Dummy ppm in apo

Hi,
I am trying to create a dummy ppm so the planner can see in proudct planning table, product view periodic, for the given art. a  "dummy line" and its able to create planned orders. But the planner should not be able to convert the planned order into a production one.
I tried to add a dummy ppm to an existing ppm but the dummy ppm gets automatically the ppm nr as a normal ppm.
and we are stll able to convert planned orders to prod ones in ppt.
I thought also about creating a prouction version in r3, transfer it to apo, and then delete the prod version in r/3 but not in apo.
this solution brings the disadvantage that the apo orders are then not transferred to r3 and hence no secondary demand will be created for the components in r3, only in apo. which leads to a difference in stocks in r3 and apo and we have then plenty of hanging orders in cif postprocessing
Has someone any idea how I could solve this?
Wojciech

Hi Sofie,
One basic thing you can do is doing consistency check on integration model (in CFM1) when it is created.
In case of PDS this consistency check is defunct.  It mostly does not check anything.
This will indicate errors like 'resource not available in APO'.
Few things you can ensure:
Resource should be available in APO
There should be some timing in the routing. (if the control key is scheduling relevent).
Regards,
Nitin

Similar Messages

  • How can I send multiple subcon PPMs to APO since one PV must be in the PIR?

    We often have two or three production versions for a single subcontracting material. For example, PV 01-1 from now until June, then PV 02-1 from June until November. To create the PPM in APO via CFM1/CFM2 we must have one PV in the subcontracing PIR. This means we can only send the currently active PV 01-1 to APO and we can not plan with 02-1 in the future! I know I can manually create this in APO or I can temporarily change the PIR, send the PPM, and then change the PIR back but I would like an automatic process for this.
    Why can't I leave the PV blank in the PIR and that would mean to send ALL PPMs? This is essentially how R/3 planning works... if you leave the PV blank in the PIR it will automatically choose the PV with the correct date ranges.
    I'm sure many people have had this issue but SAP offers no solution. Does anyone know of a user exit or have any ideas on how to resolve this?
    Thanks,
    Eric Strehlow

    Hi Vinodkumar,
    You have desribed the way that I run my process. However, for subcontracting we must also put the PV into the PIR or the PPM creation will have no link from PV to Vendor and therefore it will not create a PPM.
    In R/3 planning, we leave the PV blank in the PIR so the system will automatically choose the correct PV based on the validity dates. I would like to leave the PV blank in the PIR and have APO create PPMs for all Vendors that this material is extended to for each PV. But as far as I know this is not possible. Then APO planning can choose the correct PPM based on validity dates.
    Thanks,
    Eric

  • PPMs in APO

    Hi,
    I have a basic question with regard to PPM.I have 2 workcenters A and B in which i can process the same product. Following are the possibilities in R/3 and APO.
    1. I have defined workcenter B as alternative  to A using classification system. I have defined the Routing in R/3  with workcenter A and transferred to this APO. Now i have PPM for this material with two modes A and B.
    2. I defined the Routing with Workcenter A and maintained alternative sequence with work center B.When i transfer this Routing to APO, system creates a PPM  with alternative modes A and B.
    3. I have defined Routing with two group counters with different base quantities. one group counter with  with workcenter A and another group counter with workcenter B . When i transfer these (these are two production versions), it creates 2 PPMs in APO.
    What is the difference between 3 and above(1&2).
    When we run the MRP Heuristics in PPDS with finite planning,system will check the alternative resources also,if the primary resouce is not having capacity. Similarly  the system  should check alternative PPM2(resource B) also if PPM1 (Resource A)has no capacity.
    I believe we define 3rd case if the processing of the base qty ( and if lot sizes also different) is different in different work centers.That is 200,000Kgs qty can me machined in 24 hours in Workcenter A and 350,000Kgs qty can be processed in work center B. Is it correct?
    Please comment.
    Thanks
    Aktar

    Hi,
    In step 1 and 2 you created alternative resource. And in step 3 you created alternate routing / recipe.
    If you are using both SNP and PPDS then creating alternate resource helps as PPDS can change the resource after SNP in PPDS optimizer run.
    But if you use alternate recipe then you wont be able to change resource in PPDS as SNP will decide which recipe to choose and subsequently PPDS will follow it.
    Regards,
    Vaibhav

  • Deleting PPMs from APO

    Hi all -
    Whats the best way to clear the obsolete PPMs from APO? Can it be done only through BAPIs/program/manually as suggested in some earlier posts?
    Is there anyway we can make the system remove the obsolete ppms from APO?
    Currently we just lock the PVs in R/3 and they change to inactive in APO and thats fine. At this point no matter what I do, since the valid from/to date is in the past, the system obviosuly does not even read them.
    How do we get rid of old ppms from APO?  Appreciate all your help!
    Varun

    Thanks for the reply. So, is there no way to set an indicator on PV or on the R/3 side so that the CIF master data update job of PPM deletes it from APO?
    Thanks for your answers
    Varun

  • Transferring the Phantom BOM as PPM in APO.

