Cost component with quantity

Hi SAP Experts
My client want material actual cost component report not only with value amount, but also with quantity.
The material ledger was activated, I know using standard function, we can have material actual cost component report with value amount, like Tcode:MLCCSPD,  but cannot find any quantity information.
Do anyone have the kind of requirement and how to achieve it ?
If only customer development method, how to do it. thanks a lot!

I tested the CKMLQS, it only get the current period BOM quantity, cannot trace to origin component quantity.
for example:
Previous Period:  material A  Qty 10 -----produce------>  material B Qty 10
Current Period :  material B  Qty  7 -----produce-------> material C  Qty 7
Now, Using report:CKMLQS, it only show material B quantity 7 consumed for material C, cannot see the origin component material A consumed quantity.
I need to trace origin component(the lowest level of BOM) quantity, like amount value report(Tcode:MLCCSPD). 
Anyone have suggestions? thanks
Regards
Robin

Similar Messages

  • Error  - Material cost estimate with quantity structure

    Hello Gurus!
    Can anyone please help with the following problem:
    I’m trying to do the material cost estimate with quantity structure, but the system is throwing back the message  " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR". 
    This happens because I have a subcontratation in my routing in CHF, and in transaction OB08, and I don’t had defined that rate (type P CHF –EUR).
    I need to know if there is any solution to the system assumes other Type of Exchange Rate (the last real exchange rate that I have introduced in my system, not the planned!)
    Points will be assigned to the suitable answer.
    Thanks in advance.
    Mary Jane

    Hi Sridhar
    Thanks for your reply.
    In OKEQ for the version 0, I have the rate type M.
    I don't understand why the system throwing back the message  " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR".!
    Do you know why?
    Thanks and regards
    Mary Jane

  • Material cost estimate with quantity structure and without quantity structu

    What is the difference between material cost estiame with quantity strucutre and without quantiry structure?

    For the quantity structure pl read the following link
    http://help.sap.com/erp2005_ehp_02/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    For without quantity stucture
    http://help.sap.com/erp2005_ehp_02/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm

  • Material cost estimate with quantity structure (tcode: CK11N)

    Hey dear friends.
    I donu2019t know in which forum I should put my question above.
    In fact, Iu2019m new to SAP PM module.
    Iu2019m trying to create material cost estimate with quantity structure (tcode: CK11N) for a material u201CXu201D.
    This material is manufactured.
    While running the transaction CK11N, I got an error message.
    After analyzing this error message, Iu2019ve realised that somebody had assigned wrong activity types to cost centers which are linked to this material in tcode: CR03, tab: costing.
    So Iu2019ve changed and assigned the right activity types.
    Then, Iu2019ve tried to run the tcode CK11N again. But the system still brings the wrong activity types and seems to ignore the ones that Iu2019ve assignedu2026
    It seems like the old activity types still linked to the cost centers somewhere else than in tcode CR03u2026
    Any idea about what am I mising ?
    Thank's in advance.
    Bahia.

    Dear Bahia,
    If its rate routing means,i guess you must be working in REM scenario.
    So goto CA22,delete the existing operation and then assign the same work center in a new
    operation,check what activity types is it proposing in the rate routing,if its reflecting correctly means
    save the datas.
    Also goto KKF6N--->click the change mode icon and then calculator button to create a preliminary cost
    estimate and then save the datas.
    One of our forum friend has asked you to check the production order read PP master data once
    again,but understand there is no production order concept in REM scenario,only planned orders.
    Then come back with your queries.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Jun 17, 2009 12:05 PM

  • Material Cost Estimate with Quantity Structure (How to download)

    Is there a standard report or feature available in SAP to download the material cost estimate with quantity structure?
    Currently we have to print screen and it is very tedious and can't do analysis with those screenshots.
    Please advice.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Material cost estimate and mateiral cost estimate with quantity structure

    Hi sap guys,
    What is the difference between material cost estimate and material cost estimate with quantity structure

