dear all:
  I have a problem about subcontracting need help.
before, these is no any material need subcontracting in our company,but now our
company will produce new product whick its a component material need  subcontracting.
We will:
    1.we will send the component material (we can call it a001) to vendor  (movement type 541) using t-code mb1b.
then we recieve the material b001 from vendor(movement type 101),and recieve the
material a001 (movement type 543) using tcode migo.
  I have already setted:
  1.i have already maintained the costing variant for the subcontracing using tcode  okkn.
  2.i have already created purchasing information record for the material b001 using t-code me11.
3.i have already created a balance sheet account 12320198 to collect the cost of subcontracting .(but i don't kown whether the account 12320198 should be the p&l statement acc. if yes is it necessary to create cost element for it,and assign a cost center to the cost element.)
4. i have already assigned the account 12320198 to the type FRL using tcode obyc.
5. i have already successfully make the standard cost calculate for b001 using tcode ck11n.but i don't kown is it correct.
  my problems:
1. what should i do to collect the cost for subcontracing?
    can any  friend tell me the full flow about it,or give me some detail documents about it.
  2.what the account documents the system will create when i recieve the material  b001 from vendor using tcode migo,and when i verify the invoice using tcode miro.i.e what should i setting for the tcode migo&miro in this case.
  3.i don't kown wheher it's accurately that i have already setted.
i really need your help.
thank you a lot.
best regards!
Message was edited by:
        zhao gang
null

Please help me!!
I have an error!
Fld selectn for mvmt type 543 / acct 2026800 differs for Cost center (010)                                                                               
Message no. M7093                                                                               
Diagnosis                                                                               
Comparison of the field selection strings from movement type 543 and G/L 
     account 2026800 has revealed that there is an incompatible field         
     selection combination at one or more points.                                                                               
Field for which the field selection is different: Cost center                                                                               
Example                                                                               
On the movement type screen, a given field is a mandatory-entry field,   
     whereas on the G/L account screen, the same field is suppressed.                                                                               
System response                                                                               
You cannot post this transaction, unless you have changed the field      
     selection adequately.                                                                               
Procedure                                                                               
Contact your system administrator.                                                                               
Action to be taken by the system administrator                                                                               
Check whether any postings resulting from this movement type are to be   
     made to the G/L account determined automatically. If you find that the   
     G/L account is not correct, check the automatic account determination in 
     the Customizing system for valuation.                                    
     Proceed                                                                               
If the G/L account is correct, use the report RM07CUFA to compare the    
     field selection for the movement type with the field selection for the   
     G/L account and change the incorrect settings or the field status group  
     of the G/L account.                                                      
     Proceed                                     
Do you know what to do??
Thanks!!

Similar Messages

  • Calculation of cost for subcontracting item of type N (non stock) as it calculating for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • Costs of Subcontract Parts

    Hi,
    I am new to SAP. We have about 1000 parts that have subcontract processing.  I am trying to find a report that will show the standard cost of the subcontract portion of these parts.
    Thanks!

    Have you tried in ME1P ??
    thanks
    G. Lakshmipathi

  • Cost Settlement + Subcontracting

    Sir,
    I want to know actual cost for my fert material, which is getting ready at supplier's end, please guide me how can i get it
    scenario is as follow:
    Vendor A : Raw material SUpplier
    Vendor B : Finish Goods supplier
    Material (Fert) : "1" is my finish good:
    Material (ROH) : "x", "y" and "z" are my raw material
    I prepare a BOM for material "1" (FERT)
    Now I place a PO for ROH material (x,y, and z) on vendor - "A" which is my ROH supplier
    I ticked as SC vendor in same PO, at item detail in delivery address tab and entered vendor "B" - FERT Supplier, for direct delivery.
    I place another PO on my FERT supplier, which is Vendor "B" for material "1" - FERT Material
    now i made GRN for ROH Material (a,b, and c), system automatically generate a inventory on stock provided to vendor.
    same i am making inward for FERT supplier (against Subcontrating PO) system automatically fethc the movement type 101 for FERT and 543 for ROH materials.
    so, my material is consumed here against FERT receipt.
    HOW CAN I GET THE ACTUAL CONSUMTION COST FOR THE CONSUMED MATERIAL.?
    PLEASE ADVICE AND SUGGEST
    Regards
    Narendra

