Database upgradation post steps

After completion of upgradation we got some objects Invalid dba_registry.How to troubleshoot this issue.
If u we got invalid objects then we run utlrp.sql . we got in registry how to resolve this issue.
Please help me.

Hi;
i am upgradting 10.2.0.4 to 11.1.0.1. while upgrading whether we need check any OS requirements or database requirements?Oracle 11g and 10g (or we can say each new version) need to work wiht some settings, thatswhy you need to check installation guide and also below notes and need to make those adjustments like kernel settings, rmp needs etc..
Oracle Database on Unix AIX,HP-UX,Linux,Mac OS X,Solaris,Tru64 Unix Operating Systems Installation and Configuration Requirements Quick Reference (8.0.5 to 11.2) [ID 169706.1]
After upgradation , if i got any invalid status in dba_registry. How to make it valid staus?It depends what objects are invalid, if you have invalid objects you need to check first what objects are invalid, than you need to make some search. For instance you may hit some package are invalid than you need to search on metalink abotu some notes like below:
Select From Dba_registry Shows Packages & Types Invalid [ID 579002.1]
Regard
Helios

Similar Messages

  • Backup  oracle database - pre post steps

    I want to do cold backup of 10g database. Do I need to shutdown Oracle Application server and listeners before doing cold backup and start them again after backup done.

    for taking cold backup then its better to shutdown the apps server as well
    database.I would recommend to you whenver you are going to take cold
    backup for db then its better for you to take apps cold backup too if
    the cold backup goes after you applied any patch ,within E-Biz tech the
    patch activity affect apps files too.
    Khurram

  • SLA Pre-Upgrade program - Post steps

    Dear All,
    We upgrade our oracle applications to R12.1.3 from 11.5.10.2. Before upgrade, we applied the patch patch 5233248 and ran the concurrent program with the below values
    Migrate all sets of books: Yes
    Start Date: “01/01/1976”: Jan-76
    End Date : (Left Blank)
    The above concurrent in 11i insance took only 1 minute. Is this normal ?. There are many steps mentioned in the document R12.0 and R12.1: FAQ for the SLA Upgrade: SLA Pre-Upgrade, Post-Upgrade, and Hot Patch [ID 604893.1] .
    Since I already mentioned to upgrade all GL during the upgrade process itself by mentioning the above parameters in the concurrent program. Do I have to still do anything on this regard after the upgrade
    Please advise

    936074 wrote:
    Thanks Hussein. the pre upgrade program ran only for 1 minute. is this normal ?It should take more time. Please query GL_PERIOD_STATUSES table to verify.
    Thanks,
    Hussein

  • E-Business suite 11i database upgrade

    Hi,
    Iam in middle of 11i E-Business database upgradation (10.2.0.3 to 11.1.0.7) on solaris, Iam following the steps as per document [ID 452783.1]. In point no 13, I got stuck with in applying patch 7486407 on 11.1.0 oracle home, After applying opatch the post-install steps of this patch in readme are
    Startup the Oracle Services.
    > sqlplus '/ as sysdba'
    > spool post_install.log
    > @?/rdbms/admin/prvtaw.plb
    > @?/rdbms/admin/prvtawex.plb
    > spool off
    My question is i have no instance yet to 11g Oracle home, as i have installed 11.1.0.6 base release and installed 11.1.0.7 patch set release in 11.1.0.6 oracle home. All I have ready for now is old database 10.2.0.3(needed to be upgraded) and just 11g oracle home (just software).
    From the above patch post install steps how could i run above scripts without any instance connected to 11g?
    Please help me out as very urgent!
    thanks in advance

    Hi,
    I cannot start the database in 11g oracle home inorder to run the scripts for this particuar patch as no database is created, its just the software i have installed yet.
    I got stuck with step no 13 as per the document http://ID 452783.1.
    In step 13, Applying the following 11.1.0.7 patches in 11g oracle home. I have applied all the patches except patch 7486407. In this patch readme it says after applying with opatch i need to run the scripts by starting the database of 11g (how could it be possible to run the scripts without a database which i have not created a database yet as per the document i have followed all the steps from 1 to 12 and all i have done is installation of 11.1.0.6 base release(JUST SOFTWARE) and installed patchset 11.1.0.7 on top of 11.1.0.6 oracle home. please help me out from this point.
    Regards
    Edited by: rakhi on Nov 22, 2009 7:20 AM
    Edited by: rakhi on Nov 22, 2009 7:33 AM

