Enhancement details required...adding order header material as component in Process Order

Hi,
I am creating a process order for a qty of 10. Now when I go to components list header material with order qty (means 10) is added in the components list by the system through some enhancement...how to check which BAPI or BADI is doing this.....can somebody guide me....
Thanks
Kumar

Dear Kumar,
Find BAPI:
Get the package of the transaction and in SE84 choose the required hierarchy and input the package and execute you will get list of BAPIs. and see given threads: LIST OF BAPI FOR PRODUCTION PLANNING MODULE and BAPI to change production order components
Find BADI: Using Repository Information System (TCODE- SE84)
Go to “Maintain Transaction” (TCODE- SE93).
Enter the Transaction code( which you want to find BADI) and Click on the Display push buttons.
Get the Package Name.
Go to TCode: SE84->Enhancements->Business Add-inns->Definition
Enter the Package Name and Execute.
Best of luck
Regards,
Abbas.

Similar Messages

  • Header material batch copy to component in Process order

    Hi,
    I have the following requirement...
    We create process order and assign the batch to process order manually..now during saving of the process order system has to copy batch of the process order ( header material ) to the one of the component in the batch automatically, as this is component is by product which comes to stock along with header material...What is the enhancement/ User exit can be used to meet this requirement...
    Thanks
    Kumar

    Kumar.
    What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
    Anoop

  • Finding material codes for creating process orders ??

    Dear Experts,
             How can we get the list of material for which the process orders can be raised .In other words from a list of materials ,how one can know the material code ,relevent for raising the proces order & maintaining recipe.
    Pls update
    Regards

    Dear Dennis,
    It's difficult to answer your query with the given information.But in general for the in-house manufactured materials
    (procurement type E in MRP2 view) which has a BOM,which can be checked through CS03-->F4 display serach using the
    materials by Bill of materials,mention the plant,BOM usage and remove the maximum no of entries and you can download this
    data) and get an idea for which materials the BOM exists.
    Further to this you can identify for which materials the master recipe exists in C203 and based on these data or else for the
    plant check in C223,for which materials a production version exists for a combination of BOM and master recipe.
    For all these materials you can create a process order.Also if your process order type is configured in such a way that
    without a BOM and master recipe the order can be created means,then for the in-house manufactured materials the process
    order can be created.
    Similarly for all the in-house manufactured materials the master recipe can be created.For to this in config in SPRO-->production
    planning for process industries->settings for task list types->assign material types--->check for which material type the task
    list type 2 is linked,only for the materials created with these material type you can create the master recipe.
    Regards
    Mangalraj.S

  • Deafult batch for component in process order

    Hi Experts ,
    in one of the scenario the client requirement is the batch number for eg- "a" , should be automatically populated in the batch number column of the component in process order while saving or while release.
    this should be done only for components  that are  backflush active.
    can it be done by any user exit /Functionm module etc...
    please advice.
    regrds,
    satish

    Dear Satish
    Please check the following setting in customizing ,
    T.code OPJ2 -
    Operation for batch determination - 3 ( check during backflushing )
    give SDR as per the business requirement and activate BD indicator .
    For SDR ( Stock determination rule ) use T.code OSPX ,here you can
    sort or can give prioriy .
    Please try this ,otherwise go for enhancement /user exit
    Regards ,
    Vishwas.K
    Edited by: vishwas.k on Mar 9, 2011 5:28 PM
    Edited by: vishwas.k on Mar 9, 2011 5:38 PM

  • Adding Distribution KEY (GLEI) to a new Component at Process order Create

    Hello Experts.
    We have a Process Order where all components have the GLEI Distribution Key assigned.  FOr this particular Process order, our Scheduler routinely adds an additional Material Component (with a specific batch number to save operators from having to key in the batch number when reorting production).  The problem is, that when she adds this additional component, the Distribution Key field is greyed out so we cannot assign the GLEI key.  This causes the demand for that particular item to show on dates that dont work for us.  Should it be possible to manually assign the GLEI key to components at the Process Order create stage? 
    *Note, I have also tried adding the extra component at the Planned order stage, and while the screen allows me to enter all of the details (including Distribution key), when I save the Planned order, the new component does not get saved.
    Any help would be greatly appreciated.

