ECC 6.0 Production version ...issue

Recently,we have installed ECC 6.0 prduction version . I have logged in as 000 client with username:sap*
and password: 06071992. However, all the modules icons  are visible but not the content. I am not able to access any of the modules at all, except for staring at the icons.
      To trace the problem, I began to interact with person, who has installed it along with me. I came to know that he has copied 000 client on to 001 client, but he says that could not be the cause of the problem. As of now, I am not sure how to proceed.
could you please help me give options to deal with this problem and also give me a list of things that I should take care while implementing fresh installation. and aftermath.in real-time.(I am new guy in SAP netweaver admin area)

Hi,
         Thanks for reply. Yes, i'm not able to run transaction codes of FICO,SD,MM etc. But the thing is if we are logging into whichever client we should be able to run all the transaction codes of various modules.There are no support packages available in System-Status.Do we have to install support packages or we have to do configuration ?                                                                               
Regards,
                                                                                Varinder

Similar Messages

  • Production version issue.

    Dear Guru's,
         I have created two version in material master.
    also I have changed in "opl8"{ production version = Manual selection of production version}
    but still system is not asking me for production version at the time of creation of production order.
    system is asking me routing only
    now I am selecting version from function>read master data ( production version).
    please sugest me wat i have to do for pop up of production version at the time of production order creation
    and also system is not giving me any request no. at the time of save the changes in IMG.what will be issue
    Nilesh

    Dear,
    please see that PV is applicable in terms of lot size, dates and status
    if both
    PV are valid wityh respect to the above then only upi will get the pop up for PV selection.
    MRP4 setting is alosm required.

  • MFPR - Processing Inspection Lots for Production versions issue

    Hello,
    User are not able to seeing line item to create inspection lot for a specific part number.
    I checked inspection set up in  material master, rate routing, and compared with similar part numbers.It all looks good to me.
    Any help would be greatly appreciated!!
    Regards,
    Owais

    In REM Inspection lot for Inprocess is generated for header material for which you actually define "production version".
    Line items can not be seen in MFPR.

  • Wrong production version picked for planned order in ecc after CIF

    Dear experts,
    I am new to apo and was working on Cif of transactional data to ecc after planning run in Apo.
    we have active integration model and all the master data cifed in apo.
    we are cifing ppds ppm which is converted into snp ppm.
    The scenario is:
    We have a product FG100 at Loc1. For this product we have five alternate PPM's in APO.
    When we do SNP planning run, for some planned order it picked alternate 4 or 5 as source of supply. Which is alright.
    The problem is when we see the same planned order in ECC it shows source of supply as alternate 1. i.e. planned order in apo with alternate 4 and planned order in ecc with alternate 1.
    Is this the expected behaviour, or there is some configuration setting for this. We want that it shows the same source of supply in ecc as in SNP planned order.
    Best regards,
    AKS

    Hi Vikas/Nandkumar,
    thanks for the response, in my case the issue is that I have got two production versions in ECC. One production version is used for planning in CTM while the other version should not be considered in APO CTM for planning.
    The productionj version which I am not using for planning, I can manually attach the version in ECC to the planned order and the planned order should get CIFed to APO with the source of supply and resource details.
    Vikas after executing the report also the source of supply is not getting displayed in the planned order.
    Is their a solution by which i can achieve the above results.
    Thanks,
    Sanjog

  • Which SAP Product version to assign to a Logical Component in SMSY (SOLMAN)

    Dear SAP Colleagues,
    In our SAP environment, we do have 2 versions of ERP systems :
    1. CON - SIF - CDP systems are 'SAP ERP Central Component 5.0' product version.
    2. CDD - CDT - CDP systems are 'SAP ECC 6.0' product version.
    Question :
    When I want to assign these systems to a Z_LOGICAL_COMPONENTS, which product version do I have to choose ?
    Example for CON - SIF - CDP systems :
    1. They are 'SAP ERP Central Component 5.0' product version.
    2. In SMSY in our SOLMAN system, logical component are created using
        'SAP ECC 5.0' product version.
    Example for CDD - CDT - CDP systems :
    1. They are 'SAP ECC 6.0' product version.
    2. In SMSY in our SOLMAN system, logical component are created using
       'SAP ECC 6.0' product version.
    Question :
    What about 'SAP ERP 2004' and 'SAP ERP 6.0' product version ?
    In which case must I use this product version to assign CON-SIF-CPS
    or CDD-CDT-CDP to new Logical components ?
    Are they OSS Note or any matrix which give me the right product version to choose ?
    I have heard that 'SAP ECC x.x' product version should not used any longer ?
    Thanks
    Best regards
    P.C

