Delivering plant and production plant

hi,
what is the difference between delivering and production plant. is the config diff for bot these plants in enterprose structure.
regards
sachin

Hi,
      We have only one word as PLANT in standard sap. Forget about the difference  we dont have something specifically as a delivering plant and a production plant. Its only how we want to use our plant as.  If needed we can use the same plant for both the purposes ie., for delivery as well as for production.
      When we make use of the plant for production we assign the MRP views for it and then do the necessary configurations. If there is no PP module being implemented we can do away without the MRP views as we availability check through the sales view itself. We have the trigger for a purchase requistion needed for the MM for a purchase order and have the materials delivered at out plant from the vendor like trading goods.
      But, notice that in the material master Sales organization data view, you find the delivering plant fied for which the Field name would be MVKE- DWERK. It says deliver goods to the customer from this plant. If we specify the deliverin plant in the customer master shipping view the delivering plant field name is KNVV- VWERK, this has a higher precedence over the material master delivering plant.
   Hope this explanation clears it furhter. Pl.reward if helps.
Thanks & Regards
Sadhu Kishore

Similar Messages

  • Procurement plant and production plant

    Hi,
    I have a scenario where the procurement plant and the procurement plant for raw materials are different. The assy is produced in Plant 1 in Repetetive manufacturing, but the raw materials are procured and stored in plant 2. The raw materials to be staged from the Plant 2 to plant 1.
    How can we address this scenario.
    thanks and regards
    Murugesan

    Hi,
               Use spl procurement key Withdrawal from an alternative plant  is used for material which are procured as a component using withdrawal from an alternative plant. At the time of MRP the reservation will occur in an alternative plant if dependent requirements exist.
    If that components are moved frequently from procurement plant for production , doing Stock transfer is tedious one. This time in component overview itself we can enter plant of  procurement material
    Regards,
    Velmurugan S

  • Scheduling Parametrs for the Plant and Production Order Type

    hi SAP Gurus,
    Pls it is very urget
    Pls let me know how to maitain the Scheduling parameters for the combination of Plant and Production Order type.
    Pls provide me the Path also.....
    Points will be rewarded .....
    Ranjit Kumar

    hi Murthy,
    thanks for the solution... Problem resolved.
    Assigned points...
    Ranjit

  • Utilization(J2IUN) in case of Sales plant and Mfg plants are different

    Hello,
    we are having two company codes 1000 and 2000,
    1000 is having the Manufturing plant- 1000
    2000 is having the sales plant      - 2000
    Both the plant are having the same excise group-10
    The company will procure a materials in 1000 plant and CENVAT is credited at 1000 Plant. The 1000 plant never dispatch materials to customers,  The company want to take Monthly utilization from 2000 company code and 2000 plant.
    The company first make STO from 1000 plant to 2000 (Inter company STO), then 2000 company will sell that material to customer or delear or etc.
    Manufaturing plant and disptach plants are different
    How to take utilization in above said scenario.
    Regards
    sapman man

    Hi
    we are having two company codes 1000 and 2000,
    1000 is having the Manufturing plant- 1000
    2000 is having the sales plant - 2000
    Both the plant are having the same excise group-10
    The company will procure a materials in 1000 plant and CENVAT is credited at 1000 Plant. The 1000 plant never dispatch materials to customers, The company want to take Monthly utilization from 2000 company code and 2000 plant.
    The company first make STO from 1000 plant to 2000 (Inter company STO), then 2000 company will sell that material to customer or delear or etc.
    Manufaturing plant and disptach plants are different
    How to take utilization in above said scenario.
    As per above your input would like narrate as under.
    As per SAP & Statutory norms Utilization is only happen when you avail credit and availing of credit is only possible when your plant is register with Excise thats only possible when you can declare your plant is in actively invloves in manfacturing activity ( Input and out put material will be differ) then you can register with Excise and get excise register the sam eyou can maintain in J1ID.
    Now coming t your case which not possible as plant 2000 becomes Depot and depot scenario you can not utilize as you are not availing any input credit.
    Son what you can do is pass the credit to 2000 plant and utilise in 1000 plants which is quite easy
    And request you to create two different excise group as you can not assign same excise group to plant and deopt.
    Hope this helps you

