Damaged material adjustment posting

Your help is required for the following scenario.
Material received from the foreign vendor against import PO.
Total qty is entered in SAP through MIGO posting with movement type 101.
Partial qty damaged received which are to be settled by the insurance as per
agreement and damaged material not to be send back to the supplier.
If we adjust it through MIGO with movement type 122 (Return delivery to vendor)
that changes the PO status and shows PO open for the qty that has been rejected and settled against insurance claim.
PO should be closed manually or other way for rejected material posting that does
not reopen the PO.
Your suggestion is required.

hi
please check below thread
Insurance document at the time of GR?
regards
vijay
Edited by: vijju489 on Aug 24, 2010 12:18 PM

Similar Messages

  • How to track cost of damaged material reparied at workshop

    Hi Pm gurus
    My scenario is :
    Material is damaged and replaced at site with new one from stores and Damaged material is send to workshop to repair.
    After repairing then we have to send the material back to stores from the workshop and stock it in stores for future.
    Please help me out what steps should I use to capture it in SAP
    Regards
    Ek

    Dear,
    You are saying, Damaged material.Hope its not  an equipment.If it is a spare part that you would like to reuse, then it is having impact on moving average price of that material while updating stock in INVENTORY.
    If you are considering the material as a sub asset of that equipment, then you need to valuate the useful life of that material and the depreciation value.
    In standard SAP , the simple way of returning to stores for maintenance department is through maintenance order by putting the qty. with negative sign. for example "-2" Nos.If you post the goods issue of the maintenance order , system updates the stock.But I donot suggest this procedure for used material because of impact on MOVING AVERAGE PRICE.
    If you are using split valuation, situation would be different and you can opt this process as "repaired" material valuation type.Then you can have option to trace the cost of the material at workshop through maintenance orders.
    If you want to reuse the equipment and after overhauling at work shop, its better to be processed through REFURBISHMENT process.
    Regards,
    Pardhu

  • CIN: How to check the material document posted without excise invoice

    Hi Guru,
    Please advise how to check the material document posted without excise invoice.
    I have tried tcode J1I7 but it seems start to collect the excise invoice first and then material document.
    But my case is to find the material document WITHOUT excise invoice for internal tracking purpose.
    At the moment we start from tcode MB51 to get the list of material document and check in J_1IEXCHDR / J_1IEXCDTL
    Best regards,
    Pakorn

    Hi,
    Try creating a Query in Tcode SQVI by combining tables MKPF and J_1IEXCHDR/J_1IEXCDTL for your requirement.
    Check these threads how to create Query.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/6018c1ae-8c44-2d10-6ea9-c3fad2c82880?QuickLink=index&…
    http://ptgmedia.pearsoncmg.com/images/9780672329029/samplechapter/0672329026_CH03.pdf
    Regards
    Binoy

  • Cost object for raw material consumption posting

    the raw material cosumption posting is done in the background when the goods issue is done. so where do we assign cost object for the primary cost element of raw material consumption account. since we create primary cost element for raw material consumption account, it will expect us to give cost object, so where we assign cost object for the raw material consumption cost element

    hi
    since the raw material cost is relevent for cost accounting u need to maintain primary cost elment accounts.When ever u confirm goods, the rm issue will take place automatically and will be debited to either product cost collector or production order. so u need not to assign any cost object for these consumption accounts why bcoz issues will take palce aganist a production order or product cost collector which is a cost object .
    regards
    siva

  • Closing/Opening Material Master Posting Periods

    The instance is ECC 6.0
    Can we roll back the material master posting period. We had some issue that the material master was rolled over by 2-3 periods accidentally which is corrected now.
    OSS note 1082841 was applied so the periods can not be rolled over going forward. Now was going to some testing, but not sure if the problem is corrected or not and wanted to know what is the way to roll back the period if it is rolled over.

    Dear Pete
    Please check this thread with similar kind of issue :
    Change Current Period In Material Master
    Urgernt - Change Current Period
    Regards
    JH

  • Customer Credit Balance Adjustment Posting to Different GL without Ageing

    SAP Gurus,
    Our client uses SAP 4.7 - AP and AR functionality.  Currently there are various Customers (AR) that are having Credit Balances.  The requirement is that at Balance Sheet Date the entire set of Customer Credit Balances must be culled out and a posting must be made by showing these balances on GL Account that is part of Liability.  Currently Reconcialiation Account is showing Credit balance and the same is not acceptable.  The client team is manually passing entries to push the credit balance to different GL.
    We tried with regrouping of balances thru F101, however, it works only on Ageing of the line items.  This is not the requirement.
    Irrespective of ageing of the Credit Line Items on AR, the system must capture all line items of such nature with credit balances and hit a different Adjustment GL.  This adjustment posting must be auto reversed on first day of subsequent period.
    Requesting help.

