Creating a Double Line Graph

Hello,
I'm trying to create a graph from the information seen in the table below. I need to plot on the X- Axis, the T0,T1,T2 values. There will be two data sets for the line graph, Subject A and Subject B, the value from which will be plotted on the Y-Axis. I've spent about an hour now, trying to order the values to create the graph I need.
     Another way of saying this, is that I'm plotting the differences in Subject A versus Subject B over a period of Time (T0, T1, T2).
It should look something like this:
Help Please!
-KB

Hi KBaines,
Please don't worry about wasting anyone's time. Many users in this forum look upon Numbers problems as a challenge. If you solved your own problem, please post your solution to help others.
Regards,
Ian.

Similar Messages

  • Creating a 3 line graph report

    Need help with creating a 3 line graph  - need to be able to plot 3rd line of data  without displaying a legend and use a dynamic tag label for the line. Thanks

    You can create two graphs with the same horizontal (and if necessary vertical) scale, and make them occupy the same space on the report, one under another.
    On one report, put your 3rd graph line, and remove any visible text, gridlines etc, so you basically just have the axes lines and the graph line.
    On the top report, make the background transparent, so both graphs are visible (Chart Expert->Options->Transparent Background).

  • Help creating a simple line graph

    Hi
    Im very new to the Java language, yet have some background knowledge of C and C++.
    i have a problem with an application i am developing for a university assignment, the program is to simply simulate a water pressured nuclear reaction. the main JFrame holds various JLabels that show the current core temperature, electricity produced etc. But i want to add a very simplistic line graph to the same window, it is to purely show a line that updates (no axis or labels). The graph is to illustrate how much electricity was produced on the current cycle of the reactor, the user can initiate each cycle by pressing a JButton.
    i have found some info on drawing, but cannot find anything that helps.
    Any info on how to do this (its only meant to be a samllish part of the main window), any code examples or sites that have a very relevant tutorial would be appreciated.
    Sorry for the length of this, and if anyone needs any more info on this then let me know.
    thanks

    Cross posted,
    http://forum.java.sun.com/thread.jsp?forum=54&thread=394494&tstart=0&trange=15

  • Creating a Line Graph in a JSP...

    ive got to create a simple line graph (ability to have a title, xaxis, yaxis labels, plus label the data on hte x and y axis). right now the yaxis date is stored in an array of doubles and the xaxis just increment by 1. im having problems finding such a thing on the internet that doesnt depend on other classes or beans besides teh ones built into the jdk. i can have no other 3rd party software, is there anything like this out there? any java functions? thanks.
    Adam.

    Hi
    Keep in touch with the following thread, which is going in parallel, which is same as yours.
    http://forums.java.sun.com/thread.jsp?forum=45&thread=286179
    Thanks
    Swaraj

  • Create a line graph on EP 7.0

    We are trying to create a complex line graph in the portal which will pull data from SAP ISU. What is the best approach to developing this graph? Is SAP Chart Design suitable for creating a complex graph from scratch?
    Any help would be appreciate.

    U can open any one of this as per ur like and edit.
    Well, you cannot edit the standard delivered themes. You will need to make a copy of the standard one and edit that custom copy.
    Besides the theme editor in the portal, there is a tool called Eclipse theme editor which can come in handy to create/modify a theme. You can download this tool and the corresponding guide at the following location:
    http://www.sdn.sap.com/irj/scn/downloads?rid=/library/uuid/136dd890-0201-0010-1b9d-bd09a0d3b1d8
    Thanks,
    Shanti

  • How to table double line

    In the example, Building tables.vi, the first row and the first column has a double line.
    How do I do that on the front panel?
    creating the double-line.

    Right click on the table and select Visible Items>Row Headers and Visible Items>Column Headers. the data in Row and column headers are not part of the 2D string array that is a table but are available from the properties RowHdrs[] and ColHdrs[] as the example shows.

