Hi,
We are facing a problem with PPMs.
We changed the Production version in ECC for the corresponding Material in ECC from 5000 to 6000.
We then ran the RSPPMCHG and then generated and activated the PPM Integration Model.
No queues inbound (APO) or Outbound (APO) were blocked. \
The result was that the 5000 PPM was deactivated in APO but we could not find the 6000 PPM version anywhere.
Can anyone please help??
Regards
Abhishek Sahi

Hi,
Refer notes 448085 PPM Transfer: Tips and Tricks
Aslo after generating and Activating the IM, run the report  RSPPMCHG ( Tcode - CFP3)
Thanks,
nandha
Edited by: S.Nandakumar on Oct 8, 2010 10:05 AM

Similar Messages

  • PO is not getting create in ECC

    Hi ,
        I am in SRM 7.0 SP 3.0 and ECC.. I have developed the custom BRF for Category approver and activated Standard Role Resolver 'RR_SPENDING_LIMIT_APPROVER' for SLAPPROVER which is working fine. . But i am facing an issue that once SC has been fully approved but the PO is not getting transfer into ECC. When I check BBP_PD for the SC the status I can see the below status
    HEADER     I1015          Awaiting Approval              X
    HEADER     I1021          Created
    HEADER     I1038          Complete
    HEADER     I1106          Shopping cart ordered
    HEADER     I1129          Approved
    But when I execute the FM 'BBP_PD_SC_TRANSFER_INTERNAL' manually with the SC GUID I got the error message as
    Exception       SYSTEM_FAILURE
    Message ID:          BBP_PD                     Message number:           507
    Message:
    No links corresponding to the specified data could be determined..
    I check the BBP_PD After executing the FM 'BBP_PD_SC_TRANSFER_INTERNAL' manually with the SC GUID . The status has been moved to next status..
    HEADER     I1015          Awaiting Approval              X
    HEADER     I1021          Created
    HEADER     I1038          Complete
    HEADER     I1106          Shopping cart ordered
    HEADER     I1129          Approved
    0000000001 I1111          Item in Transfer Process
    at this stage I execute the report program 'BBP_GET_STATUS_2' to get the status. but I got the following error
             No Shopping Cart (REQUIREMENTS) Found with Status =  Transferred
            Batch program for updating status information for SCs as of Rel. 3.0
             On the basis of the data, no changes possible
            The following RFC destinations were called:
             RFC Destination:                   Call result:
    In order to create PO what are configure steps I have to perform..
    Regards,
    Jr.SRM

    Dear Elham,
    To find the solution of the problem I think you need to debug.
    Follow below steps if this help you
    a) Run the report "FBGENDAT"
    b) Input the data as below screen shot
    c) Then go to se37 execute FM : BAPI_PO_CREATE1
    d) You will find the test data directory and test data will be saved as below
    e) In this test date change PO number you should get the error which you are getting above.
    Thanks
    Ankit Jain

  • SRM PR is not getting created in ECC backend

    Hello Experts,
    We are running SRM 7.0 with SRM-MDM Catalog, we are using SRM for shopping.  We do have PI 7.11 running in the Environment as well.
    We are on ECC 6.0 with Ehp 4.0
    Purchase Order:
    However we can see the PO creating successfully using PI.
    Question, in the SRM table (BBP_FUNCTION_MAP), we see the object type: BUS2012 for ERP 4.0 has adapter name: /SAPSRM/CL_SOA_ADPT_PO_CRT_ERP for when creating PO. Please see teh screen shot.
    is this the reason that we need PI?
    Purchase Requisition:
    PR Creation is not working:
    PR is not getting created in the ERP, PR uses Object type: BUS2105, Adpater CL_BBP_BS_ADAPTER_RQ_CRT_470 for ERP 4.0 System type, can you please tell me if the adapter is correct for ERP 4.0 system type?
    I also have a question to ask:
    1) Where did you see that PR/PO was send to PI System (PI1)? My understanding is that since ERP amd SRM are 2 ABAP Systems, why we cannot send the PR/PO directly to ERP system from SRM? Why do we need a middleware(PI) in between for this process? We should be able to USE BAPI function to do it correct?
    Please advice.
    Thanks
    Kumar