  • Difference B/W Delivery plant  and item plant in Sales Order

    HI,
          May i know Difference between  Delivery plant and item plant in Sales order and what is the use of those fields.What is the process of raising sales order for different plants.
    Thnks&Rgds
    NAG
    Edited by: NAGA SUDHIR on Apr 3, 2009 6:10 AM

    HI G. Lakshmipathi,
                                   Thnks for the reply.Yes i am comparing (DWERK (at header level) and WERKS (at item level)) these two fields.
      Any how we can give only one plant in Customer Master, we are not maintaining Customer/mtrl regard (Not required in our company scenario) and we have extended MMR to different plants.
    So as per ur answer u went me to change only WERKS (at item level) while raising sales order for different plants.Is it enough?
    Thnks&Rgds
    NAG
    Edited by: NAGA SUDHIR on Apr 3, 2009 6:46 AM

  • FM or BAPI to change Maintenance plant and Planning Plant for an equipment

    Hi Experts,
    I need to change the Maintenance plant and Planning Plant for an equipment. Is there FM or BAPI available for the same?
    Thanks,
    Peri.

    what doesn't it do the same ? it contains planning plant and maintenance plant which you can update ??
    if you expect that SAP delivers custom functions for every possible question a developer has you can better search for an other job. SAP makes generic functions and you can use them for you're own sollutions.
    it is also expected that you try to work things out for you're own sollution.
    you can find sample code quickly enough if you search where the function is used
    like RISTEQ01
    kind regards
    arthur

  • How are maintenance plant and planning plant linked in PM(Plant Maint).

    Hi All,
    How are maintenance plant and planning plant are linked in PM(Plant Maint).Where can I configure both of them in SPRO(I mean the path).
    I am a hard-core technical consultant so am sorry If I am asking a silly question.
    Kind Regards,
    Anshu Kumar

    Hi,
    Please find below the path to cretae the planning plant and assigning the plant:
    SPRO-Enterprise StructureDefinitionPlant MaintenanceMaintain maintenance planning plant;
    SPRO-Enterprise StructureAssignmentPlant MaintenanceAssign maintenance planning plant to maintenance plant;
    A Maintenance plant in which the technical objects of a company are installed.
    A Planning plant is a plant in which the maintenance tasks are planned and prepared.
    Hope it will help.
    Regards,
    Manish

  • Difference between define plant and copy plant

    Hi MM experts,
    please explain me what is the difference between define plant and copy plant.
    what are the consequences in future.
    Thenks&Regards,
    Babu
    9930154536

    Hi Babu,
    Copy Means
    This function is for creating a new plant using the settings for an existing plant as your template.
    In copying of plant system copy all the objects into the new plantso you can work on them and chnge wherever you require. While in creating a new plant you have to define everything from scratch.
    SAP always recommends to copy the plant from standard template of 0001 or 1000 so that it considerably reducing the time required for maintenance.
    Hope this will help you.
    Deepak.

  • Seneior related to EOU plant and domestic plant produced the FG

    HI Gays,
    our client requirement is EOU plant place the sale order but unable produced the FG material.Domestic Plant should produced the material FG but not updated the accounting enter for plant and component avaible for production are supplied by EOU plant
    How can I Map inthe SAP?
    Please help me this issues
    Regards
    Channa

    hi,
    Domestic plant should supply the material based on a ER1 raised against a CT3 provided by EOU.
    You will have to do some Z programs to keep track of CT3 generated by EOU plants.
    ER1 will be provided as in normal deemed export.