  • Additional Patch R12 database upgrade

    Hi,
    I am upgrading my ebs db 10.2.0.4 to 11.2.0.3.
    Please suggest the way to approach for additional patch ->13001379
    a)I hv unziped patch
    b)In README, -> Prerequisites -> 7. cp kutable.xsl rdbms/xml/xsl/.
    As per the readme my understanding is - > I hv to copy the file from dir: /13001379/files/rdbms/xml/xsl/kutable.xsl to $ORACLE11g_HOME/rdbms/xml/xsl/ (file already here->update the file)
    Then do -> opatch apply
    Post step: Will happen during database upgrade
    c)If I am wrong, please correct me.
    Thanks,
    Salim

    a)I hv unziped patch
    b)In README, -> Prerequisites -> 7. cp kutable.xsl rdbms/xml/xsl/.
    As per the readme my understanding is - > I hv to copy the file from dir: /13001379/files/rdbms/xml/xsl/kutable.xsl to $ORACLE11g_HOME/rdbms/xml/xsl/
    Then do -> opatch apply
    Post step: Will happen during database upgrade
    c)If I am wrong, please correct me.Correct except for post installation which you have to do after the upgrade (Step 15. Perform patch post-install instructions).
    Thanks,
    Hussein

  • Question from database upgrade thread

    Hello ,
    I raised one question regardling database upgrade in the database upgrade thread ...but till no good responce .
    So,i am posting that question here also ..
    The qusetion link is below ...
    Database upgrade confusion
    any idea ..

    oradba11 wrote:
    Hello,
    Yes, my database version is 9.2.0.4 and i want to upgrade it to 10.2.0.4 on Linux ...
    As per my knowledge ... in upgradtion process there are 2 steps .In 1 step will upgrade ORACLE_HOME by applying
    patchset to it . In 2 step we will upgrade database by usgin DBUA ..
    is this correct... ? Yes ..
    if then how to do the 1 step .. ? Please follow
    1. Install 10.2.0.1.0 software
    The software can be downloaded from the following link :
    http://www.oracle.com/technology/software/products/database/index.html
    2. Install the 10.2.0.4.0 patchset on top of 10.2.0.1.0 oracle Home
    Patchset number is : 6810189
    Patch 6810189
    The minimum version required to upgrade to 10.2.X.X.X is 9.2.0.4.0
    Note 551141.1 : Database Server Upgrade/Downgrade Compatibility Matrix
    If your oracle database is of a lower version than 9.2.0.4.0 , then Upgrade the database to 9.2.0.4.0 first.
    3. Upgrade the database to 10.2.0.4.0
    Note 419550.1 : Different Upgrade Methods For Upgrading Your Database
    Note 316889.1 Complete checklist for manual upgrades to 10gR2
    Regards
    Rajesh

  • Database upgrades fails

    Platform: SQL Server 2008
    Running P6 R7 SP5
    When trying to upgrade the database to R8, database upgrades fails without any error message.
    I just ran the dbsetup.bat and filled the "connection information" then press next and I got the "finish" screen directly without the "Ready to begin upgrading data" or "Primavera database setup wizard" and when check I found that no upgrade has been done.
    please assest.

