Document for account integration with cProjects needed

hi all
can I get accounting integration document?
<b>mail id        [email protected]</b>
we have cProject 4 and R/3 4.7 which we will be upgrading.
i want accounting tab in cProject.
so need documentation @ it
waiting with points!!
thanx a ton

I have sent it to your mail id.
p.s. reward points if you find it useful

Similar Messages

  • Accounting Integration with cProjects documentation

    Hi !!
    I am working on cProjects and right now our team is facing issues with Accounting Integration. It would be of great help if we can get some documentation on accounting integration in cProjects. ...
    I've cProjects Implementation Guide.
    e-Mail Id: [email protected]
    Thanks,
    Jyoti

    Take the reference of the Best Practices Configuration Guides, Link to them is
    http://help.sap.com/bp_bblibrary/600/BBlibrary_start.htm
    Refer Building Block P60: Project Management in R&D with cProjects , it can be helpful
    Regards
    Sreenivas

  • CProject - The settings for Accounting integration contain errors

    Hi,
    I got error message "The settings for Accounting integration contain errors"  from cProject page when I choose controlling method  (Project Role, Automatic).
    If I choose other controlling method then this the error message disappear.
    Maybe some thing wrong while setup Role Type?.
    Please help!
    Thank you
    Long Nguyen

    Hi,
    Are you using MULTILEVEL CONTROLLING ( PROJECT ROLE , AUTOMATIC)
    that means
    Multilevel Controlling (Project Role, <b>Automatic</b>): In this method, the system automatically creates a PS project definition for the project definition and a WBS billing element at the first level of the hierarchy. More WBS elements are created for the project roles of the cProjects projects.
    Multilevel Controlling (Project Role, <b>Manua</b>l): In this method, a user has to create the PS project in the ERP system. The user then has to assign the project roles of a cProjects project to the WBS elements of this PS project manually in cProjects.
    thanks
    sunil

  • DPR_FIN_GECCO004 "The settings for Accounting integration contain errors"

    Hi all,
    I have the same trouble with Accounting Integration in new project:
    Cproject problems with accounting settings
    But this links isn't solve my problem. I've checked all following customizing in cProjects from detailed info from Message no. DPR_FIN_GECCO004:
    1) Did you assign an object type to the project type for communicating with the accounting system? (See the IMG activity Make General Settings).
    I've used predefined standard:
    - object type: Single-Obj. Controlling on WBS Elements (0FIN_INT_ERP_PS)
    -  frame: 0FRAME9
    - no costing: empty
    - revenue calc type: Use costs/revenue rates from cProjects
    2) Does this object type have the proxy class CL_DPR_OLR3_GECCO (for single-object controlling on internal orders) or CL_DPR_OLR3_WBSELEMENT (for single-object controlling on WBS elements)? (See the IMG activity Define Object Types for Object Links).
    Yes, proxy class is correct (CL_DPR_OLR3_WBSELEMENT).
    But I'm not sure that object type is active. I've viewed table V_DPR_OBL_OBTYP and the field Active is empty for this object type (0FIN_INT_ERP_PS)
    Besides, I can't see this object type (0FIN_INT_ERP_PS) in the following setting:
    SPRO -> ... -> Structures -> Define Object Types for Object Links (from message)
    But I can see it here:
    SPRO -> ... -> Connection to External Systems -> Accounting Integrations -> Define Object Links for Accounting Integration
    Is it correct?
    3) Has an RFC destination been entered in this object type? (See the IMG activity Define Object Types for Object Links).
    Yes, but not in this setting (see point 2).
    4) Have you chosen a suitable setting for confirmation with regards to 'Time Recording for' in the project type so that it matches the integration scenario? (See the IMG activity Define Project Types.) For example, time recording for roles is not permitted in a structure-based scenario.
    My setting is: 'Time Recording for' - Tasks
    Is anybody knows a solution of this trouble???

    In the target R/3 system COCPCPR shows a lot of messages like this:
    Object not known in CO
    Message no. IAOM028
    Diagnosis
    You want to post to the object with technical key E002D524BF9325F1A9D3001A4BE638F6 belonging to business scenario cProjects. However, there is no Controlling object assigned to this object.
    System Response
    Processing stopped.
    Procedure
    Example:
    You bill an order item in an external system and transfer the billing document to R/3 Accounting. An error occurs when the CO account assignment is determined, since the order item is not yet assigned to a Controlling object. The error occurs either when the order item is transferred to R/3, or while the transferred order item is being processed: Check the transfer log for the order item in the external system, and start the transfer of the order item again. Then start the transfer of the billing document to R/3 Accounting again.

  • Best practices for apps integration with third party systems ?