    closing thread

  • BAPI_GOODSMVT_CREATE Material Document Posting against Process Order

    Dear Experts,
                        I want to post more than one documents from BAPI "BAPI_GOODSMVT_CREATE". It is working fine for GR(gmcode = 02) 101 Mvt. type. But the problem is that when there is a GI (gmcode = 03), serial numbers document comes; it display an error as " Content of order 1000400: 40000134 transferred to interface (IMSEG)".
    My Question is that: Is this a correct BAPI for serial numbers assigned materials, OR I should use another bapi for these serial number materials.
    Will you please let me know the name of the BAPI which I should use in this regards.
    ***** I am using BAPI_GOODSMVT_CREATE as follows for Process Orders:::::
        CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
          EXPORTING
            goodsmvt_header               = gmhead
            goodsmvt_code                 = gmcode
    *   TESTRUN                       = ' '
    *   GOODSMVT_REF_EWM              =
    * IMPORTING
    *   GOODSMVT_HEADRET              =
    *   MATERIALDOCUMENT              =
    *   MATDOCUMENTYEAR               =
          TABLES
            goodsmvt_item                 = fitab "bapi_itab
            goodsmvt_serialnumber         = itab_serials
            return                        = errmsg
    *   GOODSMVT_SERV_PART_DATA       =
    *   EXTENSIONIN                   =
    Thanks,
    Sohail

    The function is intended to create a single document , Here is an excerpt from the FM documentation :
    Functionality
    You can use this method to create a material document for a goods movement.
    You can only create one material document each time you call up the method.
    You can use a simulation function before posting the goods movement to check how the data is updated in the database. The standard system is configured so that the goods movement is posted immediately, without prior simulation.

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • Special stock indicator for component in process order

    Hi,
    There is a field in process order where we can maintain special stock indicator for component.
    In this filed if we define consignment stock, then the vendor field becomes activated, where the vendor can be given.
    Now we want to maintain the data as a master data so that whenever process order is created the sp stock indicator as well as vendor are populated for that particular component.
    Q - where to define this master data. I could not see such fields in BOM?
    regards,
    Mohit

    Hi Sunderesan,
    Thaks for responding. Even by doing this system does not propose special stock indicator as '3' in process order & even vendor is not proposed.
    My requirement is that system should propose '3' in special stock indicator in process order.
    Request to look into this.
    regards,
    Mohit

  • Update required quantity for material component in Process Order.

    Hello.
    I need update component qty from Z dialog program.
    The famous BAPI_PROCORD_CHANGE doesn't deal with COMPONENT structure but only HEADER. Then I tried to combine it with an enhancement.
    I see that in WORKORDER_UPDATE~BEFORE_UPDATE I can't change values in IT_COMPONENT.
    Anybody have used enhancement for this purpose and how can I transfer my calculated values to order?
    In addition I check ENHANCEMENT-SECTION   CO_BT_ORDER_POST_02 SPOTS ES_SAPLCOBT  to do it.
    What syntax our developers should write if it's possible?
    Thanks
    Alex Davidov

    Kumar.
    What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
    Anoop

  • Refarnce characterstic for plan order header material

    Hi All,
    The material number ( PLAN_ORDER2) is defined as a char in the class and should be automatically populated at the time of Creation of plan order in the configuration as a characteristic value.
    PLAN_ORDER2 is created as reference char and in Addnl Values of the tab have referenced to PLAF-MATNR.
    tried to use procedure like
    $SELF.PLAN_ORDER2 = MDATA $SELF.PLAN_ORDER2
    $SELF.PLAN_ORDER2 ?= $SELF.PLAN_ORDER2
    But nothing is working.
    So does someone help me with information on tables like PLAF or CAUF can be used with reference characteristic to read and fetch values in configuration.
    Thanks
    Regards
    Ritesh

    Hello Ritesh,
    Not all tables can be used in reference characteristic. Unfortunately PLAF/CAUF cannot be used to read values. You can use few fields of PLPO and all the fields in Structure PLPO_CFMOD.
    Please review SAP Note 935885 that has information on tables that can be used.
    Regards
    Amber Naseer
    SAP Global Support

  • Regarding goods issue (reversal) against process order

    Dear friends,
    Recently i have noticed one strange thing in SAP.I have created one process order and against it i have done the confirmation.Now when i go to Transaction code mb1a and select movement type 262 (Goods Issue to process order-reversal) and give the storage location and in next screen i gave order number,material code and its qty.These material code is not maintained in the bom of order header material.And even in process order in material tab we haven't maintained this material.Also while doing the confirmation in goods movement we haven't maintained this material.Then also system allows me to do so.Which means material which i haven't issued against the process order, system is allowing me to do its reversal i.e (262).because of which system is creating the stock for that material, which is not correct.
    Can we control this behaviour of system.
    Thanking you guys in advance.