    Thanks Alex for reply,
    I've tried the above steps and I got the same action.
    I can't see any strange in the console logging.
    console logging_____________________________________________________________
    DEV [INFO] : Look and feel is com.sun.java.swing.plaf.windows.WindowsLookAndFeel
    DEV [INFO] : Setting job property unicode ->
    DEV [INFO] : TRANSITION: operation_pm -> connect_upgrade_ss
    DEV [INFO] : Calling operator SetProductSuiteTransOp
    DEV [INFO] : Setting job property PRODUCT.SUITE.KEY -> PM
    DEV [INFO] : Calling operator SetProductSuiteTransOp
    DEV [INFO] : Setting job property PRODUCT.SUITE.KEY -> PM
    DEV [INFO] : Calling operator SetActionTypeTransOp
    DEV [INFO] : Setting job property ACTION.TYPE.KEY -> UPGRADE
    DEV [INFO] : Calling operator SetServerTypeTransOp
    DEV [INFO] : Setting job property SERVER.TYPE.KEY -> SQLSERVER
    DEV [INFO] : Setting job property PRIVILEGED.USER.NAME.KEY -> PRIVUSER
    DEV [INFO] : Setting job property PUBLIC.USER.NAME.KEY -> PUBUSER
    DEV [INFO] : Calling operator SetLicenseTypeTransOp
    DEV [INFO] : Setting job property LICNESE.KEY.TYPE -> MK
    DEV [INFO] : Setting job property lictype -> _mk
    DEV [INFO] : Calling initializer SetHostnameToCurrentMachine
    DEV [INFO] : Calling page post processor SetSqlServerConnectStringTransOp
    DEV [INFO] : Connection for class ADMINISTRATIVE in page (connect_upgrade_ss) fr
    om page (connect_upgrade_ss) = sa/sa@sqlserver:servername:1433:PMDB
    DEV [INFO] : Calling page post processor SetSSUpgradeSchemaType
    DEV [INFO] : Setting job property PRODUCT.UPGRADE.KEY -> PM
    DEV [INFO] : Calling page post processor SetSSUpgradeVersionFileString
    DEV [INFO] : Setting job property PM.PRODUCT.KEY -> PM
    DEV [INFO] : Setting job property EXP.SCHEMA.NAME.STRING.KEY -> PM
    DEV [INFO] : Setting job property SCHEMA.INFO.LIST.KEY -> [PM_08_00_00]
    DEV [INFO] : Setting job property PRODUCT.INSTALLED.VERSION.KEY -> 0700.0001.000
    1.0003
    DEV [INFO] : Calling page post processor SetSSUpgradeExpUseUnicode
    DEV [INFO] : Calling page post processor SetPMUpgradeSchemaInfoListTransOp
    DEV [INFO] : Setting job property PM.PRODUCT.KEY -> PM
    DEV [INFO] : Setting job property SCHEMA.INFO.LIST.KEY -> [PM_08_00_00, null]
    DEV [INFO] : Calling page post processor SetUpgradeNeedsWebUserOptionsPage
    DEV [INFO] : TRANSITION: connect_upgrade_ss -> finish
    DEV [INFO] : Calling initializer AddTextToDataInitialize
    DEV [INFO] : Setting job property unicode ->

  • Forms HOST command no longer works after database upgrade from 10g to 11g

    Hi,
    After upgrading the database 10g to 11g the forms HOST command no longer works on Unix server. The form used to work fine prior the upgrade. I read all the threads I could find and did not see any solutions. Adding PATH and LD_LIBRARY_PATH does not work because it does not even run a basic shell script. (I saw this solution, adding PATH and LD_LIBRARY_PATH, in many questions / threads).
    1. I wouldn't expect the database upgrade to be an issue, but it is the only change we had.
    2. Note, 11g is Oracle Fusion Middleware which is quite a bit different than 10g.
    I even tried the most basic commands like "echo" which is a build-in Unix command and there is no directory for it (ie. no /usr/bin - so variable PATH is irrelvent). i.e HOST('echo hi'); and HOST('echo "hi" '); and even HOST ('echo hi > /my_file.txt'); all returns FORMS_FAILURE (actually the if is IF FORM_SUCCESS THEN ... else ... and the else part always runs now - whereas it didn't before.).
    Or basic commands like /usr/bin/ls as in HOST(/usr/bin/ls). At that point I was just testing the Unix command would return FORM_SUCCESS even though I could not see the results (because they weren't writing to a log file). Notice that I'm using the direct path /usr/bin so no Unix environment variables were needed.
    The form does use webutil but that part works. For example, we have webutil_file_transfer( ....) The file shows up on the application server and in the expected directory.
    Here's the main goal. Upload a file from clients local PC to the datebase server. The form uploads the file to the Application server, then we have a Unix script to scp (secure copy) the file from the application server to the database server. IF webutil, or any other Oracle functions could put the file on the database server that would be better. But, I don't know of any procedures that do that - or would have done it cleanly (i.e. storing to database and write back to server and then using a blob etc. )
    Anyway, I was hoping someone would help with either of these.
    1) Get the HOST command to work. - If we can get that to work then I wouldn't need any more help. We can just call the already existing Unix script to copy the file from the application server to the database.
    2) OR be able to upload directly to the database server - wanted to do that originally
    Any help would be appreciated

