Different sap solutions

1.can we install these five different applications (erp,crm,scm,srm,plm) in five different boxes and total landscape can be monitored by solman?

Dear Ramu,
we can have five different applications (erp,crm,scm,srm,plm) in five different boxes and total landscape can be monitored by solution Manager. As far as my knowledge goes this is what SAP is recommending.
Regards,
Rakesh

Similar Messages

  • 2 Different SAP systems one with only WM and other no WM system

    Hi All,
      We are having trouble to implement 2 different SAP systems. In one SAP system only MM & IM will be there. The other SAP system only WM system will be there.
                In the SAP system with only MM / IM system all the materials will be valuated where as the SAP system with only WM system, there won't be any valuations. It just serves as a 3PL warehouse for the first SAP system which has only IM environment.  Both are acting as a different companies.
    We planned to interface all the PO, Inbound Deliveries and also the Sales order and deliveries to WM SAP system and develop a custom program to do PGR / PGI in WM system and then transmit the PGR / PGI details to the SAP system (which has only MM / IM environment). The WM system also uses the RF guns. But not so sure whether this can help.
    Can you please help me how to configure the WM system. I will be very grateful for your help.
    Regards,
    Vansh

    Hello,
    there is a standard SAP solution: [Decentralized Warehouse Management (LE-IDW) |http://help.sap.com/saphelp_erp60_sp/helpdata/en/51/803c35975f0054e10000009b38f839/content.htm]
    for your scenario.
    Andrzej

  • BOE 3.1 SR3 on Solaris SPARC - how to for Int kit for SAP Solutions ?

    Hi,
    this is my first BOE installation and I've just installed the BOE SR3 Enterprise Server on Solaris SPARC with SAP WAS 7.0 and Oracle 11.2.0.2 providing the CMS database location and the Java application server for the BOE applications.
    The installation went ok and all BOE Server services are running. I've now got to install the XI 3.1 SR3 BOBJ Integration for SAP Solutions kit and have read the installation and administration guide for this.
    The pre-requisites state that the SAP RFC & Java Connector needs to be put in place before deploying. Are these not part of the NW 7 WAS 7.0 Java Server anyway ?
    If anyone has any pointers to more detailed instructions for doing Integration for SAP solutions kit other than the guide then please let me know.
    Regards,
    Brian.

    Hello Ingo,
    many thanks for your reply, although I'm still confused. My Business Objects 3.1 Enterprise Server runs on the same host as a NW 7 WAS and has it's applications deployed and running on the NW 7 WAS Java instance .According to OSS 549268 you should not use the standalone SAP JCO connector if your applications are running on a SAP WAS - it has it's own integrated SAP Java Connector
    "SAP JCo is available for two different environments: there is the standalone version and the version integrated in the SAP J2EE Engine. These two JCo variants have a compatible API but are implemented differently, so you may not mix them together within one environment.
    SAP JCo 2.1 is the standalone version and can be used in all Java applications not running in an SAP J2EE Engine environment.
    So it seems I don't need to use the standalone Java connector ?
    Regards,
    Brian.

  • Configuration for Central Monitoring System in SAP Solution Manager.

    Hi Folks,
    I am trying to setup Central System Monitoring in SAP Solution Manager, I am following the document which mention the step by step instructions.
    There are couple of items on which  I am really confused.
    In the documentation it says to activate Background Dispatching & Central System dispatching in 000 client of Solution Manager,
    it also mentioned about creating CSMREG user, but it did not say in which client this activity needs to be performed, and there are lot many steps in which there is no mention about the client of solution manager in which we have to perform the configuration.
    Can you guys please help me to configure properly?
    One set document which I saw talks about the configuration using RZ21 and other document discuss about Configuration using System Monitoring Work Center, which one do we need to follow, are both methods are 2 different options doing the same thing, can you please clarify?
    Also, is there any document which clearly explains the setup of  Central System Monitoring in SAP Solution manager using both approaches and also to test the monitoring?
    I have SAP Solution Manager 7.0 EHP1.
    Thanks.
    Jennifer

