Don't release Production Order for negative stock.

Actually i don't want Production Order to be released, if component (child) items falls into negative stock. Is there any solution for that. If yes, please help me out.
Thanks

HI!
you can write a SP to block Release a production order from planned state.
Check the onHand stock of all child items w.r.t the warehouse and block updating the status to release

Similar Messages

  • Cannot release production order for a plant

    Hi:
    When I try to release a process order , I get this error message:
    "CAnnot release production order for plant".
    I get this message  for a particular material in the plant. For other materials, it's working fine.
    Please give your suggestions!
    Gautham

    Hi,
    Check the Tasklist usage for your routing for that material.
    For this usage ,check in op45 against the task list type whether until release indicator has been enabled.If so remove
    and do the release.
    or
    check whether workcenter which is used for producing the   material has been locked in work center itself.
    Indicator: Usage only until release in orderIndicator used to specify for a task list usage and a task list type that an operation in the order cannot be released.  This occurs when a work center group that is not intended for production is allocated to this operation.
    When this type of operation in the order is released you must enter the work center where production should take place.
    Regards,
    nandha

  • Planned order for Negative stock

    Hi All,
    Negative stock set up is active at storage location level. Due to this setting I got some  negative stock in storage location.
    MRP is creating additional planned order specific to negative stock qty other than planned order created for that day requirement.
    How to get only one planned order for entire day requirement including negative stock?
    we have daily lot size in mat master.
    Thanks.

    Negative stock "requirement date" is immediate (day of MRP run). The other daily requirement that you may have, may be for a date other than "today", and this is why you get 2 planning proposals.

  • Cannot see pick list on releasing production order for WH managed material.

    Hi guys
    I created workcenters, routing, bom, control cycle record and prod. verison for the material before creating the Prod. order. Now, I am neither able to see the Pick List nor Material Staging (Simulation) after releasing my Prod. Order. The exact error is "No WM relevant components exist". All my materials are warehouse managed.
    Any help gurus??
    Regards,

    Hi
    you are mentiuoning that control cycle .
    Have assigned the coponents to the storage location which is assigned to ware house.
    pl. chk this.
    Regards
    YMREDDY

  • How get all released production orders

    Hi experts,
    I need to get all released Production Orders for a specific plant. I noticed that usually you don´t select directly from table AUFK. Most of people use function module WCFS_STTXT_GET to get the status of an order. I know that table AUFK has fields ASTNR (status) and PHAS1 (released) however those fields don't reflect the status of an order (thatu2019s why WCFS_STTXT_GET is used).
    Also, I know that table JEST contains status for an order; however, for a simple order that table shows more than one status (I guess is like a history of all status the order had).
    So my question is: How can I get all released orders for an specific plant? If I use WCFS_STTXT_GET I would have to select all orders and check the status one by one, which is obviously not efficient at all.
    Thanks!

    Hi Carlos,
       As far as i know, it is not possible to get the latest status on a production order. if we see a production order in CO03, we see that all the status' are displayed on the order which it has been through.
    I remember we had to include the system status logic similar to the transaction COHV, and we had used the table JEST for the same.
    Kindly update the solution if you find any.
    Thanks.

  • Release order for a stock transfer order in Product view

    Hi Experts
    My question is that i cann't see Release order for a stock transfer order in Product view which are available in MD04 in R/3.
    I have checked all the settings for Strategy group 50-Planning without final assembly in R/3 and Requirement type in APO. In APO I have checked requirement type and category group and I can see that in category we have defined Stock Transport Requisition, Stock Transport order,  Sales Order, TLB:VMI sales order, Replenishment delivery and VMI delivery as category.
    One more thing i am not even selecting any selection profile for Product view.
    What i need to check, Kindly suggest.
    Regards
    G C

    Hi G.C
    Check whether you have maintained correct integration model. Create integration model for transactional data. Select the sales order and PO/PR option in CFM1. The reason you need to send the sales order first when you are working with stock transfer order/stock transfer scheduling agreements you first have to send the sales order and then PO/PR. Activate the integrtion model.
    First check in ECC for the Integration with Other mySAP.com Components==>Advanced Planning and Optimization==>Initial Data Transfer==>Change Transfer==>Change Transfer for Transaction Data==>Activate Online Transfer Using BTE==> here check (ND-APO, NDI options are have been checked)
    Also check for the Maintenance of distribution definiton under APO -SPRO==>Integration with SAP Components==>Basic settings for data transfer==>Publication==>Maintain distribution definiton==>Select the publication type(External procurement, Delivery,Shipment) and assign to all the plants you are working with for STO.
    Try the above steps and do let me know if it worked.
    Regards
    KRN

