Cost sheet report for overhead calculation

Dear All,
I was going from below thread but not able to create the report for overhead head calculation (Cost sheet - KGi2)
is there any std. report available for that.
i have to show the Base , percentage and amount of base and percentage calculated against an order or monthly.
Kindly give some input on this
Report Painter
thanks
Bittu

Thanks for reply,
In KGI2 we can see individual order but i want report for multiple selection of an order..
or system club multiple order and show the structure of cost sheet.
Bittu

Similar Messages

  • Cost center planning for overhead calculation

    Gurus,
    I have a doubt regarding the cost center planning for overhead calculation.
    My scenario is:
    There is a service cost center from which a certain percentage I want to allocate to the products as overhead. Now while doing so I have created a cost center and a cost element of type 43 (internal activity allocation). This cost element is the base for overhead calculation. Also I have created one cost element of type 41 (overhead rates). I have defined the credit (of cost sheet) with the cost element of type 41 and the cost center as mentioned.
       Now I am facing a problem while planning the cost center with cost element type 43 through KP06.The system is throwing the error message: 'Cost element xxxx can only be used for activity input'. My understanding is we must carry out the planning for the cost center to allocate a certain percentage to the product cost estimate. If I am not allowed to use the cost element of type 43 to plan, what should I use for the planning?
    Request your suggestion.
    Thanks in advance!
    Snigdho.

    Hi
    Since you mentioned catg 43 cost element, I thought you are using Activuty Type
    To apply overhead on the product during CK11N, you need not plan any value on the cost center... The values planned in the cost center can not be used as a BASE in your costing sheet....
    It goes like this
    1. Your cost estimate has BOM + Routing
    2. So, the cost elements that you would see during CK11N, can be broadly classified into 3 types
    a. Primary cost ele - Material Consumption accounts for BOM components
    b. Secondary cost ele (Catg 43) - If you use any actvity type in the routing
    c. Secondary cost ele (Catg 41) - These cost elements are parasites... They need some basis to calculate the overhead value... That basis can be either the (a) or (b) above.....
    I think, what you are planning to do is Plan Primary cost ele in a cost center and trying to use the same as the Basis.. That wont work!
    What you need to do is
    a. PLan the values in the cost center, say, 100,000 USD
    b. Absorb it on the basis of 2.a or 2.b
    If 2.b is not applicable in your case, since you are not using activity types, then 2.a is the Only option left for you
    Hope it is clear....
    Regards
    Ajay M

  • Product Cost Sheet report from BW

    Hi,
    I would like to know if somone has generated the cost sheet report for product/material combination in BW.
    I have a requirement for report as follows:
    Cost Sheet for FG 101
                                              Qty     Uom    Price    Resource    Cost Element                                       
    Stage 1:
       RM1
       RM2
       Activity 1
       Overhead
    Stage 2:
       Stage1
       RM4
       Activity 2
    Stage3:
        Stage2
        PM1
        PM2
    Total Costs for FG 101:
    Total Per Unit costs FG 101:
    The costs and quantity must be same as explored in CK13N transaction. Howver, the organization of report must be of above mentioned patttern.
    Regards,
    Ankita
    Moderator Message: Not ABAP-related
    Edited by: kishan P on Nov 8, 2010 8:45 AM

    Requirement postponed by business, so withdraing the thread

  • Cost sheet Report

    Hi All,
    Requirement :
    we are Process Industries: for metals.
    we havent implmenatated Product costing, and we require Cost sheet report to arrive at product cost, we have Process orders which get settled to Cost centers and through cost center we ( we have made a cost center report we drive the cost in excel sheet) any one has worked in kind of senario or can suggest how to go about it.
    regards,
    Priya g

    Hi Priya
    I am not very sure whether you can use cost sheet without configuring the Product cost planning. But if you want to apportion overheads through cost sheet in the process orders.
    You have to assign the cost sheet in the Costing variant / Valuation variant under "overheads".
    When you run the overheads calculation it debits the process orders and credit the cost center.
    As far as i know there are no reports to get the cost sheet. You have to write a ABAP code or use report writer.
    Regads,
    suraj

  • Cost Analysis Report - For a range of process orders

    Dear all,
    Is there a standard report available to get the cost analysis for a range of process order? COR3 --> Go to --> Cost --> Analysis. Here I can see the cost analysis for one report. But I wanted to get the cost analysis report for a range of process orders. Please help.
    Thanks
    Nagarajan