    Hi,
    >
    > it also mentioned about creating CSMREG user, but it did not say in which client this activity needs to be performed, and there are lot many steps in which there is no mention about the client of solution manager in which we have to perform the configuration.
    >
    You should created this user in working client.
    > Can you guys please help me to configure properly?
    >
    > One set document which I saw talks about the configuration using RZ21 and other document discuss about Configuration using System Monitoring Work Center, which one do we need to follow, are both methods are 2 different options doing the same thing, can you please clarify?
    >
    You can use RZ21 or System monitoring through work center. From Solution manager 7.1, you need to use work center only. So, I would suggest you to use work center only.
    Thanks
    Sunny

  • SAP XI scenarios (SAP Solution Manager and SAP ECC 6.0)

    Hi!
    I have a SAP Solution Manager System 7.0 (ABAP+Java) and SAP IDES ECC 6.0 (ABAP).
    Futhermore I have SAP NetWeaver 7.0 with SAP XI 7.0.
    Which scenarios can I implement with these systems and where can I find the appropriate documentation?
    - Proxy to Proxy
    - IDOC/ALE
    - Webserice
    - other scnenarios (???)
    Thank you very much!
    regards
    Holger

    Hi Holger,
    Please do search in SDN you might get more.......
    Proxy to Proxy
    ABAP Proxies in XI(Client Proxy) - ABAP Proxy to File
    File to R/3 via ABAP Proxy - File to ABAP Proxy
    IDOC/ALE
    Introduction to IDoc-XI-File scenario and complete walk through for starters. - IDoc to File
    Few other scenarios :
    File to R/3 via ABAP Proxy - File to ABAP Proxy
    Introduction to simple(File-XI-File)scenario and complete walk through for starters(Part1) - File to File Part 1
    Introduction to simple (File-XI-File)scenario and complete walk through for starters(Part2) - File to File Part 2
    Convert any flat file to any Idoc-Java Mapping - Any flat file to any Idoc
    RFC Scenario using BPM --Starter Kit - File to RFC
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1685 [original link is broken] [original link is broken] [original link is broken] - File to Mail
    Dynamic File Name using XI 3.0 SP12 Part - I - Dynamic File Name Part 1
    Dynamic file name(XSLT Mapping with Java Enhancement) using XI 3.0 SP12 Part -II - Dynamic File Name Part 2
    The specified item was not found. - Dynamic Mail Address
    Understanding message flow in XI - Message Flow in XI
    Walkthrough with BPM - Walk through BPM
    Schedule Your BPM - Schedule BPM
    Demonstrating Use of Synchronous-Asynchronous Bridge to Integrate Synchronous and Asynchronous systems using ccBPM in SAP Xi - Use of Synch - Asynch bridge in ccBPM
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
    The specified item was not found. - Maintain RFC destination centrally
    Triggering e-Mails to Shared folders of SAP IS-U - Triggering Email from folder
    Outbound Idoc's - Work around using "Party"? - Handling different partners for IDoc
    /people/siva.maranani/blog/2005/08/27/modeling-integration-scenario146s-in-xi - Modeling Integration Scenario in XI
    The specified item was not found. - Testing of integration process
    The specified item was not found. - Authorization in XI
    http://help.sap.com/saphelp_nw04/helpdata/en/58/d22940cbf2195de10000000a1550b0/content.htm - Authorization in XI
    The specified item was not found. - Alert Configuration
    The specified item was not found. - Trouble shoot alert config
    Executing Unix shell script using Operating System Command in XI - Call UNIX Shell Script
    Overview of Transition from Dev to QA in XI - Transport in XI
    Using ABAP XSLT Extensions for XI Mapping - Using ABAP XSLT Extensions for XI Mapping
    /people/prasad.ulagappan2/blog/2005/06/07/mail-adapter-scenarios-150-sap-exchange-infrastructure - Mail Adaptor options
    IDOCs (Multiple Types) Collection in BPM - Collection of IDoc to Single File
    XI : Controlling access to Sensitive Interfaces - Controlling access to Sensitive Interfaces
    The specified item was not found. - The same filename from a sender to a receiver file adapter - SP14
    Payload Based Message Search in XI30 using Trex Engine - Payload Based Message Search in XI30 using Trex Engine XI : Configuring CCMS Monitoring for XI- Part I - XI : Configuring CCMS Monitoring for XI- Part I
    The specified item was not found. - XI: HTML e-mails from the receiver mail adapter
    Thanks
    Prabhakar