  • Engage 2008: Line Graph, can't start 2nd series @ different X value

    Using Xcelsius Engage 2008
    Created line chart w/ 2 series
    2nd series does not start at the same X value as series 1.
    How do I generate the second series so the initial part of my 2nd series line does not show all 0s?
    Thank you
    Nancy Griffin

    Hi Tammy.
    I'm using Xcelsius version: 5.0.0.99 and Build number 12,0,0,121.   I am not sure if S1 is already installed.  If not, where can I get it?
    This is what I'm trying to do:
    1) created a basic line graph with two series
    Series 1 Data has 2 columns
    Series 1 Column 1 includes dates. THis will be the labels for the X axis:
    1/1/07
    1/6/07
    1/12/07
    1/1/08
    1/6/08
    Column 2 includes the line graph data for series 1
    30
    50
    10
    90
    120, etc
    Series 2 column 1 - THis is the same as series 1 since it includes the same labels for the X axis
    Series 2 column 2  includes the data for the 2nd line graph
    HERE's WHERE IT IS DIFFERENT
    I have no data for dates 1/1, 1/6,  1/12/07.   My data starts in
    2008. I don't want the graph to show 0s for the first 3 dates and then jump up to the 2008 data.   Is there a way to make the 2nd line chart start on 1/1/08?
    thank you. Really appreciate your help.

  • Basic line graph in CR

    Hi All,
    I have an xml datasource with many items. For example:
    <?xml version="1.0" encoding="ISO-8859-1"?>
    <USRPRES_REPORT>
       <TABLE id="0">
          <VALUE>0</VALUE>
       </TABLE>
       <TABLE id="1">
          <VALUE>3</VALUE>
       </TABLE>
       <TABLE id="2">
          <VALUE>1</VALUE>
       </TABLE>
    </USRPRES_REPORT>
    I would like to create a basic line graph from these values. The values can be 0-5, so the y axis can be the 0-5 and the x axis shows the actually value from the source. How can i create a graph like this? (as i see the CR alway wants to summarize, and it is my problem)
    Thanks for all!!!
    Imre Kovacs

    This looks to be more of a Crystal Report design issue so please post to the Crystal Reports Design forum at:
    SAP Crystal Reports
    Ludek

  • Help me with a simple line-graph, plzzzzzzzz.

    hi!
    can anyone give me the basic java code to create a simple line graph for my java program output.
    thanks a lot in advance.
    cheers!

    Have a look at the Graphics.drawPolyline() method.
    kind regards,
    Jos

  • 3-color "double" line...graphic styles?

    I'd like to create a "double" line that uses 3 colors.  The third color would be the gutter space in between, either white, or clear.  The lines on the outside would have different colors, and/or different dotted or solid patterns.
    Example:
    Red 1pt
    White 1pt
    Green 1pt
    How would I create a Graphic Style of this type?

    535678,
    For a simple double line, you may use an Art Brush, for more complicated versions such as one full and one dashed, you may use a Pattern Brush.
    You may:
    1) Create a rectangle with a height corresponding to the first line thickness and an arbitrary length, or corresponding to one dash and one gap, and give it the first colour, no stroke;
    2) Move a copy straight down (or up) by the distance in between plus the first line thickness, and change the height if needed (setting the upper left Reference Point in the Transform palette/panel), and change the colour.
    Now you can define it as an Art Brush, or if you want the second line dotted:
    3) For the line to be dashed, reduce its length to the dash.
    Now you can define it as a Pattern Brush.

