WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL

dear Friends,
our users want to  WHILE CREATING PURCHASE REQUISITION,THE AVAILABILITY CHECK FOR THE MATERIAL SHOULD BE ENABLE,
at present we maintaing KP in Material Master.  if we activated what will happen?
please advice.
with regards,
Rajesh G

Hi,
The availability check is generally used for goods movements(GR,GI,reservation) & not for PRs.
Regards,
Vijay

Similar Messages

  • While creating Purchase Requisition we need to send a mail for approvers

    Hi All,
    While creating Purchase requisition we need to send a mail to approvers.
    Dowe  need to create Function module ?
    if You know the steps can you please give me the steps.
    Thanks In advance
    Sriman.

    Hi Sriman
    Here we can try for 2 approach
    one is workflow and other his sending emails via user exit.
    I am not much aware about workflow, but you can explore for user exit.
    Try for enhancement component 'MEREQ001'.
    let me know, if you need further help
    Regards
    MD

  • Bapi or Function Module to do the availability check for Planned Orders

    Hi all,
    I need a Bapi or a Function Module to do the availability check for a Planned Orders. Anyone knows how?
    I will use it in an Exit.
    Thanks in advance
    Points will be given

    I think I found it.
    If anyone is searching for it too, we will use these one:
    CO_ZA_AVAIL_CHK_ORDER_MULTI

  • Error while creating purchase requisition

    Hello
    I am getting following error when I try to create Purchase Requisition
    u201CField selection PT4B not definedu201D
    Cant progress any further due to the error
    Regards,
    sudhir

    Hi
    First Do you Have  created any new field selection for PR document types?
    IF not check your PR document type is attached with which field selection in Puchasing -> purchase requisition -> define document types -> check your document type and field selection. Is it PT4B?
    PT4B is not available then assign correct one in customization.
    If it is then check the settings for fields selection in purchasing -> PR - screen layout at document level -> field selection PT4B.
    Regards

  • Design for Availability Check for the Receiver System

    Hi,
    Scenario: Request has to be diverted depending on the availability of receiver System.
    Design: During Runtime, we will make RFC Lookup call in mapping to Receiver System, to check it availability and accordingly I will determine the Receiver.
    Issue: We had the Receiver System Up, the Availability Check using Lookup to Primary Receiver system was successful,  but due to table lock issues in the receiver system, request for RFC and Proxies was not responded back. So we got call dumped in PI saying service unavailable exception.
    Is there any better design for to handle this kind of scenarios, inorder to have functionality available round the clock?
    Regards,
    Manikandan R

    Hi Mani,
      You need to identify the availability of the system at mapping level only,i think the approch is to write UDF or simle JAVA Map to check the availability and return same status out put based on that you can route the message.
    use wait step in BPM give some particular time to wait,then process the message,in this case we are going check only once. if you want check repeatedly use loop and put your mappingt,but this is not at all adviceble.
    other way develop scenario ,if system down means communication channel throws error,based on that raise a alert,so that appropriate people will take action.
    but most of cases availability of system is 24 hours , but i am not sure about your case.raising alert is the good idea.
    Regards,
    Raj

  • Variant configuration u2013 availability check for Configurable material

    Hi Guys,
      We are doing the variant configuration scenario for one of our client. We are using planning strategy as 25 (sales order with variant configuration).
      When we configure the Configurable material at sales order level, we wanted to check the availability check of Configurable for the combination of selected characteristics.
    How we can configure it in the system.
    Regards,
    Shailendra

    Hi,
    availability check will work as per the checking group you had defined in system.
    additionaly you need to put tick in configuration profile for availability check.
    checking for material varient is optional, if your bussiness has materail varients you can activate type matching and while configuring the sales order if the values of charactersticks matches system will suggest you the the appropiate varient and you can replace your configurable material in sales order with it.
    hope it will help you.
    If you need some more information please explain what exactly your are expecting from system during availability check.
    Regards
    Ritesh
    Edited by: R S D on May 28, 2009 7:29 AM

  • Availability check for configurable material.