    Hi
    Both are in one way the same.
    Material cost estimate can be calculated as
    1. Material with quantity structure
    2. Material without quantity structure
    You can get more insight into it at the following link
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    Regards,
    Suraj

  • Cost component with attributes restricted to 20/40

    Hello Gurus,
    The cost components have been restricted to 20/40 (SAP standard) either by combining more than one values or accommodating the CO-PA requirements within that number. Now, the requirement is to have more number of entries than the max limit of 20 each (fixed/variable), system is throwing following message - Maximum number of cost fields reached (40) (Message no. KQ304).
    Basic system design- The system is limited to 40 cost component fields. Each cost component can be set to variable or total (fixed and variable). However, the database has two fields: "total" and "fixed". "Variable" is derived. So if you set a cost component to "total" you, in effect, set up two fields (total and fixed) that need to be maintained. If you set a cost component to "variable" you, in effect, set up just one field (total) that needs to be maintained. So the basic limiting factor is that if you set every cost component to "total", you can only have 20 cost components.
    Because of this system limitation the only option left for us is to utilize 40 elements at the most without the internal split of fixed and variable portions. Now, the split is also necessary as such this workaround solution also can’t be implemented.
    Is there any additional way (user exit or some additional solution) which will allow overcoming this limitation and increasing the table entries by more than 20/40?
    Thanks & regards,
    Nikhil

    Dear Experts,
    Let currently I am facing the same issue.
    I need to increase the cost components to get the effective results in my COPA report.
    I tried to increase the Limit but I am also getting the same error.
    Maximum number of cost fields reached (40)
    Message no. KQ304
    Diagnosis
    The maximum number of cost fields defined in the system for saving the fixed and variable portions of the cost components has now been exceeded because of the new cost component.
    Regards,
    Jyosh

  • Material cost estimate with quantity struchture : problem

    while running the costing transaction CK11N , the word u201Croutingu201D is not appearing under the explanation facilities.
    rate routing is already available
    what will be the reason and solution.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Digits Of Significance/Rounding Issue-Cost Estimate With Quantity Structure

    I have an Excel based BOM which includes Material (Yield) Qty, plus a scrap factor. This adjusted yield is then multiplied by the Unit Price to get the Extended Amount. An example from my file is:
    Material 10-0766 = yield of 1.824 sq ft less 4% scrap 0.07 sq ft = adjusted yield 1.897 sq ft * 1.836 USD/sq ft = Ext. Amt of 3.483 USD.
    In SAP, I created a BOM via CS01 with this material as a line item, 1.824 as the qty, UOM is FT2 (sq ft) and I added a Assembly Scrap of 4% with the Net ID indicator checked. When I create a cost estimate via CK11N (in our SAP AFS 6.0 sandbox), the itemization for this material reads: qty of 1.897, total cost of 3.48 USD.
    The math all works, but the resultant USD amount in SAP is short by .003 USD. I realize that USD currency is configured to only 2 decimal places, and that is fine. But, I thought that the calculations that costing was doing was retaining all the digits of significance past the 2 decimal places being shown, rather than rounding off to 2 decimal places. There are 24 materials in this BOM, and the total delta between my Excel sheet total (17.647 USD) and my SAP estimate (17.63 USD) is 0.017 USD. If I look at each item, the cumulative difference is due to each line rounding off to 2 decimal places.
    The units of measure (via tcode CUNI) are all configured to show display 3 decimal places (field DECAN) and round to 5 decimal places (field ANDEC).
    Does anyone have any information/suggestions around the precision in my SAP cost estimate? Am I stuck with these differences, or is there something I can do differently to prevent them? I know I can increase digits of significance in Activity Price Calculation, but I can't find anything similar in Product Cost Planning. Any help would be greatly appreciated.

    Hi
    To achieve you have to run the costing run twice once normally.
    Secondly you create an alternate BOM 2 by having the same alternate BOM 1 and remove the 2 materials which you dont want.
    Execute the costing run, provide the details required in the Costing data screen, press enter, go to the Qty structure screen give the details of the Alternate BOM 2 in the BOM details and execute the costing run.
    Save the cost estimate, which would be have been costed without the values of two materials as you wanted by using the alternate BOM 2.
    Then use CK24, select the option "other prices" to release the cost estimate for the commercial price only by selecting the indicator of commercial price 3 only.
    Regards,
    Suraj

  • Error in product costing cost component structure with quantity...

