ECM change no mandatory only for specified Plants in CA01 and CA02

Dear All,
I am in the process of activating the engineering change management for BOM and Routing.
I did the necessary setting to work ECM.
Now my problem is we have different plants and the ECM has to be activated only for 2 plants.
To make change number mandatory in CA01 and CA02 for these 2 plants. i followed the below steps.
IN T CODE OP5A- PP TASK LIST INITIAL SCREEN - CHANGE NUMBER - CHOOSE RADIO BUTTON INPUT - SELECT INFLUENCING -SELECT PLANT -CHANGE NUMBER - ENTER PLANT - CHOOSE RADIO BUTTON REQUIRED
Same like that I did for both plants. Even after this setting it is not allowing without change number.
Can any one help me to solve this issue.?
Thanks in advance
Ganesh

Thanks for your reply.
After giving authorizations also  problem pertains the same.
Can any one tell steps followed in field selection parameters is right or wrong?
Regards,
Ganesh

Similar Messages

  • Change number mandatory only for CS02

    Hi Expert,
             I want to mandatory the change number only for CS02. I have refereed scn discussion but i am unable to make mandatory  the change number.
    Refereed comments:
    how to make the Change number field in CS02 transaction
    A basic SAP Engineering Change Management Setup
    ECM Change no Mandatory for CS02 | SCN
    Kindly suggest how to make mandatory the same.
    Regards,
    Santosh Sharma

    Hello Santosh
    The change number requirements on CS02 is controlled by the authorization object C_STUE_ROH.
    Note 420878 provides more information about this scenario.
    Check the relevant information provided on the note below:
    Symptom
    In Customizing of the BOM, the history requirement is set or a BOM requires a history. Despite this, it is possible to process BOMS without engineering change management. The system only processes a warning message (29 045) which can be skipped.
    Additional key words
    CS02, change number, OS27, W045(29)
    Cause and prerequisites
    Authorization profile
    Solution
    Check the authorization profile of the respective user.
    Example:
             C_STUE_NOH <OBJ>
                &_SAP_ALL    <AUT>
                    NOHIS      <FLD>
    would have the authorization to process BOMs requiring history without a change number. In this case, if you change '*' to ' ' in NOHIS, you will no longer receive a warning, but rather an error message.
    BR
    Caetano

  • ECM Change no Mandatory for CS02

    Dear all,
    To make the ECM change no mandatory for CS01 and CS02 i have followed the below settings.
    1.In OS27 - Check box included for BOM validity maintained,EC Management active,History Requirement.
    2.In OS25 - BOM usage 1 & BOM status 1 - History Requirement check box is included.
    3.Authorization object C_STUE_NOH is with No.
    After making these changes and saving and assigning the same to that user id,logout and login.
    It is working properly for CS01 but for CS02 even waring message it is not giving, directly it is allowing to chage the BOM without change no.
    Can any one suggest what may be the issue or any other settings i am missing?
    Thanks in advance,
    Ganesh

    Dear all,
    I noticed one issue if the BOM is alraedy created without the change number, when i try to change that BOM it is not throwing error message as Change no. mandatory.
    For that same BOM if i assign with one change no and make the necessary change and saved.
    After this change it is not allowing me to change the BOM without change no.
    My question is all materials BOM are already created in the system, so the user try to change the BOM in CS02 as first time without the change no it allows.
    How can we restrict the user to change the BOM with change no only?
    I hope my question is clear.
    Thanks in advance,
    Ganesh

  • Text Mandatory only for Certain Materials in Sales Order

    Is there anyway so that I can make certain item text mandatory only for certain materials?
    I tried creating new item category group and new item category. And then create new Text procedure making this text mandatory and assigning to this new item category.
    But there are lot of different types of item categories assigned. So it does not look good to create new item category for each and everyone for this new item category group and material.
    Please guide me how to make the document incomplete for certain materials only when one text is not filled at item level
    Thanks in advance

    Hi,
    what you tried is correct and that is been followed in most of my projects wherever I worked.  That is the best way recommended also.
    If you try with incompletion procedures for item category also, you will endup doing multiple item categories anyway....
    First when I looked at the subject line, even before I opened your POSTING, I got the same resolution as you did....May be the optimal one but, not sure, if something else is possible other than by doing user exit.
    Regards

  • Source list mandatory only for scheduling Agreement

    Hi Gurus,
    My client wants to make source list mandatory only for scheduling agreement. While creating scheduling agreement for a particular type and saving it should be mandatory. But for Purchase orders and contracts this is not required. If i do it through OME5 then it becomes mandatory for PO and SA both. Also if i set in material master it becomes mandatory for both.
    Please let me know if there is way to do it.
    Thanks and Regards,
    Yuvaraj

    It doesn't make too much sense, but... do you want to be sure (garantee) that the source list has been created and it is relevant to MRP when you have a schedule agreement? perhaps you can use a user exit when you save the schedule agreement to create the source list.
    There is no standard functinality that's allow you to requirer the source list according the po type.
    regards.