  • EWA: error message in CRM check for SAP Solution Manager system

    Hello!
    In EWA report for SAP Solution Manager system I have seen error message: Many CSA* inbound queues in error status were detected in your system. As a result of this BDocs have not been delivered. And then table
    Queue Name                                Status     Date of first entry             Entries
    CSABUPA0000000070           READY     03.12.2007                          45
    CSABUPA0000000934           READY     07.05.2008                          45
    CSAIBASE0000000000           READY     23.11.2007                          36
    CSA_ORDER_8000000000      READY     22.11.2007     5
    CSA_ORDER_8000000001      READY     22.11.2007     3
    and others.
    I looked transaction smq2. There are 11300 queues in it. Is it actual error or it is a normal situation? And that must I do, to remove an error?
    Edited by: Mariya Kurbatova on Jul 2, 2009 6:27 AM

    Hi,
    Usually problems with hanaging CSA* queues are caused because too many
    indiviaual queues are created for the qRFC resources to handle. You can
    limit the number of queues as described in note 763680.
    Note 763680 would be useful if all of your qRFC resourcesa are in use
    when you have a great number of queues. With a large number of dialog
    WPs on the system it would probably make sense to reduce the amount
    as described in the note.
    the casue when you have this problem would be to check SMQR -> GOTO ->
    qRFC resources. You can also see if most of your dailog WPs are in use
    in SM50.
    Also refer to note 758677.
    Please schedule report RSQIWKEX (Inbound) to run as described in the
    note.
    And since your title has mentioned that the EWA is on your CRM satellite system; this maybe a further good reference too
    When you replicate lots of data from CRM to R/3, there could be a qRFC
    resource problem. In this case, the numebr of queues created can be
    reduced by implementing the attached note 356228, particularly solution
    2.
    For CSA* queues is slightly different from the one decribed in note;
    this is because the CSA queues exchange data within the CRM system.
    The steps described should be followed, except that table SMOFQFIND
    must be used instead of CRMQNAMES. In this table, fields TR_SNAEMS and
    SEGM_FLD are equivalent to the CRMQNAMES fieds BAPISTRUCT and BAPIFLD
    respectively. It should be possible to follow the solution 2 in the
    note as long as you use SMOFQFIND instead of CRMQNAMES.
    Hope this helps
    Cheers,
    SH