    Dear
    You can use cost analysis report like
    1.S_ALR_87099932 - Variances Between Costing Runs
    2.S_ALR_87099931 - Price vs Cost Estimate
    3.S_ALR_87099932 - Variances Between Costing Runs
    5.KOC4
    Regards
    JH

  • How to get balance sheet report for profit centers

    hi
    how to get balance sheet report for profit centers, is there any transcation code to get that report or i need to create a report painter report for this

    Hi,
    You can use T. code KE5Z for actual line items.
    More to this you can use program RFBILA10 (Use T. code SE38 and program RFBILA10) for complete blance sheet.
    The transaction is for special purpose ledger but this program RFBILA10 can be used for profit center balance also.
    In selection, you can give ledger name which is generally 8A for profit center ledger.
    Reg

  • Is it possible to change the Costing Lot size for preference calculation?

    Hi Gurus,
    Is it possible to change the costing lot size for the preference calculation?
    Reason for my question is: We have all prices on price unit 100
    and we want to use also the price unit 100 for preference calcalation.
    But the preference calculation always take price unit 1.
    Is there any possibility to set somewhere the costing lot size for pref.calculation?
    Thanks
    Regards
    Dieter

    Does really nobody has a hint?

  • Std. report for scrap calculation......

    Hi!
    I want to generate a Scrap report for production order.
    The requirement is system should display operaton-wise scrap and its cost. It should consider all material cost & activities cost (labour& machin)required for that operation & generate a overall scrap price.
    Is there any standard report available in SAP?
    OR any other way to get this report?
    Please answer this, If u have any idea.
    Thanks,
    Pankaj.

    I think you need to revalidate the Requirement Since.
    1.Scrap is generated during a Goods is produced / Processed.
    2.So in this case we have a wastage of material..only this material cost has to be calculated or accounted.
    3.The operation cost and activity cost etc should be accounted for the Finished goods ,which is already done by Cost collectors -Say Production order.
    May be you have a specific requirement.But the Approach towards the process (SCRAP calculation) has to be revisited.
    since for a SCrap material called -x and qty called  2kg.the operation time or the acitivity time cant be calculated easily as this has scrap can be generated because of 1 hr of m.c operation or 10 hr of m.c operation..
    Lot of factors like
    >M/c Efficiency
    >Rawmaterial Quality
    >operator efficiency
    lot of factors would be there
    So better to revisit the requirement

  • Report Painter- How to make cost center report for Jun07-Jul08 ?

    Hi Experts,
    I need to make a P&L (Actual/ Plan) report for Jun 07 - Jul 08 by using Report Painter, but I'm having difficulty to make column for the next year period (2008) and some other things.
    We are using K4 Fiscal Year Variant in ECC 6.0.
    The layout is somehow like this:
    Header : Cost Center
                 Actual/Plan Report
                 June 2007 to July 2008
    Body:
    Cost Element     |   Total Actual   |   Total Plan |  Actual  June | Plan June .................Actual July | Plan July    
    xxxx       
    xxxx
    Account Group (total)
    xxxx
    xxxx
    Account Group (total)
    Grand Total  
    How to:
    a. make the header "June 2007 to July 2008" ?
    b. make the selection screen to provide parameter for June 2007 to July 2008? (e.g.: period 6 fiscal year 2007 to period 7 fiscal year 2008)
    c. provide layout (rows and columns) as described above? it should provide detail cost elements and also calculate it as the total per account group, then finally the Grand Total for all of account groups. 
    Thank you before,
    -=Meila.S=-

    Hi,
    1. Put Year and Month as your General Selection parameters
    2. In the label of the fields, if you put the parameter name with & before, it will display the value
    3. If you put cost element in General selection, it will come with a group, and when you selecting the group, the report does the sub-totals automatically.
    Regards,
    Eli

  • Balance sheet reports for foriegn exchange

    hi all,
            exchange rate type M is defined for 04/01/2008 and document is posted in 04/15/08.
    when balance sheet report is taken in 05/01/2008 it should take the exchange rate from 05/01/2008
    It is still taking ERT from 04/01/2008 how can we make it work to take ERT as of 05/01/2008.
    exchange rate maintained on 05/01/2008 is the spot rate or average rate.
    B/S taken on 05/01 is based on spot rate or average/standard rate.
    Also B/S can be taken on spot rate or average/standard rate as of monthly basis.
    Thanks
    Vikram

