Cost element & work center

Dear All,
What is meant by cost element.any link between cost element and work center.how to configure this.Kindly give the steps to follow.
Regards,
Devi

Hi Devi,
Cost element is Classification of the organization's valuated consumption of production factors within a controlling area.
Each cost element corresponds to a cost-relevant item in the chart of accounts.
Primary Cost element & Secondary Cost element.
Primary cost elements are like materail costs, personnel costs, energy costs... where a corresponding GL account exists in FI..to allow costs to flow...
Secondary cost elements are like production costs, material overheads, production overheads, they can be created and administered in only CO.  These are used in internal cost allocation, overhead calculation, settlement transactions., it does not flow to FI...
I don't think there is any link between Cost element and Work Center.
If useful reward.
Regards,
Santosh

Similar Messages

  • Confirmation costs and work center link

    Hi Experts
    Can we link the costs in CO document along with line item and to a work center after production order confirmations?

    Dear
    You need to utilise tabel :
    1.AFKO - this is for your basic production header info
    2.S022 - this is for your operation header details - operation number, Work centre etc if you are only after the header details such as activity cost based on the activity type assinged at work centre -cost centre ( refer : AFVC or AUFV)
    3.AUFK - this is for your order master data - Order released flag, order complete flag, technically complete date, you'll need this to filter out confirmed order with order staus based on JEST table.
    4.Work Centre : CRCO-Work centre /cost center relation , CRHD-Work Cenre Header .
    5.Discuss with your CO  for CO document number
    -COVBP
    COSS CO Object: Cost Totals for Internal Postin
    COSP CO Object: Cost Totals for External Postin
    COSB CO Object: Total Variances/Results Analyse
    COSL CO Object: Activity Type Totals
    Hope this will be useful
    Regards
    JH

  • Costing in Work Center

    Hi all,
    I have a work center with an activity assigned. The cost of the activity has been maintained in KP26. E.g. 30 dollar /hour.
    In the costing tab of the work center, i have added the activity and put in the formula SAP008.
    When i do a calculation of the costing formula, i entered 1 day as the work duration.
    The results for the calculation gives me 30*24 = 720. So it is giving me 1 day = 24 hours.
    In the capacity tab, i have maintained the start, end and break time. Thus the operating time is 8 hours. Base of unit of measure is put as Days.
    Any ideas where i would need to configure such that 1 day = 8 hours and the result of the calculation would be 30*8 =240?
    Appreciate any advice.

    Hi,
    I think this 24 hours is not directly related to 1 day equivalant hours.The time is coming from the formula you have used SAP008.
    Please create a formula which will take 24 hours as 8 hours for this resours.
    For an example
    Create a formuls x=SAP008/3
    As 8 hours is availabe hours for your resource.The formula SAP008 use Work (internal proc) as a entry.Divide it by 3 by which you can get the actual run hours.
    Hope this will help.
    Regards,
    kaushik

  • Costing at work center

    hi guys,
    I have two materials and produced on one work center.But i do not want to do costing for one material.
    Please explain how to do it?
    Regards
    ramkrishna

    Hi Ramkrishna,
    You could deactivate the costing relevancy indicator in the routing opertion of the material for which you do not want operation costing.
    Regards,
    Prasobh
    Reward your points if this was helpful

  • Activity cost at work center

    Dear Exports,
    I have a requirement in my project
    1. In a work center we have 3 activities. 1. Labour time
                                                                       2. Machine Time
                                                                        3. No. Kgs treated.
    I am able to give labour & Machine reates  by giving price at kp26. and number of minitus in routing.
    But my client wants machine hour rate : no. labours worked X Time worked  X rate per hour .
    i.e he wanted to give time in labour time activity and no of employees worked in machine time the formula must claculate
      Labour time X Machine time(No of Workers worked) X KP26 Price(Per Labour hour).
    Can Any body help me please...
    Rao

    Check if there is an existing WC formula that you can use or create your own formula for the work center.
    My challenge (at a different business, so I don't have the exact work in front of me, but I have notes) was  Crew size x Machine Hours x Activity rate.
    In the routing Operation Details is a section General Data.
    There is a field: Number of Employees, field name ANZMA,  That is where we populated Crew size
    Use an existing formula if possible
    Which formula do I use??                                   
        Work Center Basic Data (CR02)  determine standard value key                         
        Go to  "Define Standard Value Key" in IMG (OP19); select std value key and click detail button          
         Note the Parameter used                                        IMG path:  Production>Basic Data>WorkCenter>General Data>Standard Value >Define Standard Value Key
        Go to "Define formulas for work centers" in IMG (OP54); select formula that uses the field parameters required          IMG path:  Production>Basic Data>WorkCenter>Capacity Planning>Work Center Formulas>
                         Define formulas for work centers                                        
    Not there?  Create the formula     
         In English - what do you want to calculate?
         Find parameters for the fields in the calculation
         Write formula (op54)  Copy from existing formula if possible - spaces in the equation are necessary
                             OP17 is where to create new Parameters.
    This is all configuration - with some high leve security (in our system).  Configur and TEST CAREFULLY