  • MD04 exceptions for planning plant and delivery plant

    I have a material that is to be produced in another plant via a special procurement key.  When a production order is created at times on MD04 I can see exceptions at the planning plant and not the delivery plant.  Is there a way to make sure the planning plant displays the exceptions as well? Thanks in advance for any help.

    I found the answer.  Since planning is only expected to be done at the planning plant the rescheduling dates and exception messages only apply there.  There isn't any config to allow the production plant to see the reschedule dates or exception messages.

  • Planning plant and maintenace plant

    Hello every one,
    I have a confusiton that what is role of planning plant in plant maintenance. In my project we have 3 plants and all have diffrerent planner group. So in this case should i  have 3 planning plant?. second how it affects if i have 3 different planning plant or 1 planning plant for all 3 plants. in my case 1 plant maintenance group look after for all 3 plants. Kindly give me ur suggestions. i would be very very thankfull to u all.
    Regards
    Abhishek Sinha

    Hi Abhishek,
    If you use one planner group for one planning plant then how you will do the planner group wise cost analysis, which is  just like a section.Even under one planning plant you have to create more no. of planner group to ease your business clear & tracking the cost effectively.If you use one then there is no use of planner groupwise cost analysis.
    Please think thtrough this aspect also might be you will get some help
    AR
    Edited by: Amit  Rana on Aug 19, 2009 5:43 PM

  • Route Determination on STO (Receiving plant and supplying plant same)

    Dear Experts,
    We have two different STO type,
    same supplying plant
    same receiving plant, receiving debit to PO assigned account, not inventory, so we don't maintain storage location
    same materials.
    The requirement from warehouse: They want the two types STO link to two different Route. ( we have many plants, which based on transportation zone, link to different route already)
    I tried maintained  shipping condition on the sales order type DL, which suppose copy to the delivery order type DL, but it seems not working.
    The shipping condition still copy from the ship to part (receiving plant).
    Any suggestion for this case.
    Thanks in advance.
    Jaeny

    Hi Jaco,
    Thank you to reply me. Delivery type is NL, rather than DL (sorry mistake)
    I am trying to use shipping condition which assign on sales order to separate the route.
    So create a new Stock transport Delivery order type ZNL by copy the standard one NL.
    And create a sales order type ZDL and assign the copy control (standard is DL link to NL), and set shipping condition type on new sales order type ZDL,
    but it turns out the shipping condition still come from the ship to party rather than sales order, and route keep no change.
    So if STO not follow the rules : shipping condition not from sales order , only from ship to party?
    Besides, any other suggestion for this case?
    Thank you
    Janey

  • Goods Receipt in Production Plant

    Hi,
    I have a scenario, where the sales order is placed in the sales plant and production happens in production plant. The sales order creates a purchase requisition in the production plant and MRP creates planned orders against the purchase req and the production is carried out by doing a goods receipt in the production plant itself.
    I have not used the special procurement key of "Production in alternate plant" for this scenario as I want to do the goods receipt against the production order in production plant itself.
    But for the same material if I manually create the production order in production plant and try to do the goods receipt in production plant the system is not allowing me to do this.
    The system tries to post the goods receipt directly into the sales plant even though I have not used the "production in alternate plant" sp procurement key.
    Can someone tell me how to fix this. I want to receive the goods in production plant itself and then move it to sales plant.
    Thanks!

    Dear abppp1,
    When you are working with this concept Production in alternative plant using special procurement key 80,once after creating
    the Goods receipt for the production order the stock in the planning plant will get increased,(and not first in the production plant)
    Check this link to understand the concept in detail,
    [Production in Alternative plant|http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d7444af11d182b40000e829fbfe/content.htm]
    Production In Alternative Plant
    Re: prod alt plant
    Regards
    S Mangalraj