  • Need Help with creating Line Graph Chart

    I have the following XML Data
    <DATA>
    <PERCENT_ROW>
    <YEAR>2007</YEAR>
    <PERIOD>3</PERIOD>
    <MATERIAL_TYPE>C</MATERIAL_TYPE>
    <BRANCHDESC>Longview</BRANCHDESC>
    <LOCATION>30</LOCATION>
    <QUARTERDESC>Quarter 1</QUARTERDESC>
    <CURRPERIOD>Mar 2007</CURRPERIOD>
    <VALUECURRENTPERIOD>99.9</VALUECURRENTPERIOD>
    <QUARTERVALUE>100</QUARTERVALUE>
    <YTDVALUE>100</YTDVALUE>
    <STDCURRENTPERIOD>99.2</STDCURRENTPERIOD>
    <VARIANCE_STD>-.7</VARIANCE_STD>
    <VARIANCE_STD_PERCENT>-.7</VARIANCE_STD_PERCENT>
    <CURRENT_12MMA>99.97</CURRENT_12MMA>
    <PRIOR_12MMA>0</PRIOR_12MMA>
    <CURRPERSUB1>Feb 2007</CURRPERSUB1>
    <VALUECURRENTPERIODSUB1>100</VALUECURRENTPERIODSUB1>
    <CURRPERSUB2>Jan 2007</CURRPERSUB2>
    <VALUECURRENTPERIODSUB2>100</VALUECURRENTPERIODSUB2>
    <CURRPERSUB3>Dec 2006</CURRPERSUB3>
    <VALUECURRENTPERIODSUB3>0</VALUECURRENTPERIODSUB3>
    <CURRPERSUB4>Nov 2006</CURRPERSUB4>
    <VALUECURRENTPERIODSUB4>0</VALUECURRENTPERIODSUB4>
    <CURRPERSUB5>Oct 2006</CURRPERSUB5>
    <VALUECURRENTPERIODSUB5>0</VALUECURRENTPERIODSUB5>
    <CURRPERSUB6>Sep 2006</CURRPERSUB6>
    <VALUECURRENTPERIODSUB6>0</VALUECURRENTPERIODSUB6>
    <CURRPERSUB7>Aug 2006</CURRPERSUB7>
    <VALUECURRENTPERIODSUB7>0</VALUECURRENTPERIODSUB7>
    <CURRPERSUB8>Jul 2006</CURRPERSUB8>
    <VALUECURRENTPERIODSUB8>0</VALUECURRENTPERIODSUB8>
    <CURRPERSUB9>Jun 2006</CURRPERSUB9>
    <VALUECURRENTPERIODSUB9>0</VALUECURRENTPERIODSUB9>
    <CURRPERSUB10>May 2006</CURRPERSUB10>
    <VALUECURRENTPERIODSUB10>0</VALUECURRENTPERIODSUB10>
    <CURRPERSUB11>Apr 2006</CURRPERSUB11>
    <VALUECURRENTPERIODSUB11>0</VALUECURRENTPERIODSUB11>
    </PERCENT_ROW>
    <PERCENT_ROW>
    <YEAR>2007</YEAR>
    <PERIOD>3</PERIOD>
    <MATERIAL_TYPE>C</MATERIAL_TYPE>
    <BRANCHDESC>Oakland</BRANCHDESC>
    <LOCATION>31</LOCATION>
    <QUARTERDESC>Quarter 1</QUARTERDESC>
    <CURRPERIOD>Mar 2007</CURRPERIOD>
    <VALUECURRENTPERIOD>100</VALUECURRENTPERIOD>
    <QUARTERVALUE>100</QUARTERVALUE>
    <YTDVALUE>100</YTDVALUE>
    <STDCURRENTPERIOD>100</STDCURRENTPERIOD>
    <VARIANCE_STD>0</VARIANCE_STD>
    <VARIANCE_STD_PERCENT>0</VARIANCE_STD_PERCENT>
    <CURRENT_12MMA>100</CURRENT_12MMA>
    <PRIOR_12MMA>0</PRIOR_12MMA>
    <CURRPERSUB1>Feb 2007</CURRPERSUB1>
    <VALUECURRENTPERIODSUB1>100</VALUECURRENTPERIODSUB1>
    <CURRPERSUB2>Jan 2007</CURRPERSUB2>
    <VALUECURRENTPERIODSUB2>100</VALUECURRENTPERIODSUB2>
    <CURRPERSUB3>Dec 2006</CURRPERSUB3>
    <VALUECURRENTPERIODSUB3>0</VALUECURRENTPERIODSUB3>
    <CURRPERSUB4>Nov 2006</CURRPERSUB4>
    <VALUECURRENTPERIODSUB4>0</VALUECURRENTPERIODSUB4>