  • Production Order For Project with plant stock

    Hi,
    We have a scenario where in we are required to create a production order for a project.
    But the material(raw material) is in a storage location and is a stock item. Even the header material is also a stock item and it to stored in the storage location.
    But the order is to be created for Project and to be settled to the Project. Now the system is not allowing me to create the order.
    The error is :
    "Project  does not allow make-to-order stock
    Message no. CO746
    Diagnosis
    There is no project stock for the project.
    To create a production order with reference to a WBS element the project must allow project stock to be maintained.
    Procedure
    You should select a project that allows project stock."
    Now,
    I don't want to have a project stock. How to go forward...
    Regards
    Pavan

    Hi,
    What is the strategy you are using. If you are using strategy 20, then chnage it to 40.
    Also maintain individual/collective indicator to "1" - individual in MRP-4 view. So that when the order is created, the stock will be reserved as Q-project stock.
    thanks and regards
    Murugesan

  • GR for Production Order, not updating Stock

    Hi All,
    Issue:
    I am posting a GR for a production order, but the stock qty is not getting updated. I checked in MB51, i find the document being posted, but in MMBE the stock is not updated. In the system, there is 2 settlement profiles, one which allows settlement on material & the other only on G/L or Cost Center. I find this issue only when i create orders which have settlement receivers as G/L or Cost Center, also in MB51 i find that the sloc field is blank, even though it is maintained in the order & the same is seen when i receive via MB31.
    Await your inputs as to where i need to check to resolve this issue.
    Regards,
    Vivek

    Hi Prasobh,
    I believe your pointing in the right direction. My suspicion is on similar lines.
    A brief backdrop:
    Order is created, whose settlement is to be done on a G/L acct, the settlement profile does not allow settlement onto material & hence in the GR tab, the GR non-valuated indicator is ticked. I manually ticked the GR indicator to post GR via MB31.
    In MB51 i find the material document, but what is interesting is, the storage location field is blank, even though the order contains this value, which was later seen during MB31 posting as well.
    But a similar order has been created in the legacy system with the same parameters as above & i find the stock to be updated.
    So i suspect, it is something to do with the account determination, which is not allowing the quantity updation to take place, because of the GR non-valuated tick in the order header.
    Hope i was able to put across the issue to you in a clear way.
    Regards,
    Vivek

  • Planning release order for a Stock Transfer Requisition (PRqRel)

    Hello all,
    Is there a possibility to stop MRP/MPS from planning a 'Release order for a Stock Transfer Requisition (PRqRel)' ? I would want them planned after they are released (OrdDS).
    Please do help out.
    Regards,
    Rahul

    Hello again...
    The sample code provided on method CHANGE_MDPSX_MDUA of this BAdI should do the trick:
    method if_ex_md_change_mrp_data~change_mdpsx_mdua .
    *  Makes stock transport purchase requisitions not availability-relevant
    *--> substitutes part of the modification of note 190298.
    * For the other parts the same has to be made in methods:
    * CHANGE_MDPSX_MDUP for stock transport planned orders
    * CHANGE_MDPSX_MDUB for stock transport orders.
    *--> delete flag for availability
       clear ch_mdps-vrfkz.
    *--> set changing flag
       ch_changed = 'X'.
    endmethod. "IF_EX_MD_CHANGE_MRP_DATA~CHANGE_MDPSX_MDUA
    BR
    Caetano

  • Release a production  order for partial quantity

    Hi gurus,
    Can you please tell me how can i release a production  order for partial quantity without splitting the order?
    Regards
    Rajib Pathak

    Dear,
    Best way you can conver the planned order to production oreder in partial in CO40.
    Or from MD04 screen click the planned order, choose pratial release and enter the quantity you want to release and press Generate button. the order gets converted to production orders of yr specified quantity and rest planned order remains for further processing.
    Or,
    Create order
    Goto operation overview
    Select the operation and click on release button...which will release the opration alone instead of releasing the order. If you release the order, then all the eperatios are released onec for all.
    If you go for operation release...you can release operation by operation, which will be partial release of order at header level.
    at operation level - partial release
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 12, 2008 9:44 AM

  • Capacity Requirement From Released Production Order

    Hi PP Gurus,
    Can i limit capacity requirement only from released production order ? I don't want to count requirement from production order that just created but not yet release.
    Regards,
    Arman Lie