    Hi,
    We want to transfer a Finished goods BOM with Phantom item to APO as PPM. Can anyone suggest the steps required for the same. We already tried to transfer, instead of Components, Phantom item is getting transfered and getting assigned to different operation in PPM.
    Thanks in advance.
    Regards,
    SP

    Hi,
    Please refer to OSS note 448085 PPM Transfer Tips and Tricks
    It clarifies that during CIF transfer Components that have the phantom item indicator are not transferred.
    Regards
    Datta

  • Missing operations and dummy activity in process order

    Hi,
    we currently maintain several alternate modes in PP/DS PPMs in APO.
    When we create a planned order in APO, CIF to R/3, then do conversion to process order in R/3 everything is fine.
    When we create a planned order in APO, CIF to R/3, then do conversion to process order in APO, all of the operations are missing and there is a dummy activity present.
    We also noted this only occurs when the mode selected in APO by default uses a different resource than the one assigned to the PPM's recipe back in R/3. That is, if the recipe in R/3 uses resource LINE_01 and APO selects resource LINE_02 by default, the issue occurs.If the recipe uses LINE_02 and the APO selects LINE_02 by default, then everything is fine.
    Has anyone seen this behavior before ?
    Thanks,
    Roger

    Hi Visu,
    For right now, the planned order is created in the product view.
    In R/3, the recipe has an operation which uses LINE_01 resource (let's say, production version is L1)
    In APO, there are several alternate modes :
    LINE_01
    LINE_02
    LINE_03
    By default, when the planned order is created in the product view, the mode with the shortest duration is chosen.  In this case, if I create a planned order using the PPM for production version L1, and LINE_03 happens to have the shortest duration, then the order is created for LINE_03.  Since LINE_03 is not the resource used in the recipe for production version L1, we run into the issue I mentioned previously.
    Coincidently, I also noticed that the R/3 process order type is set to schedule automatically.
    When I go into edit mode on the process order operation, make no changes, but then save the order the correct resource and operations reappear in APO.
    Regards,
    Roger

  • SOP process in APO

    Hi  Experts,
    We are planning to execute SOP process in APO (12 months), Could you please suggest how to setup Planning area Key figures for SOP (SAP has not complete development for SNP01 planning area)
    Example: we have Consensus forecast key figure In DP and then release to SNP (Using copy of SNP02 planning area, all key figures are order series)
    Which key figure we need to send back to DP from SNP for comparison for constrained forecast plan?
    How to setup Key figure from order series to time series from SNP planning area (all key figures in SNP02 is order series?
    Please suggest me.
    Thanks&Regards
    Krishna.

    Not sure if you are asking in PPDS or SNP context.
    The procedures are slightly different
    http://help.sap.com/saphelp_scm41/helpdata/en/f7/626f39ff1ee32ce10000000a114084/frameset.htm
    You always have a choice to create master data like PPM in APO instead of specifically creating in R/3 and CIFing to APO.   PDS however would need to be created in R/3 and CIFed to APO.
    Important points:
    1. Have to create a Subcontracting Purchase Inforecord that will create a TLane on cifing PIR. So PIR needs to be in an active integration model
    2. Have the Subcontracting Vendor in an active integration model
    3. Have the plant and material in active integration models
    4. If you take PDS route, have the PDS in active integration model. If you take PPM route, you have a choice of creating it in APO/R3.

  • Subcontracting process in APO

    Hi All,
    I am trying to create a typical subconracting process in APO as in R/3.
    Questions:
    1-Do I have to create a resource in R/3?
    2-Do I have to create a routing in R/3?
    3-Do I have to create a subcontracting location except vendor location?
    4-How should I transfer bom and routing, as PDS or BOM?
    I created bom, routing, production version. I transfer it to APO. I receive no error but I do not see PDS in APO. Can anyone please help?
    Thanks,
    E

    Not sure if you are asking in PPDS or SNP context.
    The procedures are slightly different
    http://help.sap.com/saphelp_scm41/helpdata/en/f7/626f39ff1ee32ce10000000a114084/frameset.htm
    You always have a choice to create master data like PPM in APO instead of specifically creating in R/3 and CIFing to APO.   PDS however would need to be created in R/3 and CIFed to APO.
    Important points:
    1. Have to create a Subcontracting Purchase Inforecord that will create a TLane on cifing PIR. So PIR needs to be in an active integration model
    2. Have the Subcontracting Vendor in an active integration model
    3. Have the plant and material in active integration models
    4. If you take PDS route, have the PDS in active integration model. If you take PPM route, you have a choice of creating it in APO/R3.