    <CURRPERSUB5>Oct 2006</CURRPERSUB5>
    <VALUECURRENTPERIODSUB5>0</VALUECURRENTPERIODSUB5>
    <CURRPERSUB6>Sep 2006</CURRPERSUB6>
    <VALUECURRENTPERIODSUB6>0</VALUECURRENTPERIODSUB6>
    <CURRPERSUB7>Aug 2006</CURRPERSUB7>
    <VALUECURRENTPERIODSUB7>0</VALUECURRENTPERIODSUB7>
    <CURRPERSUB8>Jul 2006</CURRPERSUB8>
    <VALUECURRENTPERIODSUB8>0</VALUECURRENTPERIODSUB8>
    <CURRPERSUB9>Jun 2006</CURRPERSUB9>
    <VALUECURRENTPERIODSUB9>0</VALUECURRENTPERIODSUB9>
    <CURRPERSUB10>May 2006</CURRPERSUB10>
    <VALUECURRENTPERIODSUB10>0</VALUECURRENTPERIODSUB10>
    <CURRPERSUB11>Apr 2006</CURRPERSUB11>
    <VALUECURRENTPERIODSUB11>0</VALUECURRENTPERIODSUB11>
    </PERCENT_ROW>
    <PERCENT_ROW>
    <YEAR>2007</YEAR>
    <PERIOD>3</PERIOD>
    <MATERIAL_TYPE>C</MATERIAL_TYPE>
    <BRANCHDESC>Seattle</BRANCHDESC>
    <LOCATION>32</LOCATION>
    <QUARTERDESC>Quarter 1</QUARTERDESC>
    <CURRPERIOD>Mar 2007</CURRPERIOD>
    <VALUECURRENTPERIOD>12.4</VALUECURRENTPERIOD>
    <QUARTERVALUE>18.7</QUARTERVALUE>
    <YTDVALUE>18.7</YTDVALUE>
    <STDCURRENTPERIOD>-2527.7</STDCURRENTPERIOD>
    <VARIANCE_STD>-2540.1</VARIANCE_STD>
    <VARIANCE_STD_PERCENT>100.5</VARIANCE_STD_PERCENT>
    <CURRENT_12MMA>18.7</CURRENT_12MMA>
    <PRIOR_12MMA>0</PRIOR_12MMA>
    <CURRPERSUB1>Feb 2007</CURRPERSUB1>
    <VALUECURRENTPERIODSUB1>37.2</VALUECURRENTPERIODSUB1>
    <CURRPERSUB2>Jan 2007</CURRPERSUB2>
    <VALUECURRENTPERIODSUB2>6.5</VALUECURRENTPERIODSUB2>
    <CURRPERSUB3>Dec 2006</CURRPERSUB3>
    <VALUECURRENTPERIODSUB3>0</VALUECURRENTPERIODSUB3>
    <CURRPERSUB4>Nov 2006</CURRPERSUB4>
    <VALUECURRENTPERIODSUB4>0</VALUECURRENTPERIODSUB4>
    <CURRPERSUB5>Oct 2006</CURRPERSUB5>
    <VALUECURRENTPERIODSUB5>0</VALUECURRENTPERIODSUB5>
    <CURRPERSUB6>Sep 2006</CURRPERSUB6>
    <VALUECURRENTPERIODSUB6>0</VALUECURRENTPERIODSUB6>
    <CURRPERSUB7>Aug 2006</CURRPERSUB7>
    <VALUECURRENTPERIODSUB7>0</VALUECURRENTPERIODSUB7>
    <CURRPERSUB8>Jul 2006</CURRPERSUB8>
    <VALUECURRENTPERIODSUB8>0</VALUECURRENTPERIODSUB8>
    <CURRPERSUB9>Jun 2006</CURRPERSUB9>
    <VALUECURRENTPERIODSUB9>0</VALUECURRENTPERIODSUB9>
    <CURRPERSUB10>May 2006</CURRPERSUB10>
    <VALUECURRENTPERIODSUB10>0</VALUECURRENTPERIODSUB10>
    <CURRPERSUB11>Apr 2006</CURRPERSUB11>
    <VALUECURRENTPERIODSUB11>0</VALUECURRENTPERIODSUB11>
    </PERCENT_ROW>
    <PERCENT_ROW>
    <YEAR>2007</YEAR>
    <PERIOD>3</PERIOD>
    <MATERIAL_TYPE>C</MATERIAL_TYPE>
    <BRANCHDESC>Yakima</BRANCHDESC>
    <LOCATION>33</LOCATION>
    <QUARTERDESC>Quarter 1</QUARTERDESC>
    <CURRPERIOD>Mar 2007</CURRPERIOD>
    <VALUECURRENTPERIOD>36.4</VALUECURRENTPERIOD>
    <QUARTERVALUE>68.2</QUARTERVALUE>
