Hi Team,
There is a business scenario I want to discuss and get your opinions;
A Country's Currency is changing from 01012009; I am getting stuck when I reach the cost Centres.
When i come to Cost Centre, is there a way where I can modify the Currency in the cost Centre and retain the earlier record delimited. If this is not possible then I guess the only other way os to create new cost cnetres with similar master data with new currency getting defaulted from the Company code table and assigning them accordingly. Am I right ?
A quick response will be highly appreciated.
Thanks,
Naveen
+91 9900350350

what is your controlling area currency type

Similar Messages

  • Cost centre reports in Company code currency

    Hi
    I want to check all reports in company controlling area currency and company code currency. Controlling area currency is USD and company code currency is SAR.
    For example when i execute the following report it shows only in controlling area currency.
    S_ALR_87013611 - Cost Centers: Actual/Plan/Variance
    KSB1 is working fine I can check object currency which called company code currency.
    regards
    imdad

    Hi Ajey
    I have make changes in RPC0 following changes and as you said re-login but still this report showing results in controlling area currency instead of company code currencye.
    Reporting currency tab:
    - Select radio button controlling area currency
    Currency Translation into target currency
      - Select radio button object currency
    Exchange rate
      - Current
    Exchange rate type
      - M
    Its still not working, whats wrong setting in RPC0. please advise.
    regards
    imdad

  • Functional area and cost of sales accounting (company code 2000) active

    Hi There!
    I hope someone can help.
    In our sandbox system, whenever I try to convert a Purchase requistion into a Purchase Order I get the following error message : "Functional area and cost of sales accounting (company code 2000) active".
    Anyone know how I can resolve this issue?
    Kind regards,
    Karl

    Hi,
    Double click on the error message & check the message Number..
    Then go to
    Spro>MM>Pur
    Attributes of system messages & change the Message from Error to Warning..
    Thx
    Raju

  • RA15 and cross company code processing

    We are using RA method 15 and have some projects that have account assignment WBS elements from other company codes than the billing WBS element. RA ignores figures from WBS elements with different company codes, hence recording COS in the company code of the account assignment WBS and Revenue (via RA) in the billing WBS element. Instead we would like have all revenue and COS calculated in RA on the billing element based on the incurred costs regardless of the company code in the account assignment WBS element. SAP OSS is suggesting that note 819760 may accomplish this. Does anyone have experience with this note.
    We do not want to settle WBS elements within the hierarchy or create multiple billing elements.

    Alex
    Thanks for the update.
    Regards
    Virendra

  • Help on fox used to one/all profit center/cost center of one company code

    Hi experts,
    I have a fox formula witch is to be applied in diferent situations:
    1. To one cost center
    2. To all cost centers of one company code
    3. To one profit center
    4. To all profit centers of one company code
    I'm using the following variables:
    ZIPROFCE (1st profit center selected in query)
    ZIPROFC2 (number of profit centers selected in query)
    ZICOSTCE (1st cost center selected in query)
    ZICOSTC2 (number of profit centers selected in query)
    The formula is actually like below, guess it is not worrking because I can't have an integer number accepted by chars 0profit_ctr and 0costcentr. I am thinking of adding another char in the infocube witch is integer (without master data), and it would do the job. Is there other way out, so I can mantain actual aggregation levels and filters?
    DATA PERIOD TYPE 0FISCPER3.
    DATA PER_P TYPE 0FISCPER3.
    DATA PCENTER TYPE 0PROFIT_CTR.
    DATA PCENTER1 TYPE 0PROFIT_CTR.
    DATA PCENTER2 TYPE 0PROFIT_CTR.
    DATA CCENTER TYPE 0COSTCENTER.
    DATA CCENTER1 TYPE 0COSTCENTER.
    DATA CCENTER2 TYPE 0COSTCENTER.
    DATA PLANPER TYPE F.
    PCENTER1 = VARV (ZIPROFCE).
    PCENTER2 = VARV (ZIPROFC2).
    CCENTER1 = VARV (ZICOSTCE).
    CCENTER2 = VARV (ZICOSTC2).
    PLANPER = VARV (ZEPLANPE).
    PER_P = VARV (ZEPLAPER).
    *IF CCENTER2 = 1.
    CCENTER = CCENTER1.
    *ENDIF.
    IF PCENTER2 = 1.
    CCENTER = #.
    PCENTER = PCENTER1.
    ELSEIF PCENTER2 > 1.
    CCENTER = #.
    ENDIF.
    FOREACH CCENTER, PCENTER.
    PERIOD = PER_P.
    DO.
    IF  { ZCOMPROM, CCENTER,  013, PCENTER } <> 0.
      { 0AMOUNT,  CCENTER, PERIOD, PCENTER} = { ZCOMPROM,  CCENTER, 013, PCENTER } / PLANPER.
    ENDIF.
    PERIOD = PERIOD + 001.
    IF PERIOD = 013.
    EXIT.
    ENDIF.
    ENDDO.
    ENDFOR.
    Tanks in Advance,
    João Anastácio

