Design for Availability Check for the Receiver System

Hi,
Scenario: Request has to be diverted depending on the availability of receiver System.
Design: During Runtime, we will make RFC Lookup call in mapping to Receiver System, to check it availability and accordingly I will determine the Receiver.
Issue: We had the Receiver System Up, the Availability Check using Lookup to Primary Receiver system was successful,  but due to table lock issues in the receiver system, request for RFC and Proxies was not responded back. So we got call dumped in PI saying service unavailable exception.
Is there any better design for to handle this kind of scenarios, inorder to have functionality available round the clock?
Regards,
Manikandan R

Hi Mani,
  You need to identify the availability of the system at mapping level only,i think the approch is to write UDF or simle JAVA Map to check the availability and return same status out put based on that you can route the message.
use wait step in BPM give some particular time to wait,then process the message,in this case we are going check only once. if you want check repeatedly use loop and put your mappingt,but this is not at all adviceble.
other way develop scenario ,if system down means communication channel throws error,based on that raise a alert,so that appropriate people will take action.
but most of cases availability of system is 24 hours , but i am not sure about your case.raising alert is the good idea.
Regards,
Raj

Similar Messages

  • Availability check for STO?

    Hi,
    While doing Stock transfers order (PO) plant to plant with in the company code, there is no controlling on availability check, though stocks are not available in the supplying plant, while making delivery thro VL10B,  delivery is creating with '0' Qty. This system want to stop the delivery when quantities are not available in the supplying plant.
    The following steps are configured for availability check for STO
    Schedule line Like NN activated for availability, Assigned schedule lines to item category like NLN and determined rule for STO document type, plant, Delivery type and checking rule in MM.
    how to control the delivery,  when stock are not available in supplying plant? (Means, when stock are not available in the supplying plant, delivery creation should stop through VL10B)
    Is there any more configuration is required, pl guide.
    Rao
    Edited by: R Rao on Aug 22, 2008 1:42 PM
    Edited by: R Rao on Aug 29, 2008 6:03 PM

    Alexandro,
    During delivery creation, the system performs an availability check (ATP).  You can assign the Delivery notice type for a stock transfer order delivery notice at OMGN.  The ATP for DN will be the standard ATP rules for SD delivery notices (checking rule B).You can determine which elements are used for availability checking in OVZ9. 
    To meet your goals, I suggest you use:
    Check w/o replenishment lead time ticked
    Include deliveries ticked.
    Optionally, according to your company's policies
    Include safety stock ticked
    Include quality inspection stock ticked
    Everything else unticked.
    Regards,
    DB49

  • HT203128 "Unable to check for available downloads. The network connection was lost." I have 3 downloads from yesterday that I receive this error code. Any ideas?

    I have 3 downloads from yesterday that I receive this error code. Any ideas?
    Thank you!

    I may have stumbled upon something that could help. A type of "detour" around the problem.
    I just started experiencing this problem a few days ago. Anytime I'd try to download a song/video/movie, I would get the message, "Unable to check for available downloads. The network connection was reset".
    So, instead of selecting "Check for Available Downloads" under "Advanced" menu...
    I logged into "My Account" page in itunes. If there are available downloads it comes up at the top of the page with the option button "Download Now". When I select that -- it downloads immediately.
    Can't promise it will work every time. But it's worked for me so far. Good luck...

  • Error "codepage could not be determined for the receiver-system"

    Hi,
    we use the idoc-adapter to send message from mySAP ERP to PI.
    All worked fine.
    So, this morning I have changed the datatype of the messageId from "char" to "int" in mySAP ERP in the customizing menue (install param). So, no message received in SAP PI.
    When I start transction "we05" in mySAPERP" I get the following error:
    "codepage could not be determined for the receiver-system" status 02.
    I have changed the datatyp to "char" but the same probleme
    Can anybody help me please?
    Regards
    Stefan

    This error shouldn't occur unless there is some modification at the OS level codepages.
    Please check the entried in the RFC destination for connecting to the XI system. Unicode settings.
    Regards,
    Prateek

  • Receiving Error : Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables. while trying to create a new Customer.

