CProjects 4.5 availability?

Hello,
according to the product availability matrix the collaboration suite 4.5 should be released at the end of june. Has someone already seen it in the swdc or knows the date it will be released?
Thx, Max

Hi,
SAP CPROJECT SUITE 4.50 is released. Please loo in to the following web site.
You may get ore stuff about SAP CPROJECT SUITE 4.50
http://service.sap.com/downloads>SWDC>Support Packages and Patches" SAP Application Components" SAP CPROJECT SUITE" SAP CPROJECT SUITE 4.50
SAP CPROJECT SUITE 4.50
BI CONT 7.03
BP ERP05 DEV COLLABORATION 1.0
#OS independent
BP ERP05 PROJ SELF-SERV 1.0
#OS independent
BP PROJ., PORT. & DCOL. 4.5 70
#OS independent
CPRXRPM 450_700
ECL VIEWER 5.1.2
AIX 32bit
HP-UX on PA-RISC 32bit
Solaris on SPARC 32bit
Win32
LCAPPS_2005_700
SAP LC/LCAPPS 5.0
AIX 64bit
HP-UX on IA64 64bit
HP-UX on PA-RISC 64bit
Linux on IA64 64bit
Linux on Power 64bit
Linux on x86_64 64bit
Solaris on SPARC 64bit
Solaris on x64_64 64bit
Windows Server on IA64 64bit
Windows Server on x64 64bit
WFMCORE 200
XI CONTENT CPRXRPM 4.5_700
#Database independent
Preconditioned Product Version
SAP NETWEAVER 7.0 Application Server ABAP
ASCENDER FONTS
PI_BASIS 2005_1_700
PI_BASIS 2006_1_700
ROGUEWAVE BW: OBJECT TOOLKIT
SAP ABA 7.00
SAP BASIS 7.00
SAP BW 7.00
SAP IGS 7.00
SAP KERNEL 7.00 32-BIT
SAP KERNEL 7.00 32-BIT UNICODE
SAP KERNEL 7.00 64-BIT
SAP KERNEL 7.00 64-BIT UNICODE
SAPSECULIB 5.4
SIMBA BW V1
TENSEGRITY BW: STRUCTURE CHART
Regards,
Srini Nookala

Similar Messages

  • Digital Signatures for cProjects Approval

    Hi Folks,
    I am on cProjects 4.5 and from what I understand there are 2 options for this based on whether or not I check the "Signature of Approval with User Certificate" box in Project Type config.
    Unchecked - user is prompted for cProjects password and this works fine. Only issue for us is, we are on the portal and most likely cProjects password will be different and unknown to user. As per note 928527 this is standard behavior and tough luck for anybody on the portal.
    Checked - use is given the ability to digitally sign the PDF approval document. When I select "sign" on the PDF I am given the ability to create a new ID or use an existing ID from a file, server etc. I created a new ID and signed the document. Once I do this and click the transfer button the system appears to hang. The progress indicator appears and keeps going.
    Therefore my questions are:
    1. Is there any additional config I need to do in cProjects. ADS or anywhere else?
    2. How exactly does adobe digital signatures work? If anybody simply create a signature how does that provide any verification of authenticity?
    Appreciate any help.
    Thanks,
    Lashan

    Hi,
    please see teh Configuration Content for cProjects 4.5 available in SAP Solution Manager and also as PDF attachment to SAP Note 1035436.
    There it says:
    Making Settings for the Approval
    Use
    You can use user certificates for digital signatures of approvals.
    Prerequisites
    ● You are using Microsoft® Internet Explorer 6.0 or higher.
    ● You have a user certificate that is suitable for digital signatures (for example, the single
    sign-on certificate).
    ● You have installed Adobe® Reader and Adobe Document Services.
    Procedure
    To verify the signature, enter the corresponding root certificate in the certificate list of the
    Personal Security Environment (PSE, transaction STRUST). For more information, see the
    documentation for the activity and the Adobe Document Services u2013 Configuration Guide NW
    2004s on SAP Service Marketplace at service.sap.com/adobe u2192 Media Library u2192
    Documentation.
    In fact, what is described in the ADS documentation referenced above is that you have to install
    the certificate also on the ADS.
    Kind regards,
       Florian