  • SAP Solution for Mini steel plant with DRI Process

    Dear all,
    I am a metallurgist who spent couple of years in steel and process Industry and then moved to IT Consulting as SAP consultant / business analyst mainly working in the area of solution designing.
    Here i will like to describe SAP solution for Mini steel plant with DRI proces.
    u201CManufacture Productsu201D Description
    The series of operations performed upon material to convert it from the raw material or a semifinished state to a state of further completion. This includes the establishment and maintenance of a CAPEX plan, the planning, scheduling and execution of production activities, the dispositioning of produced goods, the maintenance of production data, the monitoring of production performance and the implementation of engineering changes.
    u201CManufacture Productsu201D Objectives
    M-010
    Compile 3-year CAPEX Budget     Establish the overall manufacturing goals and metrics that the organization will use to measure performance and progress towards objectives. These goals should be consistent with overall organizational strategy/value propositions. Develop long-term goals for production capabilities and manufacturing. These goals should align with the overall goals and objectives of the organization.
    M-050
    Perform Long Range Production Planning     u201CBudgetingu201D. Long range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios. Approved capital expenditures from the 3-year CAPEX budget may influence the budget. Range and frequency for budgeting is yearly.
    M-060
    Perform Medium Range Production Planning     Medium range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios.  Range and frequency for planning is quarterly.
    M-070
    Perform Short Range Production Planning     Short term planning of production quantities based on capacities and demands as previously planned in the longer terms, actual customer demand and actual capacities. The result from short range production planning will run into the operational plan for the current and following days.  Range and frequency for planning is monthly.
    M-080
    Schedule Production     This sub-process enables detailed scheduling by resources over the planning horizon. Planned orders that fulfill demands (Stock Transfer Requisitions, Sales Forecasts and Customer Orders defined by due-dates and due-quantities) come from the short range plan. This results in a feasible schedule, optimizing utilization of the production resources. It is based on production process constraints as well as labor resources in order to minimize production costs and also taking into account constraining raw materials availability.
    M-090
    Execute MRP     The purpose of this sub-process is to generate a Materials Requirements Plan (MRP) for all materials, which are produced or purchased. The MRP process involves looking at current material inventory, planned inbound material deliveries, requirements, lead times and stock levels to generate a detailed plan for future material requirements. The materials requirements will be generated with respect to the three planning horizons, short-term, medium-term, and long term. If an over stock of raw materials occurs as a result of a planning change production and marketing personnel will be informed. This would allow for the cancellations of any unneeded shipments.
    M-100
    Perform Setup / Changeover     Perform set-up and changeover activities on production equipment as necessary, to prepare for the production of specific materials/grades. Set-up and changeover activities will enable the production equipment to perform operations on materials, as per the specifications called out on the production order. Ensure time is allocated for first off inspection requirements after changeover.
    M-110
    Execute Production     Insure that the production plan is met by converting raw materials and component supplies into finished and semi-finished products. Batch/lot documentation will be created for individual production orders to provide traceability throughout the process. Each step of the production process is continuously monitored to identify mechanical, quality, and productivity issues and suggest solutions when problems arise. Data collection for performance and financial reporting enables management to take immediate action on manufacturing processes as well as conduct historical analysis.
    M-120
    Perform Quality Management     Quality management refers to the entire supply chain process. Process activities are related to the evaluation and inspection of key characteristics of semi-finished and finished materials. These evaluations are recorded and acted on based on the results. Report/manage internal quality problems or issues. Install and manage quality control systems to insure product quality. For supplier or subcontractor based issues this data should be used as a performance measure during the vendor evaluation process.
    M-130
    Manage Product Disposition     This process ensures those semi-finished and finished products that do not meet quality requirements, are prevented from being used and distributed in good finished product to customer, or released for the next step of the production process. A semi finished product is any material that needs to have another operation on line before being shipped to the customer. Finished goods are defined as any material that can be shipped to a customer; in house produced finished goods, subcontracted materials and trading goods. The information required to make decisions regarding disposition comes from the Quality Management system of each production facility. The first step ensures that raw material and returnable goods are dealt with in another subprocess. The reason for the goods not meeting quality standards is recorded along with the results of any investigation to find the cause of the fault. Information is sent to all other parties who need to know: order fulfillment, inventory management and shipping. The process ensures that the most appropriate action is taken to either dispose of, or rework the goods. Disposal or rework may be either through the original materials supplier or subcontractor, or Mittal Steel Point Lisas.
    M-140
    Maintain Product Related Data     u201CMaterial Master Maintenanceu201D. The Sub-Process 'Maintain Product Related Data' is the list of activities that identify the steps and decision points related to the request for and performance of additions, changes, and deletions to the Material Master file or files. This sub-process begins when a need to create, change or delete a material is identified and ends when the request is either actioned or refused. The sub-process is intended to cover all material types, including finished goods, raw materials, bills of materials, equipment and service, POS, Sundry Items etc. In fact, any product which the company wishes to inventory or purchase. A number of key strategic decisions, including a clear definition of when we issue a new material, will affect this sub-process.
    M-150
    Maintain Production Related Data     u201CMaster Data Maintenanceu201D. This subprocess identifies the activities related to requesting changes or additions to production related master data. Once a need for master data maintenance is identified, a request is submitted for approval. Data defining production capacities and performance standards (e.g. line efficiencies, material yields, etc.) require Corporate level approval prior to maintenance. Other data that is more specific to internal planning functions are maintained at the plant level. Maintenance requests are returned to the originator whether the request is approved or not to improve communication throughout the system. This subprocess may be triggered by: annual operations budgeting process process/production equipment upgrade or replacement change in facility work schedule (i.e. planned hours or days) change in personnel required to operate process/production equipment new products, formulations, or packaging.
    M-160
    Operations Execution Reporting     Gather manufacturing information at various points in the production process. Prepare management reports both at the detailed level for plant management and summary level for senior operations management. Reports will be available on-demand and will include - volume, efficiencies (mechanical, line, and labor), yields, downtime, asset utilization, environmental, safety, quality, and financial data. A major goal of this sub-process is to define a consistent method of calculating operations metrics. Some plants will use line information systems and PCSs to collect information. Not all plants are equipped with these systems and the where they do exist, the level of sophistication varies.
    M-170
    Manage Process Reliability     Optimize capacity by reducing process downtime and ensuring compliance to quality expectations by the reduction of rejects. Install tracking systems to measure line time utilization, quality results, process settings. Conduct root cause analysis, and use the data to develop and implement improved operating procedures.