    <YTDVALUE>68.2</YTDVALUE>
    <STDCURRENTPERIOD>-5517.2</STDCURRENTPERIOD>
    <VARIANCE_STD>-5553.6</VARIANCE_STD>
    <VARIANCE_STD_PERCENT>100.7</VARIANCE_STD_PERCENT>
    <CURRENT_12MMA>68.17</CURRENT_12MMA>
    <PRIOR_12MMA>0</PRIOR_12MMA>
    <CURRPERSUB1>Feb 2007</CURRPERSUB1>
    <VALUECURRENTPERIODSUB1>68.6</VALUECURRENTPERIODSUB1>
    <CURRPERSUB2>Jan 2007</CURRPERSUB2>
    <VALUECURRENTPERIODSUB2>99.5</VALUECURRENTPERIODSUB2>
    <CURRPERSUB3>Dec 2006</CURRPERSUB3>
    <VALUECURRENTPERIODSUB3>0</VALUECURRENTPERIODSUB3>
    <CURRPERSUB4>Nov 2006</CURRPERSUB4>
    <VALUECURRENTPERIODSUB4>0</VALUECURRENTPERIODSUB4>
    <CURRPERSUB5>Oct 2006</CURRPERSUB5>
    <VALUECURRENTPERIODSUB5>0</VALUECURRENTPERIODSUB5>
    <CURRPERSUB6>Sep 2006</CURRPERSUB6>
    <VALUECURRENTPERIODSUB6>0</VALUECURRENTPERIODSUB6>
    <CURRPERSUB7>Aug 2006</CURRPERSUB7>
    <VALUECURRENTPERIODSUB7>0</VALUECURRENTPERIODSUB7>
    <CURRPERSUB8>Jul 2006</CURRPERSUB8>
    <VALUECURRENTPERIODSUB8>0</VALUECURRENTPERIODSUB8>
    <CURRPERSUB9>Jun 2006</CURRPERSUB9>
    <VALUECURRENTPERIODSUB9>0</VALUECURRENTPERIODSUB9>
    <CURRPERSUB10>May 2006</CURRPERSUB10>
    <VALUECURRENTPERIODSUB10>0</VALUECURRENTPERIODSUB10>
    <CURRPERSUB11>Apr 2006</CURRPERSUB11>
    <VALUECURRENTPERIODSUB11>0</VALUECURRENTPERIODSUB11>
    </PERCENT_ROW>
    <PERCENT_ROW>
    <YEAR>2007</YEAR>
    <PERIOD>3</PERIOD>
    <MATERIAL_TYPE>C</MATERIAL_TYPE>
    <BRANCHDESC>Twin Falls</BRANCHDESC>
    <LOCATION>34</LOCATION>
    <QUARTERDESC>Quarter 1</QUARTERDESC>
    <CURRPERIOD>Mar 2007</CURRPERIOD>
    <VALUECURRENTPERIOD>100</VALUECURRENTPERIOD>
    <QUARTERVALUE>99.8</QUARTERVALUE>
    <YTDVALUE>99.8</YTDVALUE>
    <STDCURRENTPERIOD>100</STDCURRENTPERIOD>
    <VARIANCE_STD>0</VARIANCE_STD>
    <VARIANCE_STD_PERCENT>0</VARIANCE_STD_PERCENT>
    <CURRENT_12MMA>99.8</CURRENT_12MMA>
    <PRIOR_12MMA>0</PRIOR_12MMA>
    <CURRPERSUB1>Feb 2007</CURRPERSUB1>
    <VALUECURRENTPERIODSUB1>99.4</VALUECURRENTPERIODSUB1>
    <CURRPERSUB2>Jan 2007</CURRPERSUB2>
    <VALUECURRENTPERIODSUB2>100</VALUECURRENTPERIODSUB2>
    <CURRPERSUB3>Dec 2006</CURRPERSUB3>
    <VALUECURRENTPERIODSUB3>0</VALUECURRENTPERIODSUB3>
    <CURRPERSUB4>Nov 2006</CURRPERSUB4>
    <VALUECURRENTPERIODSUB4>0</VALUECURRENTPERIODSUB4>
    <CURRPERSUB5>Oct 2006</CURRPERSUB5>
    <VALUECURRENTPERIODSUB5>0</VALUECURRENTPERIODSUB5>
    <CURRPERSUB6>Sep 2006</CURRPERSUB6>
    <VALUECURRENTPERIODSUB6>0</VALUECURRENTPERIODSUB6>
    <CURRPERSUB7>Aug 2006</CURRPERSUB7>
    <VALUECURRENTPERIODSUB7>0</VALUECURRENTPERIODSUB7>
    <CURRPERSUB8>Jul 2006</CURRPERSUB8>
    <VALUECURRENTPERIODSUB8>0</VALUECURRENTPERIODSUB8>