  • C- project certification question and material

    Hi Gurus,
    I want to know is there any cretification for  SAP C- Projects  could you please let me if any one has SAP done c-project certification questions, or any relevant sites wherein I can get the same.
    Thanks in advance for your help,
    Thanks
    Ashish

    Hi Ashish,
    cProjects being a part of the PLM package, you would need to undergo SAP PLM certification. As per my knowledge, there is no separate cProjects suite certification available.
    However, there are training programs conducted by SAP for cProjects and xRPM. You may get the details regarding these from the marketplace. Please refer https://websmp101.sap-ag.de/partnerportal/apj/home
    Let me know if this helps.
    Regards,
    Vivek Pandey

  • Programmed control of availability cProjects project fields.

    Hello all.
    We want to have programmatically control of availability cProjects project fields in case, when execute following event: cProjects project assign/unassign to xRPM item.  
    For example:
    We have the following event: assign cProjects project to xRPM item. 
    At this moment we transfer value from field «location» xRPM item to field «location» cProjects project (abap development). Also, we want to change «read only» attribute of  field «location» cProjects project.
    What functional module used to control availability cProjects project fields? How it possible to do this?

    Hi Aleksey,
    Please see your other post, as I see, the UI configuration supported by webdynpro can not be used, because it depends on the condition. It worth to try, if it can be realized via cProject  field cotnrol, actually it is not very easy but powerful.
    Kind regards,
    Zhenbo

  • CProjects - "Available Capacity" for resources

    Dear Experts,
    We are on cProjects 4.0, Support Pack 11.
    We have a requirement by which we use a four-day-per-week calendar. Also, this calendar is required to have some holidays which are specific to our business. And this works good in our calendar.
    However, we notice that the "Available Capacity" for resources (Under Resources > Staffing) does not caluclate the available hours based on this calendar. So to say, the available capacity for resources is calculated on the basis of some different calendar. We can make changes to the availability of a resource per day (from 8 to, say, 10 hours per day). But what we have not been able to do is to have the availablity calculated on the basis of the working days available in the project calendar.
    How can we do this?
    Summary
    How can we get the application to calculate "Available Capacity" for resources on the basis of a calendar of our liking and not the system's?
    Thanks in advance.
    Regards,
    Bittu

    Hi Vivek,
    This helped and you get 6 points!!
    I could make the settings as per your suggestion and see that the 'Available' capacity for resources is now governed by the 'factory calendar' and 'hours' per day that I specify.
    However, we have a requirement by which this 'Available Capapcity' may not be governed by the the same calendar for every resource. For e.g., resource R1 may have 'Available capacity' based on calendar C1 and Resource R2 may have an 'Available Capcity' based on calendar C2. How do I make allowance for this?
    What I mean is, the settings that I have done works good but the same rule applies to all the resources. Is there a way I can make one setting applicable to one resource and another setting applicable to another resource??
    Thanks in advance.
    Regards,
    Bittu.

  • CProjects 4.0 - Resource Availability

    How does the Resource Availability feature work in cProjects 4.0? Can the resource maintain his calendar in cProjects?
    Staffing of a resource happens when the resource has the qualification for the role? How does the system take care of 'Availability?'

    Hi Bittu,
    Some information to enhance Thorsten's answer about availability, it is not very straightforward.
    First of all, does WFD server (other name WFM core) is used?  If Yes, then the availability is controlled by the WFD server (External).
    If No, then the program using the cProject internal logic frequences to determine the availability:
    1.  The BP has the availability maintained. for example BP 'Mr. Hugo Boss'  works 8 hours each day.
    2.  The BP has a location, and the availability has maintaned for the location.
    for example: 'Mr. Hugo Boss' has location 'Germany' and location 'Germany' works 7,5 hours.
    3. The BP has not the locaion . But the role has maintained a location.
    For example: Role 'Software development' should be done in location 'U.S' and location has 9 Hours each day.
    4. If none of above is maintained, then the program check the customizing of distribution. The standard SAP dilivery has 8 hours each day.
    The note 958573 is the prerequisite, and explain the same logic.
    Please rewards point, if it is useful.
    Kind regards,
    Zhenbo