    Hi,
    Read the following document, the mapping for systems and component versions is described in here:
    https://websmp202.sap-ag.de/~sapdownload/011000358700000074392009E/SP18_SolMan_Setup_Guide_V2.pdf
    For ECC 6.0 you should select ERP 6.0
    regards,
    Jaap

  • SAP ECC 6.0 Software component Versions or Product versions in XI (SLD)

    Hi All,
    please, let me know the solution for this problem,
    Curently we r using PI 7.0 SPS 14 kernal Version  179.
    Unable to find out SAP ECC 6.0  Software component Version or (Product version) in SAP XI 7.0 SLD.
    how to solve this issue....
    Advace thanks.
    Mahesh

    Hi Volkar,
    I am doing Plant driven procurement service enablement scenario by using XI 7.0, for this,
    we are integrating MM & SRM SUS Through XI 7.0 (MM -- XI-- SRM SUS).
    For doing this Scenario,
    1. Downloaded XI Content for SRM
    2. Imported  XI Content into the IR
    3.After importing, Plan_Driven_Procurement_SupplierEnablement Scenario was enabled.
    Here, MM side SWCV is R/3 4.6 is available by default. but in my case i need to change to ECC 6.0(bcoz,currently we r using ECC 6.0 version )
    In SLD, there is no ECC 6.0 version.
    So, how to solve this issue.
    Thanks in Advance.
    Mahesh

  • ISSUE:regarding production version tab of MRP4 of  data transfer using BD10

    Hi all,
    This is regarding production version tab of MRP4 of  data transfer using ALE idoc (BD10).
    When i transfer the data using BD10 the production version is received at receiving end through segment
    but not created in MRP4 view tab.An error is coming as-
    "You wanted to maintain the master record of the material AB_06.04.09(2). However, it is already being processed by the user EBGABAP and is therefore locked."
    I logged in as-EBGABAP
    Please help me resolve the issue.
    Thanks
    Edited by: sanu debu on May 6, 2009 11:08 AM
    Edited by: sanu debu on May 6, 2009 11:09 AM
    Edited by: sanu debu on May 6, 2009 11:11 AM

    >
    sanu debu wrote:
    > Hi,
    > I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    >
    > Thanks.
    >
    > Edited by: sanu debu on May 6, 2009 3:24 PM
    BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA

  • Differences between Product Version SAP ERP 2005 and SAP ECC 6.0

    Hello Guys,
    I have to setup an new XI interface between two R/3 system. During Integration Scenario setup you have to select under Application Component Type the Product version for the R/3 systems.
    Now, i am able to select SAP ERP 2005 or SAP ECC 6.0 from menu
    Could someone tell me the differences between SAP ERP 2005 and SAP ECC 6.0. Both are listed as Product Versions.
    Thanks in advance!
    Jochen

    SAP ECC 6.0 is latest version 2005 is last year version . as you are intergatin between 2 . you need select accordingly our source and target.
    let me know you still require any doubt
    Thanks
    Sreeram
    Message was edited by:
            Sreeram Reddy

  • Change the Product version from ECC to ERP 6.0

    Hello Experts
    I am planning to apply EHP4 on my Development ECC system. In line with the the suggestion from guide "How to install SAP Enhancement Package 4 for SAP ERP 6.0" system I am supposed to define my ECC system with leading product version ERP 6.0.
    My Ecc system is currently defined with Product version SAP ECC 6.0.
    As per the above guide and also suggestion from "Note 1344564 - Maintenance Optimizer: Check system landscape" which says-
    "In particular for a system of the product SAP ERP, assign the product version of SAP ERP, not SAP ECC."
    I am supposed to change the leading product version to ERP 6.0.
    Now with the current definition of system with product version SAP ECC 6.0, it is being used in a logical component. In order to change this I need to delete the associated logical component. The problem is -this logical component is being used in more than one Project definition that has huge documentation associated with them.
    My question -
    will the deletion of current logical component affect my documentation in any way?
    How can I change the product version from SAP ECC 6.0 to SAP ERP 6.0 without affecting the current setup?
    Regards
    Dhiraj

