Header material batch copy to component in Process order

Hi,
I have the following requirement...
We create process order and assign the batch to process order manually..now during saving of the process order system has to copy batch of the process order ( header material ) to the one of the component in the batch automatically, as this is component is by product which comes to stock along with header material...What is the enhancement/ User exit can be used to meet this requirement...
Thanks
Kumar

Kumar.
What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
Anoop

Similar Messages

  • Deafult batch for component in process order

    Hi Experts ,
    in one of the scenario the client requirement is the batch number for eg- "a" , should be automatically populated in the batch number column of the component in process order while saving or while release.
    this should be done only for components  that are  backflush active.
    can it be done by any user exit /Functionm module etc...
    please advice.
    regrds,
    satish

    Dear Satish
    Please check the following setting in customizing ,
    T.code OPJ2 -
    Operation for batch determination - 3 ( check during backflushing )
    give SDR as per the business requirement and activate BD indicator .
    For SDR ( Stock determination rule ) use T.code OSPX ,here you can
    sort or can give prioriy .
    Please try this ,otherwise go for enhancement /user exit
    Regards ,
    Vishwas.K
    Edited by: vishwas.k on Mar 9, 2011 5:28 PM
    Edited by: vishwas.k on Mar 9, 2011 5:38 PM

  • Hot to copy document items in process order

    is there any settings to copy document items to process order?
    I have added item categary D in master recipe (BOM of material) of material.
    But when i create process order for that material, documents items is not getting copied.
    is any setting is there to copy it?

    Dear Vishal,
    If my understanding is correct,then I think document items does not gets copied into process order and further to this there is
    no key's to view the document as like that is available in a production order.
    If you check at the header - general data in a process order only operation/component overview keys will be available,where
    as in a production order in addition to these keys,you can check for document overview and sequence overview key's
    available.
    I'm unable to get any link in SAP help related to the same.Correct me if my understanding is wrong.
    Regards
    Mangalraj.S

  • How to automatically determine batch no. of component  in Production Order

    Hi PP gurus:
       I am facing a issue.  A finished goods with a raw material which under batch management, what I want is  when I release the production order of the finished goods, SAP can automatically determine the batch no. of the raw material  according to the presetted rule without hitting the "Batch Determination"  button in the component tab.
    Who can throw a light to me?
    Thank you very much.
    Paul

    Hi,
    To manage the materail in batches first you have to check the batch management indicator during the matreial creation in purchasing view or plandata/stor1 view .
    Next you have to set the value of batch entry in MRP-2 view for Determination of batch entry in the production/process order
    This indicator refers to the components of an order, not to the finished product to be manufactured. You have the following options:
    The batches can be determined when the goods issue is posted.
    The batches must be entered in the order before it is released.
    The batches must be entered in the order before the goods issue is posted, but not necessarily before the order is released.
    If you use pick parts, the batches are determined in the transfer order and then confirmed to the order. If there is no direct link between the transfer order and the production order/process order (for example, with release order parts or crate parts), you must enter the batches in the production order/process order manually.
    The batches are determined automatically when the order is released.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Enhancement details required...adding order header material as component in Process Order

    Hi,
    I am creating a process order for a qty of 10. Now when I go to components list header material with order qty (means 10) is added in the components list by the system through some enhancement...how to check which BAPI or BADI is doing this.....can somebody guide me....
    Thanks
    Kumar

    Dear Kumar,
    Find BAPI:
    Get the package of the transaction and in SE84 choose the required hierarchy and input the package and execute you will get list of BAPIs. and see given threads: LIST OF BAPI FOR PRODUCTION PLANNING MODULE and BAPI to change production order components
    Find BADI: Using Repository Information System (TCODE- SE84)
    Go to “Maintain Transaction” (TCODE- SE93).
    Enter the Transaction code( which you want to find BADI) and Click on the Display push buttons.
    Get the Package Name.
    Go to TCode: SE84->Enhancements->Business Add-inns->Definition
    Enter the Package Name and Execute.
    Best of luck
    Regards,
    Abbas.

  • Update required quantity for material component in Process Order.

    Hello.
    I need update component qty from Z dialog program.
    The famous BAPI_PROCORD_CHANGE doesn't deal with COMPONENT structure but only HEADER. Then I tried to combine it with an enhancement.
    I see that in WORKORDER_UPDATE~BEFORE_UPDATE I can't change values in IT_COMPONENT.
    Anybody have used enhancement for this purpose and how can I transfer my calculated values to order?
    In addition I check ENHANCEMENT-SECTION   CO_BT_ORDER_POST_02 SPOTS ES_SAPLCOBT  to do it.
    What syntax our developers should write if it's possible?
    Thanks
    Alex Davidov

    Kumar.
    What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
    Anoop

  • Adding Distribution KEY (GLEI) to a new Component at Process order Create

    Hello Experts.
    We have a Process Order where all components have the GLEI Distribution Key assigned.  FOr this particular Process order, our Scheduler routinely adds an additional Material Component (with a specific batch number to save operators from having to key in the batch number when reorting production).  The problem is, that when she adds this additional component, the Distribution Key field is greyed out so we cannot assign the GLEI key.  This causes the demand for that particular item to show on dates that dont work for us.  Should it be possible to manually assign the GLEI key to components at the Process Order create stage? 
    *Note, I have also tried adding the extra component at the Planned order stage, and while the screen allows me to enter all of the details (including Distribution key), when I save the Planned order, the new component does not get saved.
    Any help would be greatly appreciated.

    closing thread

  • Problem in automatic batch determination for components in process order

    hi
    Ours is a process order industry. Here we prepare food items.
    We are entering manual batch for finished product. We want to perform automatic batch determination for one of the components raw material. For other packing material we do not want to maintain batches.
    The batch procedure picked is me0001 for 261 movement type instead of C00001.
    Because of that we need to enter batch manually.
    Send us the procedure to automatic batch determination for components.
    regards
    ravi

    Ravi,
    Before posting please do search in this forum because this topic has been discussed many times in past.
    Please check below links which could be helpful to you Automatic batch determination in process order
    http://www.sapsword.com/home/sap-batch-management/sap-batch-determination
    If you still have issues then please come back.
    Br
    KK

  • Auto batch detmn for components in Process Order selects batch in Q status.