  • CProjects:  BP Availability

    Hi Experts.
    I have a question regarding the availability of business partners in cProjects:
    We have Business Partners which are connected to corresponding user and HR employee. When somebody makes an request for e.g. vacation, we book this offtime in cats to an network with the corresponding A/AType.
    Now i want to have the real availability of this employee in cP. I know that there is the possibility to make availability entrys in ta rpm_empdata. But i want to have real availability (e.g. when the employee is off for vacation in june, i want to see that in cP (=0 availability in june for this employee)).
    How to solve this problem?
    We are using cP Suite 4.5 / PSP Controlling / CATS Integration
    Thanks,
    Malte
    Edited by: Malte Jacobi on Jun 3, 2010 10:36 AM

    Hi Malte,
    the absences from HR are not taken into consideration when you do HR ALE distribution of employee data.
    You could do this e.g. via BAdi. Would require some programming. See also xRPM cProjects how import HR absences
    Best regards
    Thorsten
    Edited by: Thorsten Schneider on Jun 12, 2010 8:39 PM

  • Resource availability (xRPM 4.0/cProjects 4.0)

    I have a question about resource availability in xRPM/cProjects 4.0
    What do i need to do to be able to see real availability of my resources?
    Do i need to set up the link to HR, do i need WFD?
    Can i see the availability decrease if users have booked holiday time or training in their CATS?
    Thanks in advance!

    Hi Jocelyn,
    As per cProjects 3.1 and 4.0, it is possible to use WFD with cProjects. In project roles, it can be specified if a role is relevant for WFD or not.
    Note 900310 discusses the following:
    Enhanced resource management using the RPA (Resource Planner Application) and the Workforce Deployment (WFD) servers: As up to now, WFD can be used as an enhanced scenario for resource planning in cProjects to staff project roles externally or to show resource availability. However, you must install the liveCache in an separate instance in order to use these functions. See the notes in the Master Guide. In this case (when you use cProjects outside the SAP Enterprise Portal), the 'Resource planning' tab title is available at the highest navigation level in cProjects. When you use the SAP Enterprise Portal, you can use the 'Resource Planner' CRM portal role. For further information, see Note 939501.  If you intend to use cProjects 4.0 with the RPA and WFD servers, all three must be installed on the same system.
    Please let me know if WFD is forbidden for higher versions of cProjects, and if yes - what are the alternatives available.
    Thanks,
    Vivek Pandey

  • Service Desk with IC WebClient: Category Modeler not available

    Hello,
    We are currently implementing a Service Desk Application based on SAP Solution Manager. Therefore we are using the article "Implement an ITIL Employee Service Desk with IC WebClient" of "www.CRMExpertOnline".
    One of the steps, which are described in the article describes how to Categorize incidents with the Category Modeler. It says that the Category Modeler is available trough BSP Application CRMM_ERM_CAT.
    Unfortunately this SAP-Application is not available on our system.
    Our System Data:
    SOFTWARE COMPONENT               RELEASE                    LEVEL               HIGHEST SUPPORT PACKAGE          DESCRIPTION
    SAP_BASIS                                        700                              0012               SAPKB70012                                        SAP Basis Component
    SAP_ABA                                             700                              0012               SAPKA70012                                        Cross-Application Component
    PI_BASIS                                        2005_1_700          0012               SAPKIPYJ7C                                        PI_BASIS 2005_1_700
    ST-PI                                                  2005_1_700          0005               SAPKITLQI5                                        SAP Solution Tools Plug-In
    SAP_BW                                             700                              0014               SAPKW70014                                        SAP NetWeaver BI 7.0
    SAP_AP                                             700                              0009               SAPKNA7009                                        SAP Application Platform
    BBPCRM                                             500                              0009               SAPKU50009                                        BBPCRM
    CPRXRPM                                             400                              0009               SAPK-40009INCPRXRPM                    SAP xRPM/cProjects/cFolders 4.00 (ABAP)
    BI_CONT                                             703                              0005               SAPKIBIIP5                                        Business Intelligence Content                    
    ST                                                       400                              0012               SAPKITL422                                        SAP Solution Manager Tool                            
    ST-A/PI                                             01I_CRM500          0000         -                                                                 Application Servicetools for CRM 500         
    ST-ICO                                             150_700                    0009               SAPK-15079INSTPL                         SAP Solution Manager Implementation Cont
    ST-SER                                             700_2006_2          0003               SAPKITLOK3                                        SAP Solution Manager Service Tools
    Does anybody know where I can find/download the category modeler-application?
    Thanks in advance,
    Andreas