    yes, i could see a PR number with all this additional details as below.
    Table   BBP_PDBEI
    CLIENT                       453                                                              Client
    GUID                         4CAEFA58EB9D005CE1008000AC1C2031                                 Globally Unique identifier
    BE_LOG_SYSTEM                QA1400                                                           Logical System of Logistics Backend
    BE_OBJ_ITEM                                                                                Follow-On Object Item in Back-End System
    BE_OBJECT_TYPE               BUS2105                                                          Follow-On Document Object Type in Back-End System
    BE_OBJECT_ID                 2000000167                                                       Follow-On Document Object ID in Back-End System
    BE_REFOBJ_TYPE                                                                                Reference Object Type in Back-End System
    BE_REFOBJ                                                                                Reference Object in Back-End System
    BE_REFOBJ_ITEM                                                                                Reference Object Item in Back-End System
    BE_REFOBJ_SBITM                                                                               Reference Object Sub-Position in Backend System
    BE_REFOBJ_TYPE2                                                                               Reference Object Type in Back-End System
    BE_REFOBJ2                                                                                Reference Object in Back-End System
    BE_REFOBJ_ITEM2                                                                               Reference Object Item in Back-End System
    BE_REFOBJ_FYEAR2             0000                                                             Reference Document Object - Fiscal Year in Back-End System
    BE_STGE_LOC                                                                                Storage location
    BE_PLANT                     2016                                                             Plant
    BE_BATCH                                                                                Batch Number
    BE_VAL_TYPE                                                                                Valuation type
    BE_MOVE_REAS                 0000                                                             Reason for Movement
    BE_EXPERYDATE                00000000                                                         Shelf Life Expiration Date
    BE_PUR_GROUP                 206                                                              Purchasing group
    BE_PUR_ORG                   2000                                                             Purchasing organization
    BE_CO_CODE                   2000                                                             Company Code
    BE_DOC_TYPE                  CLRQ                                                             Purchase Requisition Document Type
    BE_ACCREQUIRED                                                                                Account Assignment for Logical Backend Required
    BE_SP_STK_IND                                                                                Key for Special Stock Section
    BE_INFO_REC                                                                                Number of purchasing info record
    BE_MOVE_TYPE                 201                                                              Movement type (inventory management)
    BE_PACKNO                    0000000000                                                       Package number
    BE_INTROW                    0000000000                                                       Internal line number for limits
    BE_ITEM_TEXT                                                                                Short Text of a Service Purchase Order Item
    BE_PO_PRICE                  1                                                                Price from Backend
    BE_UNLOAD_PT                 200                                                              Unloading Point in Backend
    BE_DEL_IND                                                                                Deletion Indicator in Backend Documents
    BE_TRACKING_NO                                                                                Requirement Tracking Number
    BE_COND_TYPE                                                                                Condition Key
    BE_COND_STEP                 000                                                              Level Number
    BE_COND_COUNTER              00                                                               Condition counter

  • AUC Asset not getting created when Internal Order is created

    Dear Experts,
    While Creating the internal order ( Object Class - Investment Measure)
    AuC (Asset Under Construction) not getting created automaticall . Note Investment profile is already there in the order.
    Following steps below are configured -
    1. Define the AuC Asset Class (with investment measure) - OAOA
    2. Define the Asset Class u2013 for Main Asset - OAOA
    3. Define Investment Profile - OITA
    a. Assign the AuC Asset Class (Step-1) in the investment profile
    4. Assign Investment Profile to Model Order - OITA
    5. Define Order Type (Investment) - KOT2
    a. Settlement Profile - OKO7
    b. Maintain Allocation Structures - OKO6
    Thanks
    Sanjai

    Hi Sreekanth,
    What is the setting needed to create AUC Automatically when an Internal order is created ?
    I have done all the setting, but still when I save Internal order neither AUC asset is getting created.
    So I went to extras selected create AUC and it went to AS01, but when I came back (F3) from AS01 to Internal Order and save , Auc Asset is not getting captured in the settlement rule. I even tried to give manually the AUC Asset in the settlement rule, for which sys is not allowing in the settlement rule.
    Any thoughts are highly appreciated
    Advance Thanks
    Sanjai

  • WBS Elements not getting created in ECC Project System from CRM 7.0

    Dear all,
    We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
    1.       Set up the RFC connections between the two systems
    2.       Selected the connection type as Middleware in CRM system.
    3.       Installed the cProject Add on in CRM box.
    4.       Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
    5.       The Project Scenario in PS config has the same name as the Project Type in CRM config.
    6.       Created and released the campaign ids being created in the CRM system.
    As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
    Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
    Thanks and Kind Regards,
    Aditya Shrivastava

    Hello Aditya,
    We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
    Some inputs related to our system,
    We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
    Your help is highly appreciated.
    Thanks & Regards,
    Sumukh Kapoor.