    Hello João,
    you are making it more complicated than it is:
    Fields to be changed: Key figure, period
    DATA PERIOD TYPE 0FISCPER3.
    DATA PLANPER TYPE F.
    PLANPER = VARV (ZEPLANPE).
    PERIOD = VARV (ZEPLAPER).
    IF { ZCOMPROM, 013 } > 0.
    { 0AMOUNT, PERIOD} = { ZCOMPROM, 013 } / PLANPER.
    ENDIF.
    Regards,
    Marc
    SAP NetWeaver RIG

  • Cost Center Data in Company Code Currency

    Hi All,
    We have a requirement to develop a Cost Center Report with Company Code, Account Number and Amount in Company Code Curreny.
    I have checked table COEP, we can get data of CCode, Account Number. But Amount will be in Object Currency/Transaction  Currency / COArea Curreny and not in Company Code Currency.
    Is there a way to get Cost Center data in Company Code curreny.
    Please advice.
    Thanks
    Satish

    Hi,
       In CO, you specify in the year-dependent settings for the controlling area (Transaction OKKP) whether you want to use one or more currencies (flag "All currencies", TKA00-ALLEW).
    If you decided to use one currency only, all documents are only managed in CO area currency.
    If you decided to use several currencies, the following three currencies are managed in CO:
        1. Controlling area currency
           The controlling area currency can be:
           -  10 company code currency (only if all company codes assigned to CO area have the same currency)
           -  20 free controlling area currency
           -  30 group currency
        2. Object currency (defined per object)
    As a rule, the object currency is the company code currency. Only in one case the object currency can be freely chosen, that is, if flag "different company code currencies allowed" is not active.  This flag is set automatically if CO area currency is not 10 and cross-company code accounting is set.
        3. Transaction currency (could be different in every posting).
    regards
    Waman

  • Difference between Cost Centre  and Cost Element.

    Hi Guru's,
    what is the difference between Cost Centre  and Cost Element.
    regards
    JK

    Hi,
    Cost elements:
    A cost element classifies the organization's valuated consumption of production factors within a controlling area
    Primary Element - costs that originate outside the company; relate directly to the income statement in FI and must be included in the FI Chart of Accounts
    Secondary Element - costs that result from internal allocation activities; NO relation to G/L accounts in FI. These accounts are exclusively for cost accounting and are only maintained in CO
    Cost centre :
    Organizational unit within a controlling area that represents a defined location of cost incurrence. The definition can be based on:
    Functional requirements
    Allocation criteria
    Physical location
    Responsibility for costs
    Defines the smallest area of responsibility within the company that causes and influences costs; the lowest level to which you can meaningfully assign direct and indirect costs
    If this meets your requirement, you may like to close the posting.
    Muraleedharan.R

  • Link between Cost centre and G/L Account

    Hi All,
    Please provide the Link between Cost centre.
    ie., Please provide me the T.code or Table where we will get link between Cost centre and G/L Account.
    Please let me know.
    Regards,
    Nagaraj S

    Hi,
    Please note that Cost Centers are maintained to capture costs, i.e. P & L items of GLs you have created.  These items would have been created as a Primary Cost element and the costs
    are passed to to the cost center through account assignments.  You can see these GL A/cs created as cost elements -  Cost Center-wise, period wise for which various standard  reports are available.
    Sadashivan

  • Cost centre and Profit centre in one query - Authorisations not working!

    Hiya,
    I have another problem related to Analysis Authorisations.
    I have created an AA with Cost Centre and Profit centre access restricted to a certain node of a hierarchy (type 1 - this node and below). For example, the User can only run a query at Cost Centres level of Country Belgium - the query works fine. Now, the user wants to drill down by the relevant Profit centres. According to the log, the system checks for Profit centres like * and says the user is not authorised. All this, despite the fact that all Profit centres belong to country Belgium and user has been given access to see these profit centres.
    What do I need to do to enable drilldown by Profit centre? I can't make a "*" access to Profit centre as the user will be able to run other queries at global level, which is not what I can allow.
    Any suggestions?

    Hello,
    I don't know if it is relevant, but I had a similar problem when I had two characteristic each with hierarchy restrictions in one authorization object.
    I "solved" it by separting each characteristic into its own authorization object.
    BR
    Ondrej

  • How to Capture Multiple Cost centres and Business Unit information in a project?