    <CURRPERSUB9>Jun 2006</CURRPERSUB9>
    <VALUECURRENTPERIODSUB9>0</VALUECURRENTPERIODSUB9>
    <CURRPERSUB10>May 2006</CURRPERSUB10>
    <VALUECURRENTPERIODSUB10>0</VALUECURRENTPERIODSUB10>
    <CURRPERSUB11>Apr 2006</CURRPERSUB11>
    <VALUECURRENTPERIODSUB11>0</VALUECURRENTPERIODSUB11>
    </PERCENT_ROW>
    <PERCENT_ROW>
    <YEAR>2007</YEAR>
    <PERIOD>3</PERIOD>
    <MATERIAL_TYPE>C</MATERIAL_TYPE>
    <BRANCHDESC>Spanish Fork</BRANCHDESC>
    <LOCATION>35</LOCATION>
    <QUARTERDESC>Quarter 1</QUARTERDESC>
    <CURRPERIOD>Mar 2007</CURRPERIOD>
    <VALUECURRENTPERIOD>7.7</VALUECURRENTPERIOD>
    <QUARTERVALUE>10.2</QUARTERVALUE>
    <YTDVALUE>10.2</YTDVALUE>
    <STDCURRENTPERIOD>-6016.2</STDCURRENTPERIOD>
    <VARIANCE_STD>-6023.9</VARIANCE_STD>
    <VARIANCE_STD_PERCENT>100.1</VARIANCE_STD_PERCENT>
    <CURRENT_12MMA>10.23</CURRENT_12MMA>
    <PRIOR_12MMA>0</PRIOR_12MMA>
    <CURRPERSUB1>Feb 2007</CURRPERSUB1>
    <VALUECURRENTPERIODSUB1>14.9</VALUECURRENTPERIODSUB1>
    <CURRPERSUB2>Jan 2007</CURRPERSUB2>
    <VALUECURRENTPERIODSUB2>8.1</VALUECURRENTPERIODSUB2>
    <CURRPERSUB3>Dec 2006</CURRPERSUB3>
    <VALUECURRENTPERIODSUB3>0</VALUECURRENTPERIODSUB3>
    <CURRPERSUB4>Nov 2006</CURRPERSUB4>
    <VALUECURRENTPERIODSUB4>0</VALUECURRENTPERIODSUB4>
    <CURRPERSUB5>Oct 2006</CURRPERSUB5>
    <VALUECURRENTPERIODSUB5>0</VALUECURRENTPERIODSUB5>
    <CURRPERSUB6>Sep 2006</CURRPERSUB6>
    <VALUECURRENTPERIODSUB6>0</VALUECURRENTPERIODSUB6>
    <CURRPERSUB7>Aug 2006</CURRPERSUB7>
    <VALUECURRENTPERIODSUB7>0</VALUECURRENTPERIODSUB7>
    <CURRPERSUB8>Jul 2006</CURRPERSUB8>
    <VALUECURRENTPERIODSUB8>0</VALUECURRENTPERIODSUB8>
    <CURRPERSUB9>Jun 2006</CURRPERSUB9>
    <VALUECURRENTPERIODSUB9>0</VALUECURRENTPERIODSUB9>
    <CURRPERSUB10>May 2006</CURRPERSUB10>
    <VALUECURRENTPERIODSUB10>0</VALUECURRENTPERIODSUB10>
    <CURRPERSUB11>Apr 2006</CURRPERSUB11>
    <VALUECURRENTPERIODSUB11>0</VALUECURRENTPERIODSUB11>
    </PERCENT_ROW>
    </DATA>
    Note that each Branch_Desc has 12 periods called CURRPERIOD,CURPERSUB1,CURPERSUB2 ...... and 12 values for those periods as VALUECURRENTPERIOD, VALUECURRENTPERIODSUB1, VALUECURRENTPERIODSUB2......
    I need to create a Line Graph for each Branch for the 12 periods as defined above where VALUECURRENTPERIOD, VALUECURRENTPERIODSUB1 etc. are the values for that period. The current BIPublisher Chart tool only allows one Value and One Label. In my case I have 12 VALUES (VALUECURRENTPERIOD etc.) and 12 LABELS (CURRPERIOD, CURPERSUB1 etc.). The SERIES or LEGEND should be the Branch Desc . So what I am looking for is to plot values(12 values) for 6 branches (so six lines) over a period of time (12 periods).