    Hi,
    We are implementing SAP ECC-6 & facing
    issue during availability check for
    configurable materials.
    I'd like to take an example of
    computer for better understanding.
    Will consider Computer as super BOM and
    following 2 as BOM:-
    BOM-1. a)Monitor b) Cpu c)Key
    Board d)Scroll Mouse e)With
    Mouse Pad.
    BOM_2. a)Monitor b) Cpu c)Key
    Board d)Optical Mouse e)With
    out Mouse Pad.
    But Customer wants A)Monitor B)Cpu c)
    Key Board D)Optical Mouse e) With
    Mouse Pad.
    In the above case System will not show
    %age of Configurable materials
    available & Vice-versa but rather it
    creates requirement for computer and
    it gives availability as the lead time
    maintained in the Material Master of
    the Super Bom.
    Here the busines requirement is that
    it should show %age of configurable
    materials
    available.
    Plz find the attachment for your kind
    reference.
    Kindly guide me to sort out this issue.
    Thanks & Regards,
    Chandru

    Dear Sir,
    Thanks for the guidance/ reply . Still we have some doubts in this:
    As per your instructions, I have created sales order and  did the MRP run for the same.
    I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
    No. of components checked:   641
    Missing parts:   640
    Overall confirmation date could not be determined 
    But  where I can see the Percentage of Avaialble and percentage of to be produced.
    Please guide me.
    Thanking you
    Regards
    Chandru

  • List of the available parameters for the various URL options

    Hi all,
    Where can I find a list of all of the available parameters for URL options such as OMRET0=XXXXX (OMRET0=ActivitiesList or OMRET0=Homepage). I’ve created a copy task weblink and want the destination after the copy is saved to be the newly created Task Details page. I'd also like more information about the other parameter options.
    Thanks!

    Ok, I have found the solution:
    Juste use "DefTaskNew" parameter after .../user/
    Regards,
    Laurent

  • Rounding Values while creating purchase requisitions using ME51N

    Hi MM Experts,
    I have created some materials with a Rounding Value maintained in MRP1 View of the material master.
    Whenever I raise a purchase order, the order quantity rounds off to the value maintained in the material master which is the correct functionality.
    But when i try to create a purchase requisition using ME51N, the rounding functionality doesn't work.
    Example: Rounding value (in MRP1 view) of a material is 25.
    The order quantity entered is 4. But before saving the PURCHASE ORDER the order quantity will be changed to 25(which is the rounding value). This is the correct functionality but doesn't happen with the PURCHASE REQUISITION (ME51N)
    Can someone guide me on how to make the rounding value work for purchase requisitions when using ME51N?
    Thanks in advance.
    cheers,
    Randi

    Hi!
    i had the same problem with a company.
    i did not find any customizing possibilities.
    I solved it with BAdI ME_PROCESS_REQ_CUST
    Method PROCESS_ITEM.
    I hope this helps
    Flo

  • Funds Management related error while creating Purchase Requisition

    Hi,
    Am working in ECC6.0 system with Funds Management integration. While creating PR am getting  below mentioned error
    "At least one GL account was not derived by the budgetary ledger
    Message no. FI_E034"
    Diagnosis
    You are using the Funds Management system integrated with the budgetary ledger (BL) active for FM area .
    Postings into the budgetary ledger require a GL account for each of the budgetary ledger line items. However,
    in this case, at least one of the line items in the BL interface table does not contain a GL account.
    Use the link below to analyze the table contents before and after the account derivation process.
    Budgetary ledger account derivation trace
    System Response
    The budgetary ledger cannot post this document. The BL document"
    Can some body guide me how to fix this error.
    Thanks in advance

    hi
    which component you are using?
    FORMER BUDGETING OR   BUDGET CONTROLSYSTEM( BCS)
    CHECK YOUR DERIVATION STRATEGY BY USING FMDERIVE.
    CHECK DERIVATION RULE  FOR BUDGETERY LEDGER AND G/L ACCOUNT.
    THANKS & REGARDS
    MALA K VUNDELA

  • Availability check for configurable material while creation of sale order

    Hi Experts,
    Does anyone know how stock can be viewed for configurable materials.
    Does ATP work at the time of Sales order to check for material avaialablity based on the variant in the sales order ?
    Regards
    Chandru

    Dear Sir,
    Sorry for the delayed reply. I was in long leave.
    My scenario is same like Material variant.
    This is my requirement. Whether this is possible or not.
    To check stock of machine nearest to configured specs or lead time.It should indicate the percentage of material  in production stock & lead time for manufacturing the same. & also we should be able to link production order number in sale order manually.
    Please guide me to sort out this issue.
    Regards
    Chandru

  • Sales Order - Availability check for components

    Hi All,
    I have 2 parts to my qns.
    1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
    2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
    Await inputs.
    Anyone to help on this?
    Edited by: Vivek on Jan 15, 2008 10:56 AM

    As we know, availability check is controlled by the combination of checking rule and the checking grp.
    U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
    In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
    Currently, the checking rule is predefined in SD.
    while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
    Hope i answers.
    Reward points if it is useful.