    Dear Arman,
    As a standard practice the system creates the capacityrequirements once the production order is created.
    Check this,
    When a production order is created the following actions are carried out:
    ·        A routing is selected, its operations and sequences are transferred to the order
    ·        The bill of materials is exploded and the items in the bill of material are transferred to the order
    ·        Reservations are generated for bill of material items held in stock
    ·        The planned costs for the order are generated
    ·        The capacity requirements are generated for the work centers
    ·        Purchase requisitions are generated for non-stock items and externally-processed operations
    Regards
    Mangalraj.S

  • Releasing Production order

    Dear Experts,
    Please confirm me when i should release the planned order to production order to our shop floor.
    1. Is it when all the materials are in stock ?
    2. Is it by checking by RM delivering date coming from PO. I.e., if suppose my all RM delivery date are coming as 2.12.11 then today should i release the planned order to production order for date 3.12.11 for our shop floor.
    3. Or other is any ?
    Regards,

    Hi,
    What are you asking about creation of production order from planned order or releasing of production order from created stage.?
    Conversion of planned order to production can be done according to planning activity of an organization but releasing of a created production should be done when we actually decides to run the production order into shop floor.
    Material availability of a material is checked during creation and release but you can set your system not to allow release if material is not available in OPJK as per your order type.
    Hope it helps.
    Regards,
    Alok Tiwari

  • Change of sales order in combination with planned/released production order

    Hi Guru's,
    How do you deal with changes in the sales order in combination with planned orders and the scenario how to deal with release production orders?
    Can you tell me the SAP scenario, technically or reports or transactions or user exits, etc?
    Thank you in advance,
    Eric

    Here You have 2 scenarios
    1. Sales order changed at planned order stage
    In this case any chagne of quantity done in the sales order level will be taken care by the Planned order until it was not firmed .
    In case if it was firmed for the increased qty you will get a new planned order getting created.
    In case if it is reduced and if it was unfirmed it will get changed accordingly
    2. Sales order changed at production  order stage
    if the planned order was converted to production order change we can manually changes the respective Production order util no confirmation was done to any operations..
    is all this scenariors you are looking for if it is helpful let me know
    thanks..
    dskumar

  • Create a Production order for rework

    Hi,
    I would like to create a Production order for rework.
    But I don't want to do it in the master PO with trigger point.
    I would like to create a new PO for rework and asign to account to the old or master PO.
    I've tried to do it but I want to know if it's correct.
    CO07, maintained the qty, in the settlement rule maintained (category= order,settlement reciever= master PO number) released the order and by confirmation where can I maintain the qty? (as Yield or as rework qty)
    Thanks

    Hi,
    Use T code CO07- creation of PO w/o material, settelment rule as u mentioned and the quantity has to be maintained in rework.
    When u confirmed the order and settel it, it will be settel againts the main order.
    Regards
    JDB

  • Auto Production order for SFG

    Dear Experts...
    We release somany order for 1 fg.. I mean we relase 1 order for Finished goods and another  4 to 5 order for Semifinished goods..
    Is there any possiblity to auto release the SFG order while releasing the FG order...
    Pls reply....

    Hi Sri Ram,
    Normally to start the production of FG, we need the stock available for SFG.If there are many production orders to release then you can use CO05 (manually) or you can schedule a back ground job (automatically) using the program PPIO_ENTRY program.
    Regards,
    Rajarao.

Maybe you are looking for

  • External hard drive not recognised in start up options

    Hi! I'm struggling to get to grips with creating a bootable external drive - any advice would be very welcome! I've recently bought a LaCie Triple Interface 300GB external drive to use for backup storage and to use as a back up bootable drive should

  • Serial number not working, what to do?

    I purchased the CS5 Extended Software on eBay and the serial number on my box is not working.  I am at a loss because I shelled out almost $400 for it and I still have no software.  I already tried some of the Adobe troubleshooting suggestions but no

  • My home button is broken and Accessibility Touch wont respond

    So recently I dropped my phone, around 3 feet so not much right? Plus I have an Otter box on. So when it fell My home button broke so i had to turn off the phone and turn it on to get to settings and when I turn Accessibility Touch on i tap on it and

  • Weird data obtained when running Task: AD Group Lookup Recon

    Hi, Im running the scheduled task named: AD Group Lookup Recon It works. and populates the lookup named Lookup.ADReconciliation.GroupLookup but when lookin in the design console, the Code Key and the Decode values have weird data ie: code key: 2~CN=T

  • Move from iPhoto 5 to iPhoto 11 on a new Mac

    How do I go about moving from iPhotp 5 on a G4 to iPhoto 11 on a MacBook Pro?