    Hi all
    I would like to know if there is any document from oracle or from your own regarding best practices for apps integration with third party systems.
    For example, in particular, let's say we need customization in a given module(ex:payables) need to provide data to a third party system, consider following:
    outbound interface:
    1)should third party system should be given with direct access to oracle database to access a particular payments data information table/view to look for data ?
    2) should oracle create a file to third party system, so that it can read and do what it need to do?
    inbound:
    1) should third party should directly login and insert data into tables which holds response data?
    2) again, should third party create file and oralce apps will pick up for further processing?
    again, there could be lot of company specific scenarios like it has to be real time or not... etc...
    How does companies make sure third party systems are not directly dipping into other systems (oracle apps/others), so that it will follow certain integration best practices.
    how does enterprise architectute will play a role in this? can we apply SOA standards? should use request/reply using Tibco etc?
    Many oracle apps implementations customizations are more or less directly interacting with third party systems by including code to login into respective third party systems and vice versa.
    Let me your know if you have done differently and that would help oracle apps community.
    thanks
    rrb.

    you want to send idoc to third party system (NONSAP).
    what kind of system is it? can it handle http requests
    or
    can it handle webservice?
    which version of R/3 you are using?
    what is the mechanism the receiving system has, to receive data?
    Regards
    Raja

  • Problem in Accounting Integration in cProjects 4.0

    Hi,
    I am trying to customize the Accounting Integration in cProjects 4.0 with R/3. The  problem comes when I try to replicate the Cost/Revenue rates to the R/3 system. I get the following error: "<i>Cost/revenue rate PM01: organizational unit 40000582 does not exist</i>"
    The "organizational unit" is set in the cost/revenue rate as organization responsible. Why is that error poping up? Where can I create those organization responsibles? Do I have to create the data in my R/3 system?
    Thanks in advance!
    Best regards,

    Thank you very much for your info, but I am still having the same trouble.
    Apart form the former one I got two more customizing problems:
    The point "Make settings in ERP systems" returns in an error
    In the point Define Controlling Scenario in R/3 I don't have to option to choose Multilevel Controlling (can I customize those options?)
    Thanks again,
    Best regards,

  • Accounting Integration in cProjects

    Hi,
    I am working on cProjects and right now our team is facing issues with Accounting Integration. It would be of great help if we can get some documentation on accounting integration in cProjects. If any one has something please email it to [email protected]
    Thanks and regards,
    Ankur
    9820997870

    Hi Reema,
    Could you please help me in acct integration with cProjects.
    We are doing like ,1. Creating PS WBS structure manually in ECC 6.0
    2. Trying map the cProject phase and task to manually created WBS to the structure in cProject.
    I have done config as per the SAP document.
    i am getting error costing data not valid, do you have any document to handle this type of multi level controling in cproject, please forward.
    Bijaya my email is [email protected]

  • MS Project Integration with cProjects

    Dear All,
    We are testing the MS Project Integration with cProjects 4.0. We have 1 query.
    While importing the Project from MS Project to cProjects if changes are done then it creates the new project in cProject system.
    Is it the standard MS Project Integration functionality ? We want the system to update the cProject only for the changes after Import is done. Can we get this ?
    Thanks & Regards
    Ashish Kulkarni

    The system will create a new project only if you have cleared the Project ID field (in MS project).
    Else (if you do not change the Project ID field), the system creates a simulation with the standard system provided simulation for the project.
    Once you have the simulation ready (in cProjects), you are supposed to reconcile the operational project (main project in cProjects) with this simulated copy to bring the updates/changes into effect.
    Hope this helps...

  • The settings for accounting integration contain errors

    The settings for accounting integration contain errors
    Message no. DPR_FIN_GECCO004
    System Response
    The accounting functions are not available.
    Procedure
    Check the following in Customizing for Collaboration Projects:
    Did you assign an object type to the project type for communicating with the accounting system? See the IMG activity Make General Settings.
    Does this object type have the proxy class CL_DPR_OLR3_GECCO (for single-object controlling on internal orders) or CL_DPR_OLR3_WBSELEMENT (for single-object controlling on WBS elements)? See the IMG activity Define Object Types for Object Links.
    Has an RFC destination been entered in this object type? See the IMG activity Define Object Types for Object Links.
    In the project type did you choose the confirmation setting regarding 'Time Recording for' to match the integration scenario? See the IMG activity Define Project Types. For example, time recording for a role is not permitted in a structure-based scenario.
    All the steps mentioned in the in the above error have been verfied and are correct but the error is still existing. Is there anything that I am missing here?

    Hi SAP USER123 ,
    Actually the description of the messages should the reason of the problem. Please double check the settings again one by one.
    If the problem still remains, you can open a customer message for help.
    Kind regards
    Zhenbo

  • When releasing a billing document for accounting getting error in VF02

    hi,
    when releasing a document for accounting in the transaction code VF02 we are getting the following error
    <b>" Prof.segment for Prim.cost elements not advisable for costing-based CO-PA"</b>
    Regards,
    Murali

    Hi Murali,
    Please do default setting for co- object- t code OKB9.
    hope it will serve ur purpose.
    Reward points if it helps.
    Regards
    Karan

  • Plz send step by step process  for Outlook integration with SAP

    Hi Basis experts
    Plz send step by step process  for Outlookexpress  integration with SAP.
    plz send if anybody have at the earliest.
    advance Thanks& regards to all
    Supriya

    Dear Supriya,
    If it is in SAP then please go through the below mentioed site
    http://www.duet.com/
    please tell me where in you want to integrate?
    Outlook Configuration with SAP-EP is a PPT file.
    please mail me your id i will send it accross.