    Hi,
       You will need to do it via a User exit in the Validation.
      Get the current Account Balance from Table GLT0   (add up the values of the HSLxx columns).
       Compare this to the amount now being posted and return True/False as required.
       Kind regards

  • Adjustment posting

    Hello,
    What is adjustment posting?
    Thanks

    Hi, guy
    Actual adjustment posting is a way to correct you mistake, or adjustment some cost to actual cost object.
    BR
    Thanks

  • BAPI/FM for change Material Document Posting date

    Hi Experts,
    Is there any BAPI/FM for change a material document posting date.
    Its urgnt.

    Hi You can check the source code of MB02.
    i doubt whether you can change the date , hope so you have to reverse the document asd post it again.
    check & use MB_CHANGE_DOCUMENT at your own risk.

  • Material to Material transfer posting

    Hi
    Any one used this SAP functionality in your client projects. please let me know for what type of materials it has been used
    Raju

    Hi, Raju Potnuru,
    I will assist you on this,
    If a material changes over time in such a way that it no longer corresponds to the features defined in the material master record, but to the features of a different material number, you have to carry out a transfer posting from material to material. This is often the case in the chemical and pharmaceuticals industry, for example.
    A transfer posting from material to material results in the transferred quantity being managed under a different material number. A material master record must already exist for the receiving material.
    In order to carry out a transfer posting from material to material both materials must be managed in the same stockkeeping unit.
    Such a transfer posting is always carried out in one step and without advance planning. The posting can only be carried out from the unrestricted-use stock of the issuing material into the unrestricted-use stock of the receiving material.
    To enter a transfer posting from material to material, proceed as follows:
    From the Inventory Management menu, select Goods movement ® Transfer posting.
    Enter the data on the initial screen:
    Enter the header data.
    Select the movement type Transfer posting ® Material to material.
    Maintain the data on the collective entry screen:
    Enter the number of the receiving material. Enter a plant and a storage location only if you simultaneously want to post the stock to another plant or storage location. If the receiving material is handled in batches, the system prompts you to enter a batch.
    Enter the items. For each item, you can still change the plant and the issuing storage location.
    Check the data on the overview screen and post the document.
    The transferred quantity is deducted from unrestricted-use stock of the issuing material and posted into unrestricted-use stock of the receiving material.
    For every item you enter, two material document items are created:
    an item for the issuing material
    an item for the receiving material
    Parallel to the material document, an accounting document is created. The issuing material master record determines the value of the transfer posting.
    use 309 movement type for the meterial transfer posting.
    If you need anything else, contact me, I am here to assist you. 
    Regards,
    Sri

  • Damage Material at Subcontractor

    Hi,
    There is scenario in case of Subcontracting PO.
    I have created subcontracting PO having parent material with 1 Qty.
    Child parts issued to vendor in a bulk it can be 1000 qty or more.
    Subcontractor Process the materials he required 100 child parts to create the 1 parent material.
    now while subcontracting he damages the 10 qty out of 100 and he is responsible for these 10 damage items.
    how the damage materials can be treated in the system.

    Initially I have issued 100 Qty to vendor he damages the 10 and then more 10 Qty issued to him, now total Qty has been provided to subcontractor is 110.
    Goods Receipt will be posted with 100 Qty.
    and for 10 (Damage Qty) credit memo will be posted.
    but 10 qty (which was issued later) still have status "Stock provided to Vendor" because GR is posted only for 100 Qty so how it will be adjusted in the system. either physical inventory or any other way ?

  • Delivery number for a material document posted

    Hi experts,
    I need to delivery number for the material document number posted,
    I tried to use the field XBLNR from the table MKPF
    but i see that the feild is empty in the case of inbound delivery
    why is it so.
    How ever i can get the data from VBFA ,but can any one tell me the reason why XBLNR is empty in case of inbound delivery.
    Thanks a lot in Advance.

    Hi,
    If you do GR w.r.t. Inbound Delivery No in MIGO then it will not update "Reference" field i.e. XBLNR.
    To update same with Inbound Delivery No, you have to do "Post Goods Receipt" from Inbound Delivery Document itself in VL31N or VL32N.