  • Default Plant and storage location for components in MFBF

    Hi,
    I have 2 plants 1000-procurement plant and 2000- production plant. I am using special procurement key 70( Withdrawal from alternative plant from 1000 to 2000) for components in Plant 2000. The requirements for the components are transferred from 2000 plant to 1000 plant. The 1000 plant run MRP for the dependent requirements and procure the materials and transferred to the production storage location in Plant 2000.The raw materials are purchased in plant 1000 and transferred to Plant 2000 production storage location based on the manual reservations created with movement type 301. This is fine.
    But when I do backflush in MFBF the plant and storage location for the components issue are displayed as plant 1000 which is the procurement plant  and the production storage location in plant 2000-production plant location. In the BOM the production storage location is production storage location of plant 2000. Since we use the special procurement key system defaults the plant as 1000(procurement  plant) insteadd of 2000(production plant). can we make this plant default to the production plant 2000 as default in the MFBF goods issue screen.
    thanks and regards
    Murugesan

    Hi MURUGESAN !
          Can you give me some information more in Special Procument Configure in plant 2000 like:
              -  Procurement type (maybe F)
              -  Special procurement (Maybe U)
              -  Plant (Maybe 1000).
              - Issuing plant (maybe 2000)
           We will check together.
           Regards,
          Tony

  • APO DP: Disaggregation to product&plant level from higher levels.

    Hi.
    We do demand planning on groups of products and for country/region in general, we have around 48.000 CVC's in our current setup. It works very well.
    A new situation has arisen where we need to have the forecast split down to product and plant level.
    As is we simply don't have the information at this level of granularity.
    I don't see how we can add for instance product to our setup, we have around 20.000 products so the number of CVC's in DP would become massive if we did this.
    I was thinking that perhaps something could be done by exporting the relevant key figures to a new DP setup with fewer characteristics (to keep the number of CVC's down) via some infocubes, perhaps some disaggregation could be done via some tables and the BW update rules. This still leaves the issue of how to get the figures properly disaggregated to plant and product though.
    Does anyone have experiences on how to get the figures split to lower levels from DP when you're planning on a higher level?

    Simon,
    One approach as you mentioned can be creating Z Table where in you set up disaggregation proportion from product group level to product level or product location level.
    Product Group X  100       Product A@loc1 10
                                          Product B@loc1 90
    Download your planning area data into infocube C and then use BW routines to convert the data from group in infocube C to lower level refereing Z Table....into another infocube..
    SAP also provides such standard functionality of spliting the aggregate Demand plan to detailed level
    SNP plan..through functionality like location slit or product split.
    Essential you will be using same concept in yor BW solution or you may also want to consider the
    release your DP to SNP planning area its as solution of diaggregation of data  to lower level.
    Regards,
    Manish

Maybe you are looking for

  • Is there a way to test a PRAM/NVRAM battery

    I have a newer iMac that was not restarting after power failures automatically. I performed a PMU reset (or equivalent, ie unplug power cord for 15 seconds) which did not resolve the problem. I ended up zapping the PRAM and now my issue seems to be r

  • Product Costs by Sales Orders

    HI, Is there any extractor that pulls the Product Costs by Sales Orders? The 0CO_PC_02 extractor extracts Product Cost by Order and Product Cost by Period. It extracts just the OR* entries from the COSB, COSS tables but not the VB* and PR* entries fr

  • How do I resolve the issue Cannot open the file ".indd". Adobe InDesign may not support the file for

    How do I resolve the issue Cannot open the file ".indd". Adobe InDesign may not support the file format, a plug-in that supports the file format may be missing , or the file may be open in another application?

  • Variable engine write hangs

    I am using the shared variable engine to bind shared variables to an OPC server (DSC/Labview 8.5) When using read only variables, all works OK When using a read/write variable (specified either R/W or W only in the shared variable definition), the sh

  • Creation of Variable in RSZV in BW 2.0 version

    Hi All, Can anyone tell me how to Create a variable in BW 2.0 version as we have a requirement in 2.0. In RSZV can u please list out the steps to create a Custom variable for 0calmonth characteristic. RSVP Thanks & Regards, Sai.