    Sir,
    I want to know actual cost for my fert material, which is getting ready at supplier's end, please guide me how can i get it
    scenario is as follow:
    Vendor A : Raw material SUpplier
    Vendor B : Finish Goods supplier
    Material (Fert) : "1" is my finish good:
    Material (ROH) : "x", "y" and "z" are my raw material
    I prepare a BOM for material "1" (FERT)
    Now I place a PO for ROH material (x,y, and z) on vendor - "A" which is my ROH supplier
    I ticked as SC vendor in same PO, at item detail in delivery address tab and entered vendor "B" - FERT Supplier, for direct delivery.
    I place another PO on my FERT supplier, which is Vendor "B" for material "1" - FERT Material
    now i made GRN for ROH Material (a,b, and c), system automatically generate a inventory on stock provided to vendor.
    same i am making inward for FERT supplier (against Subcontrating PO) system automatically fethc the movement type 101 for FERT and 543 for ROH materials.
    so, my material is consumed here against FERT receipt.
    HOW CAN I GET THE ACTUAL CONSUMTION COST FOR THE CONSUMED MATERIAL.?
    PLEASE ADVICE AND SUGGEST
    Regards
    Narendra

  • Help with Costs in Subcontracting

    For the subon process, the finished product is ordered and the components are supplied.  Normally, the final cost of the finished product is the PO price + cost of the component. 
    However if I incurred a cost for transferring the component to the vendor site, I want this to be included in the finished product cost.  Any ideas on how I can do this?
    PS I've explored using condition type in the PO however since the ration of my finished product to component is 1 : 0.5 (Invoicing of the freight cost is incorrect, as it is agains the quantity of the finished product)
    Appreciate any help on this.

    HI
    For your scenario you have to maintain moving average price "V" for ur FG or final product.
    Now suppose u send 5kg of RM valued at 100Rs each to make 10pc of FG.
    Vendor charges Rs10 per pc and freight to transfer 5kg of RM is Rs1 per kg
    Enter in PO rate as 10 per pc and total freight as 5
    Then ur FG becomes Rs60.5 per pc
    and if u cant maintain "V" for FG then what Ravi said should work

  • Costing for Subcontracting

    Hi Experts,
    I have a scenario where the business procure spare parts and then send to a subcontractor for assembling and pays the subcontractor an assembling fee.
    I am not so clear how the costing should happen for the finished good we receive from the subcontractor. Highly appreciate if someone can enlighten me in this regard.
    Thanks in advance.
    Em Jay

    Hi Em Jay
    If the final finished good is always assembled by the subcontractor, you dont need costing for it
    Option 1
    Simply put the Price control as V. The cost of spare parts + Assembling fee will become the Valuation for the FG material
    Option 2
    If you wanna have this FG at Price control S, then you need a BOM for the FG Material in which Spare part should be the component
    Material master of FG will have Spl Procurement Key as 30 in MRP View
    Tick the "With Qty Structure" check box in Costing View
    You need to maintain info record for Sub Con Charges for the FG material
    Now, when you run CK11N, it will take cost of BOM Components + Sub Con Charges = Std cost of FG
    The Sub Con charges must be there in OBYC: FRL and in your Cost Component Stryucture in OKTZ
    Br. Ajay M