    Hello Andreas,
    The question is that  CRMM_ERM_CAT is an application, also a transaction but this is not the name of the associated BSP I think, this belongs to component CRM-PCF more than Solution Manager.
    I have seent some messages speakin about to call:
    http://server:port/sap/bc/bsp/sap/crm_bsp_frame/entrypoint.do?
    appl=CRMM_ERM_CAT
    Sorry! I can not tell you more about this, regards,
    Dolores

  • Resource planning in cprojects with xRPM or MRS?

    Dear Experts,
    To my understanding there are four options to perform resource planning in combination with cprojects:
    1.     Do a planning in cprojects only
    2.     Use resource planning application (RPA) from SAP CRM
    3.     Schedule resources with xRPM
    4.     Schedule resources with SAP MRS (Multi Resource Scheduling)
    I have a couple of questions:
    (a) Is it correct that I cannot assign resources to project roles in xRPM based on qualification matching? Is it right that xRPM is used rather for a long-term view to define the available capacity of projects/roles than assigning specific resources to roles?
    (b) How can help SAP MRS in comparison to option 1 (planning in cprojects)? I assume that I can do also in cprojects itself a qualification matching. MRS provides a more detailed qualification object to cover complex requirements, right? What else provides MRS what cannot be managed in cprojects itself?
    (c ) If we want to use a staffing process were project lead and resource manager doing the staffing and have the option to suggest or reject roles, we have the option to use xRPM or MRS, right? What are the differences? In MRS we have options like using several resource managers, softbooking/hardbooking or itu2019s possible to define the workflow who proposes resources and who is doing the final staffing (project lead or staffing manager), reasons for rejections can be configured etc. Are these options in xRPM available as well?
    Thanks,
    Angie

    Hi Angie,
    I have not implemented MRS or RPA so can only answer your first question. You cannot do a resource search via qualification in Portfolio Management (aka xRPM), typically you would do this in Project Management (aka cProjects) and this functionality works fine provided you have maintained qualification data for BP's and roles. Portfolio Management financial planning function can be used for a long term view as you have mentioned. However, it is also typically used to summarize and/or roll up resource demand / assignment to a bucket or portfolio level or summarize resources for multiple projects via initiatives or collections. You can also use a top down approach and at a high level plan values at the bucket level (i.e. forecasted demand or business case demand) and compare against detailed planned / assigned demand rolled up from project management.
    Hope this helps.
    Regards,
    Lashan

  • Support Message and cProject

    Hi experts,
    I'm working with Solman Service desk and I would like to know
    how can I do to create support message in cProject?
    Somebody help me.
    Thanks
    Daniely

    Hi Ragu,
    I'm implementing the SolMan - Service Desk.
    So the end-user can create support message in many system like CRM, R/3, and BW. The end-user working in c-Project too but, in this system there isn't the same option (through help- create support message).
    I wouldnu2019t like available a link to SolMan - Service desk because, in this way the system not fill the component system automatically for example.
    Is it possible to available u2018help-create support messageu2019 like the other system?
    Do you know how can I do this?
    Thanks
    Daniely

  • Standard Package available for DMS in EP

    Hi,
    Is there any Standard package available for DMS in EP?
    If No, then what are the alternative possibilities to access DIRs from web apart from WEB DMS.
    Regards
    sham

    Im not sure but
    you can use iViews for accessing web dms just like cFolders or cProjects....
    Niranjan