  • Material consumption posting date before MIGO

    Hi,
    I have one issue related to Material Consumption....
    If material received and posted on 25.12.2011 then how come system is allowing to consume ( Mtype 261) on 12.12.2011.  As material stock on 12.12.2011 is Zero.  We have not allowed Negative Stock Posting for Plant or in Material.
    We are consuming material for Production Order with in CO11N with Mtype 261.  Material phisically received on 12.12.2011 and we used it but due to some problem we are not able to do MIGO.  Now problem solved and MIGO posted on 25.12.2011, so we entered confirmation of production order with posting date 12.12.2011 and system is allowed to consume the material and now account reports shows nigetive values on 12.12.2011.
    can anybody focus on this issue......

    SAP checks only if there is enough stock in the period (month) not at a certain day (for performance reasons)
    Dont blame SAP, Why has your user posted the goods issue with an earlier date?
    Usually they do it because it was the date the goods issue happened physically, I have rarely seen users that user changing posting dates to fraud the system.
    was the GR eventually posted with  a wrong date?

  • UOM group error while material document posted throgh BDC( MB01)

    Hi All,
    we are facing issue while posting material through MB0-goods reciept
    error "UOM group not maintaineed for 'XXXXX" material" for some line items,
    and i have checked in material master data, UOM group not maintained for some material,
    even after maintaind UOM group for those material's still we are facing same problem,
    as i checked in BDC code there is no validation for UOM group,
    if we posted same PO manual, document posted successfull,
    please suggest me.....why this error message coming eventhogh UOM group mainted?
    Regards,
    Suresh.D

    check this link:
    Updating Function module for Material master (UoM)
    BAPI for MIGO
    cheers
    Aveek

  • BAPI_GOODSMVT_CREATE Material Document Posting against Process Order

    Dear Experts,
                        I want to post more than one documents from BAPI "BAPI_GOODSMVT_CREATE". It is working fine for GR(gmcode = 02) 101 Mvt. type. But the problem is that when there is a GI (gmcode = 03), serial numbers document comes; it display an error as " Content of order 1000400: 40000134 transferred to interface (IMSEG)".
    My Question is that: Is this a correct BAPI for serial numbers assigned materials, OR I should use another bapi for these serial number materials.
    Will you please let me know the name of the BAPI which I should use in this regards.
    ***** I am using BAPI_GOODSMVT_CREATE as follows for Process Orders:::::
        CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
          EXPORTING
            goodsmvt_header               = gmhead
            goodsmvt_code                 = gmcode
    *   TESTRUN                       = ' '
    *   GOODSMVT_REF_EWM              =
    * IMPORTING
    *   GOODSMVT_HEADRET              =
    *   MATERIALDOCUMENT              =
    *   MATDOCUMENTYEAR               =
          TABLES
            goodsmvt_item                 = fitab "bapi_itab
            goodsmvt_serialnumber         = itab_serials
            return                        = errmsg
    *   GOODSMVT_SERV_PART_DATA       =
    *   EXTENSIONIN                   =
    Thanks,
    Sohail

    The function is intended to create a single document , Here is an excerpt from the FM documentation :
    Functionality
    You can use this method to create a material document for a goods movement.
    You can only create one material document each time you call up the method.
    You can use a simulation function before posting the goods movement to check how the data is updated in the database. The standard system is configured so that the goods movement is posted immediately, without prior simulation.

  • Material Document (Post goods receipt) for each Tranfer order in Inbound De

    Hello All,
    We have following the below process for goods receipt.
    1. Create Purchase order.
    2. Create Inbound Delivery.
    3.Create Transfer order for each line item in  Inbound Delivery
    4. Confirm tranfers orders.
    5. Post goods receipt will automatically takes place after last Transfer order confirmation for that delivery.
    So, in the above scenario the Inventory is not available in the IM till last transfer order is confirmed.
    So, is it  possible to create a Material Document at each transfer order confirmation and post IM inventory , instead of waiting till last transfer order is confirmed.
    please advice.
    Thank you
    T Reddy .

    Hello Aktar,
    Yes With standard SAP we can post  goods receipt either before using MIGO and after using VL32N.
    In our scenario we are using Inbound Delivery.
    So , with using Inbound delivery we are posting goods receipt after  last TO confirmation.
    But In our client they may take 2 days to puyawat all the items of an Inbound Delivery.So they do not want to wait till 2 days for the IM posting.
    ie in SAP WM as soon as Inbound delivery is created it creates negative stock in 902 and once all the transfer order are confirmed and then post goods receipt takes place and 902 is cleared.
    So, we are slitting the TO at delivery line item level and creating separate TO for each line item in a delivery.
    So, I am wondering whether is there a way so as soon as first TO is confirmed WM stock updates and IM stock also should also update with same amount with a material docuement.
    ie TO by TO IM posting should take place and at Last TO post goods receipt should happen at delivery level.
    Please advice.
    Thank you
    T Reddy.