    Hi All,
    We have set up a new Operating Unit in Oracle Apps. Now when I am trying to create a new Customer in that Operating Unit, I am receiving following error:
    ERROR MESSAGE:-Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables.
    We do have MO: Operating Unit and MO: Default Operating Unit set properly at Responsibility level for the Responsibility through which I am accessing this form.
    Your help is appreciated!
    Thanks in advance,
    SKA

    You can refer this thread and check your MO operating unit is set or not https://community.oracle.com/message/3937028 thanks

  • HT1725 When I click on a Movie I get the following "You have already purchased this item but it has not been downloaded. To download it, select Check For Available Downloads from the Store menu." Then get err = 11111

    iTunes quit unexpectedly during the download of a movie.  When I click on that movie now I get the following message: "You have already purchased this item but it has not been downloaded. To download it, select Check For Available Downloads from the Store menu."
    I follow the instructions, but the download still doesn't resume - err = 11111
    Any advice?

    Yeah, I am going to blast my iPhone for the 4th time today and pray this goes away. I had 6 apps showing updates, the 6 badge icon shows on the App Store on my iPhone and, having run them all, the 6 apps have two copies each on my iPhone: one that is the old version of the app and will not run and the other is a faded version of the app with an empty progress bar on the icon. Click those and you get an error message about connecting to iTunes, etc. as described in the article I linked to above.
    It gets stranger than this. If I install a completely NEW app, the 6 that are stuck mid-update heal themselves and appear with the new version only, however now completely different apps (Hold Em for instance - which I did not update and didn't need an update) will not launch "app name Cannot Launch" message comes up.
    Agh!

  • Check for available downloads in the Store menu not working!

    I have an iPod Touch 2nd gen and use my it mainly for the applications, and that's where my problem is!
    Normally I click on Get updates on the apps I have already bought and they normally download for syncing with my iPod but for some reason they aren't. It says "x updates available" but when I click on them it comes up with a message like :-
    "You have already purchased this item but not downloaded. To download it, select Check for available downloads in the Store menu"
    Which I do. As soon as I click ok it comes up with a network connection timeout and the same when I click on Check for avaiable downloads - EVERY time! Done a diagnostic and network connection is ok and also can still buy stuff.
    All I want to do is update these apps, what's wrong???

    Contact itunes support.

  • HT1725 The files seems to be corrupted.  To redownload the file, choose "Check for Available Downloads" from the Store menu.

    While downloading apps from iTunes Store following error is repeatedly coming "The files seems to be corrupted.  To redownload the file, choose "Check for Available Downloads" from the Store menu."? Please suggest any solution.

    Contact itunes support.

  • Please, 1. Please set the Receivables system options for this operating

    hi
    please i have this error:
    1. Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables.
    can some one help me!
    thinks

    think you a lot mister.
    i am not the administrator of the base, our base administrator is not here for the moment, i have just the count apps and sqplus to change parameters.
    and the request :
    select fnd_profile.value('SO_ORGANIZATION_ID') from dual ;
    gives as result : 101!
    think you for all!.
    Message was edited by:
    brahim37

  • Bapi or Function Module to do the availability check for Planned Orders

    Hi all,
    I need a Bapi or a Function Module to do the availability check for a Planned Orders. Anyone knows how?
    I will use it in an Exit.
    Thanks in advance
    Points will be given

    I think I found it.
    If anyone is searching for it too, we will use these one:
    CO_ZA_AVAIL_CHK_ORDER_MULTI

  • WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL

    dear Friends,
    our users want to  WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL SHOULD BE ENABLE,
    at present we maintaing KP in Material Master.  if we activated what will happen?
    please advice.
    with regards,
    Rajesh G

    Hi,
    The availability check is generally used for goods movements(GR,GI,reservation) & not for PRs.
    Regards,
    Vijay

  • Unable to check for available downloads. The network connecting was lost.

