Do we need to create Storage Bins for each Client?

Hi,
I have defined the storage bin structure etc which I could transport.
But does the creation of bins (using LS01N) need to be done separately for each client? If on the test client we dont have access to Create Bins then what is the right approach to get it done.
Thanks.

Thanks. I tried using LS05.
What entries should I make?
I entered Warehouse and Storage Type
The Default Session was showing as RLLS0500 and I left it as it is.
But I am getting Error message "Check you entry for manual storage bin creation".
Any suggestions?
Thanks.

Similar Messages

  • HT2534 i need to create apple ID for each of my girls   it keeps saying DO NOT MEET AGE REQUIREMENT   im very frustrated

    i need to create an ID for each of my daughters  it says DO NOT MEET MINIMUM AGE REQUIREMENT    very frustrated

    If u haven't resolved this issue yet, I just did.
    What I did:
    1. Toggle the hold switch (turn it on and off)
    2. Reset to 'Disk Mode'
    by pressing the 'Play' and center buttons
    simultaneously
    (it may take a couple of trials to get it right)
    3. Update iPod with latest iTunes in Disk mode.
    4. Incase the 'Can't find firmware' error msg is displayed,
    follow the instructions in the link given below:
    http://docs.info.apple.com/article.html?artnum=304309
    Toshiba SatelliteA30-203, Compaq Presario 3000   Windows XP Pro  

  • Graphical mapping question - need to create 2 nodes for each record

    The mapping is from flat to nested, i.e. flat file to FIDCC2 idoc. Each record has to go to 2 repeated IDoc segments, each one with different posting key. Right now, I have it working for each record to a segment(for one segment) by using splitByValue (value change). How can I repeat the creation of another but with slightly different constant.
    Also, how do I add line numbers? I remember seeing a posting on this a while ago - cannot locate it.
    Will be Rewarded WELL.
    Thanks,
    Pam

    Hi, Pam
    Using the following example to store it as global variable
    SetParameter from GloabalContainer:
    container.getGlobalContainer ().setParameter ("COUNTER", "0");
    GetParameter from GloabalContainer:
    String myCounter = (String) container.getGlobalContainer().getParameter ("COUNTER");
    When you map to your constant, store it in global variable, then you map other field, get current global variable, check its value, based on the value, you do proper mapping.
    Hope it helps
    Liang

  • Create single TO for each position of material in purchase order

    Hi, I am facing a problem while recieving stock from GR mvt 101
    I'm following this steps
    1.- I'm creating a purchase order with several materials (The number of material
    is diferent for each material)
    2.- Good Receipt with MIGO,I'm using movement type 101, this was configurated for
    create automatic TR and TO
    3.- while I'm traying to create a Tranfer Order(LT04), SAP system send this errror
    "you need to create single TO for each position of material"
    Note: Only one Transfer Requirement was created with several postions.
    4.- if I use LB11, the transfer order is created manual for each material, however
    I need to do this one by one.
    Are there any configuration that enable create one single TO for each position in
    purchase order??.
    Im trying to create  TO with LT10 using a new movement type and this enable me move
    material to bin location. However the TR still exist.
    Thanks in advance.
    Regards

    The problem was resolved.
    Thanks in advance

  • Storage Bin for Interim Storage Type 902 for GR

    Hi,
    We know that the the dynamic storage bin for goods receipt for PO is the PO number. However, when we are posting GR, system creates TR with interim storage bin as material document number.
    I looked into the movement type config. However, we can only state that whether interim bin should be cordinates or fixed bin or dynamic bin. It has no way to mention what that dynamic bin would be.
    Can you please suggest a way to change the dynamic storage bin as PO number instead of material document number.
    Thanks,
    Shekhar

    Dear Shekhar,
    Could you please check in view V_T308 (transaction code OMNF) whether the indicator "Dynamic bin material document" is set for your warehouse number and requirement type B?
    Best regards,
    Christiane
    Edited by: Christiane Schnellenbach on Apr 12, 2010 10:25 PM

  • Do we need to create two zones for Two HBA for a host connected with SAN ?

