean not found

    Using WLS5.1, SP2 on Win2K Pro and when Weblogic tries to compile my JSP, I           get the error:           class jsp_servlet.<nameofmybean> not found...           Where is my bean class supposed to be? If I place it in the jsp_servlet           f