    Hi Gurus,
    We have the following issue with automatic batch determination for component batches for a Process Order:
    Say for a Process Order it requires components A,B, and C.
    The issue is with component C. if the PO requires 100 Qty of C. the system is picking batch X having 80 qty  and picking 20 from another batch Y which is still in u201CQu201D status (due to some defects it is not cleared .  for which inspection should have completed 3 days before Process Order is released).
    Also there are only these two batches for this component in MMBE.
    What I understand is system adds GR date + GR processing days ( for inspection) and release component for production after that (ie., moves to Un restricted stock). Therefore system selects this batch as per the availability check (by calculating the GR+ GR processing date) even thoe it is not cleared yet.
    Also, I want to know If this is correct procedure, how can we make system to not to include batch with Q stock (batch which is having some defects).
    Thanks,
    N.

    Hi
    Use separate Checking Group(Availability Check) in MRP-3 view for comp C with the settings in OPJJ(Availability Check+Checking rule combination) with untick incl.quality insp stock. Idea is to select the un-restricted batch stock qty during Auto Batch determination for Components
    Regards
    Brahmaji

  • Single batch for a component in production order goods issue

    Hi,
    We have a requirement where during good issue to a production order
    through CO11 & MIGO, more than one batch of a particular component
    should not be issued i.e. only one batch for a component should be used
    for goods issue for a production order..If the stock for a particular
    batch not full it should not allow the system to issue that batch. We
    want an error message or any other restriction where system will not
    allow more than one batch for a particular componet to a production
    order.
    Please advise how to design such scenario.
    Regards,
    Chandan

    Hi Chandan,
    Try with below steps,
    - Create Batch Search procedure -
    - Create Batch Determination Strategy for that Material (Create it for both COB1 and MBC1)
    - Set NO. of Batch Split as 1 and don't tick Check box for Change Allowed
    - Then go to Order type Dependent Paramter OPL8 - Assign your Batch Search Procedure and also tick Check Batch (This will check the auto check if Batch Determination is done manually and if you have violet the Batch Determination it will throw an error Massage)
    Regards,
    Dhaval

  • To make material and quantity grid out in process order

    Hi ,
    is there any user exit  so that material and quanitiy column in process order can be made grid out................as the material and quantity will flow from BOM ........

    Hi
    Open this link and press Ctrl+F and write component. You will get all possible userexits and Badis relatred to component tab in service or maintenance order. Ask your ABAPER to try those which will be found in this link.
    PM-CS User Exits - ERP Operations - SCN Wiki
    Thank$

  • Auto Batch selection during GI for Process order

    Hi Gurus
    My requirement is that the system should select available batches of raw materials automatically during goods movement for Process order using COR6 and Goods issue for order MB1A . Could any body plz let me know the procedure in detail

    Dear,
    You need to define the batch search procedure MBC1 with serach strategy as ME01 for your material plant and movement type assign selection condition and sort rule and save the condition record.
    Please refer this thread for details,
    BATCH SELECTION DURING ISSUE
    Please come back if any problem.
    Regards,
    R.Brahmankar

  • Special stock indicator for component in process order

    Hi,
    There is a field in process order where we can maintain special stock indicator for component.
    In this filed if we define consignment stock, then the vendor field becomes activated, where the vendor can be given.
    Now we want to maintain the data as a master data so that whenever process order is created the sp stock indicator as well as vendor are populated for that particular component.
    Q - where to define this master data. I could not see such fields in BOM?
    regards,
    Mohit

    Hi Sunderesan,
    Thaks for responding. Even by doing this system does not propose special stock indicator as '3' in process order & even vendor is not proposed.
    My requirement is that system should propose '3' in special stock indicator in process order.
    Request to look into this.
    regards,
    Mohit

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Batch Determination for material in Process Order

    Hello,
    I need to set up a Batch determination strategy for the Raw material at IM level for a Process Order.
    Basically the materials are Batch Managed and already have a Batch number assigned to it.
    I just want to use a simple strategy of determining material with the oldest GR datel(FIFO) during the Process Order creation/release or during the Process Order confirmation.
    Can you guide me how to set up the strategy and the conditions to do a FIFO for the materials during the Process order.
    Thanks in Advance
    SAP FANS....

    Hi,
    Only Problem with this FIFO strategy in which you want to do Batch Determination with reference to Oldest GR date is GR date itself.
    Batch determination will only possible if Batch Characteristic values are maintain.What I have observe for this GR date is if we use this as a Reference Characteristic in that case also Value is not set automatically in the Batch Data, so value of the GR date is maintain manually.Pls check it your end if no problem then The rest of the things for Batch determination are not difficult.
    Use below link for Batch determination,
    [Batch Management and Determination |Re: Browser Based PI sheet]
    Regards,
    Dhaval

Maybe you are looking for