    Solution for those interested and for anyone else searching this forum for a solution
    I found this on My Oracle Support:
    <h3>Host Command from Forms Not Working in 11g in Sun Solaris Sparc OS [ID 1157346.1]</h3>
    Applies To: Oracle Forms - Version 11.1.1.1.0 and later
    Sun SPARC Sun OS
    Symptoms:
    When trying to execute a Shell script or any OS command using the host() Built-in from Forms 11g, the host()command is not getting executed. The same functionality works on other operating systems and in previous versions like 10gR2.
    Steps to be followed:
    1) Take a backup and edit the $DOMAIN_HOME/config/fmwconfig/servers/WLS_FORMS/applications/formsapp_11.1.1/config/default.env or any custom environment file.
    2) Locate the following environment variable:
    LD_PRELOAD=/ora10gas/app/11.1.0/Middleware/as_1/jdk/jre/lib/sparcv9/libjsig.so
    3) Comment out this variable. After the changes, it will look like the following:
    #LD_PRELOAD=/ora10gas/app/11.1.0/Middleware/as_1/jdk/jre/lib/sparcv9/libjsig.so
    3) a) Instead of LD_PRELOAD, kindly use LD_PRELOAD_64 as given below :
    LD_PRELOAD_64=/ora10gas/app/11.1.0/Middleware/as_1/jdk/jre/lib/sparcv9/libjsig.so
    (This makes HOST AND RUN_REPORT_OBJECT work fine).
    4) Save the file and execute your forms. The Host() built-in will work as expected
    The LD_PRELOAD setting in default.env is only required for the working of signal chaining facility in JVM version 1.5 and later. If you are not using theSignal chaining facility, this variable is not required. For more information, refer to the following documentation
    http://download.oracle.com/docs/cd/E14571_01/doc.1111/e14772/forms.htm#CJAJGAFF

  • Oracle Database upgrade to 11G (Host_Command Issues)

    Sorry I'm posting this again. Original post in Database - Upgrade. I'm not getting a lot of clicks in that category
    We recently upgraded to Oracle 11g (Oracle Database 11g Enterprise Edition Release 11.2.0.2.0 - 64bit Production). Our PL/SQL release: (PL/SQL Release 11.2.0.2.0 - Production). We use a lot of host commands inside our PL/SQL stored procedures. One of these included fetching data from an external server and pushing the data into Oracle Tables.
    Most of this process is running fine, except the execution never completes. There is no issue data wise. It's just that the Host_command doesn't receive the completion status and seems to be running even though there's nothing going on in the background.
    The Oracle e-business suite's concurrent program based on this stored proc also never completes, though it doesn't do anything in the background. For testing purpose, our DBA used 2 insert statements one before and one after the host_command. The insert before the host_command worked but not the one after. Please help! This is happening after we upgraded to 11g 3 weeks ago!
    Thanks, Naveen Gagadam.

    Pl do not post duplicates - Upgrade to 11g, Host Command Inside Stored Proc doesn't end.
    I have moved your duplicate post to the EBS forums
    Srini

  • 11.5.10.2 12.1.1 and 10g 11g database upgrade at same time

    I have just started an 11.5.10.2 > 12.1.1 upgrade and have created a project in MWIZ 2.15 for it.
    I would also like to upgrade the 10.2.0.2 database to 11.1.0.7 as part of the same upgrade and create an MWIZ project for that.
    I have a couple of questions that the MWIZ FAQ does not address:
    1. At what point in the 11.5.10.2 > 12.1.1 upgrade should I do the database upgrade?
    MWIZ has two points when it can be done based on apps/database versions. One is at the end of the 'Prep for Upgrade' category and the other is during the 'Upg to Rel 12.1.1' category. The MWIZ step notes cover upgrading to the latest 10g or 11g patch version but not upgrading from 10g to 11g so I am unsure which category to go for.
    2. When I create the database upgrade project which 'Destination Version' should I choose?
    The two options are 'RDBMS 11.1 and E-Business Suite 11.5' and 'RDBMS 11.1 and E-Business Suite 12'.
    As I haven't upgraded to R12 yet and am still at the pre-upgrade stage should I pick 11.5? Or should I go with R12 because I am upgrading Apps and the database at the same time?
    Any help and advice gratefully received.
    Thanks