    Thank you for your prompt response. I'm assuming you are still proposing to use Sales order -> purchase order -> invoice verification -> Customer billing process flow. Is that correct?

  • 1)    Is there North Bound Interface / API from SAP Solution Manager available for 3rd party integration?       i. The list of the modules that are being managed by SAP Solution Manager(s)      ii. The performance metrics of those modules/components at th

    1)
    Is there North Bound Interface / API from SAP Solution Manager available for 3rd party integration?
    i. The list of the modules that are being managed by SAP Solution Manager(s)
    ii. The performance metrics of those modules/components at the high level
    iii. The information about Early Watch Alerts (or situations to watch for)
    2)
    Is there a full SNMP interface for getting the above information from SAP Solution Manager?
    3)
    Is that understanding that SAP has SNMP support for forwarding alerts to a 3rd party system, correct?
    4)
    Does SAP has both free and licensed? If yes then what are the advantages of licensed over the open/free version?

    Mugunthan
    Yes we have applied 11i.AZ.H.2. I am getting several errors still that we trying to resolve
    One of them is
    ===========>>>
    Uploading snapshot to central instance failed, with 3 different messages
    Error: An invalid status '-1' was passed to fnd_concurrent.set_completion_status. The valid statuses are: 'NORMAL', 'WARNING', 'ERROR'FND     at oracle.apps.az.r12.util.XmlTransmorpher.<init>(XmlTransmorpher.java:301)
         at oracle.apps.az.r12.extractor.cpserver.APIExtractor.insertGenericSelectionSet(APIExtractor.java:231)
    please assist.
    regards
    girish

  • Competitors for SAP Solution Manager within central system monitoring

    Hello!
    We currently use SAP Solution Manager (CCMS monitors from RZ20) for the central system monitoring for several SAP systems.
    Are there some other tools/competitors that can also serve as central platform for system monitoring of several SAP systems?
    (e.g. HP OpenView).
    Many thanks!

    Hello,
    You may want to take a look into the EarlyWatch Alert report.
    It's a weekly report that gives information about many different areas of your systems and helps you to maintain them. It helps to detect problems before they occur by analysing trends on your systems and alerting about it. It definitely may work taking a look into it: service.sap.com/ewa.
    It does not have an additional cost, all you need is a solution manager.
    Regards,
    Daniel.
    Edited by: Daniel Nicol on Apr 11, 2011 8:04 PM

  • How to work sap solution manager

    < MODERATOR:  Message locked.  Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. please search first. >
    Hi experts,
    can anybody what is the use of sap solution manger and how its work.
    Regards,
    arti singh

    The SAP Solution Manager supports you throughout the entire life-cycle of your solutions, from the Business Blueprint to the configuration to production processing. It provides central access to tools, methods and preconfigured contents which you can use during evaluation, implementation and operational processing of your systems.
    Features
    Implementing and Upgrading SAP Solutions
         Central access to all tools for your project (Project Administration, Business Blueprint, Configuration, Test Workbench, create Group Rollout templates)
         Central management of all information for your Project (roadmaps, system landscape, project documentation)
         Compare and synchronize customizing in different SAP components
    Solution Monitoring
         Central System administration
         Analysis of your system landscape with Service Level Reporting
         Real-time System Monitoring
         Business process monitoring
    Services and Support
    Access to programs and Services to monitor and optimize the performance and availability of your system landscapes, and minimize risks when running your systems
    Service Desk
    Solution support with workflow to Create and Process Problem Messages
    Change Management
    Manage change requests, with workflow to trace and audit changes and transports in your system landscape with Change Request Management.