    I have purchased a film on my Apple TV and now want to download it to my iTunes on my MacBook. I can see that I have 1 available download, but when i try to down load it, it just keeps saying:
    "Unable to check for available downloads. The networl connection was lost"
    I know there is not a problem if my network!
    is anyone else having the same problem? Is this a problem with iTunes or my MacBook?
    cheers

    Hello loz114,
    This is frequently due to an inability to establish or maintain a connection to the iTunes Store. The following article provides some useful information and troubleshooting steps that can help restore this connection.
    Can't connect to the iTunes Store
    http://support.apple.com/kb/TS1368
    Cheers,
    Allen

  • Trans struc is not available for InfoSource ZF_GLER in the source system

    Hello Experts,
    I am facing an issue:
    While trying to load data in the data target(ODS) from the data source ZF_GLER i am getting an error message :
    Error message from the source system
    Diagnosis
    An error occurred in the source system.
    System Response
    Caller 09 contains an error message.
    Further analysis:
    The error occurred in Service API .
    Refer to the error message.
    Procedure
    How you remove the error depends on the error message.
    Note
    If the source system is a Client Workstation, then it is possible that the file that you wanted to load was being edited at the time of the data request. Make sure that the file is in the specified directory, that it is not being processed at the moment, and restart the request.
    The error message states that:       No transfer structure is available for InfoSource ZF_GLER in the source system
    For this I activated the data source in se38> RS_TRANSTRU_ACTIVATE_ALL.
    After this I tried to load data again I am getting the same error.
    Pls provide me the solution
    Thanks in Advance,
    Amit

    Hi,
    This is a Time stamp error
    You need to Replicate the respective Data source from the corresponding source system first then Activate the Transfer Rules and load again
    If you are in Production system you cannot activate transfer rules directly
    Go to SE38 --> run the Program RS_TRANSTRU_ACTIVATE_ALL --> mention the infosource and click execute. this will activate the transfer rules and try to reload.
    Regards,
    Gunjan.

  • HT204370 check for available downloads for the store menu appears when i try to download my copy of Ted? why and how to follow through?

    im trying to download my free copy of Ted when i purchased the blu ray copy, and i cant seem to get it to download, i seem to have it, i run windows 7 and use itunes most current version as well. i try to download it and i get a window that pops up and says: You have already purchased this item. You have already purchased this item but it has not been downloaded. To download it, select Check For Available Downloads from the Store menu.
    after that i just don't know where to goe, where available downloads are located in the store, i look up the movie and it just says to purchase, i already have so i just need to downloade my copy, any help or advice?

    http://www.apple.com/support/mac/app-store/contact.html?form=account

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

Maybe you are looking for

  • Issue in Free Goods - I.C(TANN)

    Dear all, I have an issue while creating Free Goods. For the free goods item(TANN), the net price should not be there.when I create an order for Free Goods,net price is there. What is the cause for this? Thanks in Advance Regards Balaji

  • Accents (does Adobe have something against other languages different than English?)

    I am absolutely astonished with this problem. I understand that in the previous versions (up to 1.3) Adobe does not care about millions of persons typing with accents (around 3500 billions of persons, 60% the whole world population) but I cannot unde

  • GarageBand 3 is missing 3 loops from earlier versions

    I did a clean install of Garageband 3 (hid my old GBand 1&2 loops folder), and then compared the two folders. There are three loops missing from GBand3 that are present in my older loop folder: Club Dance Beat 052.aif Plucky Guitar Loop 01.aif Plucky

  • Click a report button to change a report field value

    Hello All, I need to create a report where when a user clicks a report button its image changes and a field relating to that record also changes from "N" to "Y" I had a look at this Denes's example located on this link http://htmldb.oracle.com/pls/ot

  • Two ATI 5770 or one 5870 ?

    Hello All, I am using MacPro Early 09 model with default GT120 Display card and connected with two 1920x1200 displays, graphics not smooth at all, lag even in Finder effects such as changing spaces and expose. Recently, I would like to upgrade to TWO