  • CProjects - Set-up field control - Usage of conditions

    Hello
    In cProjects, in set-up field control it is possible to adjust behavior (display, updatable, mandatory, u2026) field by field.
    My questions are:
    - Where to find the complete list of conditions available?
    - Is any condition is usable everywhere, for example C001 Object is released on a DAG Document (means the object link to this document is released)?
    - Is there a condition with a meaning like u201CThe object is in creationu201D (to have for example a phase description not updatable after creation)?
    - How to create its own conditions?
    Thanks for your help.
    Rémy
    Here you can find a list of conditions for the main objects.
    CTO (Checklist)      C001 Object is released
    ITO (Checklist Item)      C001 Object is released
    MTG (Project Participant)      C001 Object is released
    PPO (Phase)      C001 Object is released
    TTO (Task)      C001 Object is released
    MTG (Project Participant)      C002 CATS is active
    TTO (Task)      C002 CATS is active
    TTO (Task)      C004 Confirmation for task
    MTG (Project Participant)      C005 Role start and finish are specified
    ITO (Checklist Item)      C006 Object has a superior phase
    TTO (Task)      C006 Object has a superior phase
    TTO (Task)      C007 Phase without approval
    TTO (Task)      C008 Appr. is in process, granted, rejected
    CTO (Checklist)      C009 Ind. 'Changeability' to 'Cannot Be Chgd'
    ITO (Checklist Item)      C009 Ind. 'Changeability' to 'Cannot Be Chgd'
    CTO (Checklist)      C010 Ind.'Changeability' to 'Partlly Chngble'
    ITO (Checklist Item)      C010 Ind.'Changeability' to 'Partlly Chngble'
    PPO (Phase)      C011 Project Type 'Initiative'
    PPO (Phase)      C015 Constraint: As soon as possible
    TTO (Task)      C015 Constraint: As soon as possible
    ITO (Checklist Item)      C016 Constraint: As late as possible
    PPO (Phase)      C016 Constraint: As late as possible
    TTO (Task)      C016 Constraint: As late as possible
    ITO (Checklist Item)      C017 Constraint (Finish Date): None
    PPO (Phase)      C017 Constraint (Finish Date): None
    TTO (Task)      C017 Constraint (Finish Date): None
    TTO (Task)      C018 Task is a summary task
    TTO (Task)      C019 'Remaining Work Man.'indicator is active
    TTO (Task)      C020 Object is part of a project version
    ITO (Checklist Item)      C030 Access to Forecasted Dates
    PPO (Phase)      C030 Access to Forecasted Dates
    TTO (Task)      C030 Access to Forecasted Dates
    OAG (Object Link)      C100 Object has not been specified yet
    RAG (Checklist Reference)      C200 Checklist reference was created
    ATO (Approval)      C300 Approval has the status: Created
    EAG (Project Element Link to Role)      C400 Status: Staffing in Process/Complete
    MTG (Project Participant)      C500 Status: Staffing in Process/Complete
    MTG (Project Participant)      C501 Confirmation for project role
    BAG (Link to Business Partner)      C502 Distribution is active
    MTG (Project Participant)      C502 Distribution is active
    MTG (Project Participant)      C503 Status: Staffing in Process
    MTG (Project Participant)      C504 Cost/revenue rate is initial
    TTO (Task)      C504 Cost/revenue rate is initial
    MTG (Project Participant)      C505 Org. Unit (Staff. Manager) is changeable
    MTG (Project Participant)      C506 Org. Unit (Cand. Manager) is changeable
    MTG (Project Participant)      C507 Staffing Manager is changeable
    MTG (Project Participant)      C508 Candidate Manager is changeable
    SAO (Individual Approval)      C600 Approval allows decision maker change
    DAG (Document)      C700 cProjects file is checked out
    DAG (Document)      C701 Plug-in for documents is used
    DAG (Document)      C702 Document has status 'Not in Process'
    DAG (Document)      C703 Document is changeable
    DAG (Document)      C704 Link to document template
    DAG (Document)      C705 Document in projekt-/checklist template
    DAG (Document)      C706 cProj. file is checked by current user