    Hi
    What is the report you are executing and what steps did you take to convert the report to have the exhcange rate as of  05/01/2008?
    Rgds
    Nadini

  • Cost Center Report for each Cost Center

    Hi everybody,
    I am using SAP R/3.
    I have 90 Cost Centers (and Variants) and want to print a report for each one. But I dont want to key in all 90 Cost Centers (or select all Variants).
    What opportunities do I have? And I would like to have a kind of report were I can change the layout.
    I use this kind of report (no standard):
    Y_HGS_46000001 - Actual : month/cost center
    The problem: We have more than 500 Cost Centers in our system. So I can't use "range".
    Markus
    Edited by: Markus Schreiter on May 27, 2008 4:12 AM

    @ Karl:
    I defined variants for:
    1. "All Cost Centers"
    2. "Business Divisions"
    - Production
    - G&A
    - Selling
    - Non-Operating ...
    3. "Business Groups"
    - NSW Lab
    - WA Lab ...
    4. "Each Cost Center"
    With No.1 I now have the opportunity to run a report with all CCtr.
    Markus

  • Cost Element Report for all cost objects

    Hello,
    Is there any standard SAP report where it can list down all cost elements, and their line item/total postings done to various CO Objects in one shot.
    We have CE/CCTR, CE/IO, etc, but if we can have one report which can list all cost elements and postings done via it to different cost objects - cost centers, internal orders, WBS, etc, might be very handy to us.
    Thanks
    Balla

    Hi Balla,
    Please use S_SL0_21000007 for your requirement.
    It gives cost element postings to different cost objects.
    regards,
    makrand

  • Cost Breakdown Report for Date Range

    Hi Guys,
    i have 6 payrolls running and all of them while running for this report is working fine but for specified payroll it's not working the strange thing that it's working On TEST and not working in Production, can any one of you tell me about the prerquezt for solving or tracking this issue.
    BestRegards,

    but for specified payroll it's not working
    ==========================
    What is not working can you little specific.
    Thanks

  • Function module usage in vendor ageing report for ageing calculation

    hi everybody there
    as i have to calculate the vendor ageing
    which is nothing but
    AGEING = Currentdate - BLINE date
    so for this i have coded as follows and use the function module but couldn't get the result .it is alwayas showing 0 means ageing  is o but it is not like that
    parameter:p_date1 type dats.
    call function 'days_between_two_dates'
    exporting
    i_datum_bis = p_date1
    i_datum_von = itab-zfbdt
    importing
    e_tag = itab-ageing
    exceptions
    days_method_not_defined =1
    others = 2.
    so what is the bug in it.

    hi,
    <b>declare ur internal table field , of type BSIK-ZFBDT or sy-datum
    thats the only thing u want to do.
    the other parameter is sy-datum</b>
    <b>data: field like BSIK-ZFBDT.</b>
    DATA:lv_diff TYPE i.
    CALL FUNCTION 'DAYS_BETWEEN_TWO_DATES'
    EXPORTING
    <b>i_datum_bis = sy-datum
    i_datum_von =  field</b>
    IMPORTING
    e_tage = <b>lv_diff</b>
    EXCEPTIONS
    days_method_not_defined = 1
    OTHERS = 2.
    IF sy-subrc = 0.
    WRITE:/ <b>lv_diff</b>.
    ENDIF.
    nw it will work.
    rgds'

  • Product Cost sheet from BW

    Hi,
    I would like to know if somone has generated the cost sheet report for product/material combination in BW.
    I have a requirement for report as follows:
    Cost Sheet for FG 101
    Qty Uom Price Resource Cost Element
    Stage 1:
    RM1
    RM2
    Activity 1
    Overhead
    Stage 2:
    Stage1
    RM4
    Activity 2
    Stage3:
    Stage2
    PM1
    PM2
    Total Costs for FG 101:
    Total Per Unit costs FG 101:
    The costs and quantity must be same as explored in CK13N transaction. Howver, the organization of report must be of above mentioned patttern.
    Regards,
    Ankita

    Requirement postponed by business, so withdraing the thread