  • PPDS PPM is deactivated

    Dear Experts,
    As we know whenever we put to (lock for any usage) a Production Version in R/3 this change is logged in table CIF_PPM_CHANGED which is then picked up by program RSPPMCHG. After running program RSPPMCHG the PPDS PPM in APO in return gets inactive and the description is changed to: Plan Invalid (Prod.Vers. Deleted in R/3).
    The problem is our PPDS PPM is in inactive status and has a description: Plan Invalid (Prod.Vers. Deleted in R/3).
    The change in PPM is dated 6/20/2011 in APO.
    We already checked MM04 to display any changes for the material and the last change was dated 4/20/2011 for C223.
    There is no change from 6/20/2011.
    How come the PPDS PPM in APO gets inactive if there is no changes in the Production Version in R/3? Is there any other way to deactivate the PPM aside from running program RSPPMCHG? is there a log in APO to see the changes made in the PPM?
    Hope anyone can help me.
    Thanks and best regards,
    Marcus

    Hi Nandha,
    The Production Version is Not locked in C223.
    I checked MM04 just now and the last change I see is dated 4/20/2011.
    But in the PPM the change happened on 6/20/2011 and is now still Inactive.
    We have a batch job running RSPPMCHG everyday.
    Thanks,
    Marcus

  • PPM MAINTENANCE

    Hello Everybody,
    Q. Can you please let me know what are the required Entities in R/3 to be maintained & also the fields in CIF Integration model to maintain a PPM in APO.
    Assumption based on my knowledge is that we need to maintain a BOM, Production Version & a Routing for sure (MANDATORY) to maintain a PPM in APO. CORRECT me if i am wrong.
    Also when you maintain Routing (it is assumed that Work Center is also pulled in to APO) . Am i Right?
    These questions are quite Critical for my implementation. Please let me know.
    Best regards,
    KING.

    I think i know what you mean by Components should be der in APO before BOM gets CIFed over to APO but i dont understand how do i send Work center to APo as Resource as i dnt see any option to send the Routing over to APO as a Resource.
    Correct me if i am wrong :
    Procedure to maintain a PPm in APO:
    1. BOM must be maintained in R/3 (if needed not Mandatory though)
    2. Routing must be maintained in R/3 & Workcenters will be assigned to the Routings.
    3. Production Version is a Must which will have all the entries like BOM & Routing mentioned in it.
    In the Intergration model for maintaing PPM in APO, the following fields should be checked:
    1. PPM
    2.BOM
    3.Mention the Production Version.
    4. Parent Material & Location.
    Please let me know if i need to check or maintain anything else.
    Best Regards,
    KING

  • PPDS PPM to SNP PPM

    Hello Experts,
    I am CIFfing production versions to create PPDS PPMs in APO. From there I am creating SNP PPMs.
    The question is, when I do initial CIF of all the production versions(some production versions are old and some are new), how do I find a list of the PPDS PPMs that are still not converted to SNP PPMs.
    Also is there a list which shows PPDS PPM plan along with the respective SNP PPM plan?
    I tried referring the table /sapapo/plan, but it just gives the plan number, date of creation etc etc. Not even the Input/ouput products and the location.
    Regards
    Manotosh

    Hi,
    Use the BAPI : BAPI_PPMSRVAPS_GETLIST to get the PPM details.
    /SAPAPO/PLAN_GEN to get the details of SNP PPM generated from PPDS PPM in the coloumn Plan generated.
    Thanks,
    nandha

  • Creating PPDS PPM

    Hi, While trying to CIF PPM in APO 5.0, getting the error "Activity Network is not complete"
    Message no /SAPAPO/PPM_MAINTAIN517
    Diagnosis
    The activity network does not include all activities of the PPM.
    Procedure
    Check that the activity relationships of your PPMs are complete.
    Any remedy??
    Regards, Bhavesh

    Hi Bhavesh,
    You need to check the activity relationships. Suggest you check each activitiy relationships (SS, SF, FS, FF) from Reference Type field and draw them out on a piece of paper to see if there is any activity which is not properly linked.
    Remedy is to rectify any missing relationship in the PPM.
    Thanks,
    Somnath

