Cost profile/function in SNP PPM

Dear colleague,
         i have created a cost function for a material with values
0-10 -- variable cost as 10
10-100 -- variable cost as 9.
and i have attached this cost function to the PPM under cost profile but while running the SNP optimizer the cost is never considered.
Not sure what could be the issue in this. Request if any body can help me on this topic.
Thanks
Sandeep

Hi Sandeep,
Among the two optimzation options of Linear Optimzation and Discrere Optimzation,  If you choose  Discrete optimization ,  you can specify that you want the optimizer to consider the piecewise linear cost function (defined in the production process model (PPM)), for the PPM.
u2022 You  need to  activate Discrete Optimization in the optimizer profile header data.
u2022 You  need to  define the piecewise linear cost function (cost profile) in the PPM.
Regards
Datta

Similar Messages

  • Upload single level variable cost in SNP PPM in mass by MASSD

    Hi experts,
    I am trying to upload single level variable cost in SNP PPM in mass by MASSD by following selections:-
    Selection
    Object Type:- PPM
    Selction Criteria:-
    Component:- Plan        Attrib:- Use of Plan
    Component:- Plan        Attrib:- Plan
    Components & Attributes to be Maintained
    Component:- Plan        Attrib:- Var.Sing.Lvl Costs
    While maintaining the cost, under selection criteria, compoment: PLAN and attribute: PLAN I am unable to maintain multiple plan names.
    The single level variable cost that I have to maintain for all these plans is the same and therefore was trying to use transaction MASSD
    Can you please throw some light on how multiple PLAN selections can be done?
    Regards
    Chetan

    DEAR GURUS,
    *There is a question regarding the resoucre  consumptions  relevant to PDS in SNP,*
    ****The inputs are:****
    ****1) Base Qty= 7700 TH****
    ****2) Set Up =45 MIN****
    ****Resource consumed by operation activity is 112 207 seconds = 31,17 hours.****
    ****Unfortunately we didnu2019t understand how this figure is calculated.****
    ****Can you please help us in this****

  • Switch between SNP-PPM and SNP-PDS

    Hi,
    In APO I have both SNP-PPM and SNP-PDS, but right now I am having some trouble with the bucket time from the PDS so I am trying to temporarly change my PDS to PPM.
    My query is:
    - Is there a way in APO to make the SNP-PPM the default production model over theSNP- PDS?
    I was searching for some kind of documentation on this topic and I found that I should change the priority for the PDS throught the PDS_MAINT transaccion in ECC, is this the only way to do it?
    Thank you in advance,
    Fernando

    Hi ,
    SNP heuristics  planning source determination gives first preference to Quota arrangement.
    You may include PDS as a source of supply in the inbound quota arrangement of the product.
    There is a BADI  BAdI /SAPAPO/PWB_SOS to modify the content and the sequence of the sources of supply in the ranking list.
    The normal ranking list for SNP source determonation  is as below:
    Quota arrangements
    Procurement priority
    Procurement costs
    Procurement type
    There are two other BADIs releveant as below:
    u2022        /SAPAPO/CURTO_SNP ) Enhancements When Creating an SNP PDS (R/3) (Generation)
    u2022        /SAPAPO/CULLRTOSNP ) Change SNP/CTM Production Data Structure Data (Generation)
    Hope this gives some options.
    Regards
    Datta

  • SNP PPM Selection Criteria

    Hi Experts,
    I would be really glad if you could help me regarding this issue.
    I have 2 Materials with 2 SNP PPMS. The SNP PPMS were generated by converting PPDS PPMS  which was cifed from R/3. The production versions in R/3 has the same validity date.
    Lets say for Material A:
    - It has 2 production versions and 2 SNP PPMs
    - PRD1 and PRD2
    - when I had run the SNP location heuristic it had selected PRD1.
    Material B
    - It has 2 production versions and 2 SNP PPMS
    - PRD1 and PRD2
    - when I had run the SNP location heuristic it had selected PRD2.
    May I kindly ask therefore how PPMs are selected by the APO system in the case of SNP PPMs running SNP location Heuristic? Unless I understand the process, I cannot still create alternative PPMs. I cannot always assign manually the Procurement Priority of all the PPMs generated.
    I am really hoping you'd help me regarding this issue.
    Thank you so much.
    Sincerely Yours,
    Ria
    Edited by: Ria Montealto on Jul 31, 2008 10:16 AM