  • Cost work center A to work center B

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, I want to transfer the cost the work center A to and other work center B.
    I want to keep the history u2018s confirmations on the work center A.
    The first confirmation CO11N on the order 1 and work center A => Quantity 1 hrs.
    Actually we transfer the cost by KB15N by at the level EOTP.
    We want to push the cost down at the work center.
    So we want this situation :
    The first confirmation CO11N on the order 1 and work center A => Quantity 1 hrs.
    The second confirmation on the order 1 and work center A=> Qauntity -1 hrs ( Itu2019s possible and how?)
    The third confirmation CO11N on the order 2 and work center 2 => Quantity 1 hrs.
    Thank you for your answer.
    Regards,
    Géraldine

    Hello,
    The user clock in his time by CO11N, for example 2 hrs, on the posting date 2011.02.01 (on the project A).
    After the cost transfer into CO.
    At the end of the project, on the posting date 2011.06.01 , we want to transfer 1 hrs and the cost to an other project B.
    I try two incorrects solutions :
    - The first : I can't use the CAT5 by negative value.
    - The second : The user don't want to modify or cancel the initial confirmation.
    How can i to deduct one hour from the initial project to the second project, and i want to keep the information work center ?
    Can you help me ?

  • COPA derivation for thecombination of Cost center and Cost element/GL accou

    Hi Gurus,
    In COPA derivation using KEDR i am trying to make a derivation for the
    combination of Cost center and Cost element. Here i got following problems
    • While posting FI document using t.code FB50 system not automatically
    updating the fields Cost center and cost element in Profitability
    segment. Hence system not posting COPA document. How can i make this
    derivation? Is there any note should i apply regarding these.
    • How can i create cost element as characteristic.
    • If i configure derivation for the combination of Cost center and cost
    element will it be posted with copa document for postings or automatic
    postings from MM,HR and FI
    Pls provide me solution at the earliest.
    Thanks and Best regards,
    Dhanumjaya.Ranga
    Mobile: - 919940093579
    Mail : [email protected]

    Hi Murali
    Thanks for update
    I explain my req clearly
    For me segment is Distribution channel field (EXPORT and DOMESTIC)
    If GL account is 1000-2000     always                      Export
    If GL account is 2001-3000    and Cost center is     X then Export.
    If GL account is 2001-3000    and Cost center is     Y then Domestic.
    Based on above REQ i am making derivation using KEDR T.code.
    These postings should work for all modules postings such as MM, HR also.
    Actually this should work automatically and after saving the transaction we should have copa document also.
    But problem is in source fields of derivation we have GL account (HKONT) and Cost element (KSTAR). I am making derivation using either of these.
    But after posting document system not giving COPA document.
    I found the reason is  at GL postings we are giving input to GL account (HKONT) but we took in KEDR source field as GL account (SAKNR). GL account (HKONT) is not updating GL account (SAKNR) field in PSEG screen in Fb50. Even i try with cost element (KSTAR), GL account (HKONT) is not updating this in PSEG screen in fb50.
    If GL account (HKONT) updates either GL account (SAKNR) or cost element (KSTAR) at the time of posting FB50
    Or
    If we have the field GL account (HKONT) as source field in KEDR i hope my problem
    Get solved.
    If you want further info pls give me your mobile number then i ll call you

  • BPS Retraction for Cost Center Accounting - Cost Element - Compounding with

    Hello everybody,
    I'm using the "BPS Retraction for Cost Center Accounting" described in the blog from Praveen Mayalur. I have customized the BPS system  (3.5) as described.
    But if i started the retraction i receive a dump. I have debug a little bit and i found out that there is a problem with the InfoObject "Cost Element". It is compounding with two InfoObjects "Source system ID" and "Controlling area".
    PERFORM FILL_RSRDEP USING I_AREA
                              I_CHANM
                              ITO_CHADEP
                        CHANGING LT_RSRDEP
                                 L_SUBRC.
    IF L_SUBRC NE 0.
    *Abhängige Merkmale müssen in der ITO_CHADEP stehen
      MESSAGE X099(UPC).
    ENDIF.
    Does anybody have this problem before. ?
    Regards Detlev