    Dear sap gurus
    I am creating material cost estimation with quantity structure while doing in T CODE CK11N the following error is coming Message no. 213 Cost component structure z9 is not active. But I am not using the particular Cost component structure z9. I am using the standard Cost component structure 01 and I have activated it at OKTZ and the z9 is deactivated. Plz, tell me where I can fix this error
    Awaiting for you kind reply.
    Naveen

    Hai MoH
    Thanks for yuor reply, yes you are correct. i have checked in OKKN where i found that the cost component structure z9 is assigned to my co. code that is not mine i am using the standard cost componet structure. plz, tell me where i should go and change the assignment plz, give the T.CODE
    regards
    Naveen

  • Cost component view German instead of English

    When I display product cost estimate with quantity structure. Under the tab costs all the cost component view description show up in German. In our development and test client they show up fine in English. I don't know if this problem has any thing to do with costing at all but I was just wondering if any of you faced this problem and how did you solve the issue. If this is not the forum can you please point me to where should I pose this question.
    Regards

    Hi NIK83,
    When a cost estimate and its itemization is saved in txn CK11N, the text of the items is only written in one language to database table CKIT. So if somebody who was logged on in German created and saved the cost estimate, everybody who displays this cost estimate in CK13N will  see German texts. This is the design of the database tables. If there would be texts           
    for the items in every language installed in your system, the data volume would increase significantly.                                                                               
    However, you can change the layout of the itemization and the cost structure by adding certain columns, e.g. material description, with the English texts. You can save this layout and make it available to all users.                                                                       
    Regards,
    Antje

  • Cost component in cost estimate

    Hi all,
    In cost estimate with quantity structure, costs assigned to one of my cost components do not appear in the correct group.
    This only happens for a group that should include semi-finished costs. The correspondance in the customizing is correctly made between the cost element and the cost component and when looking at itemization, the correct cost element is displayed but no cost component is shown.
    I assume the problem may arise from the fact that my finish product use elements from other cost component, e.g. raw material, packaging,...
    Would someone have any idea on this issue?
    Thanks in advance for your help.
    Ronan

    Hi,
    Pls. used tcode CKMCCCC - Manual Change of Actual Cost Comp Split.
    Pls. assign points if it's helpful
    regards
    sel

  • Reg:Cost Estimate without Quantity Structure

    Hi Guru's,
    For Cost Estimate with Quantity Structure we need to run the following T.Codes....
    1) KP06
    2) KP26
    3) KSPI
    4) CS01
    5) CA01
    6) CR01
    7) CK11N
    8) CK24
    I want what are the T.Codes for Cost Estimate without Quantity Structure

    Hi,
    while am doing T.Code:KKPAN the following issue is coming....
    *Material F29 in plant 1000 w/o cost comp split: price acc to val strategy
    Message no. CK193*
    Diagnosis
    When valuating material components,
    the system could not find a cost component split for F29 in plant 1000.
    Possible causes:
    The material has not been costed.
    The material has not been selected for the costing run.
    The BOM was changed after the selection or BOM explosion for the costing run was carried out, and the material now has a new low-level code.
    This is a configurable material and does not have a costing view in the material master.
    The default value for price control is not set in the material type.
    The material belongs to a recursive structure. With this material, the system begins the iterative costing of the cycle. You can check in the material overview of the cost estimate whether the material belongs to a cycle.
    System Response
    The material is valuated with the price determined through the valuation strategy.
    Procedure
    Check the log.
    Carry out selection and BOM explosion for the costing run again.
    If the material is a configured material, create a costing view in its master record.
    Note: I already checked cost component spilt assigned for Plant....