  • In ME51N need to make Purchase Org. as mandatory only for selected one

    Dear guru's
    While creation of Purchase requisitions (ME51N), I need to make Purchase Org. as mandatory only for selected one Purchase Org. out of say 10 Purchase Orgs.
    Is there any userexit or workaround for this.
    Thanks in advance,
    With regards,
    Harisha

    Dear Harisha,
    One way is to define a transaction variant with SHD0.
    http://help.sap.com/saphelp_webas620/helpdata/en/eb/5fab41d79b11d296190000e82de14a/content.htm
    In the SAP Reference IMG, you can create transaction variants. Choose Basis Components -> Application Personalization -> Tailoring of Application Transactions -> Configure Transaction-Related Display Values for Fields (Transaction SHD0). Transaction variants allow you to preset values for fields in a transaction, set field attributes, or hide entire screens.
    To execute a transaction variant, you define a variant transaction using the Transaction Maintenance transaction (SE93).
    Once you have entered a transaction code and short description, choose transaction type Transaction with variant (Variant transaction).
    To define a variant, enter the name of the transaction and the name of the variant. You can then use the new transaction code to start the special variant of the transaction.
    or
    In IMG under
    Materials Management -> Purchasing -> Purchase Requisition -> Data Screen Layout at Document Level.
    Hope this will help.
    Regards,
    Naveen.

  • Change history of User for Business Partner Number attaching and removing

    Hi Experts
    Is there any t-code in SRM which will show change history of User for Business Partner Number attaching and removing.
    Thanks--
    Guru Prasad Dwivedi

    Serene,
    I am not too sure if anyone can DELETE a Payment Term linked to a BP. The system would not allow this.  If at all a Payment term was deleted, I don't think it can be traced.
    It is therefore very important to use Proper user authorization so that only people authorized to do certain things are doing it and not everyone.
    Suda

  • I want to change my Apple ID for IPad because forgot password and all email addresses changed so cannot get informations for password reset. What can I do?

    I want to change my Apple ID for IPad because forgot password and all email addresses changed so cannot get informations for password reset. What can I do?

    I was wondering if you ever figured this out. I have the same issue. When I try to use the support communities, there are so many with the same problems and never seem to be any replys?? Not very helpful and I can not get Apple to return my emails.

  • Hello, I have an ipod touch 2g and I can not download the application or change the version. made for me a solution please. and thank you

    Hello, I have an ipod touch 2g and I can not download the application or change the version. made for me a solution please. and thank you

    The hardware on the 2G does not support an iOS version higher than 4.2.1. If you want apps that require a higher version you will need to get a newer model iPod.
    To more easily find compatible apps:
    iOSSearch - search the iTunes store for compatible apps.
    Vintapps 3.1.3 - paid app.
    Apple Club - filter apps by iOS version.

  • Why 10 key PinYin keyboard only for iphone sold in HK and China?

    Why 10 key PinYin keyboard only for iphone sold in HK and China? Have apple considers the other Chinese around the world?

    ZelinfromCHN wrote:
    Why 10 key PinYin keyboard only for iphone sold in HK and China? 
    Nobody in the forums can tell you why Apple has done this.  It really makes no sense at all.  You can tell them you want it elsewhere as well via
    http://www.apple.com/feedback

  • "Only For Distribution in Asia Pacific and Japan."  Will this work on my laptop?

    I purchased a copy of CS6 on eBay, and when I received it I found the label on the top of the box saying "Only For Distribution in Asia Pacific and Japan."
    Will this work on my laptop?  I would like to be sure before removing the shrinkwrap, in case I need to return it.
    Thanks!

    Hi there - I would contact Adobe Customer Service for individual help with your issue.
    You can access the Customer Service contact page by going here and choosing Photoshop as your product.
    Live chat
    1-800-833-6687 (Mon-Fri, 5am-7pm PST)

  • Swapping the blackberry playbook wifi only for a blackberry playbook wifi and cellular.

    Hello there! how possible is it to swap my playbook wifi only for playbook with both wifi and cellular? if possible please let me know.

    Hello lewtha and welcome to the BlackBerry Support Community Forums.
    Thanks for your question about your BlackBerry PlayBook tablet.
    If you have the first generation tablet which uses Wi-Fi only, it cannot be altered to use mobile networks. 
    The ability to use mobile network and Wi-Fi was introduced to the second generation tablet. You would need to purchase it to have this ability.
    Hope this helps to clarify.
    -HMthePirate
    Come follow your BlackBerry Technical Team on twitter! @BlackBerryHelp
    Be sure to click Kudos! for those who have helped you.Click Solution? for posts that have solved your issue(s)!