  • Upload of Test Cases in SAP Solution Manager.

    Hello,
    I am trying to create a project and its component in SAP Solution Manager with 12 Test Plans. The Test Plans have different number of test cases. I do not have the Test cases now, but I shall have them in future. I currently have the following data.
    Test Plan ID
    Module
    Business Process
    Business Area
    Sub Business Area
    Test Case Description
    Test Case Details
    Transaction Codes
    Priority of Test Cases
    Can I create a structure of a project in the development system in which I have 12 Test Plans and n number of Test Cases under every Test Plan? The structure would have place holder for each test case in which I can upload the Test Cases later. Is that possible?
    Regards,
    Namrata.

    Hi Namrata,
    Yes, you can create project structure before using solar01 tcode. later once your test cases (either manual or automatic) are ready then you can upload them using solar02 on test cases tab,
    refer Link Test Case to Transactions/Reports - Configuration - SAP Library
    Assignments - SAP Solution Manager - SAP Library
    Thanks
    Jansi

  • Ticket SAP Solution Manager 7.0 to SAP EHP 1 for SAP Solution Manager 7.0

    Hi,
    I want to migrate all tickets from SAP Solution Manager 7.0 to SAP EHP 1 for SAP Solution Manager 7.0 , please let me know the procedure how to migrate it.
    DB Detail
    SAP Solution Manager 7.0 - MSSQL( 9.00.4035)
    SAP EHP 1 for SAP Solution Manager 7.0 - MSSQL(10.00.2531)
    Thanks,
    Kaleel

    Dear Mohamed,
    I was reading the post and the replies and while I think your question has been answered, I just want to make sure what you are trying to achieve. Is it a migration, where you have one Solution Manager system on SAP Solution Manager 7.0 and another
    SAP Solution Manager EHP1 system and you were looking to migrate the Service Desk messages?
    If you are "Upgrading" one system from Solution Manager 7.0 to  EHP1 then all the messages are preserved.
    If you are "Migrating" to a physically different system, then transfer of Service Desk Messages is not supported.
    Please see the document [SAP Solution Manger-  Conent Transfer|https://websmp204.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000608232009E]
    Also Service Desk is a completely independent CRM Service, so the messages could always be archived, as has been suggested.
    No depending on your scenario, is the EHP1 system brand new or is it already productive? If it was brand new, you might be able to do a homogenous system copy, and then upgrade the new system to EHP1. But if it is already productive, this would not be an option.
    Hope this helps to clarify.
    Regards,
    Paul

  • Users are not able to access two different SAP portals at a time

    Hi Experts,
    Users are not able to access two different SAP portals at a time, if users login the OLD SAP Portal then they are not able to access NEW SAP Production Portal asking user id's & Password while doing ECC & APO transactions.
    If user clear the Internet Explorer cache then for time being they can access but its not the permanant solution.
    Can any one please help me on this.
    Thanks,
    Jay

    Hello Jay,
    here we are facing this problem, this company users not able to access both the portals at at time
    If you want to access HTC and Armed at the same time you gotta complete SSO Config or User mapping between these two Portals. You can refer to the below link for more details.
    http://help.sap.com/saphelp_nw04/helpdata/en/f8/3b514ca29011d5bdeb006094191908/content.htm
    Thanks
    SM

  • Welcome to Forum "SAP Solution Manager for VAR Partners"