    Answer to above question not required now as:
    Having read the 24th December update of note 761570.1 - 'Database Preparation Guidelines for an Oracle E-Business Suite Release 12.1.1 Upgrade' I have decided to upgrade the database to 11.2.0.x by following the Path C option.
    Unfortunately as the 11.2.0.x upgrade isn't covered by MWIZ yet I will have to follow the manual steps.

  • Testing while doing the database upgrade from 9.2.0.6 to 11.2.0.2 apps ?

    Dear Experts,
    Please note that we are in process of doing database upgrade from 9.2.0.6 to 11.2.0.2 ?
    We have gone through the interoperablity note id for 11i 11gr2 ?
    Step 1
    upgrading the database from 9.2.0.6 to 9.2.0.8 ?
    Step 2-
    Upgrading the Forms patchset to 19 ?
    Step-3
    Applying the Rollup-6 patch ?
    Step -4
    Upgrading the database from 9.2.0.8 to 11.2.0.2 ?
    We would like to know whether after each step do we have to do any kind of testing on the Oracle Application Instance and the database?
    Please advise.
    Regards
    Mohammed.

    We would like to know whether after each step do we have to do any kind of testing on the Oracle Application Instance and the database?There is no such a list. However, you can refer to the documents referenced in each task above and it should cover if any testing need to be done or not (for example, the Developer Patchset doc). For the rest of the docs you will have to do your regular testing (test the application/database and make sure it is working properly).
    Also, make sure you review (Known issues on Top of 11i.ATG_PF.H. delta.6 (RUP6) - 5903765 [ID 459353.1]).
    ATG RUP 7 is the latest 11i.ATG_PF patch.
    About Oracle Applications Technology 11i.ATG_PF.H.delta.7 (RUP 7) [ID 783600.1]
    Known Issues On Top of 11i.ATG_PF.H.delta.7 (RUP7) - 6241631 [ID 858801.1]
    Thanks,
    Hussein

  • How can I determine what sites are being referenced within Central Admin Upgrade and Migration Manage Databases Upgrade Status?

    When I go to Central Admin > Upgrade and Migration  > Manage Databases Upgrade Status, I have 2 content databases which have the status:
    Database is up to date, but some sites are not completely upgraded.
    How can I determine which sites are not completely upgraded?

    Manage Databases Upgrade Status will provide you all active and offline DB details, you can get same result
    using below PowerShell cmdlet.
    Get-SPDatabase and Get-SPContentDatabase will provide all active database/Content DB in Farm which include Service application db, central admin DB.
    Get-SPDatabase | Format-Table Name, ID
    Coming back to your question, if you find that there are some site are not completely upgraded then run below command and understand the cause if issue on specific DB.
    Test-SPContentDatabase WSS_ContentDB_Name
    If you find any missing file issue in DB then resolve these issue to upgrade content database.
    (verify all customizations referenced within the content database are also installed in the web application. This cmdlet can be issued
    against a content database currently attached to the farm, or a content database that is not connected to the farm )
    Use the Upgrade-SPContentDatabase cmdlet
    to resume a failed database upgrade or begin a build-to-build database upgrade against a SharePoint content database
    Upgrade-SPContentDatabase WSS_Content
    reference:
    http://technet.microsoft.com/en-us/library/ff607813(v=office.15).aspx
    http://technet.microsoft.com/en-us/library/ff607941(v=office.15).aspx
    If my contribution helps you, please click Mark As Answer on that post and
    Vote as Helpful
    Thanks, ShankarSingh(MCP)

  • ECC 5.0 database instance install error in  database load (post processing)