    Hi,
    it looks that your 0COSTELEMNT has been changed and the additional compounding object 0SOURSYSTEM has bben added. In BI Content it is only compounded to 0CO_AREA. So may be this is the problem.
    To be sure that it works you must make the change in your source system to and "compound" 0COSTCENTER to 0SOURSYSTEM. Or you have to chabge the retraction that way that it ignores the source system and only reads 0CO_AREA and costcenter.
    Regards,
    Juergen

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • Cost Center and Cost Element Hierarchy and Actual Cost Center

    In Bex - Right now I am displaying Cost Center and Cost Element hierarchy with 12 months of data. I want to display the actual Cost center number next to cost element hierarchy - Can I display in Bex?
    Tried to with Structure creating formula variable for Cost Center using replacement path - didn't work. Can you please suggest me how i can achieve this?
    The format should be
    CostCenter H1   CostElement H1   CostCenter   Jan  Feb ...
    Thanks in advance and appreciate for any help...

    Let me explain it clearly and hope it is clear now...
    Designed the report as like this - Cost Center Hierarchy by Cost Element Hierarchy for 12 months of data. But Business agian search in R/3 for actual cost center numbers based on above two hierarchy nodes.
    I am trying to achieve this Bex instead of going back to R/3 - so that they can understand how the dollar amount is summed up on which major cost centers.
    If I remove the hierarchy on Cost Center - it will display all the cost centers. They want to see the Cost center numbers based on CC and CE hierarchy node so that you are displaying only those cost centers. That's the reason I am trying to design the  report with CC Hier, CE hier, Cost Center number and 12 months of data.
    In my data model - have only one Cost Center, if i can create another ZCOSTCENTER same as 0COSTCENTER - May be I can achieve this. still looking for options with out changing the design.

  • Work center to actvity element

    Hi,
    I have created 1 work center and assigned to activity and iam getting the plan cost.
    If i assign the same work center OR any other Work center to Activity element, system is showing the error No cost were calculated.
    Pls advise.
    Regards
    Narayan Raju

    Hi Narayan,
    The actiivity elements are used for the breaking the a activity into detail....
    You can plan at both i.e at activity level or in activity elements...if you have planned at activity elements level the sum will be accumulated & displayed at the activity level...
    For detailed planning we can breakup the activity into activity elements and assign the workcenter at the activity elements level. The activity elements shall be assigned with the work or duration as required.
    Hope this helps you.
    Rgds.
    Pradeep

  • Cost center & cost element

    Hi Experts,
    Can anybody please tell me,
    What is difference between cost center and cost element.
    what is exact role of both.

    Hi,
    Cost Center
    Definition
    External object (object type K) from Controlling which represents a clear origin of costs.
    If you implement the Controlling component, you can find more information in SAP Library under Cost Center (Financials u2192 Controlling u2192 Cost Center Accounting u2192 Master Data in Cost Center Accounting (CO-OM-CCA) u2192 Cost Center)
    and
    Cost Center Accounting (Financials u2192 Controlling u2192 Cost Element Accounting).
    Use
    By assigning cost centers to organizational objects, you determine where costs incurred by the object are to be charged. The inheritance principle applies: If an organizational object is not assigned a cost center, the cost center assigned to the superior object applies.
    An organizational object may also be assigned more than one cost center. For more information, see Cost Distribution (infotype 1018).
    Integration
    A cost center can be related to the following organizational objects:
    ·        an organizational unit via relationship A 011 (Cost center assignment)
    ·        a position via relationship A 011 (Cost center assignment)
    ·        a work center via relationship A 011 (Cost center assignment)
    Cost Elements
    Definition
    Cost elements classify an organizationu2019s valuated consumption of production factors within a controlling area. A cost element corresponds to a cost-relevant item in the chart of accounts.
    Structure
    We distinguish between primary cost and revenue elements and secondary cost elements.
    Primary Cost/Revenue Elements
    A primary cost or revenue element is a cost or revenue-relevant item in the chart of accounts, for which a corresponding general ledger (G/L) account exists in Financial Accounting (FI). You can only create the cost or revenue element if you have first defined it as a G/L account in the chart of accounts and created it as an account in Financial Accounting. The SAP System checks whether a corresponding account exists in Financial Accounting.
    Examples of primary cost elements include:
    · Material costs
    · Personnel costs
    · Energy costs
    Secondary Cost Elements
    Secondary cost elements can only be created and administrated in cost accounting (CO). They portray internal value flows, such as those found in internal activity allocation, overhead calculations and settlement transactions.
    When you create a secondary cost element, the SAP System checks whether a corresponding account already exists in Financial Accounting. If one exists, you can not create the secondary cost element in cost accounting.
    Examples of secondary cost elements include:
    · Assessment cost elements
    · Cost elements for Internal Activity Allocation
    · Cost elements for Order Settlement
    Integration
    Cost elements in Controlling (CO) are closely related to the general ledger accounts used in Financial Accounting (FI). This is because the SAP System is structured as an Integrated Accounting System:
    Cost elements document which costs (differentiated by category) are incurred within a settlement period, and in which amount. They provide information concerning the value flow and the value consumption within the organization. Cost Element Accounting and Cost Center Accounting/Internal Orders are closely linked in the SAP System. Each posting to an account that is also a cost element, is assigned either to a cost center or order. This ensures that at period-end the data is subdivided by cost elements and cost centers/internal orders for analysis purposes. The following section describes how you can subdivide and characterize cost elements in the SAP System.
    Cost element characteristics depend on the controlling area and the allocation methods used in your organization.
    Hope this helps clarifying your doubt about cost center & cost element.
    Regards,
    Tejas