  • Availibility check for sales orders created simultaneously

    Hi SD experts,
    When a sales order is being created with an item "A", while a second sales order is being created too, at the same time, with the same item "A", the system can't carry out the availibilty check.
    It displays the following message : "The material A (plant M500) in item 000010 which you entered for processing is blocked for another transaction. The system is therefore unable to carry out either the availability check or the transfer of requirements."                           
    This is quite logic... But for example for a call center where the operators create orders simultaneously how can we make it possible??
    Any suggestions please ?
    Thank you,
    Bahia.

    Hi there,
    In SPRO -> SD --> Basic functions --> Availability check & TOR --> Avaliability check --> Avaliability with ATP --> Define material block for other users.
    Here you make the settings for different availability check types 02 for individual requirements etc. If you check the field Block, system will block the material for other remaining sales orders if availability check is being carried for one sales order. It is set at plant level. If same material is available at other plants, it will be available there.
    Regards,
    Sivanand

  • What is the Availability check relevant for batches in Std. SAP except CH

    Hi,
    What is the Availability check value in material master relevant for batches in standard SAP except CH.
    As far as I know CH will enable to have automatic batch determination at sales order level. In the same manner, do we have any other availability check value in standard SAP like CH which will enable batch determination at delivery level.

    Don't post the same question repeatedly. Keep one thread open and close the other threads.
    You have already posted the same at  Wha is batch relevant availability check value in standard SAP except CH
    Regards,

  • Availability check for sales order stock

    Hi,
    We use sales order stock in sales order which creates purchase requisition automatically.Movement types for GR 101E, for GI 601E. Material master data has on MRP2 view as GR processing time 2 days for example. I create sales order with requested delivery date today.After saving SO, PR is created and I create PO with delivery date today and post goods receipt document for today. System gives as confirmation date today + 2 days. although the material is in stock.
    We use also project stock in sales order which creates purchase requisition automatically.Movement types for GR 101Q, for GI 601Q.I run the same scenario for the same material. As soon as I create the purchase order system confirms the open quantity in sales order for today. (Scope of availability check is the same for both sales orders and includes PO)
    What can be the reason?
    Thanks

    Hi Murat,
    i guess the problem is with the 'Check without RLT' indicator' in Availability check control. For the MTO (checking rule AE) i guess this indicator is not set but for the Project systems (Checking rule PS) this indicator is set. This makes the difference. Do the changes as desired in transaction OVZ9.
    Please check and revert back if you are still facing the same problem.
    regards,
    Kathir

Maybe you are looking for

  • Looking for help in making my computer good enough to play games

    I bought a computer from Best Buy right after Christmas. It's a HPE-410y. I'm pretty happy with it in terms of speed and ease of use. I'm glad to be finally done with freaking Vista and blue screens of death. Anyho, a buddy of mine wants me to play B

  • 2nd iPod not being recognized under devices

    3rd try! Sorry if it posts a number of times but it keeps saying can't post without a message. I have two iPod touch and two iPad2. I got the second iPod touch before the iPads. When I plug it in to sync ( all are on my account), iTunes lists the I P

  • Why can't I get my ipod nano to shuttle songs

    I cannot get my ipod nano to shuttle songs.

  • Final Cut Studio lost S/N

    I've upgraded to Leopard and now have to re-enter my serial number before I can use any of my Final Cut Studio (ver 1) applications. I'm also having trouble with the system recognizing my HP All-In-One (1315v) scanner. Everything else seems to work,

  • Building Flash Bar Chart

    HI I am building a flash bar chart which works, I load data from a txt file. When I load whole numbers, the chart works fine but when I load a number like 7.5 it stays at 7 or goes to 8. I am using the flash time line as the reference on the bar char