  • Subcontracting Purchase Order with Delivery Cost

    Hello Experts,
    I am facing issue during Goods Receipt against Subcontracting Purchase Order.
    Note:
    a) Subcontracting PO has delivery cost given 200 /pc.
    b) Condition type Z001 for Delivery has Condition Category "B" with accrual checked.
    c) Pricing Procedure has Accrual Key FR1 with condition type Z001
    d) Condition Z001 is common for Standard Item Category PO and Subcontracting PO for delivery cost.
    During Goods receipt, system generates following accounting.
    BSX     Inventory-SemiFinish     M     S     521.12
    WRX     GRIR Clrg-Mat A/c     S     H     100.00-
    BSV     Inc/Dec. in Semi-F     S     H     521.12-
    FRL     Job Work                          S     S     100
    FRN     Freight Clearing A/c     S     S     100
    FR1     Freight Clearing A/c     S     H     100.00-
    BSX     Inventory-RM(Domest)     M     H     321.12-
    GBB     RM Consumed-Domestic     S     S     321.12
    As shown above FRN is the account which is the resultant of Devliery cost during Subcontracting. Entry of this Key is not completely knocked off in this transaction and next transaction for invoice verification MIRO.
    My query:
    A) Can we stop account posting for FRN.
    B) If not How will FRN entry be knocked off, (Entry for FR1 gets set off during MIRO- Invoice verification.)
    C) In case B is not possible, Posting in account  assigned to FRN Key will always show values.
    Can any one help me to confirm that Entries above during Goods Receipt are ok, If not what sort of changes are required.
    Can we use same condition types for Delivery cost for Standard Item category PO and Subcontracting PO .
    Awaiting reply,
    Regards,
    Manish

    Hi Vaibhav,
    a) I am not able to understand why do you think the above entries are not correct.The entries are perfect.
    My Reply:  Ok I do agree for a movement that entries are ok, No Issues
    b) If you want that freight entries should not go to separate account then you can include the freight charges in the same condition as basic price condition so that charges will go to FRL and WRX.
    My Reply: How can I include Freight Charges in the same condition as basic price condition, so that charges will to go FRL & WRX, Can you please explore this,
    Regards
    Manish

  • Subcontracting

    Hi
    How to trasport material from Sale order stock to Subcontractor?
    Raju

    How to trasport material from Sale order stock to Subcontractor?
    Materials assigned to sales order or project (that are located in sales order or in project special stock segment) are not "transported" in SAP to the subcontractor.
    Please check SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b90b043ad11d189410000e829fbbd/frameset.htm
    Subcontracting is also possible in conjunction with sales order stocks and project stocks. The subcontracting orders are account-assigned to a sales order or a WBS element. Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the sales order stock or the project stock at the time of the goods receipt. The material manufactured is also posted to the sales order stock or to the project stock. The cost of subcontracting is then debited to the sales order or WBS element.
    Since the components are not transferred to the "stock of material provided to vendor", we recommend that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the sales order stocks and project stocks.
    Regards,
    Csaba

  • Calculation for subcontracting item of type N (non stock) as it for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • MTO-Subcontracting

    Hi
    Scenerio:
    1. Against saleorder MRP will be done, output will be PR with account assignment cat "M"
    2. Subcontracting PO will be created w r t PR (Sucontracting PO will a/c assignt cat "M" and Item cat "L" )
    3. Compoents will be shown at "Sale order stock" using tcode MMBE
    4. Transfer posting using tcode MB1B. with movement type 411 + E (Saleorder stock to Unrestricted stock)
    5. Transfer posting using tcode MB1B with movement type 541 (Unrestricted stock to Subcontractor)
    with reference to PO
    Here am geeting error as "PO XXXXXX has no items"
    How to resolve this issue? or any alternative solution ?
    Your immediate suggestions will be appreciated
    Raju

    Hi,
    Please check SAP online help where it is explained how to manage this situation:
    Subcontracting is also possible in conjunction with sales order stocks and project stocks. The subcontracting orders are account-assigned to a sales order or a WBS element. Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the sales order stock or the project stock at the time of the goods receipt. The material manufactured is also posted to the sales order stock or to the project stock. The cost of subcontracting is then debited to the sales order or WBS element.
    Since the components are not transferred to the "stock of material provided to vendor", we recommend that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the sales order stocks and project stocks.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b90b043ad11d189410000e829fbbd/content.htm
    Regards,
    Csaba

  • Overhead on Subcontract Vendor Charge

    We have implemented Raw Material Costing, adding overhead through use of a costing sheet.
    We use subcontracting (PrcTypF/SpcPrcTyp 30). In most plants it is a minor portion of the cost, so we did not need to know how to add overhead to the vendor charge
    At One of the plants that we are converting now to Raw Material costing, the Subcontract vendor charge is 80 - 90% of the value. We need overhead added to that charge.
    I thought I could just check the box in the valuation variant for Overhead on Subcontract Materials and it would calculate.
    It did not..
    I did add the subcontract cost element to the BASE on the costing sheet.
    What else do I need to do to get the overhead
    thank you
    Althea