    Hi,While creating Zone , Do we need to create two zones for Two HBA for a host connected with SAN ? Or a zone is enough for
    a host which having Two HBAs...We have two 9124s for our SAN fabric...
    As I found like one zone  below, I little bit confused that , if a host having two HBA connected with SAN, should I expect two zones for every Host?
    from the zone set, I gave the command show zoneset
    zone name SQLSVR-X-NNN_CX4 vsan 1
        pwwn 50:06:NN:NN:NN:NN:NN:NN
        pwwn 50:06:NN:NN:NN:NN:NN:NN
              pwwn 10:00:NN:NN:NN:NN:NN:NN
    But I found only one zone for the server's HBA2:by the same time in the fabric I found switches A & B showing the WWNs of those HBAs on its
    connected N port...Its not only for this server alone, but for all hosts..Can you help me to clarify on this please..that should we need to create one zone for
    one HBA?

    if u have two independent fabrics between hosts and storage, i think the below confs are recommended.
    Scenario 1:  2 HBAs single port each ( redundancy across HBA / Storage port )
    HBA1 - port 0 ---------> Fabric A ----------> Storage port ( FAx/CLx )
    HBA2 - port 0 ---------> Fabirc B ----------> Storage port ( FAy/CLy )
    Scenario 2: 2 HBAs of dual port each
    HBA1 - port 0 -------> Fabric A ---------> Storage port ( FAx/CLx )
    HBA2 - port0 ---------> Fabric A ---------> Storage port ( FAs/CLs )
    HBA1 - port 1 --------> Fabric A --------> Storage port ( FAy/CLy )
    HBA2 - port 1 ---------> Fabric B --------> Storage port ( FAt/CLt )
    the zone which is in your output is VSAN 1. if its a production VSAN, Cisco doesn't recomends to use VSAN 1 ( default vsan ) for production.

  • Transport the created Storage Bin Automatic from develop to quality LS10

    Hello,
    My customer has created a new entry in LS10 u2013 Create Storage Bin Automatically in the development system with a transport order.
    He forgot to do Environment u2013 Create bins. I did it with my user in the development system and SAP has created the bins automatically (the system creates and launch a batch-input). The system did not ask me for a transport order (I think because this created data is master data).
    The user has transported the transport order from development to quality system but the Storage Bins are not in QAS. I told to the user that the Storage Bin are master data and we has to do Environment u2013 Create bins in each new environment but LS10 transaction has status 'not modifiable' in quality and production system.
    There is a way to transport the created Storage Bin Automatically from development to quality and production? Now the user is asking me to have the Storage Bins in quality and production with access LS10 in status 'not modifiable'.
    Cheers,
    Marta

    I could not transport them but I have created the storage bin directly in QAS with LS05 because LS10 is not available.
    Thank you very much.

  • Do I need to create a view for this?

    Hi Ihave got 2 tables emp and project
    In emp tabe:
    emp_no
    family name
    given name
    In porgect table:
    emp_no
    status(assigned,unassigned)
    start_date
    end_date
    emp_no Family_name given_name
    1 Smith John
    In project table same employee can have many assigement eg
    emp_no status start_date end_date
    1 assigned 01-may-08 01-july-08
    1 assigned 01-sep-08 01-july-09
    1 unassigned 01-july-09 01-oct-09
    In the form:
    there are 2 querable fields "project ends between field1(date) and field2(date)" which is used to
    retrive records which have end date between field1 and field2.
    The following fields are needed to get from database:
    emp.family_name emp.given_name project.start_date project.end_date No.of time assigned
    Requirements:
    1. project.start_date and project.end_date must be the latest project_end_date for the same emp
    so in the above sample date
    2. No. of time assigned is a count of total of number records which have status='assign'
    So for the given sample data the record expected after query would be(field1=01-jun-08 field2=02-july-09)
    emp.family_name emp.given_name project.start_date project.end_date No.of time assigned
    Smith John 01-sep-08 01-july-09 2
    What is the best approach to get:
    1 The lastest project(latest end_date) for the emp
    2. get No.of time assigned.
    Do I need to create a view for this? If yes, any sample sql code this this?
    Thanks for your help