  • Change number mandatory Routing for a particular Plant

    Dear All,
    i have requirement to make change no field mandatory for only one plant. this field should not be mandatory for other plant. I tried with OP5A tcode, using plant as influencing field, change no as modified field and content as plant no. so its working but,
    it doesnt work for the 1st time execution. from 2nd time only its working. like this user will be able to make the changes without change number in every login 1st time.
    So i set the plant as user parameter in user profile and made it working. but its not full proof soluton. can any one suggest some solution??
    please suggest.
    Thanks & Regards
    Vinay
    Edited by: vinay  upadhyay on Sep 7, 2009 9:46 AM

    Hello Santosh
    The change number requirements on CS02 is controlled by the authorization object C_STUE_ROH.
    Note 420878 provides more information about this scenario.
    Check the relevant information provided on the note below:
    Symptom
    In Customizing of the BOM, the history requirement is set or a BOM requires a history. Despite this, it is possible to process BOMS without engineering change management. The system only processes a warning message (29 045) which can be skipped.
    Additional key words
    CS02, change number, OS27, W045(29)
    Cause and prerequisites
    Authorization profile
    Solution
    Check the authorization profile of the respective user.
    Example:
             C_STUE_NOH <OBJ>
                &_SAP_ALL    <AUT>
                    NOHIS      <FLD>
    would have the authorization to process BOMs requiring history without a change number. In this case, if you change '*' to ' ' in NOHIS, you will no longer receive a warning, but rather an error message.
    BR
    Caetano

  • Change the issue quantity for different plants

    We are facing a problem in the following issue.
    A material is being used in two plants. The material is procured from vendors in packets. The pack quantity varies for each plant for the same material since it is procured from different vendor. The base unit of measure for the material in the material master is maintained as NOS and the unit of issue is PAC. The alternative unit of measure in the material master can be maintained for only one PAC. If the pack quantity varies for different plant, how to maintain in the material master.
    For example : -
    Plant I u2013 Vendor A u2013 Pack quantity u2013 200nos.
    Plant II u2013 Vendor B u2013 Pack quantity u2013 300 nos.
    While creating reservation in plant II for one pack, the stock keeping quantity is 200 nos. On issue the issue quantity is 200 nos, but our requirement is the system should issue 300 nos. Kindly give solution to the problem.

    Hy afzal,
    I don't think it is possible to maintain different Conversion factor for 2 different plant for a single material.
    Acording to me there is 3 way to comeout of this problem.
    1) Create different Material codes for both plants.
    2) Insted of using alternate unit of measure use Batch specific unit of measure.But for this Materials are Batch Managed.
    [Batch Specific Unit of measure|http://help.sap.com/bestpractices/BBLibrary/Documentation/Q24_BB_ConfigGuide_EN_US.doc]
    3) Try to convince one of the vendor to change its packing qty/Packet.
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Jul 31, 2008 11:25 AM
    Edited by: Dhaval Choksi on Jul 31, 2008 1:26 PM

  • Mandatory field FOR SOME PLANTS - batch management - MARC-XCHPF

    I know you can force material master fields to be mandatory in SAP.  I am not positive that you can force batch management MARC-XCHPF for some of your plants but not all?
    plant A - field does not exist
    plant B-C - field exists and should always be checked for HALBs

    yes you can achive that
    first check which field selection key is assigned to your plant
    then go to tcode OMS9 and select the field selectin  key for your plant and then search the batch manag. field and make it required
    3 factors affect the field status
    1> matrail type field selection key
    2>plant field selection key
    3>industry sector filed selection key
    as your requirement is plant specific then you need to mak ethe batch. filed mandatory using that

Maybe you are looking for

  • Can I install Adobe Creative Cloud in more than one computer with the individual plan?

    I don´t have clear about the diference between individual plan an teams. My questions are: Can I install Adobe Creative Cloud in more than one computer with the individual plan? The team plan means that I have to pay for US$70 for each computer that

  • Link to Oracle 9i Release 2 CD?

    Hello, I'm on a dial-up and I simply cannot spend weeks downloading Oracle 9i Release 2 from the OTN Downloads section, I read that the Production version of the software is available at Oracle World but since I don't live on the same continent, I ca

  • Ora -00283 & ora-01610

    Hello i got the following errors on creation of database. after the command alter database open resetlogs i got the above error i checked the status of datafile and it shows as recover. so after mounting the database i ran the command recover datafil

  • Split records T-SQL

    Hi Friends, I have a full record which does have single and return information in the same record so I want to split into two records using SQL have a look attached below screen shot this is the Input I have  The below output I am expecting using SQL

  • Save Folder Screen not showing all options

    Hi All I had a question regarding SO Form header. I need to get the action Fulfillment Acceptance in Sales Order Form header (SO Form > (B) Actions > Fulfillment Acceptance) but not able to get it. One method is to configure it by creating a folder.