    Hello ,
    As you must be aware the basis for selection of ppm are 'quota arrangment' ,'procurement priority' ,'costs(multilevel cost)' ,'procurement type' .
    Kindly refer to following link for more detailed information and how this ranking list can be changed. "http://help.sap.com/saphelp_scm2007/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htm ".
    Also if all the parameters are same , it will refer to nomenclature of the ppm as the ppm name contains the version number ciffed from r/3.
    For example, if there are versions "0001 " and  "0002 " in r/3 and these versions are ciffed to APO to create ppm .
    The snp hueristics will select the ppm of prod. version 0001 .
    Thanks & Regards
    Abhijit S Nakhwa

  • Function modules for PPM

    Hello APO gurus,
    I am new APO technical, Can anybody please suggest Remote function modules for PPM creation, change and Delete
    Thanks
    suresh

    Hi,
    These are BAPI Remote Function modules you can use for create , change and delete PPMs
    BAPI_PPMSRVAPS_GETLIST     - Read PPMs, Plans and Dependent Operations                                                  
    BAPI_PPMSRVAPS_SAVEMULTI_30A      - Maintenance of Production   Process Models and Plans.
    I hope useful for PPMs
    Thanks
    sreeni

  • Mass Upload of Define Mode Combinations_PPDS to SNP PPM

    Dear All ,
    I am converting huge numbers of PPDS PPMs to SNP PPMs , I would need your support in telling me a mass upload ( program ) for defining Mode Combinations transaction .
    As such a BDC has been prepared but that takes a very long time for pushing data in this transaction .
    Thanks and Regards ,
    Prashant Kumar

    Dear Murali ,
    I have specific field values e.g. variable lot size , without PPDS Campaign , Blank Mode Combination to be selected .
    When we select the PPDS PPM no. or Product Location Combination inserting all these values in the table after execute done on the selection screen needs manual entry of all the field values .
    Data is really very huge and was wondering if there could be a quicker way out . There is more SNP PPM converted from PPDS PPM due to alternate modes of 10-15 in many of the PPDS PPMs .
    Would appreciate any further help .
    Thanks and Best Regards ,
    Prashant Kumar

  • Handling Unit - Print profile functionality

    Can you please let me know how to enable HU print profile functionality? I have created two different print profiles for V6 (Handling Unit) and assigned two separate printers. In addition, I have added the PPT parameter in User profile. But I still have issues with the print for this condition record. In the NACE (V6) output profile, I have the output configured for Plant/Pkg Material combination. Thank you in advance.

    Hi
    I did one simulation in my system and it is working fine. can i request you to follow the below steps and share the result with us
    1) Use HU02, Goto Pack button enter the Packaging material manually for which you have already created the condition record,
    2) Enter the packaging material and let system create an HU.
    3) Once the HU is generated select the HU and goto Extras---Output, Enter the output type (if not generated automatically and see what is the message system is giving please share the message with us). This will help us to find where it is failing

  • Error In SNP PPM Creation . . .

    Hi All,
    I am getting following error message while converting PPDS PPM to SNP PPM. . .
    " SNP-relevant and non-snp relevant modes exist in operation "
    Please can someone let me know the solution on this. .
    Thanks in advance.
    Regards,
    PP.