    Dear Experts,
    With the help of UDA functionality in project super responsibility, I have captured Cost centre and Business unit information and this info will be used/reflected in CC and BU segments of all transactions gets recorded against that project.
    Now, our user wish to have multiple cost centres and business units to be tracked in the same one project. How is this feasible? Below example describes my requirement in a summary, please advise.
    An Indirect project is created when a defect on a machine reported from client's customer and all subsequent activities (purchases, travel to customer site to analyse and troubleshoot, purchases for any in-house analysis etc..involves costs spending internally) in resolving that defect/project involves 6 to 7 different departments (Sales, Tech Support, Quality team etc.,who actually work/travel and spend costs against project until defect resolution). And, each of the above departments will have 1 dedicated owner (project owners) to manage that project and each of these 6 or 7 owners owners will have their own cost centres (eg: 2345 - Sales team) against which they wish to see their transactions (travel, purchases during defect resolution) globally.
    So, all I want to know is how can I make one single project to accommodate multiple cost centresand business unit information to be assigned using UDA? Please let me know if I am not clear.
    Regards
    Venkat

    I think you should use the expenditure organization on the transaction itself to derive the CC/BU. Have AA lookups and define AA rules where you look at a Exp Org to BU or Cost Center to derive accounting.

  • Send cost centre and attendence type not filled automatically

    Hello,
    I am configuring the time recording in ESS. I configured the recording profile and in cats2 it looks good. The send cost centre and attendence type get filled automatically. But when I do the same thing in ESS the values are not populated. Is there something I have to take into account in order to get this done?
    Thanks a lot, Vanessa

    Dear Venessa,
    Please note that in contrast to personal templates, which enable you to prefill the data entry area when you start time recording, the system first displays default values when you create a new account assignment row with one receiver object and at least one working time.The system only proposes default values when you create a new account assignment row. In ESS, this is correct, because it does not make sense to provide default values for the sender cost center and activity type if you are only entering an attendance or absence type.
    Hope this helps,
    Regards,
    Roy

  • Foreign currency settings and cross company code settings

    Hi
         Any one can send me the configuration documents on foreign currency settings and cross company code postings.
    Regards
    Shilpa.

    Foreign currency settings - OBBS: Define translation ratios
                                            OB08 - Maintain exchange rates
    You can read the relevant IMG help for this.
    Cross company code: OBYA - read the IMG help for this also.
    Regards,

  • Blocking of Cost centre and activity type

    Dear all,
    Please tell me how to block cost centres and activity types which will no longer be used
    best rgds,
    Manoj

    Hi,
    There are two ways .
    If you wish to use the cost center number for any other cost center , then you need to delete the cost center by KS04 & you need to mention the future period for which the same should deleted, normally, starting would be 1st day of next year to 31.12.9999
    Keep in mind, cost center can only be deleted , if no data (Actual/Plan/reversal) is posted in it. You may do it , before starting next year's budget processing.
    If you wish to just block the same , lock Actual primary/Secondary & Plan primary/Secondary in the control tab.
    Regards,
    Deepak Kolwankar

  • IW41 using HR data (cost centre and activity type)

    Hi all,
    Does anyone know the steps required to make IW41 determine the Cost Centre and Activity Type from the HR master?
    We can change the Activity Type by user-exit CONFPM04, but not the Cost Centre.
    Also posted [here|http://www.sapfans.com/forums/viewtopic.php?f=7&t=329923].
    PeteA

    Hi Pete,
    Which cost center field are you using? SKOSTL (sender cost center) should be changeable in export structure AFRUD_EXP. It is this field that is written to the AFRU table (not KOSTL). I did a quick check through debug and it looks possible to set a value in the exit that gets written to AFRU-SKOSTL.
    -Paul

  • Cost center belongs to company code 1000, not 2000

    Hi,
       When i am entering cost center in sales order, I am getting  an error "Cost center belongs to company code 1000, not 2000"
    Does anyone know which transaction i can use to extend this cost center to a different company code?

    I think you are creating sales rder for plant 1000. While the cost center you are providing is attched to plant 2000. Either you can change the cost center for plant 1000 or you can change the customiztion so that cost center is attached to plant 1000.

Maybe you are looking for

  • Load images from folder

    I havent used flash in a couple years and i'm feeling a little lost (not that i knew what i was doing before!) I am however determined and can understand the code, i just am a little overwhelmed. I'd like to tell a movie clip to look into a specific

  • HP Officejet Pro 8630 won't print from tray 2; says there's no paper

    Action: Print from tray 2. Expected Results: Paper feeds from tray 2 and prints. Actual Results: Printer displays "out of paper" dialog. Notes: Ever since I purchased the Officejet Pro 8630 six or eight months ago, tray 2 has not functioned. It says

  • How can i transfer my videos and pictures from mini ipad to my laptop

    how can i transfer videos and pictures in photos folder of mini ipad to my laptop

  • REP-51002: Bind to Reports Server failed

    Hi, I have installed Oracle Database 10g R2 and Oracle Developer 10gR2. I installed it in both Windows 2000 SP4 and Windows XP SP2. I would like to call a Report using a button inside Oracle Form. I create my own Report Server, using : rwserver serve

  • 6pm and the latency spikes. 10pm and the internet ...

    Had this problem for the last three weeks and it is just getting more and more frustrating to stick with BT EVERY evening at 6pm on the dot the internet grinds to a halt and the latency shoots upto the 500~ mark and continues to fluctuates from 500 t