    Have you specified OH costing sheet under the tab overhead? This costing sheet needs to be specified for the Finished/semi finished field.
    Please check if you can see the OH sheet under the valuation tab. Also check if the cost element in OH costing base is showing in itemization.
    I think it is a OH costing sheet issue and not subcontracted material issue.
    Sanjay Wagh

  • Subcontracting for Project

    Dear SAP Guru,
    In my organization, the business requirement is to use subcontracting process for project.
    I maintain the movement type 311 Q for subcontracting process, but at the time of reconciliation of subcontracting Challan, the system does not refer the stock transfer material docuement.
    Movement type 541 (for subcontracting) does refer the project stock.

    Hi,
    Subcontracting for Project Stock: -
    Purpose: - Subcontracting is also possible in conjunction with Project stocks. The subcontracting orders are account-assigned to a Project. Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the Project stock the time of the goods receipt. The material manufactured is also posted to the Project stock.
    The cost of subcontracting is then debited to the Project.
    Since the components are not transferred to the "stock of material provided to vendor", it is recommend that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the Project stocks.
    Features: -
    Withdrawal from Stock of Mat. Provided or Project: -
    For components that are managed in Project stock, you can define whether the components are to be withdrawn directly from each Project or from the stock of material provided to vendor. You manage this via the dependent requirements indicator for individual customer requirements and collective requirements (MARC-SBDKZ).
    You can maintain this indicator in the following places:
    In the MRP view of the material master record (MRP 4)
    In the explosion types for the BOM item (in Customizing for Production in the step Basic Data -> Bill of Material -> Item Data -> Define explosion types)
    Configuring the explosion types has priority over the configuration in Inventory Management.
    If the indicator is set at Collective requirements only (2), the materials are withdrawn from the stock of material provided to vendor. If this indicator is set any other way, the system withdraws materials from Project stock.
    Here all the processes will remain same except; MB1B - Do Transfer Posting of material from RM Warehouse to this Storage Location via movement type "311 Q" (Instead of doing 541)

  • Plant to plant subcontracting against sales order

    hi
         my scenario is like this
    two plants A and B under one company code, its repair scenario in this sales order come in plant b ,in this repairing we have 5 process out of which one process has to be carried out in plant 1,so  for that  we will do subcontracting against that sales order with plant b. so how to handle subcontracting with plant a against sales order.
    Edited by: AMIT RANE on Mar 4, 2009 7:55 AM

    Purpose: - Subcontracting is also possible in conjunction with sales order  The subcontracting orders are account-assigned to a slaes order . Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the sales order stock the time of the goods receipt. The material manufactured is also posted to the SO
    The cost of subcontracting is then debited to the SO.
    Since the components are not transferred to the "stock of material provided to vendor", it is recommended that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the Project stocks.
    Features: -
    Withdrawal from Stock of Mat. Provided for Project: -
    For components that are managed in Project stock, you can define whether the components are to be withdrawn directly from each Project or from the stock of material provided to vendor. You manage this via the dependent requirements indicator for individual customer requirements and collective requirements (MARC-SBDKZ).
    You can maintain this indicator in the following places:
    In the MRP view of the material master record (MRP 4)
    In the explosion types for the BOM item (in Customizing for Production in the step Basic Data -> Bill of Material -> Item Data -> Define explosion types)
    Configuring the explosion types has priority over the configuration in Inventory Management.
    If the indicator is set at Collective requirements only (2), the materials are withdrawn from the stock of material provided to vendor. If this indicator is set any other way, the system withdraws materials from Project stock.
    Regarding Subcontracting Challan: -
    Go to OMJJ, select the field "movement type" and press enter
    Enter movement type "311" and double click on "Field selection (Enjoy)" under Dialog Structure on left side.
    here "New Entries" and add field "LIFNR" (Vendor- plant as vendor )
    Now in MIGO, at the time of transfer posting of components using movement type "311 E", specify the vendor code of the Subcontracting PO (i.e. Subcontractor)
    Now create Subcontracting Challan in J1IF01 for material document of 311 E movement type.
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0001", Movement Type "311 E" should be maintained.
    Then do GR against PO and refer the Subcontracting Challan here.
    And then do reconciliation in J1IFQ for the GR Document against Subcontracting Challan.
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0002", Movement Type "543 E" should be maintained.
    Follow the below mentioned process;
    Process Steps: -
    1. OX09 - Create Storage Location as "9999" for Subcontractor Location
    2. MB1B - Do Transfer Posting of material from RM Warehouse to this Storage Location via movement type "311 E" (Instead of doing 541)
    3. Now go to J1IF01 - here use material document of movement type "311 E" and create Subcontracting challan. (If required)
    Prerequisite: - In SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > Here for Movement Type Group "0001" (For issues), maintain movement type "311 E" also along with 541.
    Rest all; refer subcontracting challan during GR and then reconciliation and completion, etc... Will be same as usual.
    Note: - At the time of GR, consume components from storage location "9999" (for 543 movement type)
    regards
    KI