    Hello Warren,
    Thanks for the suggestion.
    I have already taken care of all the suggested notes in the master note that you suggested. I am able to generate the XML file for other solution defined in my system. In those I have my ECC system defined purely as ERP 6.0 system. I am not able to make out why its not generating the XML for this solution.
    Regards
    Dhiraj

  • PPM not getting created when ECC Production version is changed

    Hi,
    We are facing a problem with PPMs.
    We changed the Production version in ECC for the corresponding Material in ECC from 5000 to 6000.
    We then ran the RSPPMCHG and then generated and activated the PPM Integration Model.
    No queues inbound (APO) or Outbound (APO) were blocked. \
    The result was that the 5000 PPM was deactivated in APO but we could not find the 6000 PPM version anywhere.
    Can anyone please help??
    Regards
    Abhishek Sahi

    Hi,
    Refer notes 448085 PPM Transfer: Tips and Tricks
    Aslo after generating and Activating the IM, run the report  RSPPMCHG ( Tcode - CFP3)
    Thanks,
    nandha
    Edited by: S.Nandakumar on Oct 8, 2010 10:05 AM

  • Linking SNP PPM to desired ECC production version

    Hi
    We have a need where we manually create SNP PPMs and so the APO and ECC have no connection in terms of the PPM or production version.
    I have two SNP PPM1, PPM2 in APO and I have two production versions in SAP ECC, VA and VB.
    The requirement is to some how maintain a table in APO where we can choose to map the SNP PPM to ECC production version.
    something like
    SNP PPM1 and PPM2 both need to refer to version VB so that an SNP planned order pushed into ECC would automatically pick up production version VB.
    Appreciate if any one can throw some light on how we can create a user maintained table or Z transaction  in APO to achieve this.

    Hello KA,
    Could you please let me know why you want to change the source of supply in ECC only?
    Do you have PPDS? If yes then you can have one source of supply for that production version VB and transfer these orders to ECC system.
    Apart from that if you want to do the development then check FM /SAPAPO/DM_PROD_ORDER_CHG_OLTP inside that with your own custom logic you can update the production version.
    Best Regards,
    R.Brahmankar

  • Product Version SAP ERP 6.0 Missing from solman 7.0

    Hi All,
    I have installed an ECC6 system and now  i need to configure the solution manager and download the support packs
    and xml file for EHP4 upgrade. I have done this before where in i configure the new system in SMSY as SAP ERP 6.0
    and then configure maintenance optimizer and it gives me the option of Enhancement Package Installation.
    However now in the current solution manager i dont see the product version  SAP ERP 6.0 when im clicking
    trying to creating a new system.
    Our Solman version is 7.0 . I tried creating my new system under SAP ERP EHP as ehp version 1 and used maintenace
    optimizer but it does not give me the option of EHP package installation. Can any one let me know how to address this
    issue??
    Regards,
    Ershad Ahmed.

    Hi,
    Goto Tcode SMSY
    1. Under Landscape Components --> Product Systems --> Select ERP --> Under that select your system ID and click on it,
        Goto --> Header Data on your right side, change the Product Version to SAP ERP 6.0 and SAVE.
    2. Goto System Groups and Logical Components --> Logical Components  --> SAP ERP --> Create NEW Logical Component for   your ECC system under this component and select Production version as SAP ERP 6.0 & assign ur system then SAVE.
    3. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and REMOVE your ECC systen form the Solution and SAVE.
    4. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and ADD your ECC system form the Solution and SAVE.
    Regards
    Kannan.K

  • There is already a transaction for the systems of this product version(MOPZ)

    Hello All,
    I am trying to configure maintenance optimizer in Solution Manager 7.0
    on Windows 2003 server and SQL 2005 server.
    I am configuring this for SAP CRM 2007 server.
    Created the server, database and system in SMSY
    Created Logical Component in TA code SMSY
    SM59 connection for SAP-OSS is OK.
    S-User is assigned to a User.
    Created a solution using TA code solution_manager.
    Defined the product version for the solution created in the TA code
    solution_manager.
    When creating a Maintenance Optimizer transaction, I select the
    product version and its logical component in the Plan Maintenance
    (Phase) and click on Continue to go to Select Files Phase, I get below
    warning:
    Information Procedure 8000000130 Saved
    Warning: Status was reset by system
    Warning: There is already a transaction for the systems of this
    product version
    I cannot get pass this phase.
    I have deleted and recreated the solution, carried out the same
    activity again but its giving the same Warning
    Warning: Status was reset by system
    Warning: There is already a transaction for the systems of this
    product version
    Any help will be appreciated???
    Regards,
    Satish.