    Hi Jitendra,
    This is fact and there is no standard Control available for the same.Only thing you can do is put control over Movement type 262 or try it by implementing User Exit.
    I am not sure but you can use Enhancement CCOWB001 - Customer exit for modifying menu entries.
    Include is LXCOWBF01.
    Regards,
    Dhaval

  • BAPI for process order header delivered quantity

    Hi,
    current requirement is to get the process order quantity with drawn and delivered quantity , when we try using the BAPI
    BAPI_PROCORD_GET_DETAIL , it does not have the process order delivered quantity - it has only total quantity  for which process order is created .
    Is there a way or any standard BAPI/RFC gives the below :
    1. Process Order Header Delivered Quantity
    2. Process order component's quantity with drawn
    Regards,
    Madhu Kiran

    Hi Madhu Kiran,
    BAPI_PROCORD_GET_DETAIL of course has all the required fields:
    1. --> check table POSITION, field DELIVERED_QUANTITY
    2. --> check table COMPONENT, field WITHDRAWN_QUANTITY
    Regards,
    Andreas

  • Batch determination configuration for process order.

    Hi,
    Can anybody help me to configure batch determination for process order in step by step.
    My requirement is
    1. multiple selection of component in process order.
    2. click on batch determination icon.
    3. system will check batch, valuation type, stock. Assign batch,valuation type, storage location automatically in the process order confirmation(COR6N)-Goods movement tab.
    Thanks,
    Jishu

    Hi Jishu,
    Please refer below documents whcih will help you on batchdetermination
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c09b7216-65da-2b10-bdb5-870cf9916350?QuickLink=index&…
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0caed4a-40f9-2c10-349a-96ec617a8161?QuickLink=index&…
    Regards,
    R.Brahmankar

  • Goods Receipt for Material which has no Standard Price in Process Order

    Hello everyone, is there a way by which we can prevent GR for process order which contains material that does not have standard price? And if ever we received material using process order how can we correct the process order right after we correct the standard price.

    Hi,
    i just don't know why you raised new thread as already ur previous thread is not closed
    Now just let us know whether system is throwing any error
    or what exactly happing in cofirmation screen
    Go to OPK4, here
    under goods movement there is option all components  just tick it
    then in second tab Gen individual entry tick Goods movement & termination for incorrect goods movement
    Coming to GR
    what is storage location ur giving
    just check in MMSC, whether this storage location is activated for the header material ( GR )
    Added
    Plz Go through all possible options
    [Auto GR is not happening.;
    Regards
    kumar
    Edited by: kumar kumar on Nov 10, 2009 2:25 PM

  • Query on open planned orders details with process order GR details

    Dear Experts,
    I need to create a query in SQ01 where the requirement is as given below,
    Query output should display the open planned orders  (Planned orders which is not converted to process order details) details for a material like Planned order number, Planned order quantity, Start date, Finish date and also  the details of the list of process orders created for the same material with its details like PO qty, GR qty, Basic start date, Finish date, Actual finish date, BOM Component material codes, component quantity.
    But i tried creating this query by joing the tables PLAF+ AFPO+AUFK+ AFKO+RESB . My input parameter will be the Material Number for which Planned order and Process orders are being created.
    But i am unable to generate the output when i create a query by joining these tables
    Is it possible to obtain the output for open planned order details and process order details in a single query ?
    I am failing in my repeated attempts
    Please provide your suggestions for developing this query
    Regards,
    J.Balakrishnan

    Dear Bala,
    as alternative , for use a query report and not a custom abap report, you can try to read data from MRP tables MDKP and MDTB . In these one tables you can find both elements (planned order and production orders) for to start to research all details that you need.
    You can also use MDTB-DELKZ to filter only planned order (PA) and Production order (FE).
    With the number order you can read the RESB table in order to define components details.
    With this table would you the advantage to have always the opened orders.
    If the following table are empty you should make a little customizing modification so that once MRP run will write them.
    Give me feedback if i have been useful for you.
    Daniele

Maybe you are looking for