    Hi Matthias
    I am trying to setup field control to make a bespoke field in a bespoke tab toggle between READ only and Editable. 
    I have gone through number of posts and the SAP note you mentioned. I have setup the entire configuration required and it is still not working.
    What confuses me is that, to setup a field control dynamically, is it all done via configuration?. Is some coding still required in the VIEW methods?. I am setting up a debug breakpoint in the class method that is created for the condition I created, but the program is not stopping there so I think the condition method is not being called.
    Please can you give some more details.
    Thanks
    Raj

  • CProjects 4.0 - SAP R/3 4.7 - Accounting Integration problem.

    Dear all,
    I have performed all steps necesaary for accounting integration in cProjects and SAP R/3 FI System.
    I can even see and assign the cost rate that I have created in cProjects to a project role.
    System also calculates the  cost for the role multiplyin the cost rate with the number of hours the resource has been assigned.
    However, it also displays the following warning messages:
    1. An error occurred in Accounting (system QASCLNT777) 
    2. Function module "IAOM_CPRO_MISC_RFC_CPDEF_CHECK" not found. 
    3. No cost center could be determined for organizational unit 00000000 
    4. Maintain a revenue element for cost/revenue rate ZZ_000001 
    5. Error occurred in accounting - check the costing in the ERP system
    When I execute the transaction COCPCPR in R/3 system, I cannot see the internal order, but see the project name under "Internal Orders not created"
    Regards,
    Reema.

    Hi reema, if we refer to the documentation pertaining to accounting integration for cProjects 4.0, we see that the prerequisities is ECC 6.0
    Please see below from the help documentation
    Integration
    To be able to use the functions of accounting integration, you have to implement the Internal Orders (CO-OM-OPA) application component and Project System (PS) in SAP ECC 6.0.
    Prerequisites
    You need to make a number of Customizing settings in both the Collaboration Projects and SAP ECC Implementation Guides (IMG):
    Settings in the Collaboration Projects IMG
    You selected the Controlling in mySAP ERP setting in Customizing for Collaboration Projects under Connection to External Systems ® Accounting Integration ® Activate Integration as the Accounting Integration Scenario.
    I feel the error messages are thrown because you are using SAP R/3 4.7.  I see from the SAP notes, for CATS integration with cProjects 4.0 and SAP R/3, SAP consulting is available, but nothing is mentioned for accounting integration.

  • Additional field in cProjects

    Dear All,
    How can i bring customer field in cProjects 4.0.
    My users want four extras field which is not available in cProjects.
    We have done following things
    1.                   As per SAP  Note : 947936 in PLM server
    2                  Go to SPRO->SAP Customizing Implementation Guide -> Collaboration Projects -> Collaboration Projects -> Define Field Groups for customer fields
    3.                   Object Type: DPO (Project Definition)
    4.                   Field Group ID: (ID) eg ZTAB_DPO
    5                   Field Group Name: This will appear as the text on the TAB & make sure active check box is checked.
    6                  Select the entry made above and double click on u201CCustomer Fields for Field Groupu201D.
    7               Customer Field will be the additional fields that you have added in the customer include in the table DPR_TS_PROJECT_EXTENDED_ATTR / dpr_projects
    8              Select Mode and Field Type & make sure active check box is checked.
    9               Double click on the folder u201CField Group as per Project Typeu201D & click on new entries.
    10               Select the project Type for which you want the tab to be displayed
    Object Type: DPO (Project definition)
    Field Group ID (ZTAB_DPO) & make sure active check box is checked.
    Please do needful
    Regards
    Ravindra

    Hi Ravindra,
    there is one more step that needs to be done in the customizing:
    You have to set up a field control for your customer fields (IMG activity 'Set Up Field Control'). Here you define the conditions when these fields are displayed, hidden etc...
    If you have no field control, these fields will be always hidden.
    Please do not change the standard field control 0SAP but rather copy it to your own and adapt it according to your needs. Please refer also to the available IMG documentation.
    Afterwards, this field control needs to be assigned to your project type (IMG 'Define Project Types').
    Regards,
    Silvia