    Hi Tim,
    We have this XML data calculated from several tables where the layout was in the format of One account(a Branch in this case) and 12 periodic values for the same . So reformatting the XML is not going to be easy as the source data is like this itself. I tried un-pivioting the table (as this one is already pivoted) but it looks like Oracle doesn't support this feature yet, but is suported in DB2 or SQL. Please take a look at this link
    http://blogs.ittoolbox.com/database/technology/archives/unpivot-query-12798?close=true
    So I am stuck with the data in this format and users want a line graph for each branch over he period of time. May be somone on this forum can figure out how to un-pivot a table in Oracle. Thanks for your help in advance.

  • Creating multiple Line Graph having common values..

    Hi...
    I've created one application process for creating Multiple Line Graph.
    And i've integreted two tables in this graph, where values may be common for both the tables. In this case, for common values, instead of getting overlapped I'm getting scattered graph(its totally abnormal). Please help me if you 've any idea about this issue.....?
    Please go through the App Process and the output of the SQL query.
    In output of the query, in the NAME column "Feb-2010" is common.
    This is the SQL query OUTPUT:_
    TABLE 1
    NAME VALUE
    Sept-2009 100
    Oct-2009 95
    Nov-2009 98
    Feb-2010 97
    TABLE 2
    NAME VALUE
    Jan-2010 93
    Feb-2010 100
    Mar-2010 98
    Application Process :_
    DECLARE
    BEGIN
    OWA_UTIL.mime_header ('text/xml', FALSE);
    OWA_UTIL.http_header_close;
    HTP.p ('<?xml version = "1.0" encoding="utf-8" standalone = "yes"?>');
    HTP.p ('<anychart>');
    HTP.p ('<settings>');
    HTP.p ('<animation enabled="True"/>');
    HTP.p ('</settings>');
    HTP.p ('<charts>');
    HTP.p ('<chart plot_type="CategorizedVertical">');
    HTP.p ('<data_plot_settings default_series_type="Line">');
    HTP.p ('<line_series>');
    HTP.p ('<marker_settings>');
    HTP.p ('<marker type="None" />');
    HTP.p ('<states>');
    HTP.p ('<hover>');
    HTP.p ('<marker type="Diamond" />');
    HTP.p ('</hover>');
    HTP.p ('</states>');
    HTP.p ('</marker_settings>');
    HTP.p ('<tooltip_settings enabled="True">');
    HTP.p ('<format>Year {%Name}{enabled:false} {%SeriesName} - {%Value}{numDecimals:0}%</format>');
    HTP.p ('</tooltip_settings>');
    HTP.p ('<effects enabled="True">');
    HTP.p ('<drop_shadow enabled="False" />');
    HTP.p ('<bevel enabled="true" distance="1" blur_x="2" blur_y="2" />');
    HTP.p ('</effects>');
    HTP.p ('<line_style>');
    HTP.p ('<line thickness="3" /> ');
    HTP.p ('</line_style>');
    HTP.p ('</line_series>');
    HTP.p ('</data_plot_settings>');
    HTP.p ('<chart_settings>');
    HTP.p ('<title enabled="true">');
    HTP.p ('<text>Avg. %App. Uptime per month </text>');
    HTP.p ('</title>');
    HTP.p ('<axes>');
    HTP.p ('<y_axis>');
    HTP.p ('<title>');
    HTP.p ('<text>Value</text> ');
    HTP.p ('</title>');
    HTP.p ('<scale minimum="90" maximum="101" major_interval="1" />');
    HTP.p ('<labels>');
    HTP.p ('<format>${%Value}{numDecimals:0}</format>');
    HTP.p ('</labels>');
    HTP.p ('<axis_markers>');
    HTP.p ('</axis_markers>');
    HTP.p ('</y_axis>');
    HTP.p ('<x_axis tickmarks_placement="Center">');
    HTP.p ('<title enabled="False" /> ');
    HTP.p ('</x_axis>');
    HTP.p (' </axes>');
    HTP.p ('</chart_settings>');
    HTP.p ('<data>');
    FOR ObjRecord IN (select DISTINCT(K_OBJECT.OBJECT_ID) as OBJECT_ID,name from K_OBJECT, K_OBJ_TYPE_ASP_REL where K_OBJECT.OBJECT_ID=K_OBJ_TYPE_ASP_REL.OBJECT_ID and K_OBJ_TYPE_ASP_REL.OBJECT_TYPE_ID=1)
    LOOP
    HTP.p ('<series name="'|| ObjRecord.name ||'">');
    FOR MonthlyValueRecord IN (select NAME,VALUE
    from K_REPORT_RUN,K_ASPECT_VALUES,K_ASP_TIM_RPT_REL
    where K_REPORT_RUN.RUN_ID=K_ASP_TIM_RPT_REL.RUN_ID
    and
    K_ASPECT_VALUES.ASPECT_VALUE_ID=K_ASP_TIM_RPT_REL.ASPECT_VALUE_ID
    and
    K_ASP_TIM_RPT_REL.ASPECT_ID=1
    and
    K_ASP_TIM_RPT_REL.OBJECT_ID=ObjRecord.OBJECT_ID
    order by K_REPORT_RUN.STARTTIME)
    LOOP
    HTP.p ('<point name="'|| MonthlyValueRecord.name ||'" y="'|| MonthlyValueRecord.value ||'" />');
    END LOOP;
    HTP.p ('</series>');
    END LOOP;
    HTP.p ('</data>');
    HTP.p ('</chart>');
    HTP.p ('</charts>');
    HTP.p ('</anychart>');
    htmldb_application.g_unrecoverable_error := true;
    END;
    Edited by: user12873839 on Apr 9, 2010 3:58 AM
    Edited by: user12873839 on Apr 9, 2010 4:02 AM
    Edited by: user12873839 on Apr 9, 2010 8:00 AM