    Hi W1zard,
    Thanks for your reply. Could you clarify the following points for me:
    1.) you could create a master block basing on your emp table and a detail block basing on your project table with the relation over emp_no. set the default_where clause of your detail block programmatically using
    set_block_property('project', default_where, 'status = ''assigned'' and <your_date_criteria>');
    Q1: where I pit this code? in pre-query trigger in detail block?
    2.) Of course you could create a view to join both of your tables if you don't want to use master detail blocks; Also do the join over emp_no
    create or replace force view v_emp as
    select emp.family_name, emp.given_name, project.start_date, project.end_date
    from emp, project
    where emp.emp_no = project.emp_no
    Q2 As I mentioned before, there are multipal entries for the same emp in project table and we only need the maching record from project table which has latest end_date. So I think I need something like
    max(project.end_date) somewhere in create view to make sure only one record for one employee.
    Also is there possible to include the no. of assigned field(select count(*) from project where status='assigned' and emp=emp_no) into the view as well?
    Q3 All the fields mentioned above are diaplay-only. So Can I create a control block which has all the fields from emp and project. Then populate them with my sql. The question is
    where I put this customerised sql so when user click excute query. My sql will run and display one the form?
    REally appreciated your help!
    Michael

  • HT5622 We are a family of 4, each with their own apple device. Is it best for us to set up individual apple ID's for things like ITunes? If we do can the same e-mail address be used for all of them or do we need to create e-mails for the kids? Thank-you

    We are a family of 4, each with their own apple device. Is it best for us to set up individual apple ID's for things like ITunes? If we do can the same e-mail address be used for all of them or do we need to create e-mails for the kids?
    Thank-you

    1. Yes, it is.
    2. You may be able to use the same address by adding a plussed suffix to it, such as [email protected] If that doesn't work, create separate emails.
    (103279)

  • What is the need of creating partner functions for sales document type.

    Hi SAP (SD-GURUS),
    Actually we create partner functions  before creating customer ex: sold to party, ship to party, bill to party, and payer.
    These partner functions are going to be copied into sales order while processing sales order.
    Again what is the need of creating partner functions for sales document type.
    Thanks&Regards
    sreenivas peruru

    There are some Partners you could enter at Sales ORder Level. E.g. Sales Person, Employee Responsible, Forwarding Agent, Broker, etc.
    Thus these partner Determination need to be carried out at Sales Order Level & not at Customer Master level.
    So we have to configure partner Determination for various levels e.g. Customer Master, Sales Order, Delivery level etc...
    Hope this helps...
    THanks,
    Jignesh Mehta

  • Need to Create a Check for Plant in WBS & Plant in Network

    Dear Guru's,
    While creating Project (CJ01) my users are creating in a Plant, and while creating network for the same project/WBS, they are using different Plant Code.
    Since my Profit center is related to the plant in CJ01,
    and because of wrong Plant in network, all my PR/ PO is going in a different Profit center, which is creating a huge problem while auditing.
    I need to Create a Check for Plant in WBS & Plant in Network...!!
    Kindly suggest me the ways to do it and how to do it...

    Hi Deepa,
    The Check you are trying to create between Plant defined at Project def and network level that should be same can be achieved through validation at the network level by using a user exit at network level.
                    While creating the network you can change the plant value not equal to the value at proj def/network profile may be one of the reason is since the network type is defined for more than one plant (OPUV).
                    While creating validations at network level we do not have the option of setting the prerequisite/check  using WBS or Proj def fields (i.e. PROJ-, PRPS- fields)    so we need to create a user exit at the network level.
    I am not sure but logically u can have a user exit for both prerequisite and check steps of the validation.
    You need to create the user exit in program ZGGBR000.
    Please take help from your Abaper for the same.
    OPSI-Network header-Validation- Step - Prerequisite u2013 Check u2013 Message.
    Prerequisite
    If Proj Profile = u2018XXXu2019 and Network Profile = u2018XXu2019 (or as per your logic if need be use a exit)
    CHECK.
    PROJ-WERKS = CAUFVD-WERKS   (This logic needs to be defined in user exit and set the same user exit at the check.)
    Once you define the user exit in ZGGBR000, it will be available in the tab u2018exitsu2019 at the Prerequisite and Check levels.
    The name of the form pool (e.g., ZGGBR000) that contains your user exit must be stored in table T80D.
    It is important that you make declare the code generation program for your user exit; how many and what type of parameters you are using for the user exit. You do this by entering your newly defined user exits in the form routine GET_EXIT_TITLES. Found in program ZGGBR000.
    Check with your Abaper to check on all the aboveu2026
    Message:
    Plant at Network level should be same as at Project def level.
    Hope it helps you,All the best..
    Regards
    Vinayak.