  • Need help:  Distribution demand is not getting created when Iu2019m using Purch

    Friends,
    When Iu2019m running the heurisitic plan distribution demand is not getting created. Iu2019m working on SCM 5.1
    I have a transportation lane which are automatically created using the Purchase inforecords. Iu2019m not
    facing any issues tranfering this purchase info records (PIR). Iu2019m able to see this as transportation lanes
    in APO.  When I run the heuristic plan run purchase requsition are getting created but distribution
    demand is not getting created. I have tested the same  scenario by manually creating transportation
    lanes. The manually created transportation lanes  are generating distribution demand but purchase info
    record transportaton lanes are not generating the distribution demand. What may the cause?  I would really appreciate for
    your input in advance.
    Regards
    KRN

    Friend,
    I have maintained the means of transport to the tranportation lane
    Regards
    KRN

  • Invoice not getting created in ECC 6.0

    SRM Classic Scenario 5.0 and ECC 6.0 as backend. ECC6.0 is where all purchase documents are created
    Started invoice posting from SRM and it gets posted in ECC 6.0. Our FI data is maintained in ECC.
    When we are trying to create Invoice from SRM and IDoc is seen in ECC and IDoc is in 'Error' status.
    Debug was run
    We have couple of messages from BD87
            --  Reversal quantity greater than quantity invoiced to date (M8080)
            --  Cash discount amount cannot be posted.(M8845)
    Can it be related to credit/debit indicator?
    Can you please let me know from an FI standpoint if we are missing any configuration on the ECC side. Its SRM Classic Scenario with 5.0, Server5.5 and ECC 6.0 ? I checked the Goods Movement type of 201 and it has a Indicator of H (Credit). We use this movement type in SRM as well.
    Please advise. Thanks for your time.

    Hi,
    Supposed to install GERMAN Language while installing the Solaris OS. As we have missed it, SAP could not interpret the German Characters properly and thus the "Mysterious Characters error occured".
    After installing the German Language, the problem was rectified and we were able to release the transports without any errors.
    Thanks for the help.
    L Raghunahth.

  • SRM PR,PO is not getting created in ECC backend

    HI
    i create SC in classic scenario. and after the manager approve the SC the follow on Doc didnt create in ECC
    i define object for po pr and reserve in backend
    when i check FM :BBP_PD_SC_CHECK i havent any error message
    but when i have chek the SC in RZ20 i have this error: Local Error: Shopping cart 0010000308: Error creating the follow-on document
    and when i chek BBP_PD i have this status:
    Stats:
               Status         Description                    Inactiv
    HEADER     I1015          Awaiting Approval              X
    HEADER     I1021          Created
    HEADER     I1038          Complete
    HEADER     I1106          Shopping cart ordered
    HEADER     I1129          Approved
    how to resolve this issue?
    Regards
    Elham

    Dear Elham,
    To find the solution of the problem I think you need to debug.
    Follow below steps if this help you
    a) Run the report "FBGENDAT"
    b) Input the data as below screen shot
    c) Then go to se37 execute FM : BAPI_PO_CREATE1
    d) You will find the test data directory and test data will be saved as below
    e) In this test date change PO number you should get the error which you are getting above.
    Thanks
    Ankit Jain

  • Deemed exports not getting created when excise invoice generated in backgro

    Hi guys,
    when i create an excise invoice in background .and try to create ARE-3 in J1IA301.I am getting a error (081091004/2009 excise invoice is meant for normal invoice).
    when i create excise invoice manually and click on goto - utilization . The excise invoice type will be local .If i click on the pencil tab it will change to EXPORT and we can see DEEMED in blue color after this i will save and create ARE-3. ARE-3 gets generated.
    while creating excise invoice in background the EXCISE INVOICE TYPE in J1IIN will be LOCAL and we will not be able to change after this when i try to create ARE - 3 IAM GETTINGTHE ERROR..
    Please help me out of this..
    As my client wants to create the excise invoice in background while billing document is created..
    Regards,
    Shivdeep B

    Hi,
    If you want to create excsie invoice in back ground while creating billing document for  Deemed exports.
    Please follow the navigation as mentioned below.
    SPRO - Logistic General - Tax on goods movement - India - Business transaction - Out going Excise invoice - Maintain default Excise group and series group.
    Here please maintain you Plant, Excise group & Series group for deemed exports sales area combination and export type as Deemed exports in *details screen*. Now system will  create excise invoice for deemed exports in background while creating the billing document go to display excise invoice and see the utilization you get Deemed exports.
    This will do for you.

  • Silent Installation - Respond file not getting created !!!

    Hi,
    I am trying to create a respond file by running the installation as follows
    ./runInstaller -ignoreSysPrereqs -record -destinationFile /backup/ORA_DOWNLOADS/9201.rsp
    ignoreSysPrereqs is used because we have Sun Solaris 5.10 which is not in oraparam.ini.
    I am installing 9.2.0.1 Please do not ask why 9.2.0.1 now.
    Now the problem is my respond file is not getting created when I run the install. Does the respond file gets created after the installation is complete? I do not want to end up doing installation at one server without the respond file.
    Please help.
    Thanks,
    Ankit.