  • How to activate cost component

    Hi guys,
    Following is the scenario which I met,Can you help me?
    Scenario: When I want to simulation costs for an material, It will show error message: Cost component structure 01 is not active.
    Operation Steps:
    1. Tcode: CU50, Input Material and Plant,keep other selections as default value
    2. Execute and show an new screen:Configuation Characteristic Value Assignment
    3. Goto Menu: Environment --> Simulation --> Costing
    4. It will go to Screen: Create Material Cost Estimate with Quantity Structure
    5. In this screen: input the costing variant and Transfer control.
    6. Execute it
    7. Red flag will show, the error message is: Cost component structure 01 is not active
    So my question is: how can I activate cost component.

    And do not forget each time you change cost componenet structure assignments componenet and cost element assignments it is deactivated automatically.

  • Cost Component Structure (OKTZ) Issue - Max number of cost fields reached

    Hello.
    I'm having this issue in OKTZ when adding new cost component in an exisiting cost component structure. it says "maximum number of cost fields reached (40)".
    not sure what to do with this.
    please see screenshot
    http://img39.imageshack.us/img39/1700/oktz.jpg

    Hi Andrew,
    When yo create the Cost Components in the Cost Component Structure, inside each Cost Component, there will be properties relating to whether the Cost in that Cost Component is Fixed / Variable, relevant to Inventory Valuation or not etc.
    To view these options...Go to OKTZ, select the line of your Cost Component Structure, double click on "Cost Component with Attributes" in the left side navigation. Now, you will be able to see  the list Cost Components on right hand side. If you double click on any Cost Component, you will see the properties of that Cost Component.
    There, you can see ther radio buttons "Variable Costs" and "Fixed and Variable Costs".
    Now, in Standard SAP, you will be able to create a maximum 40 Cost Components. The behaviour of the system goes like this.... If one Cost Component is only "Variable Cost", it will take the space of one Cost Component out of the maximum 40. If  one Cost Component is of "Fixed and Variable Costs", then it will take the space of two Cost Components out of the maximum 40. That means, if all of your Cost Components are "Fixed and Variable", then you will be able to create only 20 Cost Components.
    You can find the SAP explanation regarding this in the IMG Documentation...
    SPROControllingProduct Cost ControllingProduct Cost PlanningBasic Settings for Material Costing--Define Cost Component Structure. Check the IMG Documentation there to find the following text...
    Structure of the Cost Components in a Cost Component Split
    The cost components are listed in a cost component structure that can contain up to 40 cost components (cost fields).
    You can create up to 40 cost components that contain variable costs.
    For cost components that contain full costs, the system creates a second cost field for the fixed costs. This means that you can create no more than 20 cost components that are full costs.
    Revert back for further explanation...
    Srikanth Munnaluri

Maybe you are looking for

  • Setting displayname as header in GetDataTable

    HI, I am fetching records from a custom list and binding to a datatable. The datatable works, but the header shows the Internal names of the columns. How to set the display name of the column as header when converting to datatable. My current code is

  • Handling errors nicely in logoff called procedure

    I have a logoff trigger that calls an autonomous tx procedure which purpose is to collect program names and session stats (resource consumption) for some basic session profiling and accounting. To catch any error that otherwise could lead to unclean

  • Question on JTabbed Pane

    Hi, I am working on a swing application, which uses JTabbedPane. I am stuck at one point. There are two tabs and when the button in first tab is clicked, the second tab should show up (User should be able to see the components in another tab). How ca

  • Smtp help

    hello to all!!!!!!! i know smtp is necessary to send email so it ie necessary that smtp must be of isp means to say my i have hosted a website and that company gives me smtp so can i use that... and my second question is that can we use any smtp in t

  • Variants missing error in RSTRANSP

    Hi All, I want to transport eight screen variants of the program 'RSUSR070' to another system. SAP&_AUTH SAP&_BENU SAP&_CHANGE SAP&_MINI SAP&_PROFIL SAP&_STANDARD SAP&_TRANSAKT SAP&_VALUES I ran RSTRANSP but it could not find any variants and threw t