  • Storage bin for storage type

    Hi ,
    How to maintain storage bin for storage type in WM
    Regards
    RB

    Hi
    Check it in LS01N.
    This will do
    Regards,
    Raman

  • Do we need to create message interfaces for idocs and rfcs thatare imported

    do we need to create message interfaces for idocs and rfcs thatare imported
    from sap server
    in scenarios from sap system to file or vice versa
    i knew that we need not create message types
    do we also skip creating message interfaces

    hi,
    you create an abstract message interface for IDOC only if you want to use
    them in a BPM (integration process)
    for more about IDOCs have a look at my book:
    <a href="/people/michal.krawczyk2/blog/2006/10/11/xi-new-book-mastering-idoc-business-scenarios-with-sap-xi"><b>Mastering IDoc Business Scenarios with SAP XI</b></a>
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • Do I need to create new group for standby redo log files?

    I have 10 group of redo log files with 2 members for each group for my primary database , Do I need to create new group for standby redo log files for the standby database
    Group#     Members
    ==============
    1              2
    2              2
    3             2
    4             2
    5             2
    6             2
    7             2
    8             2
    9             2
    10           2
    If So, The following statment is correct? or nto
    ALTER DATABASE ADD STANDBY LOGFILE GROUP 1 ('D:\Databases\epprod\StandbyRedoLog\REDO01.LOG',D:\Databases\epprod\StandbyRedoLog\REDO01_1.LOG');
    please correct me if am doin mistake
    becuase when I issue the statment I getting error message sayin the group is already created.

    Thanks John
    I just find the answer
    Yes, it's recomeded to add new group , for instnace If I have 10 group from 1 to 10 then the standby shoudl be from 11 to 20
    Thanks I found the answer.

  • Storage bin for Project items (Q) MSPR .

    Hello gurus,
    In MM/IM - The storage bin for regular  items resides in MARD.
    I can't find in any table the storage bin for Project items (Q) MSPR .
    Have any idea ?
    Thanks
    Amnon

    Hi ,
    First ,  only IM no WM.
    No "Special stock" field in MARD.
    No sucjh table - VKLAB ,
    Thanks

Maybe you are looking for

  • How to get the File name that File Adapter is giong to write to a directory

    Hi, I am really stuck at one pint while working with File Adapter/FTP Adapter. My requirement is I need to read a message from the Queue and write it to a directory as a physical file using a File/FTP adapter and the name that adapter will give to th

  • Text effects not rendering properly....

    Hi All, I am beating my head against the wall on this one so I hoping some one can help me out. I have a Motion 2 HD720 project (3 of them actually) that 2 weeks ago were successfully rendered with no issues. Last week I got a new MacBook Pro, and no

  • Install laserjet 5p on mac mini

    Hi, We just got a mac mini and I tried using a usb to parallel cable to connect it to the mini.  When I actually connected it, Os X grabbed the HP driver from apple and installed it.  So far so good. Then I was able to "add" the 5P as the mini now re

  • BI servers

    Hi, I have installed business content related objects under 0CRM infoarea in development server.Due to to this some of the already used objects under differant Infoarea(not 0CRM) are affected(deactivated the cubes/ods/transfermatio/dtp),all others ar

  • How can I do a search within a folder on desktop

    I have a folder (on the desktop) that I want to do a search within the folder only.How do I limit the search to just the folder without everything on the HD showing. Thanks Greg