    >
    Help Needed Urgent.....
    >
    That is one surefire way to not get any help and certainly not urgently. I suggest that you amend the title of your post to something that reflects the actual issue. This will also help anyone with similar issues to find the thread.
    When posting code please put {noformat}{noformat} (with the curly brackets and the word code in lower case) above and below it to preserve formatting like this...
    {noformat}{noformat}
    SELECT *
    FROM emp
    {noformat}{noformat}
    This will be displayed on the forum like this...SELECT *
    FROM emp
    Cheers
    Ben                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

  • How do i  create a line graph and scatterplots graph in numbers?

    hi fellow mac users, i am taking a biology class and i have to create a graph, the only problem is i dont know where to begin. I would love your advice and ideas on how to do so.THE OTHER TYPES OF GRAPHS THAT I HAVE TO MAKE IS A LINE GRAPH     SCATTER PLOT    BAR GRAPH   AND    A  PIE CHART.  if yall could help me that would be great. (a list of steps will help me alot)

    HI izzie,
    As well as the link in Wayne's post, you can get the Numbers '09 User Guide through the Help menu in Numbers.
    Besides Chapter 7, which deals with your current question, I would strongly suggest reading at least the first four chapters of the guide for a good grounding in the basics of using Numbers.
    Regards,
    Barry

  • Creating Line Graphs in Portal

    Is it possible to create line graphs in Portal, I can create the bar graphs but they dont suit my needs.
    If not in Portal, are there any Oracle products that can create line graphs on data in a database?
    Thanks

    What about Oracle Graphics?
    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by Elliott Hamm:
    Is it possible to create line graphs in Portal, I can create the bar graphs but they dont suit my needs.
    If not in Portal, are there any Oracle products that can create line graphs on data in a database?
    Thanks<HR></BLOCKQUOTE>
    null

  • How do I create a line graph in numbers if my y values are in minute/second format?

    When I try clicking line graph, it shows me an empty graph.....no data on it.....just an x and y axis

    Convert your Duration values to numerical equivalent using DUR2MINUTES. Chart the values in the converted column, as shown:
    Chart 1: Result when cells containig duration values (column C) are selected and charted.
    Chart 2: Result for same type of chanrt with same rows of column D are selected.
    D2, and filled down: =DUR2MINUTES(C)
    Regards,
    Barry

Maybe you are looking for

  • Can I install Windows through an external hard-drive onto bootcamp?

    Is there any way for me to install Windows onto my mac by using an external harddrive that contains the install files to windows 7?

  • Upgrade from Windows 7 pro to windows 8.1?

    Hi all, I've just purchased a brand new Elitebook 840 G1 for work, but upon receiving and open the first time, I noticed it come along with Windows 7 pro preinstalled. Are there any case I could "upgrade" it back to the windows 8.1 version as origina

  • How to detect object being touched or not in kinect

    Dear all, i am new bie to kinect programming. i want to build application where camera can detect object touched or not.consider 3 object are placed on table like in set book ; remote & MOUSE . whenever object being picked i wanted to increment paric

  • My Macbook connects to Internet but won't open webpage

    Thanks in advance for reading this. My Macbook shows various Airport connections but hasn't worked for a while unless it is directly plugged into my modem. I just set up a new modem and connect via Airport. The Airport signal shows that it is strong

  • How to reconcile deleted users with GTC

    Hi all, I'm wandering wich is the best approach to perform reconciliation of deleted users using GTC connector. (It doesn't concile it by default, does it?). I don't know if it's a bad idea to mark the deletion in the target table row (setting a valu