    Hello Ragu,
    Thanks for your response.
    As of now, we do not have ChaRM in place. Secondly, we use a single customer number.
    I would like to let you know that in our landscape we have two CRM server, one ECC sever, one SOLMAN7.0 server.
    I tried to configure MOPZ for CRM, ECC, SOLMAN server to download the respective STACKS.
    I was successful in configuring CRM and SOLMAN.
    But  when I tried to configure in ECC, it failed due to RFC erros.
    So I deleted the transaction for the ECC system and deleted the system itself in Solution Manager.
    Reconfigured the Systems in "SMSY", RFC connections are correctly defined to configure MOPZ between SOLMAN7.0 and ECC6.0.
    When I start configuring the MOPZ, I cannot get pass the first phase and this is when I get an error: There is already a transaction for the systems of this product version.
    Please let me know if you need further information.
    Regards,
    Satish.

  • How to add production Version  field in COOIS to selection options?

    Dear Experts,
    Need your suggestion for below issue raised by client.
    1) As per client, he was running COOIS with the selection option of a production version. But currently he is  not able to see this selection while executing a COOIS t-code.-----> Kindly guide me on its possibilities & necesary checks.
    2) If I want to correct it & want to add Production Version field in COOIS report what steps I should take?
    Need all your valuable guidence to resolve above issue.
    Thanks & Regards,
    Mehul

    Hello Vivek,
    Really thanks for your mail. Please see below comments-
    1) I checked the transaction COOIS & also told user to select Production Version after executing the report by giving Plant code & dates. But user asking for this field before execution.
    As per your suggestion I checked in Header level of first screen but its not showing me also.
    2)  I am using ECC6.0 version
    3) One finding from my side- This is I am checking only selecting Production Orders. But when I am selecting only Planned order then Production version can be seen in first screen under Repetitive Mfg. section.
    so kindly tell me why this not showing when Production order selected?
    Thanks in Advance for your help.
    Regards,
    Mehul

  • REM Product cost collectors and Production version

    Hi All,
    Can some one pls let me know
    What are the product cost collectors in REM and how to create the product cost collectors ?
    What is the production version and the difference between production version and controlling version?
    Thanks & Regards,
    Bujji

    Dear Bujji,
    A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
    [Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    [Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    A production version determines the various production techniques that can be used to produce a material. It defines the following information:
    Alternative BOM for a BOM explosion
    Task list type, task list group, and group counter for assignment to task lists
    Lot-size restrictions and period of validity
    A material can have one or more production versions.
    It can be defined in the Material Master (txn MM02) in one of the following views:
    MRP 4
    Work Scheduling
    Costing 1
    The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
    BR,
    Antje

Maybe you are looking for

  • OM related issue

    Hi All Have uploaded data in the IT 0001 thru BDC. IN OM the holders are not getting assigned (rather its not getting reflected there)....I ran RHINE00 report & created the eraltionship b/w the Person & position also but still its not coming up in th

  • How  we can restrict the Measurements in the Archtecture View

    Hi Experts, Ex: In the AV main Object Measurents:              Floor Area 10000 m2                                                                         Green Area 10000 m2       In the subordinate Objects :                         Floor Area above

  • How do I allocate more memory to Photoshop CS5?

    I'm using a number of plugins with Photoshop, and Photoshop often closes automatically or freezes.   The plugins use considerable memory (>1GB) and the problem may be that there's not enough memory allocated to Photoshop + plugins.   Under preference

  • Problem with j_security_check - Error 404

    Hi, I am trying to modify an application that works with Apache and Tomcat server. I tried to add basic form authentication, but when I enter a login-name/password I get an HTTP 404 Error about the requested page, that it was not found. Here are my w

  • Portal Error:Unexpected error when trying to access gatewayed content.

    hi friends... Am encountering a Portal Error: Unexpected error when trying to access gatewayed content. this error generally occurs on click on submit buttons.. occuring on my test portal only.... kindly help m resolve this issue...