    Hm, you might be hitting a bug. Need to check my archive of historic Oracle events (means, I'll get back when I have looked through my notes in a few hours or more).

  • Production version is not getting created using ALE-IDOC

    Hi all,
    Am using BD10 to transfer the material from sending to receving system.All the views are geting sent successfuly accept the production version tab data of MRP4 view.The segment is available in the standard IDOC.But prodction TAB  is not getting created at receving system .Please help to resolve this issue.
    Thank you.

    Hi Sanu,
    BD10 Send Material..
    the reason might be Production tab is not created is the segment is not a mandatory..
    and the data is not populating for that fields.
    if the segment is not madatorty and data is not available for the fields in the segment ..the prodction TAB  will not be created ..
    Regards,
    Prabhudas

  • Linking SNP PPM to desired ECC production version

    Hi
    We have a need where we manually create SNP PPMs and so the APO and ECC have no connection in terms of the PPM or production version.
    I have two SNP PPM1, PPM2 in APO and I have two production versions in SAP ECC, VA and VB.
    The requirement is to some how maintain a table in APO where we can choose to map the SNP PPM to ECC production version.
    something like
    SNP PPM1 and PPM2 both need to refer to version VB so that an SNP planned order pushed into ECC would automatically pick up production version VB.
    Appreciate if any one can throw some light on how we can create a user maintained table or Z transaction  in APO to achieve this.

    Hello KA,
    Could you please let me know why you want to change the source of supply in ECC only?
    Do you have PPDS? If yes then you can have one source of supply for that production version VB and transfer these orders to ECC system.
    Apart from that if you want to do the development then check FM /SAPAPO/DM_PROD_ORDER_CHG_OLTP inside that with your own custom logic you can update the production version.
    Best Regards,
    R.Brahmankar

  • I am using a WD My Passport Studio external hard drive as a Time Machine. I get the error that a back up folder could not be created when my iMac has been asleep, any advice.

    I am using a WD My Passport Studio external hard drive as a Time Machine. I get the error that a back up folder could not be created when my iMac has been asleep, any advice. The hard drive is set set not to go to sleep.

    Were you not plugged in via USB to begin with?
    I would recommend performing some resets just to be on the safe side. Unplug the external HD, and try these steps:
    http://support.apple.com/kb/HT3964
    http://support.apple.com/kb/HT1379

  • How to stop the prodution order creating when the product is not valued?

    Hi guyes:
    How to stop the prodution order creating when the product is not valued using CO01?
    I hope that when i create the production order,the system will check the product is valued or not,if not
    the system will show an error or warning message!
    How to config for this?
    Thank you!

    Dear Zhao Gang,
    Check with this user Exits mentioned in this link,
    Prevent Production Order from "Release" if there is no Cost Estimate
    Re: User Exit at Production Order Release
    Check and revert back.
    Regards
    Mangalraj.S

  • Method is not getting created in sproxy

    Hii,
      I have created proxy for OutBound Asynchrous Message Interface in sproxy. After activating the object. When I see in the class, Execute_asynchrous Method is not getting created.
    What could be the problem?
    Any help would be appreciated.
    Regards,
    Varun

    Hi,
    Since ECC 6.0 version, EXECUTE_ASYNCHRONOUS methos and EXECUTE_SYNCHRONOUS methods are not generated with that names.
    Instead, The same name of your message interface is created as a method.
    Carlos

Maybe you are looking for

  • Printing from Editor in PSE 8 on Windows 7

    When I try to print from the editor I get a message stating that I must install a printer first.  My printers are installed.  When I go to the organizer I can print without getting this message.  How do I fix this problem?

  • I can't see my music videos

    Can hear playing but can not find video, can hear music.

  • Forum Module, How to link to the forum register page?

    Simple qeustion: Is there a way to just link to the forum register page? if so how?! Btw where can you find the bc docs? im really getting annoyed because i cant figure out just that simple stuff. - Rob

  • Phone randomly rebooting for no apparent reason

    Yesterday my phone started randomly rebooting. No apparent reason. No physical damage. No recent software changes that I am aware of. I have auto-update of apps turned off. Verizon store could not explain it. Forced soft reset did not fix the problem

  • Which Forms version works with Personal Oracle 8i

    Can any one let me know which version of Forms/Developer works with Personal Oracle 8i (8.1.7)? The OS that I have Personal Oracle 8i is Windows 2000. Also is the Forms/Developer version that goes with this available for download? If yes, where? Than