    Hi,
    Please  check if any  single or multi-mixed resource has "Not SNP Rel. indicator" has  been set on the Planning Parameters tab page is in the PPDS ppm.
    Regards
    Datta

  • Multiple Resource in SNP PPM

    Hi Experts,
    I have scenario where bottleneck resources changes with time. Lets say that I have two workcenters WC1 & WC2. Operation 10 will be performed through WC1 and operation 20 will be performed through WC2. SFG1 is input material for operation10 and FG1 is output material through WC2. So SFG1 will be processed through WC1 & WC2 and output material is FG1. Operation 10 & 20 are sequential operations. WC1 & WC2 have the same scheduling time for both the operations 10 & 20
    Now, WC1 runs in three shifts in May'10 and WC2 runs 2 shifts in May'10. So WC2 is bottleneck resource in May'10. In June'10 WC1 runs in two shifts and WC2 runs in three shifts so WC1 is the bottleneck resource in June'10. Simply, bottleneck resource can be either WC1 & WC2 depends on time.
    So in my routing I have two operations and operation 10 contains WC1 & operation20 have WC2. Further, we created Production Version (PV) and CIFed as PPM. When converting PP/DS PPM to SNP PPM I can chose only one mode so only one work center (resource) in one PPM and another work center in another PPM. We need both workcenters in one SNP PPM.
    Could any one guide to meet this scenario.
    Thanks,
    Naveen
    Edited by: Wilian Segatto on May 14, 2010 11:54 AM

    Hi Bandana,
    I am trying the same but I am not able to create single Resource,
    Would u plz briefly explain me what parameters u are providing,
    Thanks,
    Radhey

  • How to activate this profiling function

    Hi Pros,
          I can't use profiling function, because it is greyed, do you know how to activate this function?

    Hi,
    what do you mean by profiling Function. Is it BODS column Profiling?.
    If you want to BODS profiling, 1st you should you need to login in profiling server.
    Steps:Tools-->profiler server login-->give user name and Pasword then you can select the profiling repository
    Pre Requisites:  Profiler repoistory should be created 1st.
    Thanks,
    Deepa

  • Getting error while trying to generate SNP PPM

    Hi Experts,
    I am getting error, while trying to generate SNP PPM fron PP/DS PPM. It says Set up matrix for resource in planning version is not define. But I checked that i havea set up matrix as well as setup group.
    Any help will be appreciated. Thanks In advance.
    Sani

    Hi Sani,
    Try running resource & ppds ppm consistency check against
    their respective transactions (/sapapo/res01 & /sapapo/scc_03)
    and check any inconsistencies found.
    Regards
    R. Senthil Mareeswaran.

  • PPDS PPM to SNP PPM

    Hello Experts,
    I am CIFfing production versions to create PPDS PPMs in APO. From there I am creating SNP PPMs.
    The question is, when I do initial CIF of all the production versions(some production versions are old and some are new), how do I find a list of the PPDS PPMs that are still not converted to SNP PPMs.
    Also is there a list which shows PPDS PPM plan along with the respective SNP PPM plan?
    I tried referring the table /sapapo/plan, but it just gives the plan number, date of creation etc etc. Not even the Input/ouput products and the location.
    Regards
    Manotosh

    Hi,
    Use the BAPI : BAPI_PPMSRVAPS_GETLIST to get the PPM details.
    /SAPAPO/PLAN_GEN to get the details of SNP PPM generated from PPDS PPM in the coloumn Plan generated.
    Thanks,
    nandha

  • SNP PPM Generation from PPDS PPM - Time less than 1 sec. in snp bucket con

    Dear All,
    Request immediate help .
    (a) My PPDS PPM have time elements less than 1 seconds towards processing time and there are operations without a set up time .
    (b) While converting such a PPM PPM into an SNP PPM I get an error of bucket consumption as SNP cannot convert less than 1 second into a daily bucket .
    (c) I have to maintain the base qty in BOM and Routing as 1 unit hence cannot increase the same .
    (d) Is there a way in which SNP PPM can be generated from a PPDS PPM wherein the PPDS PPM has only a processing time of 1 second and no set up time .
    (e) Infact I have tried to convert the PPDS PPM with a time of 1.5 seconds but now I have lot of products where the routing suggests a processing of less than 1second and no set up . This is leading to a PPDS PPM of time less than 1 second and SNP PPM is not getting generated as guess it cannot convert a PPDS PPM with less than 1.5 seconds in a day .
    Would appreciate a quick response .
    Thanks and Best Regards ,
    Prashant Kumar