  • Documents Needed for cFolder integration with SRM50

    Hello SRM Experts,
    I am in need of some info about the cFolder integration with the SRM system. Can anybody help me by sending some documents regarding the same. my email id is [email protected]
    Our system is SRM50 SP11.
    Thanks & Best Regards
    Raj

    Hi,
    Do you have cFolders on the same server as SRM ?
    Foll are the settings reqd:
    --.define a LS for cFolders( you have to duplicate SRM LS if it is on the same server)
    -->define an RFC destination for this system (even if same as SRM)
    -->define a backend system of type cFolders in SRM SPRO
    -->activate SICF cFolders service (with external alias)
    Normally the collaboration area should be displayed in document tab.
    See these related links;
    http://help.sap.com/saphelp_srm50/helpdata/en/c1/c3fe3930a34b2ae10000000a114084/frameset.htm
    http://help.sap.com/saphelp_ppm400/helpdata/en/e7/1fc30727cd4ddeb7f6351416ebf591/frameset.htm
    BR,
    Disha.
    Pls reward points for useful answers.

  • Pricing Error in Release Billing Documents for Accounting

    Hi All,
    While executing the VFX3  (clear off the billing list) system displaying the error message and when I click the error log the following error message displayed.
    "0090345866 000000 Document  0090345866 has been saved  (Pricing Error)"
    Can anybody through  some light what could be the reason ?
    Awaiting your valuable reasons.
    Srinivasa Chary

    Hi
    As others mentioned you need to look at conditions tab in Billing doc and see if there is any pricing related error. You can also use analysis part to see which condition has problem.
    Another reason could be  > the taxes on sales order and Billing doc may not have been calculated. The reason is there is no tax jurisdiction code maintained for the ship-to party in the sales order.
    If the above is the case, the tax jurisdiction code should be maintained for ship-to from within sales order ( Goto > header> partner > double click on ship-to and the address screen opens up. You can add tax jurisdiction and save the order. This will solve the problem for this sales order alone.
    If you run the new pricing with option copy pricing elements as it is and redermine taxes, your taxes will be calculated.
    This does not automatically correct your billing document error. You need to cancel billing doc (VF11) > reverse goods movement on delivery ( VL09) and unpick delivery and then delete delivery.
    After this, you need to again create delivery with ref to sales order > pick > PGI and then go for billing. This will now rectify the release to accounting issue.
    For permanent problem solving, you need to ask master data team to maintain tax jurisdiction code in ship-to customer using tcode XD03 or VD03...so that the subsequent transactions for this ship-to will be smooth.
    Regards
    Sreedhar Reddy

  • Sap Banking - Display change documents for accounts

    Hello,
    Can anybody help me? I need to write a report that shows all the change documents for a range of accounts, and I don't know how to retrieve this info. I know that there's a table BCA_CN_LINK that storages what object type was modified and by whom. But I don't know in which table the old and new data is stored for each change document.
    Any idea is welcome!!!
    Thanks a lot.
    Regards, Marcela Sanchez

    You can see the change documents for a single account vía transaction BCA_CN_ACCT_03 (Account Management -> Account -> Account Master Data -> Display Account) and then click the ChangeDocuments Account pushbutton

  • XRPM integration with Cprojects

    Hi,
    can anybody provide the document related to XRPM and Cprojects as well as Msprojects client/server.
    Please send it to theemial address bharat_suman20042yahoo.co.in.

    It would be foolish to impliment anything on older versions of SAP for the fear of config/customising going forward r/3 wont be suppoted, then anyways u have to upgrade.then what?
    Look at this as an opportunity to learn. SDN is there to help u anyways
    btw this book below is an excellent resource to have in your case.
    http://www.sap-press.com/product.cfm?account=&product=H1906

Maybe you are looking for

  • "Error while trying to sync Audio and Midi"

    "Error while trying to sync Audio and Midi" I have been having this problem now and then for some time. Now, I can't run any audio files without a lot of popping. I tried all the suggestions on the support document for this issue. I even downloaded n

  • Was FCPX import broken by the 10.9.5 update?

    I did the recent Mavericks 10.9.5 update. After that I can't import fcpxbundles. Or am I doing something wrong?

  • Send mail with PLSQL

    Hi, I am using oracle 10G Express Edition for personal use, and i need to send emails with PLSQL. Please any ideas on how to accomplish this. Thanks.

  • We are upgrading EHP 3 on ECC 6.0, but we received the following error:

    The installation was stopped, since an error occurred during the phase DDIC_ACTIVATION, which the Add-On Installation Tool is unable to resolve without your input. After you have corrected the cause of the error, continue with the import by choosing

  • ERP Order in CIC - Need to default Division and Channel

    Hi Experts, Setting up ERP orders in CIC. Everything is working fine, but to make it more efficient, we need to default the Channel and division in the order for less clicks and errors. I tried using the user paramters SPA and VTW in both CRM and R/3