    HI  all!
    The installation of the environment :
    VM SERVER v1.03
    ECC 5.0 /WINDOWS SERVER 2003
    SQL SERVER 2000 SP3
    DB INSTANCE install occur error in database load (post processing)  step:
    sapinst.log:
    INFO 2008-10-16 14:20:54
    Creating file C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB\keydb.5.xml.
    ERROR 2008-10-16 14:22:29
    MSC-01015 Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPSSEXC.log
    ERROR 2008-10-16 14:24:59
    MSC-01015 Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPAPPL2.log
    ERROR 2008-10-16 14:24:59
    MSC-01015 Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPSDIC.log
    ERROR 2008-10-16 14:26:30
    MSC-01015 Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPPOOL.log
    SAPSSEXC.log:
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: START OF LOG: 20081016142100
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: sccsid @(#) $Id: //bas/640_REL/src/R3ld/R3load/R3ldmain.c#27 $ SAP
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: version R6.40/V1.4
    Compiled Aug 18 2008 23:28:15
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe -dbcodepage 1100 -i C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPSSEXC.cmd -l C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPSSEXC.log -loadprocedure fast
    (DB) INFO: connected to DB
    (DB) INFO: D010INC deleted/truncated
    Interface access functions from dynamic library dbmssslib.dll loaded.
    (IMP) INFO: EndFastLoad failed with <2: Bulk-copy commit unsuccessful:3624 Location: rowset.cpp:5001
    Expression: pBind->FCheckForNull ()
    SPID: 54
    Process ID: 1120
    3624 >
    (IMP) ERROR: EndFastload: rc = 2
    (DB) INFO: D010TAB deleted/truncated
    SAPAPPL2.log
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: START OF LOG: 20081016142130
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: sccsid @(#) $Id: //bas/640_REL/src/R3ld/R3load/R3ldmain.c#27 $ SAP
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: version R6.40/V1.4
    Compiled Aug 18 2008 23:28:15
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe -dbcodepage 1100 -i C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPAPPL2.cmd -l C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPAPPL2.log -loadprocedure fast
    (DB) INFO: connected to DB
    (DB) INFO: AGR_1250 deleted/truncated
    Interface access functions from dynamic library dbmssslib.dll loaded.
    (IMP) INFO: import of AGR_1250 completed (139232 rows) #20081016142200
    (DB) INFO: AGR_1251 deleted/truncated
    (IMP) INFO: EndFastLoad failed with <2: Bulk-copy commit unsuccessful:2627 Violation of PRIMARY KEY constraint 'AGR_1251~0'. Cannot insert duplicate key in object 'AGR_1251'.
    3621 The statement has been terminated.>
    (IMP) ERROR: EndFastload: rc = 2
    (DB) INFO: AQLTS deleted/truncated
    (IMP) INFO: import of AQLTS completed (17526 rows) #20081016142456
    (DB) INFO: disconnected from DB
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: job finished with 1 error(s)
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: END OF LOG: 20081016142456
    SAPSDIC.log:
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: START OF LOG: 20081016142230
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: sccsid @(#) $Id: //bas/640_REL/src/R3ld/R3load/R3ldmain.c#27 $ SAP
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: version R6.40/V1.4
    Compiled Aug 18 2008 23:28:15
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe -dbcodepage 1100 -i C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPSDIC.cmd -l C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPSDIC.log -loadprocedure fast
    (DB) INFO: connected to DB
    (DB) INFO: DD08L deleted/truncated
    Interface access functions from dynamic library dbmssslib.dll loaded.
    (IMP) INFO: ExeFastLoad failed with <2: BCP Commit failed:3624 Location: p:\sql\ntdbms\storeng\drs\include\record.inl:1447
    Expression: m_SizeRec > 0 && m_SizeRec <= MAXDATAROW
    SPID: 54
    Process ID: 1120
    3624 >
    (IMP) ERROR: ExeFastload: rc = 2
    (DB) INFO: disconnected from DB
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: job finished with 1 error(s)
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: END OF LOG: 20081016142437
    SAPPOOL.log:
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: START OF LOG: 20081016142530
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: sccsid @(#) $Id: //bas/640_REL/src/R3ld/R3load/R3ldmain.c#27 $ SAP
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: version R6.40/V1.4
    Compiled Aug 18 2008 23:28:15
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe -dbcodepage 1100 -i C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPPOOL.cmd -l C:\Program Files\sapinst_instdir\ECC_50_ABAP_NUC\DB/SAPPOOL.log -loadprocedure fast
    (DB) INFO: connected to DB
    (DB) INFO: ATAB deleted/truncated
    Interface access functions from dynamic library dbmssslib.dll loaded.
    (IMP) INFO: ExeFastLoad failed with <2: BCP Commit failed:3624 Location: p:\sql\ntdbms\storeng\drs\include\record.inl:1447
    Expression: m_SizeRec > 0 && m_SizeRec <= MAXDATAROW
    SPID: 54
    Process ID: 1120
    3624 >
    (IMP) ERROR: ExeFastload: rc = 2
    (DB) INFO: disconnected from DB
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: job finished with 1 error(s)
    D:\usr\sap\IDS\SYS\exe\run/R3load.exe: END OF LOG: 20081016142621
    please help!   thanks!