    Hi
    Firstly, can I ask why the base unit has to be 1, this seems a strange restriction?
    If it has to be, then two possible solutions:
    1) In the CIF enhancement CIFPPM01 you could multiply all values by, for example, 100 to give you larger values in the PP/DS PPM in APO and hence of a size that SNP conversion can cope with.
    2) In one of the BADI's /sapapo/ppm_calc or /sapapo/ppm_gen you can do the same conversion factor if the PP/DS PPM has to also be 1 unit.
    Hope this helps
    Ian

  • Converting PPDS PPM to SNP PPM

    Hello,
    On converting a PPDS PPM to an SNP PPM which has multiple activities(operations).  Is there a way to generate the SNP PPM the same number of activities included in the PPDS PPM to capture one Resource for each SNP PPM.  Or it has to be converted multiple times?
    Thanks.
    Edited by: Wilian Segatto on Aug 18, 2010 3:19 PM

    Hi,
    Below is an example:
    PP/DS PPM A
    Activity 1 - Resource A
    Activity 2 - Resource B
    Activity 3 - Resource C
    If PP/DS PPM is set-up like the example above, can this be converted to 3 different PPMs for the 3 different resources in one conversion?  Or i would need to do the conversion three times to generate the SNP PPMs (examples below)?
    SNP PPM 1A    
    Activity 1 - Resource A
    SNP PPM 1B    
    Activity 1 - Resource B
    SNP PPM 1C    
    Activity 1 - Resource C
    SNP PPMs are set-up per resource to monitor utilization and capacity per resource.  Also, resources are set up per production line in ERP.
    Thanks
    Edited by: pipsquik on Aug 17, 2010 3:03 AM

  • Linking SNP PPM to desired ECC production version

    Hi
    We have a need where we manually create SNP PPMs and so the APO and ECC have no connection in terms of the PPM or production version.
    I have two SNP PPM1, PPM2 in APO and I have two production versions in SAP ECC, VA and VB.
    The requirement is to some how maintain a table in APO where we can choose to map the SNP PPM to ECC production version.
    something like
    SNP PPM1 and PPM2 both need to refer to version VB so that an SNP planned order pushed into ECC would automatically pick up production version VB.
    Appreciate if any one can throw some light on how we can create a user maintained table or Z transaction  in APO to achieve this.

    Hello KA,
    Could you please let me know why you want to change the source of supply in ECC only?
    Do you have PPDS? If yes then you can have one source of supply for that production version VB and transfer these orders to ECC system.
    Apart from that if you want to do the development then check FM /SAPAPO/DM_PROD_ORDER_CHG_OLTP inside that with your own custom logic you can update the production version.
    Best Regards,
    R.Brahmankar

Maybe you are looking for

  • No export in 9.1.3 - a big warning!

    I've just updated to iPhoto 9.1.3. I cannot export photos as an error message says 'Unable to create [pathname]'. I've also just tried to drag the photos out to a folder and that does not work either! Also, you cannot drag photos to Apple Mail!!! Thi

  • FND related processes can't be started

    EBS suite 12.1.3 env: db:11.2.0.3 on windows 2008 R2 two app nodes:one is 64bit oracle linux 5.8,the other is 64bit oracle linux 6.3 No errors occured when starting appl tier,but can't find the FND related processes For oracle linux 5.8 server(SLC03O

  • How to run ABAP Function Module in Background FOR LONG TIME?

    I am not that experienced with ABAP. I am on SAP BI 7.0. I WANT TO RUN A FUNCTION MODULE RSDRT_INFOCUBE_DATA_COPY. I used SE37 and then executed the module, I supplied  the parameters on the form which opped-up and then  program started running. . Pr

  • Create Folder in a BA via API?

    Hi, is it possible to create a folder and it's attributes in a EUL from outside via some Discoverer API? TIA Tamas

  • Are permissions updated along with system updates?

    I have heard that permissions are updated along with system updates and that I should use only the latest version of Disk Utility rather than the Disk Utility that is on the original Snow Leopard install disk. Is this true? In my experience, there ar