    Welcome to our forum to discuss topics on set up SAP Solution Manager for VARs scenario to support your SAP BUSINESS ALL-IN-ONE customers.
    You ask everything about configuration of the Service Desk, SAP Solution Manager  operation, tips and tricks.
    This forum is visible not to customers but exclusively to partners.
    The preferred language is English.
    All documents you need for configuration of the VAR scenario of the Service Desk you can find in the SAP Service Marketplaces under the Quick Link [var-partner.|http://www.service.sap.com/var-partner]
    Have a look at the [SAP All-in-One Resources|http://service.sap.com/smb/ao/resources] (perhaps different user ID required)
    Feel free to create questions on all SAP Solution Manager topics as a VAR.
    Feel free to create answers on all questions other members posted.
    This means worldwide collaboration.
    For questions / discussion not specific to VARs please consider also the [general  forum SAP Solution Manager|SAP Solution Manager;.
    Notice: to save a posting click "Edit Message".
    Welcome Thread: Welcome to Forum "SAP Solution Manager for VAR Partners"
    Rules of Engagement https://www.sdn.sap.com/irj/scn/wiki?path=/display/home/rulesofEngagement
    Test & Playground Forum: Try SCN Features

    Welcome to our forum to discuss topics on set up SAP Solution Manager for VARs scenario to support your SAP BUSINESS ALL-IN-ONE customers.
    You ask everything about configuration of the Service Desk, SAP Solution Manager  operation, tips and tricks.
    This forum is visible not to customers but exclusively to partners.
    The preferred language is English.
    All documents you need for configuration of the VAR scenario of the Service Desk you can find in the SAP Service Marketplaces under the Quick Link [var-partner.|http://www.service.sap.com/var-partner]
    Have a look at the [SAP All-in-One Resources|http://service.sap.com/smb/ao/resources] (perhaps different user ID required)
    Feel free to create questions on all SAP Solution Manager topics as a VAR.
    Feel free to create answers on all questions other members posted.
    This means worldwide collaboration.
    For questions / discussion not specific to VARs please consider also the [general  forum SAP Solution Manager|SAP Solution Manager;.
    Notice: to save a posting click "Edit Message".
    Welcome Thread: Welcome to Forum "SAP Solution Manager for VAR Partners"
    Rules of Engagement https://www.sdn.sap.com/irj/scn/wiki?path=/display/home/rulesofEngagement
    Test & Playground Forum: Try SCN Features

  • Copy SAP Solution Manager

    We would like to copy or install SAP Solution Manager 7.0.
    We investigate 2 options:
    1) Copy from existing SAP Solution Manager (export/import with SAPINST)
    2) new installation
    Question:
    Which approach is better (1 or 2)?
    Is a system copy of SAP Solution Manager different to other system copy of SAP systems?
    Which points should be regarded with system copy approach?

    Hi,
    I suggest you go for copy system option as it will copy all the config settings also
    Only in case if IP etc is changed the RFC needs be regenerated again otherwise basic settings will be there.
    This saves a lot of time
    Regards
    Prakhar

Maybe you are looking for

  • How can i transfer music and photos from my ibook g4 to my new mac mini?

    the g4 has a firewire 400 and the mini is firewire 800.  IS there 400 to 800 firewire or a male-male usb2 cable out there?  I've tried moving files to my external drive and then moving to the mini but the photos move over as one event. The music move

  • Statement in resumable session 'SYS.SYS_IMPORT_FULL_01.1' was timed out

    I am working on Oracle 10.2.0.2 database on Solaris 10. I am trying to import a schema into the database but the datapump job was hanging due to resumable timeout. Temp tablespace ran out of space. Alert log ORA-01652: unable to extend temp segment b

  • AE Crashes on Export to QT

    After Effects Production Premium CS3 on Windows Vista. AE Worked great for about 10 Projects then on Export to Quick Time started crashing. 1. Question AE Export to QT Movie -(Default Settings) Crashes half way thru Export to QT  get a Error  0 : : 4

  • Isight not working after power went out in house

    Something was making my serrate bracket to be thrown in my basement making the power to go out, and after that my isight does not work any more. My macbook pro was plugged into a power strip but i dont think it has a serg protector on it. I have trie

  • Safari keep closing automatically

    I just updated my iphone 3gs to 4.3.5. And when I tried to open safari,it close after 2 seconds. I tried to reboot it or turn it off and on even reset the setting ,but it still not working.Could anyone tell me what should I do?