    VM SERVER v1.03
    can you please tell me what you mean with that? VMWare? Is that ESX-Server?
    (DB) INFO: connected to DB
    (DB) INFO: ATAB deleted/truncated
    Interface access functions from dynamic library dbmssslib.dll loaded.
    (IMP) INFO: ExeFastLoad failed with <2: BCP Commit failed:3624 Location: p:sql
    tdbmsstorengdrsinclude
    ecord.inl:1447
    Expression: m_SizeRec > 0 && m_SizeRec <= MAXDATAROW
    SPID: 54
    Process ID: 1120
    3624 >
    (IMP) ERROR: ExeFastload: rc = 2
    I´ve seen those load problems under VMWare and on boxes hosted as Xen VMs.
    Markus

  • Database Upgrade 10.1.0.4 to 10.2.0.4

    Newbie here.
    So I am starting to use OEM on Windows XP workstation and have upgraded it to 10.2.0.4 and also wanted to upgrade the repository to 10.2.0.4 as well.
    So this is what I have done so far.
    I have installed 10.2.0.1 into a new home. I have patch it to 10.2.0.4. I am using DBUA to upgrade the database and have set my ORACLE_HOME to the new home and started DBUA. Everything is working just fine until the new OracleService is created and is trying to start. I received a message that it is unable to start service. If i click on continue I received the ORA-12560 TNS error. I have tried multiple times to get this to work and it always fails on this part..
    Also to let you know that when I connect to SQLPlus before upgrade I have to connect using sysplus sysman/xxxxx@emrep with out emrep it won't connect. I have also set TNS_ADMIN to the original homes network/admin directory.
    I have research the documentation on upgrading, but maybe I am missing a step or someone has run into the same issue.
    Any help you can lend me would be appreciated.

    The database files won't be copied over. As general practice, databases aren't stored under Oracle Homes. You could always fix that by moving the database, backup the control file to trace, and edit it with new file locations. I wouldn't worry about that right now.
    Did you run the prerequisite script before trying to upgrade?
    <10.2 HOME>/rdbms/admin/utlu102i.sql
    Once a database is opened upgrade, you won't be able to open it with the old binaries.
    Was the listener up when you tried to connect to it with 10.1? Were there any errors?
    The manual process of upgrading the database is to export the 10.2 env, open the database upgrade, upgrade the data dictionary <10.2HOME>/rdbms/admin/catupgrd.sql, startup the database normally, and Compile all the invalid objects <10.2HOME>/rdbms/admin/utlrp.sql. I would make sure to go over the sql that executes prerequisite checks and read through the upgrade docs. I would also take a backup before doing anything.

  • 11.2.0.3 database upgrade to 12c

    I am currently doing a database upgrade from 11.2.0.3 to 12.1.0.2. The server has a number of other 11g database instances which have not yet been upgraded and the listener on teh server is 11g. Should i be creating a 12c listener for the upgrade i.e. having two listeners on the same server or what's the best way to tackle this scenario? thank you.

    Pl do not post duplicates - 11.2.0.3 upgrade to 12.1.0.2 - listener question

Maybe you are looking for