  • Subcontracting for Sales Order Stock and collective Transfer Posting

    Dear Expert,
    We have a scenario in subcontracting wherein the sales order the customer also wants to see the components and as such along with the Header item of subcontracting ,we also mention the components as another line item in the sane Sales Order.
    Now from the sale sorder two Po's are created onr for the subcontractor and one for the compnens to be procured.
    Since the components are procured on sales order stock there is noway we can issue it to the Vendor stock through Movt .Type 541.
    As per SAP AG WE CAN:
    "ubcontracting is also possible in conjunction with sales order stocks and project stocks. The subcontracting orders are account-assigned to a sales order or a WBS element. Thus, the components are not transferred (using a transfer posting) to the u201Cstock of material provided to vendoru201D but are directly withdrawn from the sales order stock or the project stock at the time of the goods receipt. The material manufactured is also posted to the sales order stock or to the project stock. The cost of subcontracting is then debited to the sales order or WBS element.Since the components are not transferred to the u201Cstock of material provided to vendoru201D, we recommend that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor.This information is particularly important when you carry out a physical inventory of the sales order stocks and project stocks."
    But my query is that how many such storage locations will be created for the subcontracting vendors.
    Secondly for the stock transfer from sales to storage location , we have lots of sales order, is dera way through which we can do bulk transfer rathar than clicking at new item everytime and then doing the transfer posting.
    your expert advice shallbe helpful in resolving a longtime pending issue , waiting for the response.
    Regards
    Jabeen

    This is a known issue, the system doesnt allow stock to have two special stock statuses at the same time.
    Your concern of having to make multiple storage locations is valid (since this is a configuration).
    I suggest you do the following
    - Configure a warehouse and a single storage type (say 001). Allow mixing of materials in a single bin
    - Assign this warehouse to a new storage location.
    - Create a bin for every sales order number in the warehouse.
    - When goods are moved to subcontractor, perform a transfer posting to the storage location, and perform a putaway to the respective bin. The putaway strategy can be tweaked using a user exit to go to the relevant bin. This way you do not have to enter the WM transaction for putaway.
    - To consume the stocks, you can use 231E movement (MB1A). On the WM side, the picking strategy can be enhanced so that the picking TO is generated with the correct source bin. Make sure the GL account and CO objects are as per FICO requirements.
    This way you can track the stocks binwise (bin level reports are available in WM), perform physical inventory and also consume the stocks from the relevant bin automatically.
    We had faced the same situation, and we ended up not having sales order stock at all.
    Hope this helps.
    Regards,
    Aroop

  • DS for Cost estimation(COGM)

    Hi Friends,
    In ECC, cost estimation (ck40n) - cost of goods mfg(COGM) stored. I would like to bring all 6 components(material cost, labor, subcontract, depreci,other over heads..) incurred per unit . I would like to bring rates info to BI system.
    Data stored in ECC tables KEPH & KEKO.
    What datasources are helpful to bring rates to BI ?
    Thanks,
    naresh

    created database view based on 2 tables.
    Next created custom datasource and enhanced datasource with cost fields via append str.
    Added exit code to populate costs fields.

Maybe you are looking for