  • SNP PPM Generation from PPDS PPM - Time less than 1 sec. in snp bucket con

    Dear All,
    Request immediate help .
    (a) My PPDS PPM have time elements less than 1 seconds towards processing time and there are operations without a set up time .
    (b) While converting such a PPM PPM into an SNP PPM I get an error of bucket consumption as SNP cannot convert less than 1 second into a daily bucket .
    (c) I have to maintain the base qty in BOM and Routing as 1 unit hence cannot increase the same .
    (d) Is there a way in which SNP PPM can be generated from a PPDS PPM wherein the PPDS PPM has only a processing time of 1 second and no set up time .
    (e) Infact I have tried to convert the PPDS PPM with a time of 1.5 seconds but now I have lot of products where the routing suggests a processing of less than 1second and no set up . This is leading to a PPDS PPM of time less than 1 second and SNP PPM is not getting generated as guess it cannot convert a PPDS PPM with less than 1.5 seconds in a day .
    Would appreciate a quick response .
    Thanks and Best Regards ,
    Prashant Kumar

    Hi
    Firstly, can I ask why the base unit has to be 1, this seems a strange restriction?
    If it has to be, then two possible solutions:
    1) In the CIF enhancement CIFPPM01 you could multiply all values by, for example, 100 to give you larger values in the PP/DS PPM in APO and hence of a size that SNP conversion can cope with.
    2) In one of the BADI's /sapapo/ppm_calc or /sapapo/ppm_gen you can do the same conversion factor if the PP/DS PPM has to also be 1 unit.
    Hope this helps
    Ian

  • Selection of PPM at HALB by PPDS heuristic

    Hi All -
    I have 4 resources MIX1, PACK1, MIX2 and PACK2. I can make a product on Line 1 ( MIX1- semi FG and PACK1 - FG) or Line 2(MIX2 and PACK2). I can NOT use Mixer of one line for one making my semi FG and then a different line for packing.
    I have 2 production versions( PPMS in APO) for both the levels. 10 and 20 at FG and Semi FG level. The planner picks the right PPM at the FG level based on the planning situation. For example lets say PV20( which is PACK2). When the heuristic runs for the lower level BOM components, by default the system selects the PV10 at the Semi FG. I understand that the system picks up PV10 because its the first valid PPM. Is there anyway we can make the system select the right PPM at the Semi FG level based on what PV is selected at the FG level?
    In other words, if the planner selects 10 at FG, the system should pick PPM 10 at the HALB level. IF the selects 20 at the FG, the HALB PPM should be 20 as well.
    I cannot create a single ppm at the FG level with multiple operations of PACK and MIX as I need to do accounting at the Semi FG number and Semi FG needs to be its own material.
    So is there a way we can do it in the system? At this point, the planner has to select the right PPM at the Semi FG level as well.
    Appreciate all your help!
    Varun

    Hi Varun,
    Standard SCM system does not have functionality to cater to this requirement.
    We had exactly the same requirement but could not find any standard solution to this. This was also confirmed by SAP.
    For now the only option to do this is using the Badi as mentioned by Andrew:
    BADI /SAPAPO/RRP_SRC_EXIT
    or the RRP_PLANNING badi.
    Asheesh

  • Setup/clean-out orders for production campaign

    Hi experts,
    Can you tell me the steps that I have to execute if I want to create in APO PPDS a setup/clean-out order for a production campaign
    Regards,
    Arnulfo Cordero Pradel

    HI Victor,
    In the setup matrix you are suppose to maintain the dummy PPM detains aganist the setup groups.
    means: maintain the following information in setup matrix and try
    Setup transactiopn type: I
    Predecssr: Setup group 1
    Sucessor: Setup group 2
    Setup time: blank
    Unit: Min
    plan: Dummy PPM
    Product: Dummy product
    Regards
    Sravan maturu

Maybe you are looking for

  • Photoshop CS 5.1 crashes when opening jpg files

    I installed both the Photoshop CS 5.1 for 64 and 32 bit...I opent the 64 bit Photoshop to edit a jpg file, but when I import it or drag and drop it into the Photoshop interface, Photoshop dies , and stops working and shuts down every time I do this. 

  • Screen

    I would like to ask you how can i clean my iMac screen. Can you tell me a couple of products that i could buy?  Thank you

  • Passing Parameter from Dashboard to WebI

    Hi All,           I need to pass the value that I select from the dashboard to a WebI document. I have the code below which is not working.  openAnalytic.jsp?DocumentName=Test&RepositoryType=C&DocumentId=9413&DocumentExt=wid&nbPrompts=1&sWindow=New&m

  • Downloading FireFox, won't connect to internet upon download

    All of a sudden FireFox stopped working. I uninstalled it to see if maybe there was a conflict somewhere, reinstalled it and am still getting the same message that it can't connect to the internet. Opera, Chrome, IE, Safari all work fine. Can't find

  • FB01 - Need to update fields and cannot find solution

    I have a need to update VERTN, KUNNR, WERKS, and PPRCT when posting an invoice with FB01.  The only field I can find a way to change is PPRCT (through substitution).  I have looked at all the user exits, BADI's, BAPI's, and BTE's and cannot find a so