  • Settlment Cost element determined from work centre

    Hi
    I want to settle costs on plant maintenance orders to different type 21 cost elements depending on the main work centre on the order.
    I understand that the ORDER TYPE can have different SETTLEMENT PROFILES and that these can determine the cost element to post to. HOWEVER the problem I have is I can not create new order types for this purpose (to much re-work).
    any help would be appreciated
    phil

    Hi,
    I dont think so that in Standard setting you can assign Settlement profile by work center. Automatic assignment of settlement profile is possible by Order type . Manual assignment of settlement profile will also not work as in one PM order you may have mutiple operation which belongs to different work center.
    So this looks very unique requirement and you will have to go for some development or user exit which can make you able to post the settlement based on Work center.
    regards
    Ranjan

  • Secondary Cost Element Values doesn't display in Profit Center Report

    Hi everyone,
    I'm having a problem with our Profit Center plan/actual/variance reports wherein it doesn't display the postings I made to the Secondary cost element when I executed an assessment cycle (KSU5). I already set in the configuration that all postings to be done in the cost centers, should have a parallel posting to the profit center assigned to it. I can see the postings in my cost center reports, but not in my profit center report. Could I have missed out on any procedure to enable the secondary cost element parallel posting in my profit centers? Any help would be appreciated. Thanks!

    it might be the configuration of the library or some parameter in the report (record type should be 0 and 2 for actual values, where 2 stands for distributed values and 1 and 3 for planned values)
    but it also might be that the reconciliation is done between different CC and same PC
    - check your CC organisation asignment
    - if sender cost center and receiver cost center have tha same PC it is probably the reason
    - I had that problem my self and didn't solve it
    cheers
    matej

  • Work center planned cost calculation- PM related

    i have created a work center with t-code ir01, used in Maintenance order under operations tab. In cost tab, it is not showing Planned costs of the pm order. Please advise what are check ups or config settings should be done? Thanks.

    hi
    first kindly check whtether you have defined value categories, grouped the calue value categories then specified the defualt values categories for order,
    then plan for activity type and cost center specified in workcenter in KP26,
    also check whether you have specified the formula in the work center costing tab page
    regards
    thyagarajan

Maybe you are looking for

  • Why App Store Speed is very slow on Macbook Pro w/ Retina Display?

    Hi, I'm facing few problems on my Macbook Pro w/ Retina Display in terms of Net Speed. I live in Delhi, India. I have 8 MBPS Broadband Plan. I have a Windows PC too at my home and Galaxy S2 Smart Phone. Both gives an awesome speed of around 7 to 8 MB

  • Does anyone know how to sync aol mail to your iPad mail?

    I am having problems accessing aol mail from safari.  It comes up in code format.  I can check my mail from the mail app however it says I have 2000 messages all of which were already deleted from my aol account.  I would like to sync the accounts so

  • Material's which contain C indicator must not show in MIBC

    Hi, I want to remove the C indicator from all Material's under MRP View. Through BDC i clear the C Indicator. For confirmation i saw in MARC table that ABC indicator column has no value as C. But when i run the transaction MIBC, how it shows the C in

  • PPro CS3 not opening

    For some reason, the PPro CS3 doesn't load.  I see it loading in the box in the middle, but then it just blinks and refuses to open.  Any ideas?  It was working fine a day ago.  I have the CS3 suite and the rest of the applications open fine.

  • Maximum number of free accounts have been set up on iPad

    Hi, one of my students was attempting to set up iCloud after setting up his Apple ID but 'the maximum number of accounts has been set up on this iPad' keeps appearing. He had a previous account on the iPad. I was told it may be because the IP address